CN111428379B - Method for guaranteeing connection consistency between simulation system diagrams of nuclear power station analog machine - Google Patents

Method for guaranteeing connection consistency between simulation system diagrams of nuclear power station analog machine Download PDF

Info

Publication number
CN111428379B
CN111428379B CN202010255231.2A CN202010255231A CN111428379B CN 111428379 B CN111428379 B CN 111428379B CN 202010255231 A CN202010255231 A CN 202010255231A CN 111428379 B CN111428379 B CN 111428379B
Authority
CN
China
Prior art keywords
model
graph
file
inter
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010255231.2A
Other languages
Chinese (zh)
Other versions
CN111428379A (en
Inventor
方华建
杨墨
刘伟
张大志
李敏
景应刚
侯雪燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Power Operation Technology Corp Ltd
Original Assignee
China Nuclear Power Operation Technology Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Power Operation Technology Corp Ltd filed Critical China Nuclear Power Operation Technology Corp Ltd
Priority to CN202010255231.2A priority Critical patent/CN111428379B/en
Publication of CN111428379A publication Critical patent/CN111428379A/en
Application granted granted Critical
Publication of CN111428379B publication Critical patent/CN111428379B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Abstract

The invention relates to a simulation system of a nuclear power station simulator, in particular to a method for guaranteeing connection consistency between graphs in a simulation process flow of the nuclear power station simulator. Because the existing engineer station software has no guarantee mechanism for consistency of inter-diagram connections, the situation that inter-diagram connections on a certain model diagram are lost or the inter-diagram connections are not matched occurs from time to time. The invention ensures the quality of nuclear power analog machine products. The method comprises the following specific steps: the method comprises the following steps: data downloading, step two: simulation modeling, step three: software checking, step four: and uploading and integrating. The invention can provide a method capable of ensuring the consistency of connection between the graphs, and the quality of a nuclear power analog machine product is ensured.

Description

Method for guaranteeing connection consistency between simulation system diagrams of nuclear power station analog machine
Technical Field
The invention relates to a simulation system of a nuclear power station simulator, in particular to a method for guaranteeing connection consistency between graphs in a simulation process flow of the nuclear power station simulator.
Background
The analog machine simulation system generally comprises a plurality of nuclear power simulation subsystems, and a plurality of modules in the systems or the systems are mutually related and mutually influenced. Since the simulation system of the simulation machine directly represents a model diagram connected by various components, the correlation between the model diagrams is realized by the inter-diagram connecting component. The inter-diagram connection part has the connection information between two diagrams, so that in the use process, the jump from one diagram to the other diagram can be realized only by clicking the inter-diagram connection on a certain model diagram, and the technology greatly facilitates the development, debugging and use of a simulator system.
In the process of developing a simulation machine project, due to insufficient design drawing information or continuous upgrading and optimization of a simulation system, a model development engineer needs to frequently add, modify or delete inter-diagram connections on a model diagram and then upload the model diagram to a server. Because the existing engineer station software has no guarantee mechanism for consistency of inter-diagram connections, the situation that inter-diagram connections on a certain model diagram are lost or the inter-diagram connections are not matched occurs from time to time. The occurrence of the situation will reduce the debugging efficiency of a model development engineer, and cause the operation of the simulation system of the analog machine to be disordered and abnormal.
In order to improve and improve the development efficiency of model engineers and effectively prevent the occurrence of abnormal phenomena caused by inconsistent connection between diagrams, a method capable of ensuring the consistency of the connection between the diagrams needs to be provided, so that the quality of a nuclear power simulator product is ensured.
Disclosure of Invention
1. The purpose is as follows:
the invention provides a method for guaranteeing the consistency of inter-diagram connection in a simulation system of a nuclear power station simulator, which can effectively avoid the phenomenon of connection loss or connection mismatching between diagrams and ensure the correctness and stability of the simulation system of the nuclear power station simulator.
2. The technical scheme is as follows:
in the development process of the nuclear power plant simulator, each simulation system consists of a plurality of model diagrams, the model diagrams are related through inter-diagram connection, and as shown in fig. 1, the hexagonal light yellow components are inter-diagram connection.
In the process of the project development of the analog machine, a plurality of tools are needed, the invention mainly uses the client software of the data development and management system of the analog machine and the software of the engineer station, wherein: the client software of the operation data development and management system is mainly used for writing and downloading model diagram files from and uploading the model diagram files to the server, and the engineer station software is mainly used for simulation modeling development and debugging, for example, adding or deleting connections between diagrams in the model diagrams, adding components and the like are all performed in the engineer station software. To better describe the present solution, certain specific terms are now explained.
Writing and downloading: and downloading a certain file from the server and locking the file, wherein the locked file can not be written and downloaded by other users any more, so that modification conflict is avoided.
Uploading: and sending the developed model diagram file to a project server for integration.
The invention mainly comprises the following procedures:
1. and the model development engineer uses the client software of the running data development and management system to write and download the model diagram file to be developed from the server to the local.
2. And the model development engineer locally starts the engineer station software, and opens the downloaded model graph file by using the engineer station software to perform simulation modeling development.
3. The engineer station software checks whether the model diagram file being edited has the adding or deleting operation of the diagram connection, if so, checks whether two model diagrams related to the diagram connection are written and downloaded, if not, the adding or deleting operation of the diagram connection is forbidden on the model diagrams, otherwise, the model development engineer can add or delete the diagram connection in the model diagrams, and simultaneously, the client software of the operation data development and management system is informed of the information of the model diagram file having the adding or deleting operation of the diagram connection.
4. After the simulation modeling development is completed, a model development engineer uploads all developed model diagram files to a server for integration by using client software of the operation data development and management system.
Therefore, for model graph files, the cooperation of client software of the data development and management system and engineer station software is required to solve the problem of consistency of inter-graph connections.
3. The effect is as follows:
(1) The inter-diagram connection consistency guarantee mechanism is transparent to users and does not need to be specially set;
(2) And the consistency and the correctness of the connection between all model diagram file diagrams are ensured.
Drawings
FIG. 1 is a flow chart of connection consistency guarantee between simulation system diagrams of a nuclear power plant analog machine
FIG. 2. Process for ensuring consistency of connection between software diagrams of engineer station
FIG. 3 Process for uploading model graph files by running data development and management system client software
Detailed Description
The present invention is described in detail below for the purpose of clearly describing features and advantages of the present invention.
The invention provides a method for guaranteeing connection consistency between simulation system diagrams of a nuclear power station simulator. The operation flow chart is shown in fig. 1, and the flow is described as follows:
1. the model development engineer writes a download model graph file to the local by using client software of the running data development and management system, starts engineer station software, opens the downloaded model graph file and performs simulation modeling development on the basis;
2. if the newly added or deleted inter-graph connection exists in the currently edited model graph, the engineer station software checks whether two model graphs related to the inter-graph connection in the model graph file are written and downloaded to the local. If not, the model development engineer needs to write and download the model diagram file which is not written and downloaded but is associated with the connection between the diagrams, otherwise, the simulation modeling development is continued;
3. after the simulation modeling is completed, a model development engineer needs to upload the developed model diagram file to a project server for integration.
For clarity of description of the features and advantages of the present invention, the following detailed description of the operational procedures of the present invention is provided.
The operation flow step 1 of the method for guaranteeing the connection consistency between the simulation system diagrams of the nuclear power station analog machine comprises the following steps:
(1) The model development engineer writes a download model map file from the server to the local running data development and management system client software;
(2) The client software of the operation data development and management system writes the written and downloaded model diagram file information into a shared configuration file WriteLock.xml file of the client software of the operation data development and management system and an engineer station;
(3) And starting engineer station software by a model development engineer, opening the downloaded model graph file by the engineer station software, and carrying out simulation modeling development on the basis.
The operation flow 2 of the method for guaranteeing the connection consistency between the simulation system diagrams of the nuclear power station is shown in fig. 2 and mainly comprises the following contents:
(1) A model development engineer uses engineer station software to carry out simulation modeling development and debugging;
(2) The engineer station software checks whether the currently developed model diagram has the addition or deletion of the connection between the diagrams;
(3) If yes, the engineer station acquires model graph file information associated with the added or deleted inter-graph connection to obtain an inter-graph connection associated model graph file list;
(4) The engineer station software opens and reads the information of the model graph files written and downloaded in the configuration file WriteLock.xml to obtain a current written and downloaded model graph file list;
(5) The engineer station software checks whether two model graphs associated with the inter-graph connection are both in the write download file list, if so, the step (6) is carried out, otherwise, the model graph files which are not in the write download file list are write downloaded;
(6) Xml, opening a configuration file WriteLock, and setting an inter-graph connection modification mark corresponding to two model graph files with modified inter-graph connections;
(7) And continuing to develop the next step.
The operation flow 3 of the method for guaranteeing the connection consistency between the simulation system diagrams of the nuclear power station provided by the invention is shown in fig. 3 and mainly comprises the following contents:
(1) A model development engineer selects developed model diagram files in client software of the operation data development and management system, clicks an uploading button and prepares to upload the developed model diagrams to a server;
(2) Xml, opening a configuration file WriteLock, and acquiring all model graph file information with inter-graph connection modification marks set;
(3) Checking whether a model graph file with modified inter-graph connection exists in a file list to be uploaded, if so, turning to (4), otherwise, turning to (5);
(4) Judging whether the model diagram file with the inter-diagram connection modification flag set is in a model diagram file list to be uploaded or not, if so, turning to (5), otherwise, adding the model diagram file to the model diagram file list to be uploaded, so as to ensure that all model diagram files with inter-diagram connection modification are uploaded to a server;
the operation flow step 4 of the method for guaranteeing the connection consistency between the simulation system diagrams of the nuclear power station provided by the invention is shown in fig. 1 and mainly comprises the following contents: and uploading all model map files in the uploaded list to a server.
The main advantages of the invention are as follows:
the method starts from the root of the generation of the inconsistency of the inter-graph connection, analyzes the reason, avoids the problem of the inconsistency of the inter-graph connection from the tool level, and solves the problems of low efficiency and overhigh cost of manual inspection;
the phenomenon of inconsistent connection between the graphs is avoided by adopting a cooperative working mode of two simulator development tools, so that a more reliable mechanism is guaranteed;
the inter-graph connection consistency guarantee mechanism is transparent to the user and does not need the user to carry out other settings;
the inter-graph connection consistency guarantee function can be started only under the condition that the inter-graph connection of the model graph is increased or deleted, and the system overhead is reduced.

Claims (3)

1. A method for guaranteeing connection consistency between simulation system diagrams of a nuclear power station simulator is characterized by comprising the following steps: the method comprises the following steps: the method comprises the following steps: downloading data; step two: simulation modeling; step three: checking software;
step two: simulation modeling, specifically comprising:
(1) A model development engineer uses engineer station software to carry out simulation modeling development and debugging;
(2) The engineer station software checks whether the currently developed model diagram has the addition or deletion of the connection between the diagrams;
(3) If yes, the engineer station acquires model graph file information associated with the added or deleted inter-graph connection to obtain an inter-graph connection associated model graph file list;
(4) Xml, opening and reading the information of the model graph files written and downloaded in the configuration file WriteLock to obtain a current writing and downloading model graph file list by the engineer station software;
(5) The engineer station software checks whether two model graphs associated with the inter-graph connection are both in the write download file list, if so, the step (6) is carried out, otherwise, the model graph files which are not in the write download file list are write downloaded;
(6) Xml, opening a configuration file WriteLock, and setting an inter-graph connection modification mark corresponding to two model graph files with modified inter-graph connections;
(7) And continuing to develop the next step.
2. The method for guaranteeing the connection consistency between the simulation system diagrams of the nuclear power plant analog machine, as recited in claim 1, wherein: the first step is as follows: the data downloading specifically comprises the following steps:
(1) The model development engineer writes a download model map file from the server to the local running data development and management system client software;
(2) The client software of the operation data development and management system writes the written and downloaded model diagram file information into a shared configuration file WriteLock.xml file of the client software of the operation data development and management system and an engineer station;
(3) And starting engineer station software by a model development engineer, opening the downloaded model graph file by the engineer station software, and carrying out simulation modeling development on the basis.
3. The method for guaranteeing the connection consistency between the simulation system diagrams of the nuclear power plant analog machine, as recited in claim 1, wherein: the third step is that: software inspection, specifically comprising:
(1) A model development engineer selects developed model diagram files in client software of the operation data development and management system, clicks an uploading button and prepares to upload the developed model diagrams to a server;
(2) Xml, opening a configuration file WriteLock, and acquiring all model graph file information with inter-graph connection modification marks set;
(3) Checking whether a model graph file with modified inter-graph connection exists in a file list to be uploaded, if so, turning to (4), otherwise, turning to (5);
(4) Judging whether the model diagram file with the inter-diagram connection modification flag set is in a model diagram file list to be uploaded or not, if so, turning to (5), otherwise, adding the model diagram file to the model diagram file list to be uploaded, so as to ensure that all model diagram files with inter-diagram connection modification are uploaded to a server;
(5) Including uploading all model map files in the uploaded list to the server.
CN202010255231.2A 2020-04-02 2020-04-02 Method for guaranteeing connection consistency between simulation system diagrams of nuclear power station analog machine Active CN111428379B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010255231.2A CN111428379B (en) 2020-04-02 2020-04-02 Method for guaranteeing connection consistency between simulation system diagrams of nuclear power station analog machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010255231.2A CN111428379B (en) 2020-04-02 2020-04-02 Method for guaranteeing connection consistency between simulation system diagrams of nuclear power station analog machine

Publications (2)

Publication Number Publication Date
CN111428379A CN111428379A (en) 2020-07-17
CN111428379B true CN111428379B (en) 2023-03-17

Family

ID=71556113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010255231.2A Active CN111428379B (en) 2020-04-02 2020-04-02 Method for guaranteeing connection consistency between simulation system diagrams of nuclear power station analog machine

Country Status (1)

Country Link
CN (1) CN111428379B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112818433A (en) * 2021-02-25 2021-05-18 哈尔滨工程大学 Rapid modeling method for simulation model of control system of nuclear power plant

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101770608A (en) * 2008-12-26 2010-07-07 新奥特(北京)视频技术有限公司 Management method and device of engineering versions
CN109522595A (en) * 2018-10-15 2019-03-26 中国核电工程有限公司 A kind of functional diagram importing automatic diagnosis method based on nuclear power plant's verification platform

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101770608A (en) * 2008-12-26 2010-07-07 新奥特(北京)视频技术有限公司 Management method and device of engineering versions
CN109522595A (en) * 2018-10-15 2019-03-26 中国核电工程有限公司 A kind of functional diagram importing automatic diagnosis method based on nuclear power plant's verification platform

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Lerisk-i*框架自动建模与编辑工具介绍;李天颍 等;《计算机科学》;20140915;第45-52+79页 *
李天颍 等.Lerisk-i*框架自动建模与编辑工具介绍.《计算机科学》.2014,第45-52+79页. *
面向视残障人士的无障碍化信息服务平台的设计与实现;朱胜芳 等;《计算机应用与软件》;20100315;第65-67+119页 *

Also Published As

Publication number Publication date
CN111428379A (en) 2020-07-17

Similar Documents

Publication Publication Date Title
CN103279088B (en) Graphical programming language object editing and reporting tool
CN104615541A (en) Simulation testing modeling system and method based on flow chart
CN102750301B (en) Blueprint generating method for integrated avionic system model aiming at architecture analysis and design language (AADL) description
US8701079B2 (en) Procedure and development environment for generation of an executable overall control program
CN102306122A (en) Automated testing method and equipment
CN102981882B (en) Analytic method and device
CN114327678A (en) Real-time data processing system and method supporting multiple engines
CN111428379B (en) Method for guaranteeing connection consistency between simulation system diagrams of nuclear power station analog machine
CN113934684A (en) Data format automatic conversion method and device, electronic equipment and storage medium
CN111737227A (en) Data modification method and system
CN104881311A (en) Method and apparatus for judging version compatibility
CN106951593B (en) Method and device for generating configuration file of protection measurement and control device
Sandmann et al. Autosar-compliant development workflows: From architecture to implementation-tool interoperability for round-trip engineering and verification and validation
Rong et al. DevDocOps: towards automated documentation for DevOps
CN105550116A (en) Automated test management system
CN112597023A (en) Case management method and device based on guide picture, computer equipment and storage medium
JP2006031354A (en) Test program generating device and test program generating system
CN114625447A (en) Robot running system based on RPA editor flow control
Bondé et al. Traceability and interoperability at different levels of abstraction in model-driven engineering
CN113760354A (en) Method and device for managing and controlling body information version of dispatching automation system
CN106648648B (en) Zookeeper-based configuration management method and system
Halle et al. Evaluation of the ashley seamless tool-chain on a real-world avionics demonstrator
CN108647018A (en) Can live preview code generating system
CN108196853A (en) For disposing the method for Android system SDK, storage medium, equipment and system
CN112764396B (en) Configuration method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant