CN111398737B - Recording management method and system applied to recording type fault indicator - Google Patents

Recording management method and system applied to recording type fault indicator Download PDF

Info

Publication number
CN111398737B
CN111398737B CN202010267493.0A CN202010267493A CN111398737B CN 111398737 B CN111398737 B CN 111398737B CN 202010267493 A CN202010267493 A CN 202010267493A CN 111398737 B CN111398737 B CN 111398737B
Authority
CN
China
Prior art keywords
recording
collecting unit
sampling
phase
started
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010267493.0A
Other languages
Chinese (zh)
Other versions
CN111398737A (en
Inventor
孙增献
于青松
吴园园
肖希凤
薛海军
董金海
李明辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xunfeng Electronics Co ltd
Beijing Hexinruitong Electric Power Technology Co ltd
Original Assignee
Shandong Xunfeng Electronics Co ltd
Beijing Hexinruitong Electric Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Xunfeng Electronics Co ltd, Beijing Hexinruitong Electric Power Technology Co ltd filed Critical Shandong Xunfeng Electronics Co ltd
Priority to CN202010267493.0A priority Critical patent/CN111398737B/en
Publication of CN111398737A publication Critical patent/CN111398737A/en
Application granted granted Critical
Publication of CN111398737B publication Critical patent/CN111398737B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/088Aspects of digital computing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Abstract

The invention provides a recording management method and a recording management system applied to a recording fault indicator, wherein the recording management system is provided with a collecting unit and a collecting unit, the collecting unit is arranged on A, B, C three phases of an overhead line, the collecting unit is arranged on a tower near the collecting unit, the collecting unit and the collecting unit are in wireless communication through 433MHz, when the line has a fault, the fault line starts recording, the non-fault line starts recording synchronously, and after the recording is finished, the collecting unit calls recording information and recording data of the three-phase collecting unit to synthesize zero-sequence current and generate a recording file, so that the accuracy and the stability of the recording of the collecting unit are improved through the optimization of a process and a management method, and the phenomenon that the recording of the recording fault indicator is started by mistake or is not started in the operation process is prevented.

Description

Recording management method and system applied to recording type fault indicator
Technical Field
The invention relates to the technical field of distribution line state monitoring, in particular to a recording management method and a recording management system applied to a recording type fault indicator.
Background
Along with the development of intelligent power distribution network, distribution lines state monitoring is also more important in the distribution automation field, and fault indicator is the important equipment of distribution lines state monitoring for realize distribution lines's fault location. The transient recording type fault indicator is a type of fault indicator, and fault judgment and positioning of a line are realized through high-speed sampling and recording analysis, so that the accuracy of fault judgment and positioning is directly determined by the quality of the recording of the transient recording type fault indicator. Through optimization and improvement of the wave recording process of the transient wave recording type fault indicator, the accuracy and stability of wave recording can be improved, and higher-quality basic data are prepared for subsequent fault positioning and judgment.
However, in the prior art, the wave recording type fault indicator is often started by mistake or not started, and the reliability and the safety of the power distribution network are affected.
Disclosure of Invention
The invention aims to provide a recording management method and a recording management system applied to a recording type fault indicator, which aim to solve the problem that the fault indicator in the prior art is started by mistake or not started, improve the accuracy and stability of recording of an acquisition unit and prevent the phenomenon that the recording of the recording type fault indicator is started by mistake or not started in the running process.
In order to achieve the technical purpose, the invention provides a recording management method applied to a recording type fault indicator, which comprises the following operations:
the acquisition unit acquires the change conditions of the current and the electric field, copies data in the sampling cache to the wave recording cache when preset conditions are met, and sends a synchronous starting instruction;
the acquisition unit analyzes the time setting label and the sampling count value of the synchronous starting instruction, and judges whether the wave recording of the starting is effective or not according to the time setting label and the sampling count value;
the collecting unit locks the three-phase recording cache, compares and analyzes the three-phase recording information, calculates the absolute time of each phase of recording data, and calls to collect the recording data when the absolute time difference is not greater than a preset time interval.
Preferably, the preset conditions are specifically:
when the current sampling values continuously satisfy I (k) > I (k-N) > I (k-2N) and the value of delta I ═ (I (k) -I (k-N)) - (I (k-N) -I (k-2N)) is continuously greater than the set sudden change threshold value for 5 times, the system marks that the current sudden change is started;
when the electric field of the system is normal and the value of delta U ═ U (k) -U (k-N)) - (U (k-N) -U (k-2N)) is greater than the set abrupt electric field threshold value for 3 consecutive times, the system marks that the electric field abrupt change starts.
Preferably, the step of judging whether the wave recording started at this time is valid by using the time tick mark and the sampling count value specifically includes:
the started phase analyzes a starting time tick mark and an AD sampling counter of the synchronous starting instruction, and assumes that a1 is the synchronous time tick mark, b1 is the AD sampling counter, a2 is the recording time tick mark stored inside the started phase, b2 is the AD sampling counter stored inside the started phase, 8000 is the time tick sampling interval of the system, and when (a1 8000+ b1) - (a2 8000+ b2) > is satisfied, the started phase considers the received synchronous starting instruction to be valid.
Preferably, the acquisition units are installed on three phases of an overhead line, the collection unit is installed on an electric power tower, and data interaction is performed among the collection unit, the acquisition units and the acquisition units in a 433MHz wireless mode.
The invention also provides a recording management system applied to the recording type fault indicator, which comprises the following components:
the wave recording starting module is used for acquiring the change conditions of the current and the electric field by the acquisition unit, copying data in the sampling cache to a wave recording cache when preset conditions are met, and sending a synchronous starting instruction;
the recording data effective judgment module is used for analyzing the time setting label and the sampling count value of the synchronous starting instruction by the acquisition unit and judging whether the recording of the current starting is effective or not according to the time setting label and the sampling count value;
and the recording data calling module is used for locking the three-phase recording cache by the collecting unit, comparing and analyzing the three-phase recording information, calculating the absolute time of each phase of recording data, and calling and acquiring the recording data when the absolute time difference is not greater than a preset time interval.
Preferably, the preset conditions are specifically:
when the current sampling values continuously satisfy I (k) > I (k-N) > I (k-2N) and the value of delta I ═ (I (k) -I (k-N)) - (I (k-N) -I (k-2N)) is continuously greater than the set sudden change threshold value for 5 times, the system marks that the current sudden change is started;
when the electric field of the system is normal and the value of delta U ═ U (k) -U (k-N)) - (U (k-N) -U (k-2N)) is greater than the set abrupt electric field threshold value for 3 consecutive times, the system marks that the electric field abrupt change starts.
Preferably, the condition whether the recording started this time is valid is as follows:
the started phase analyzes a starting time tick mark and an AD sampling counter of the synchronous starting instruction, and assumes that a1 is the synchronous time tick mark, b1 is the AD sampling counter, a2 is the recording time tick mark stored inside the started phase, b2 is the AD sampling counter stored inside the started phase, 8000 is the time tick sampling interval of the system, and when (a1 8000+ b1) - (a2 8000+ b2) > is satisfied, the started phase considers the received synchronous starting instruction to be valid.
Preferably, the acquisition units are installed on three phases of an overhead line, the collection unit is installed on an electric power tower, and data interaction is performed among the collection unit, the acquisition units and the acquisition units in a 433MHz wireless mode.
The effect provided in the summary of the invention is only the effect of the embodiment, not all the effects of the invention, and one of the above technical solutions has the following advantages or beneficial effects:
compared with the prior art, the invention is provided with the collecting unit and the collecting unit, the collecting unit is arranged on A, B, C three phases of an overhead line, the collecting unit is arranged on a tower near the collecting unit, wireless communication is carried out between the collecting unit and the collecting unit through 433MHz, when a line has a fault, the fault line starts wave recording, a non-fault line starts wave recording synchronously, the collecting unit calls the wave recording information and the wave recording data of the three-phase collecting unit to synthesize zero sequence current and generate a wave recording file after the wave recording is finished, so that the wave recording accuracy and stability of the collecting unit are improved through the optimization of a process and a management method, and the phenomenon that a wave recording fault indicator is started by mistake or not started in the operation process is prevented.
Drawings
Fig. 1 is a flowchart of a recording management method applied to a recording fault indicator according to an embodiment of the present invention;
fig. 2 is a schematic diagram of a transient recording-type fault indicator system according to an embodiment of the present invention;
fig. 3 is a schematic diagram of a wave recording process of a transient wave recording type fault indicator according to an embodiment of the present invention;
fig. 4 is a block diagram of a recording management system applied to a recording fault indicator according to an embodiment of the present invention.
Detailed Description
In order to clearly explain the technical features of the present invention, the following detailed description of the present invention is provided with reference to the accompanying drawings. The following disclosure provides many different embodiments, or examples, for implementing different features of the invention. To simplify the disclosure of the present invention, the components and arrangements of specific examples are described below. Furthermore, the present invention may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed. It should be noted that the components illustrated in the figures are not necessarily drawn to scale. Descriptions of well-known components and processing techniques and procedures are omitted so as to not unnecessarily limit the invention.
The following describes a recording management method and system applied to a recording fault indicator in detail with reference to the accompanying drawings.
As shown in fig. 1, the present invention discloses a recording management method applied to a recording type fault indicator, the method includes the following operations:
collecting the change conditions of the current and the electric field, copying data in the sampling cache to a wave recording cache when preset conditions are met, and sending a synchronous starting instruction;
analyzing the time setting label and the sampling count value of the synchronous starting instruction, and judging whether the wave recording of the starting is effective or not through the time setting label and the sampling count value;
and locking the three-phase recording cache, comparing and analyzing the three-phase recording information, calculating the absolute time of each phase of recording data, and calling to acquire the recording data when the absolute time difference is not greater than a preset time interval.
As shown in fig. 2, the acquisition units of the corresponding phases are installed on the A, B, C three phases of the overhead line at the unified position, the collection unit is installed on the electric power tower, and the data interaction is performed among the collection unit and the acquisition units in a 433MHz wireless mode.
The acquisition unit acquires the current and the induction electric field of the three-phase line in real time, the sampling frequency is 400MHz, the acquisition unit reserves 4K byte cache space for the current and the electric field respectively, and reserves 2K byte wave recording cache.
The acquisition unit calculates the current and the change condition of the electric field point by point at intervals of 7ms in the following calculation mode:
when the current sampling values continuously satisfy I (k) > I (k-N) > I (k-2N) and the value of delta I ═ (I (k) -I (k-N)) - (I (k-N) -I (k-2N)) is continuously greater than the set sudden change threshold value for 5 times, the system marks that the current sudden change starts, and N is the number of sampling points of 1 cycle and is taken as 80.
When the system electric field is normal and the value of delta U (k) -U (k-N)) - (U (k-N) -U (k-2N)) is greater than the set sudden change electric field threshold value continuously for 3 times, the system marks that the electric field is suddenly changed to start, the start phase starts to copy the data in the sampling buffer into the recording buffer, and a synchronization start instruction is sent.
The acquisition unit judges whether the recording started at this time is effective, and when the ground fault or the short-circuit fault is detected, the recording is confirmed to be effective. The started phase analyzes a starting time tick mark and an AD sampling counter of the synchronous starting instruction, and assumes that a1 is the synchronous time tick mark, b1 is the AD sampling counter, a2 is the recording time tick mark stored inside the started phase, b2 is the AD sampling counter stored inside the started phase, 8000 is the time tick sampling interval of the system, and when (a1 8000+ b1) - (a2 8000+ b2) > is satisfied, the started phase considers the received synchronous starting instruction to be valid.
The started phase calculates the recording start of the phase through the received synchronous time tick mark and the AD sampling count value and the self real-time synchronous time tick mark and the AD sampling count value, and copies the data of 5 cycles which are started by the starting point to the recording cache.
As shown in fig. 3, after the start of recording, a recording completion instruction is sent, and the collection unit sends a recording lock to lock the recording cache of the three-phase acquisition unit, so as to prevent the acquisition unit from recording repeatedly. And unlocking the wave recording cache after the wave recording data is transmitted or overtime and invalid. The acquisition unit times through internal timer TA1, and the recording buffer is unlocked when the time reaches the threshold of 2 minutes.
The collecting unit calls the recording information of the three phases of the collecting unit A, B, C one by one, calculates the absolute time of each phase of recording data according to the content of the recording information, and starts to call and collect the recording data when the absolute time difference is not more than 5 ms.
According to the collecting unit and the collecting unit which are arranged in the embodiment of the invention, the collecting unit is arranged on A, B, C three phases of an overhead line, the collecting unit is arranged on a tower near the collecting unit, wireless communication is carried out between the collecting unit and the collecting unit through 433MHz, when a line fails, a fault line starts wave recording, a non-fault line starts wave recording synchronously, and after wave recording is completed, the collecting unit calls wave recording information and wave recording data of the three-phase collecting unit to synthesize zero sequence current and generate a wave recording file, so that the wave recording accuracy and stability of the collecting unit are improved through optimization of a process and a management method, and the phenomenon that a wave recording fault indicator is started by mistake or is not started in the operation process is prevented.
As shown in fig. 4, an embodiment of the present invention further discloses a recording management system applied to a recording type fault indicator, where the system includes:
the wave recording starting module is used for acquiring the change conditions of the current and the electric field by the acquisition unit, copying data in the sampling cache to a wave recording cache when preset conditions are met, and sending a synchronous starting instruction;
the recording data effective judgment module is used for analyzing the time setting label and the sampling count value of the synchronous starting instruction by the acquisition unit and judging whether the recording of the current starting is effective or not according to the time setting label and the sampling count value;
and the recording data calling module is used for locking the three-phase recording cache by the collecting unit, comparing and analyzing the three-phase recording information, calculating the absolute time of each phase of recording data, and calling and acquiring the recording data when the absolute time difference is not greater than a preset time interval.
The method comprises the steps that acquisition units of corresponding phases are installed on A, B, C three phases of an overhead line unified position, a collection unit is installed on an electric power tower, and data interaction is carried out among the collection unit, the acquisition units and the collection units in a 433MHz wireless mode.
The acquisition unit acquires the current and the induction electric field of the three-phase line in real time, the sampling frequency is 400MHz, the acquisition unit reserves 4K byte cache space for the current and the electric field respectively, and reserves 2K byte wave recording cache.
The acquisition unit calculates the current and the change condition of the electric field point by point at intervals of 7ms in the following calculation mode:
when the current sampling values continuously satisfy I (k) > I (k-N) > I (k-2N) and the value of delta I ═ (I (k) -I (k-N)) - (I (k-N) -I (k-2N)) is continuously greater than the set sudden change threshold value for 5 times, the system marks that the current sudden change starts, and N is the number of sampling points of 1 cycle and is taken as 80.
When the electric field of the system is normal and the value of delta U (k) -U (k-N)) - (U (k-N) -U (k-2N)) is greater than the set abrupt electric field threshold value for 3 times continuously, the system marks that the electric field is abruptly started, the start phase starts to copy the data in the sampling buffer into the wave recording buffer, and a synchronization start instruction is sent.
The acquisition unit judges whether the recording started at this time is effective, and when the ground fault or the short-circuit fault is detected, the recording is confirmed to be effective. The started phase analyzes a starting time tick mark and an AD sampling counter of the synchronous starting instruction, and assumes that a1 is the synchronous time tick mark, b1 is the AD sampling counter, a2 is the recording time tick mark stored inside the started phase, b2 is the AD sampling counter stored inside the started phase, 8000 is the time tick sampling interval of the system, and when (a1 8000+ b1) - (a2 8000+ b2) > is satisfied, the started phase considers the received synchronous starting instruction to be valid.
The started phase calculates the recording start of the phase through the received synchronous time tick mark and the AD sampling count value and the self real-time synchronous time tick mark and the AD sampling count value, and copies the data of 5 cycles which are started by the starting point to the recording cache.
And after the phase recording is started, a recording completion instruction is sent, and the collection unit sends a recording to lock the recording cache of the three-phase acquisition unit, so that the acquisition unit is prevented from recording repeatedly. And unlocking the wave recording cache after the wave recording data is transmitted or overtime and invalid. The acquisition unit times through internal timer TA1, and the recording buffer is unlocked when the time reaches the threshold of 2 minutes.
The collecting unit calls the recording information of the three phases of the collecting unit A, B, C one by one, calculates the absolute time of the recording data of each phase according to the recording information content, and starts to call and collect the recording data when the absolute time difference is not more than 5 ms.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. A recording management method for a recording type fault indicator, the method comprising the operations of: the acquisition unit acquires the change conditions of current and electric field, and when the preset conditions are reached, the sampling buffer is buffered
Copying the data to a wave recording cache and sending a synchronous starting instruction; the acquisition unit analyzes the time-setting label and the sampling count value of the synchronous starting instruction, and the time-setting label and the sampling count value are acquired
The sample counting value judges whether the wave recording started at this time is effective or not; the collecting unit locks the three-phase recording cache, compares and analyzes the three-phase recording information, and calculates
The absolute time of each phase of recorded wave data is obtained, and when the absolute time difference is not greater than a preset time interval, the collected recorded wave data is called;
whether the wave recording started at this time is effective or not is judged through the time setting label and the sampling count value specifically comprises the following steps: the started phase analyzes a starting time tick mark and an AD sampling counter of the synchronous starting instruction, and assumes that a1 is the synchronous time tick mark, b1 is the AD sampling counter, a2 is the recording time tick mark stored inside the started phase, b2 is the AD sampling counter stored inside the started phase, 8000 is the time tick sampling interval of the system, and when (a1 8000+ b1) - (a2 8000+ b2) > is satisfied, the started phase considers the received synchronous starting instruction to be valid.
2. The method according to claim 1, wherein the preset conditions are specifically:
when the current sampling values continuously satisfy I (k) > I (k-N) > I (k-2N) and the value of delta I ═ (I (k) -I (k-N)) - (I (k-N) -I (k-2N)) is continuously greater than the set sudden change threshold value for 5 times, the system marks that the current sudden change is started;
when the electric field of the system is normal and the value of delta U ═ U (k) -U (k-N)) - (U (k-N) -U (k-2N)) is greater than the set abrupt electric field threshold value for 3 consecutive times, the system marks that the electric field abrupt change starts.
3. The method for managing the recording waves applied to the recording wave type fault indicator of claim 1, wherein the collecting units are installed on three phases of an overhead line, the collecting unit is installed on an electric tower, and data interaction is performed among the collecting unit, the collecting unit and the collecting unit in a 433MHz wireless mode.
4. A recording management system for use with a recording-type fault indicator, the system comprising:
the wave recording starting module is used for acquiring the change conditions of the current and the electric field by the acquisition unit, copying data in the sampling cache to a wave recording cache when preset conditions are met, and sending a synchronous starting instruction;
the recording data effective judgment module is used for analyzing the time setting label and the sampling count value of the synchronous starting instruction by the acquisition unit and judging whether the recording of the current starting is effective or not according to the time setting label and the sampling count value; the method comprises the steps that a started phase analyzes a starting time tick mark and an AD sampling counter of a synchronous starting instruction, and assumes that a1 is the synchronous time tick mark, b1 is the AD sampling counter, a2 is a wave recording time tick mark stored inside the started phase, b2 is the AD sampling counter stored inside the started phase, 8000 is a time tick sampling interval of a system, and when (a1 8000+ b1) - (a2 8000+ b2) > (20) is met, the started phase considers that a received synchronous starting instruction is valid;
and the recording data calling module is used for locking the three-phase recording cache by the collecting unit, comparing and analyzing the three-phase recording information, calculating the absolute time of each phase of recording data, and calling and acquiring the recording data when the absolute time difference is not greater than a preset time interval.
5. The system according to claim 4, wherein the preset conditions are specifically:
when the current sampling values continuously satisfy I (k) > I (k-N) > I (k-2N) and the value of delta I ═ (I (k) -I (k-N)) - (I (k-N) -I (k-2N)) is continuously greater than the set sudden change threshold value for 5 times, the system marks that the current sudden change is started;
when the electric field of the system is normal and the value of delta U ═ U (k) -U (k-N)) - (U (k-N) -U (k-2N)) is greater than the set abrupt electric field threshold value for 3 consecutive times, the system marks that the electric field abrupt change starts.
6. The recording management system for the recording type fault indicator according to claim 4, wherein the collecting unit is installed on three phases of an overhead line, the collecting unit is installed on an electric tower, and data interaction is performed among the collecting unit, the collecting unit and the collecting unit in a 433MHz wireless mode.
CN202010267493.0A 2020-04-08 2020-04-08 Recording management method and system applied to recording type fault indicator Active CN111398737B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010267493.0A CN111398737B (en) 2020-04-08 2020-04-08 Recording management method and system applied to recording type fault indicator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010267493.0A CN111398737B (en) 2020-04-08 2020-04-08 Recording management method and system applied to recording type fault indicator

Publications (2)

Publication Number Publication Date
CN111398737A CN111398737A (en) 2020-07-10
CN111398737B true CN111398737B (en) 2022-05-17

Family

ID=71429484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010267493.0A Active CN111398737B (en) 2020-04-08 2020-04-08 Recording management method and system applied to recording type fault indicator

Country Status (1)

Country Link
CN (1) CN111398737B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112433178B (en) * 2020-12-03 2022-06-03 石家庄科林电气股份有限公司 Line fault detection method for synchronous synthesis of data among multiple devices
CN113189517B (en) * 2021-04-26 2022-06-10 福建奥通迈胜电力科技有限公司 Analysis method for efficient transmission and filtering of ground fault recording file
CN113589064A (en) * 2021-06-21 2021-11-02 华能西藏雅鲁藏布江水电开发投资有限公司 Hydropower plant fault recording implementation method and system with chain starting function

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1112652A (en) * 1964-07-13 1968-05-08 Gen Dynamics Corp Improvements in or relating to the determination of the time of travel of a signal through a medium
JP2009027358A (en) * 2007-07-18 2009-02-05 Nissan Motor Co Ltd Data repeater, data relaying method, and communication network system
CN104683057A (en) * 2015-02-15 2015-06-03 大唐联仪科技有限公司 Method and system of time synchronization among multiple instruments
CN105338613A (en) * 2015-11-02 2016-02-17 珠海许继电气有限公司 System and method for time setting synchronization of scattered nodes by use of wireless communication
WO2016138750A1 (en) * 2015-03-04 2016-09-09 江苏省电力公司常州供电公司 Power quality disturbance source locating system and locating method
CN106771491A (en) * 2016-12-26 2017-05-31 国网北京市电力公司 Residual voltage measuring method and device
CN207730877U (en) * 2018-02-12 2018-08-14 北京和信瑞通电力技术股份有限公司 A kind of transient state recording type distribution line failure indicator
CN108445279A (en) * 2018-02-12 2018-08-24 北京和信瑞通电力技术股份有限公司 Based on the wireless synchronous sampling method of short frequency in transient state recording type fault detector
CN109116187A (en) * 2018-08-31 2019-01-01 东方电子股份有限公司 A kind of recording synchronous method applied to transient state recording type fault detector

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7676327B2 (en) * 2007-04-26 2010-03-09 Westerngeco L.L.C. Method for optimal wave field separation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1112652A (en) * 1964-07-13 1968-05-08 Gen Dynamics Corp Improvements in or relating to the determination of the time of travel of a signal through a medium
JP2009027358A (en) * 2007-07-18 2009-02-05 Nissan Motor Co Ltd Data repeater, data relaying method, and communication network system
CN104683057A (en) * 2015-02-15 2015-06-03 大唐联仪科技有限公司 Method and system of time synchronization among multiple instruments
WO2016138750A1 (en) * 2015-03-04 2016-09-09 江苏省电力公司常州供电公司 Power quality disturbance source locating system and locating method
CN105338613A (en) * 2015-11-02 2016-02-17 珠海许继电气有限公司 System and method for time setting synchronization of scattered nodes by use of wireless communication
CN106771491A (en) * 2016-12-26 2017-05-31 国网北京市电力公司 Residual voltage measuring method and device
CN207730877U (en) * 2018-02-12 2018-08-14 北京和信瑞通电力技术股份有限公司 A kind of transient state recording type distribution line failure indicator
CN108445279A (en) * 2018-02-12 2018-08-24 北京和信瑞通电力技术股份有限公司 Based on the wireless synchronous sampling method of short frequency in transient state recording type fault detector
CN109116187A (en) * 2018-08-31 2019-01-01 东方电子股份有限公司 A kind of recording synchronous method applied to transient state recording type fault detector

Also Published As

Publication number Publication date
CN111398737A (en) 2020-07-10

Similar Documents

Publication Publication Date Title
CN111398737B (en) Recording management method and system applied to recording type fault indicator
US7444248B2 (en) System and method for synchronized phasor measurement
CN111537830A (en) Power distribution network fault diagnosis method based on cloud edge architecture and wavelet neural network
CN107390023B (en) Broadband multi-frequency measuring device for electric quantity of power grid and implementation method thereof
CN102710012B (en) Data resynchronization method for analyzing fault waveform of intelligent transformer substation
CN110412349B (en) Interpolation DFT-based synchronous phasor data subsynchronous oscillation parameter identification method
CN112946424B (en) Method and device for accurately positioning fault
CN107884739A (en) A kind of powered analysis system of electronic mutual inductor
CN114384374A (en) Fault study and judgment method and device based on edge calculation FTU and fault indicator
CN112098738A (en) Phase sequence self-adaption method based on transient recording type fault indicator
CN103117599B (en) Intelligent transformer substation link redundancy sampling value online seamless switching method
CN113691322B (en) Communication system and communication method applied to low-voltage leakage locator
CN110011414B (en) Intelligent substation sampling loop fault judgment method based on homologous data comparison
CN110579679A (en) power distribution network line fault detection system based on negative sequence current vector analysis and detection method thereof
CN110456174B (en) Three-phase synchronization method and system based on crystal oscillator proportional time synchronization
CN115864449B (en) New energy access system oscillation monitoring method, device, system, equipment and medium
CN110988599A (en) Distributed wave recording high-precision synchronization method for power distribution fault indicator
CN108594156B (en) Improved current transformer saturation characteristic identification method
CN109298361A (en) Accident analysis preprocess method based on transient state recording type fault detector
CN111044981B (en) Fault detection method and system for multi-model radar communication extension set
CN109471060B (en) Device for monitoring metering accuracy of digital electric energy meter on line
CN109164339B (en) Method for counting and displaying accuracy of bus low-current grounding pull-out sequence
CN110940946A (en) Equipment and method for detecting fault of mutual inductor based on AR technology
CN210666429U (en) PMU collection system
CN117147994A (en) Continuous recording system of fault wave recording device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant