CN111411944A - 一种随钻核磁共振测井仪及其工作模式控制方法、系统 - Google Patents
一种随钻核磁共振测井仪及其工作模式控制方法、系统 Download PDFInfo
- Publication number
- CN111411944A CN111411944A CN202010343398.4A CN202010343398A CN111411944A CN 111411944 A CN111411944 A CN 111411944A CN 202010343398 A CN202010343398 A CN 202010343398A CN 111411944 A CN111411944 A CN 111411944A
- Authority
- CN
- China
- Prior art keywords
- working mode
- logging
- mode
- logging instrument
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005481 NMR spectroscopy Methods 0.000 title claims abstract description 36
- 238000005553 drilling Methods 0.000 title claims abstract description 36
- 238000000034 method Methods 0.000 title claims abstract description 23
- 238000005259 measurement Methods 0.000 claims abstract description 21
- 230000001133 acceleration Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V3/00—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
- G01V3/18—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation specially adapted for well-logging
- G01V3/32—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation specially adapted for well-logging operating with electron or nuclear magnetic resonance
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Sensing (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Fluid Mechanics (AREA)
- High Energy & Nuclear Physics (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
本发明涉及一种随钻核磁共振测井仪及其工作模式控制方法、系统,包括:测井仪上集成的辅助测量系统当次作业测量所得的井眼的倾斜角(A)、测井仪振动的有效值(V)、测井仪自身的转速(R)和测井仪的温度(T);判断所述辅助测量系统当次作业测量所得的各项数值是否满足预设的主工作模式阈值;如果判断所述辅助测量系统当次作业测量所得的各项数值满足所述预设的主工作模式阈值,则根据所述辅助测量系统当次作业测量所得的各项数值和所述预设的主工作模式条件确定对应的主工作模式;确定了所述主工作模式后,根据预设的参数选择所述主工作模式对应的子模式,从而确定最终工作模式。提高了仪器对严苛的工作环境的适应性以及测量数据的准确性。
Description
技术领域
本发明涉及核磁共振测井技术领域,尤其是涉及一种随钻核磁共振测井仪及其工作模式控制方法、系统。
背景技术
随钻核磁共振测井仪是一种适用于油气井钻井过程的测量仪器。随钻核磁共振测井仪利用核磁共振原理测量地层中的油、气、水等自由流体的含量,指导钻井过程的操作以及完井后的采收作业。
核磁共振原理要求在测量过程中测量仪和样品保持相对静止,但是随钻核磁共振测井仪在钻井的高温、高压、高振动等严苛的条件下工作,从而导致随钻核磁共振测井仪测量数值不准确的问题;与此同时,仪器所在的环境参数也无法及时传输到地面,地面上的工作人员因此不能根据仪器所在环境实时的调整仪器的工作测量模式,进一步加剧了测量数值不准确的问题。
发明内容
本发明要解决的技术问题是:为了克服现有技术中随钻核磁共振测井仪因工作环境恶劣以及工作模式无法实时根据所在环境进行调整而导致的测量数据不准确的问题,本发明首先提供一种随钻核磁共振测井仪的工作模式控制方法,该方法通过测井仪上集成的辅助测量系统监控工作工况智能地决策测井仪的工作模式适应油气井钻井作业,从而解决测井仪测量数值不准确的问题;其次提供一种随钻核磁共振测井仪的工作模式控制系统;最后提供一种随钻核磁共振测井仪。
本发明解决其技术问题所采用的技术方案是:首先,本发明第一方面实施例的一种随钻核磁共振测井仪的工作模式控制方法,包括如下步骤:
步骤S01:根据测井仪当前作业工况确定参数集中所选用的参数,并确定参数集中每个参数的正常工作模式阈值及振动工作模式阈值;其中参数集包括井眼的倾斜角A、测井仪振动的有效值V、测井仪自身的转速R和测井仪的温度T;
步骤S02:读取测井仪上集成的辅助测量系统所获取的步骤S01中所涉及的各参数的实际数值;
步骤S03:将步骤S02中所读取的各参数的实际数值与步骤S01中设定的正常工作模式阈值及振动工作模式阈值进行相应的比较,具体如下:
如果步骤S02中所测各参数的实际数值均<各参数自身所对应的正常工作模式的阈值则测井仪进入正常工作模式;
如果参数集中存在至少一个参数的实际数值≥其正常工作模式阈值,则步骤S02中所测各参数的实际数值与各参数自身所对应的振动工作模式的阈值进行对比,如果步骤S02中所测各参数的实际数值均<各参数自身所对应的振动工作模式的阈值,则测井仪进入振动工作模式;
如果参数集中存在至少一个参数的实际数值≥其振动工作模式阈值,则测井仪进入空闲模式。
其次,本发明第二方面实施例的一种随钻核磁共振测井仪的工作模式控制系统,包括:读取模块、判断模块及控制模块;
读取模块,用于读取测井仪上集成的辅助测量系统所获取参数的实际数值;
判断模块,用于将由读取模块获得的测井仪上集成的辅助测量系统所获取参数的实际数值与根据测井仪当前作业工况设置的正常工作模式阈值及振动工作模式阈值进行相应的比较;
控制模块,用于在判断模块完成测井仪工作模式的判断过程后对测井仪的工作模式进行控制。
最后,本发明第三方面实施例的一种随钻核磁共振测井仪,包括本发明第二方面实施例的一种随钻核磁共振测井仪的工作模式控制系统。
本发明的有益效果是:1、通过获取辅助测量系统当前测量所得的井斜、振动、转速和温度数据与预设的工作模式条件进行比对判断从而进行工作模式的选择,提高了仪器对严苛的工作环境的适应性,增强了测量数据的准确性;2、在确定了工作模式后,根据预设的参数选择该工作模式对应的子模式,且子模式的预设参数可配置,进一步提升了仪器的测量精度。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是根据本发明一个实施例所述的一种随钻核磁共振测井仪的工作模式控制方法的流程图;
图2是根据本发明一个实施例所述一种随钻核磁共振测井仪的工作模式控制系统的结构示意图。
具体实施方式
现在结合附图对本发明做进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
图1是根据本发明一个实施例所述的一种随钻核磁共振测井仪的工作模式控制方法的流程图,包括如下步骤:
步骤S01,根据测井仪当前作业工况确定参数集中所选用的参数,并确定参数集中每个参数的正常工作模式阈值及振动工作模式阈值;其中参数集包括井眼的倾斜角A、测井仪振动的有效值V、测井仪自身的转速R和测井仪的温度T;
其中,工作模式的种类根据当前作业工况进行配置,各工作模式对应参数集中每个参数的阈值应提前配置,在测井仪入井前通过软件写入到测井仪中,在当次入井作业过程中不做更改。
步骤S02:读取测井仪上集成的辅助测量系统所获取的步骤S01中所涉及的各参数的实际数值。
其中,辅助测量系统集成在测井仪上,通过三轴加速度传感器和三轴磁场传感器测量地球重力场和地磁场确定随钻核磁共振测井仪的姿态和振动状态,辅助测量系统测量数据中仪器振动的有效值V的单位G为地球的重力加速度,仪器自身的转速R的单位RPM为每分钟转动圈数,仪器的温度T单位为摄氏度。
步骤S03:将步骤S02中所读取的各参数的实际数值与步骤S01中设定的正常工作模式阈值及振动工作模式阈值进行相应的比较,具体如下:
如果步骤S02中所测各参数的实际数值均<各参数自身所对应的正常工作模式的阈值则测井仪进入正常工作模式;
如果参数集中存在至少一个参数的实际数值≥其正常工作模式阈值,则步骤S02中所测各参数的实际数值与各参数自身所对应的振动工作模式的阈值进行对比,如果步骤S02中所测各参数的实际数值均<各参数自身所对应的振动工作模式的阈值,则测井仪进入振动工作模式;
如果参数集中存在至少一个参数的实际数值≥其振动工作模式阈值,则测井仪进入空闲模式。
本发明实施例中预设三种工作模式,分别是正常工作模式、振动工作模式和空闲模式,正常工作模式是测井仪作业条件良好时的工作模式;振动工作模式是测井仪处于一定振动条件下时的工作模式;空闲模式是测井仪处于剧烈振动条件下的工作模式,三种工作模式所对应辅助测量系统所测得参数的阈值详见表1。
参数名称 | 正常工作模式 | 振动工作模式 | 空闲模式 |
A | 90° | 120° | |
V | 2G | 8G | |
R | 80RPM | 120RPM | |
T | 125℃ | 150℃ |
表1
具体而言,在本发明实施例中,将从辅助测量系统当次作业测量所得的井眼的倾斜角A、测井仪振动的有效值V、测井仪自身的转速R和测井仪的温度T的数值与预设的正常工作模式对应参数的阈值进行对比;
如果A<90°、V<2G、R<80RPM并且T<125℃,则确定工作模式为正常工作模式;
如果辅助测量系统当次作业测量所得的井眼的倾斜角A、测井仪振动的有效值V、测井仪自身的转速R和测井仪的温度T的数值其中之一大于等于正常工作模式对应参数的阈值,则将辅助测量系统当次作业测量所得的井眼的倾斜角A、测井仪振动的有效值V、测井仪自身的转速R和测井仪的温度T的数值与振动工作模式对应参数的阈值进行对比;
如果A<120°、V<8G、R<120RPM并且T<150℃,则确定工作模式为振动工作模式;
如果辅助测量系统当次作业测量所得的井眼的倾斜角A、测井仪振动的有效值V、测井仪自身的转速R和测井仪的温度T的数值其中之一大于等于振动工作模式对应参数的阈值,则确定工作模式为空闲模式。
步骤S04:所述正常工作模式或振动工作模式具有各自对应的子模式,子模式的参数预先设置,测井仪进入正常工作模式或振动工作模式后,其对应的子模式即为最终工作模式。
子模式必须有对应的设置参数,子模式的设置参数在入井前由软件写入到仪器中,在当次入井作业过程中不做更改,各主工作模式可以有多个对应的子模式,但当次入井作业时各主工作模式皆分别对应一个子模式,子模式的参数具体包括:等待时间、脉冲间隔时间和脉冲数量。本发明实施例中,正常工作模式对应2个子模式,分别为子模式1.1和子模式1.2;振动工作模式对应1个子模式,为子模式2.1,各子模式所对应的参数详见表2。
表2
仪器进入正常工作模式或振动工作模式后会读取测井仪预设的子模式参数,以该正常工作模式或振动工作模式所对应的子模式作为最终工作模式。
与上述实施例提供的一种随钻核磁共振测井仪的工作模式控制方法相对应,本发明还提供一种随钻核磁共振测井仪的工作模式控制系统,图2是根据本发明一个实施例所述一种随钻核磁共振测井仪的工作模式控制系统的结构示意图。如图2所示,该随钻核磁共振测井仪的工作模式控制系统包括读取模块10、判断模块20和控制模块30。
具体的,读取模块,用于读取测井仪上集成的辅助测量系统所获取参数的实际数值;
判断模块,用于将由读取模块获得的测井仪上集成的辅助测量系统所获取参数的实际数值与根据测井仪当前作业工况设置的正常工作模式阈值及振动工作模式阈值进行相应的比较;
控制模块,用于在判断模块完成测井仪工作模式的判断过程后对测井仪的工作模式进行控制。
为了实现上述实施例,本发明还提出一种随钻核磁共振测井仪,包括本发明任一实施例所述的一种随钻核磁共振测井仪的工作模式控制系统。
综上,本发明通过读取测井仪上集成的辅助测量系统当次作业测量所得的井眼的倾斜角A、测井仪振动的有效值V、测井仪自身的转速R和测井仪的温度T数值与预设的主工作模式阈值进行比对判断从而进行主工作模式的选择,提高了仪器对严苛的工作环境的适应性,增强了测量数据的准确性;在确定了主工作模式后,根据预设的参数选择该主工作模式对应的子模式,且子模式的预设参数可配置,进一步提升了仪器的测量精度。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。
Claims (5)
1.一种随钻核磁共振测井仪的工作模式控制方法,其特征在于,包括如下步骤:
步骤S01:根据测井仪当前作业工况确定参数集中所选用的参数,并确定参数集中每个参数的正常工作模式阈值及振动工作模式阈值;其中参数集包括井眼的倾斜角A、测井仪振动的有效值V、测井仪自身的转速R和测井仪的温度T;
步骤S02:读取测井仪上集成的辅助测量系统所获取的步骤S01中所涉及的各参数的实际数值;
步骤S03:将步骤S02中所读取的各参数的实际数值与步骤S01中设定的正常工作模式阈值及振动工作模式阈值进行相应的比较,具体如下:
如果步骤S02中所测各参数的实际数值均<各参数自身所对应的正常工作模式的阈值则测井仪进入正常工作模式;
如果参数集中存在至少一个参数的实际数值≥其正常工作模式阈值,则步骤S02中所测各参数的实际数值与各参数自身所对应的振动工作模式的阈值进行对比,如果步骤S02中所测各参数的实际数值均<各参数自身所对应的振动工作模式的阈值,则测井仪进入振动工作模式;
如果参数集中存在至少一个参数的实际数值≥其振动工作模式阈值,则测井仪进入空闲模式。
2.如权利要求1所述的一种随钻核磁共振测井仪的工作模式控制方法,其特征在于,测井仪进入正常工作模式或振动工作模式后,所述工作模式控制方法还包括如下步骤:
步骤S04:所述正常工作模式或振动工作模式具有各自对应的子模式,子模式的参数预先设置,测井仪进入正常工作模式或振动工作模式后,其对应的子模式即为最终工作模式。
3.如权利要求2所述的一种随钻核磁共振测井仪的工作模式控制方法,其特征在于,所述子模式的参数具体包括:等待时间、脉冲间隔时间和脉冲数量。
4.一种随钻核磁共振测井仪的工作模式控制系统,其特征在于,包括:读取模块、判断模块及控制模块;
读取模块,用于读取测井仪上集成的辅助测量系统所获取参数的实际数值;
判断模块,用于将由读取模块获得的测井仪上集成的辅助测量系统所获取参数的实际数值与根据测井仪当前作业工况设置的正常工作模式阈值及振动工作模式阈值进行相应的比较;
控制模块,用于在判断模块完成测井仪工作模式的判断过程后对测井仪的工作模式进行控制。
5.一种随钻核磁共振测井仪,其特征在于,包括:如权利要求4所述的一种随钻核磁共振测井仪的工作模式控制系统。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010343398.4A CN111411944B (zh) | 2020-04-27 | 2020-04-27 | 一种随钻核磁共振测井仪及其工作模式控制方法、系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010343398.4A CN111411944B (zh) | 2020-04-27 | 2020-04-27 | 一种随钻核磁共振测井仪及其工作模式控制方法、系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111411944A true CN111411944A (zh) | 2020-07-14 |
CN111411944B CN111411944B (zh) | 2024-04-09 |
Family
ID=71490091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010343398.4A Active CN111411944B (zh) | 2020-04-27 | 2020-04-27 | 一种随钻核磁共振测井仪及其工作模式控制方法、系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111411944B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427448A (zh) * | 2020-09-25 | 2022-05-03 | 中国石油化工股份有限公司 | 一种基于温度控制的随钻仪器功耗管理方法及系统 |
Citations (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050030020A1 (en) * | 2003-04-01 | 2005-02-10 | Siess Charles Preston | Abnormal pressure determination using nuclear magnetic resonance logging |
US20060015256A1 (en) * | 2004-07-15 | 2006-01-19 | Baker Hughes Incorporated | Apparent dip angle calculation and image compression based on region of interest |
JP2006153461A (ja) * | 2004-11-25 | 2006-06-15 | Hitachi Ltd | 核磁気共鳴計測装置 |
RU2289690C2 (ru) * | 2005-02-03 | 2006-12-20 | Сергей Георгиевич Фурсин | Способ контроля забойных параметров скважины |
CN101223335A (zh) * | 2005-06-07 | 2008-07-16 | 贝克休斯公司 | 用于收集钻头性能数据的方法和设备 |
WO2008116695A1 (de) * | 2007-03-26 | 2008-10-02 | Robert Bosch Gmbh | Vibrationsdosimeter zur ermittlung der vibrationsbelastung |
US20100078216A1 (en) * | 2008-09-25 | 2010-04-01 | Baker Hughes Incorporated | Downhole vibration monitoring for reaming tools |
CN102418516A (zh) * | 2011-12-30 | 2012-04-18 | 中天启明石油技术有限公司 | 随钻近钻头定向参数测量装置 |
US20130106413A1 (en) * | 2011-11-02 | 2013-05-02 | Tim Hopper | System and Method for Measuring Borehole Geometry While Drilling |
CN103147743A (zh) * | 2013-02-20 | 2013-06-12 | 西安思坦仪器股份有限公司 | 随钻测量的双向通信方法及其系统 |
CN203214049U (zh) * | 2012-12-28 | 2013-09-25 | 中国电子科技集团公司第二十二研究所 | 无线随钻测量系统 |
CN103362505A (zh) * | 2012-04-10 | 2013-10-23 | 中国石油化工股份有限公司 | 一种用于在钻井液添加油存在条件下判识钻遇油层的方法 |
CN103984032A (zh) * | 2014-04-28 | 2014-08-13 | 吉林大学 | 实时信噪特征提取的多工作模式核磁信号探测装置及方法 |
CN105201496A (zh) * | 2015-09-23 | 2015-12-30 | 中国石油大学(北京) | 具有双层磁体的核磁共振测井仪探头及天线激励方法 |
US20160003035A1 (en) * | 2013-02-25 | 2016-01-07 | Evolution Engineering Inc. | Integrated downhole system with plural telemetry subsystems |
CN105298486A (zh) * | 2015-11-25 | 2016-02-03 | 中国石油集团钻井工程技术研究院 | 井下可控的随钻核磁共振测井装置 |
CN106099838A (zh) * | 2016-07-25 | 2016-11-09 | 贝兹维仪器(苏州)有限公司 | 基于采样电阻的随钻测井仪器保护装置 |
CN106156505A (zh) * | 2016-07-05 | 2016-11-23 | 中国科学技术大学 | 一种基于正交匹配追踪算法的核磁共振t2谱反演方法 |
CN106444453A (zh) * | 2016-10-31 | 2017-02-22 | 广州视源电子科技股份有限公司 | 一种收音机双向自动感应切换的方法与系统 |
CN106930754A (zh) * | 2017-04-20 | 2017-07-07 | 长江大学 | 一种储层自适应的核磁共振测井数据采集方法 |
CN107201897A (zh) * | 2016-03-15 | 2017-09-26 | 中国石油化工股份有限公司 | 双信道随钻测量系统及其井下模式控制方法 |
US20170284185A1 (en) * | 2016-04-01 | 2017-10-05 | Baker Hughes Incorporated | Downhole operational modal analysis |
CN108469274A (zh) * | 2018-03-28 | 2018-08-31 | 北京经纬恒润科技有限公司 | 一种工况识别及模式切换的方法及装置 |
US20180283156A1 (en) * | 2017-04-03 | 2018-10-04 | Nabors Drilling Technologies Usa, Inc. | Binning During Non-Rotation Drilling in a Wellbore |
CN108627877A (zh) * | 2018-04-11 | 2018-10-09 | 中国石油大学(北京) | 随钻核磁共振测井仪井下原位回波信号补偿方法与装置 |
CN108663972A (zh) * | 2018-05-23 | 2018-10-16 | 中国石油大学(北京) | 随钻核磁共振测井仪器主控系统与装置 |
CN109031437A (zh) * | 2018-08-10 | 2018-12-18 | 中国石油大学(北京) | 随钻核磁共振自旋回波校正方法与装置 |
CN109147449A (zh) * | 2018-08-10 | 2019-01-04 | 中国石油大学(北京) | 随钻核磁共振振动和旋转的模拟方法及装置 |
US20190049615A1 (en) * | 2016-09-29 | 2019-02-14 | Halliburton Energy Services, Inc. | Rf flip angle adjustment in a downhole nmr tool |
US20190048690A1 (en) * | 2016-05-04 | 2019-02-14 | Halliburton Energy Services, Inc. | Overvoltage protection of downhole generators |
CN110005398A (zh) * | 2019-04-04 | 2019-07-12 | 中国石油大学(北京) | 随钻电磁波电阻率测井仪器设计参数确定方法及装置 |
CN110617061A (zh) * | 2019-09-20 | 2019-12-27 | 无锡量子感知研究所 | 一种随钻核磁测井仪钻铤结构 |
CN110761783A (zh) * | 2019-12-06 | 2020-02-07 | 无锡量子感知研究所 | 一种随钻核磁测井仪刻度装置 |
-
2020
- 2020-04-27 CN CN202010343398.4A patent/CN111411944B/zh active Active
Patent Citations (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050030020A1 (en) * | 2003-04-01 | 2005-02-10 | Siess Charles Preston | Abnormal pressure determination using nuclear magnetic resonance logging |
US20060015256A1 (en) * | 2004-07-15 | 2006-01-19 | Baker Hughes Incorporated | Apparent dip angle calculation and image compression based on region of interest |
JP2006153461A (ja) * | 2004-11-25 | 2006-06-15 | Hitachi Ltd | 核磁気共鳴計測装置 |
RU2289690C2 (ru) * | 2005-02-03 | 2006-12-20 | Сергей Георгиевич Фурсин | Способ контроля забойных параметров скважины |
CN101223335A (zh) * | 2005-06-07 | 2008-07-16 | 贝克休斯公司 | 用于收集钻头性能数据的方法和设备 |
WO2008116695A1 (de) * | 2007-03-26 | 2008-10-02 | Robert Bosch Gmbh | Vibrationsdosimeter zur ermittlung der vibrationsbelastung |
US20100078216A1 (en) * | 2008-09-25 | 2010-04-01 | Baker Hughes Incorporated | Downhole vibration monitoring for reaming tools |
US20130106413A1 (en) * | 2011-11-02 | 2013-05-02 | Tim Hopper | System and Method for Measuring Borehole Geometry While Drilling |
CN102418516A (zh) * | 2011-12-30 | 2012-04-18 | 中天启明石油技术有限公司 | 随钻近钻头定向参数测量装置 |
CN103362505A (zh) * | 2012-04-10 | 2013-10-23 | 中国石油化工股份有限公司 | 一种用于在钻井液添加油存在条件下判识钻遇油层的方法 |
CN203214049U (zh) * | 2012-12-28 | 2013-09-25 | 中国电子科技集团公司第二十二研究所 | 无线随钻测量系统 |
CN103147743A (zh) * | 2013-02-20 | 2013-06-12 | 西安思坦仪器股份有限公司 | 随钻测量的双向通信方法及其系统 |
US20160003035A1 (en) * | 2013-02-25 | 2016-01-07 | Evolution Engineering Inc. | Integrated downhole system with plural telemetry subsystems |
CN103984032A (zh) * | 2014-04-28 | 2014-08-13 | 吉林大学 | 实时信噪特征提取的多工作模式核磁信号探测装置及方法 |
CN105201496A (zh) * | 2015-09-23 | 2015-12-30 | 中国石油大学(北京) | 具有双层磁体的核磁共振测井仪探头及天线激励方法 |
CN105298486A (zh) * | 2015-11-25 | 2016-02-03 | 中国石油集团钻井工程技术研究院 | 井下可控的随钻核磁共振测井装置 |
CN107201897A (zh) * | 2016-03-15 | 2017-09-26 | 中国石油化工股份有限公司 | 双信道随钻测量系统及其井下模式控制方法 |
US20170284185A1 (en) * | 2016-04-01 | 2017-10-05 | Baker Hughes Incorporated | Downhole operational modal analysis |
US20190048690A1 (en) * | 2016-05-04 | 2019-02-14 | Halliburton Energy Services, Inc. | Overvoltage protection of downhole generators |
CN106156505A (zh) * | 2016-07-05 | 2016-11-23 | 中国科学技术大学 | 一种基于正交匹配追踪算法的核磁共振t2谱反演方法 |
CN106099838A (zh) * | 2016-07-25 | 2016-11-09 | 贝兹维仪器(苏州)有限公司 | 基于采样电阻的随钻测井仪器保护装置 |
US20190049615A1 (en) * | 2016-09-29 | 2019-02-14 | Halliburton Energy Services, Inc. | Rf flip angle adjustment in a downhole nmr tool |
CN106444453A (zh) * | 2016-10-31 | 2017-02-22 | 广州视源电子科技股份有限公司 | 一种收音机双向自动感应切换的方法与系统 |
US20180283156A1 (en) * | 2017-04-03 | 2018-10-04 | Nabors Drilling Technologies Usa, Inc. | Binning During Non-Rotation Drilling in a Wellbore |
CN106930754A (zh) * | 2017-04-20 | 2017-07-07 | 长江大学 | 一种储层自适应的核磁共振测井数据采集方法 |
CN108469274A (zh) * | 2018-03-28 | 2018-08-31 | 北京经纬恒润科技有限公司 | 一种工况识别及模式切换的方法及装置 |
CN108627877A (zh) * | 2018-04-11 | 2018-10-09 | 中国石油大学(北京) | 随钻核磁共振测井仪井下原位回波信号补偿方法与装置 |
CN108663972A (zh) * | 2018-05-23 | 2018-10-16 | 中国石油大学(北京) | 随钻核磁共振测井仪器主控系统与装置 |
CN109031437A (zh) * | 2018-08-10 | 2018-12-18 | 中国石油大学(北京) | 随钻核磁共振自旋回波校正方法与装置 |
CN109147449A (zh) * | 2018-08-10 | 2019-01-04 | 中国石油大学(北京) | 随钻核磁共振振动和旋转的模拟方法及装置 |
CN110005398A (zh) * | 2019-04-04 | 2019-07-12 | 中国石油大学(北京) | 随钻电磁波电阻率测井仪器设计参数确定方法及装置 |
CN110617061A (zh) * | 2019-09-20 | 2019-12-27 | 无锡量子感知研究所 | 一种随钻核磁测井仪钻铤结构 |
CN110761783A (zh) * | 2019-12-06 | 2020-02-07 | 无锡量子感知研究所 | 一种随钻核磁测井仪刻度装置 |
Non-Patent Citations (5)
Title |
---|
卢文东;肖立志;季红鹏;刘东明;: "随钻核磁共振测井仪的关键技术简介", 测井技术, vol. 31, no. 02, pages 107 - 111 * |
徐挽杰;王梓翔;徐南阳;荣星;苏吉虎;杜江峰;: "基于直接数字合成技术的电子自旋-核自旋双共振实验射频信号源设计", 波谱学杂志, vol. 28, no. 04, pages 471 - 478 * |
李新等: "随钻核磁共振测井仪探测特性研究", 《波谱学杂志》, vol. 28, no. 1, pages 84 - 92 * |
童茂松;曹宇欣;孙旭光;: "过钻杆测井仪器通信与控制模块设计", 测井技术, vol. 43, no. 06, 20 December 2019 (2019-12-20), pages 569 - 573 * |
钟剑;李梦春;杨德龙;师光辉;黎晗;李斌;: "核磁共振测井仪高压发射控制时序设计与应用", 测井技术, no. 03, pages 352 - 355 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427448A (zh) * | 2020-09-25 | 2022-05-03 | 中国石油化工股份有限公司 | 一种基于温度控制的随钻仪器功耗管理方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN111411944B (zh) | 2024-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3143246B1 (en) | Real-time, limited orientation sensor auto-calibration | |
US20140019052A1 (en) | Device and method for predictive calibration | |
AU2019203884A1 (en) | Multiple downhole sensor digital alignment using spatial transforms | |
US20090187346A1 (en) | Methods for the identification of bubble point pressure | |
CN111411944A (zh) | 一种随钻核磁共振测井仪及其工作模式控制方法、系统 | |
US20170269255A1 (en) | Simultaneous error correction and inversion | |
US11574459B2 (en) | Distance-to-bed-boundary inversion solution pixelation | |
CN107589473B (zh) | 随钻测量传感器正交误差消除方法 | |
AU2016261837B2 (en) | Drilling and power loss dysfunction characterization | |
CN116122792B (zh) | 用于在随钻测量期间获取加速度计的重力系数的方法 | |
CN109164482B (zh) | 基于光纤传感器的井下微地震求解方法、装置及系统 | |
EP3294989B1 (en) | Power loss dysfunction characterization | |
Song et al. | Full waveform vibration and shock measurement tool for measurement-while-drilling | |
CN213450362U (zh) | 一种hds姿态测量单元 | |
CN116662439B (zh) | 一种基于gis数据的钻井施工进度展示方法及系统 | |
US11921247B2 (en) | Full automation of high-resolution interval velocity estimation for check-shot and other vertical seismic profile-type datasets | |
Lautzenhiser | Amoco/Lacoste and Romberg automated borehole gravity meter | |
CN103791996B (zh) | 一种钻头扭转测量装置及测量方法 | |
CN114814975A (zh) | 声波曲线修复的探测方法、装置、设备和存储介质 | |
CN117552767A (zh) | 一种定向仪、基于该定向仪的测量方法及系统 | |
Lande | Analysis of the factors influencing the annulus pressure far away from downhole pressure measurements | |
CN115961936A (zh) | 随钻近钻头环井周位置信息测量方法及相关装置 | |
CN115341894A (zh) | 油气井产能评价方法和装置 | |
Peressini et al. | An Integrated Digital Well Logging System | |
Cooling | Experimental microcomputer-controlled inclinometer/magnetometer system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211203 Address after: 214000 No. 899, Huizhou Avenue, Qianzhou street, Huishan District, Wuxi City, Jiangsu Province (Urban Railway Huishan station area) Applicant after: Guoyi Petroleum Technology (Wuxi) Co.,Ltd. Address before: 214100 Zhanqian Road, Huishan District, Wuxi City, Jiangsu Province Applicant before: Wuxi Institute of quantum perception |
|
GR01 | Patent grant | ||
GR01 | Patent grant |