CN111395980A - Method for solving sand blockage in casing of brine well - Google Patents

Method for solving sand blockage in casing of brine well Download PDF

Info

Publication number
CN111395980A
CN111395980A CN202010238934.4A CN202010238934A CN111395980A CN 111395980 A CN111395980 A CN 111395980A CN 202010238934 A CN202010238934 A CN 202010238934A CN 111395980 A CN111395980 A CN 111395980A
Authority
CN
China
Prior art keywords
water
well
brine
casing
water injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010238934.4A
Other languages
Chinese (zh)
Other versions
CN111395980B (en
Inventor
李峰
徐延培
张伟
刘玄渊
陈卫斌
郑有恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Yongyin Chemical Engineering Industrial Co ltd
Original Assignee
Henan Yongyin Chemical Engineering Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Yongyin Chemical Engineering Industrial Co ltd filed Critical Henan Yongyin Chemical Engineering Industrial Co ltd
Priority to CN202010238934.4A priority Critical patent/CN111395980B/en
Publication of CN111395980A publication Critical patent/CN111395980A/en
Application granted granted Critical
Publication of CN111395980B publication Critical patent/CN111395980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Sewage (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a method for solving sand blockage in a casing of a brine well, which comprises the following steps in sequence: 1) injecting 100m into a smooth water injection well3The water is returned from the water injection well, and the flow rate of the returned water is not less than 60m3H; 2) after 20 minutes, a groove building pump is used for injecting water into the brine returning well which is blocked by the sleeve and is horizontally communicated with the water injection well, and the flow is not less than 50m3And h, after at least 2 hours, the gravel in the casing is flushed into the dissolution cavity. The invention utilizes the principle that a certain amount of water can be injected when the underground dissolving cavity is large, a certain amount of water is injected into the water injection well, and under the condition that the water injection well can be injected with water in one direction for production, the water is reversely discharged from the blocked sleeve with large discharge capacity, so that gravel in the sleeve is scattered, at the moment, the brine-returning well is injected with water in a reverse direction, and the gravel in the sleeve sequentially enters the dissolving cavity under certain pressure, so that the aim of unblocking the brine well is fulfilled.

Description

Method for solving sand blockage in casing of brine well
Technical Field
The invention relates to the technical field of petroleum drilling, in particular to a method for solving sand blockage in a brine well casing.
Background
For a brine well mined by a water solution method, due to the fact that a large amount of settled sand exists in a brine well dissolving cavity, sand blockage in a casing pipe is caused due to the reasons that the settled sand is lifted up due to collapse of a top plate, backflow of water injection is caused due to sudden power failure, sand carrying amount of produced brine is large due to large flow and the like in the production process, and the brine well is a common underground accident.
After the casing is sand-blocked, the common solutions are a pressure-holding blowout method and a high-pressure-holding blowout method, but the pressure-holding blowout method can only inject water from a water injection well, return brine from a brine well, and the water injection flow of the brine well cannot exceed 4.5m3And h, otherwise, the blockage is removed again, namely the blockage removing success rate of the pressure-holding pressure-releasing spraying method and the high-pressure-holding method is low and is only about 25%, and meanwhile, the high-pressure-holding method needs equipment such as a fracturing truck and the like, and certain cost is generated. If the method cannot be successful, only well repairing equipment can be adopted for repairing, but the generated well repairing cost is higher, particularly when repairing operations such as casing milling, back-off, grinding milling and the like are needed, the cost is higher, and meanwhile, the normal production of the brine well is influenced due to the longer repairing period.
Therefore, it is an urgent need to solve the problem of the art to provide a method for solving sand blocking in a casing of a brine well with low cost and high success rate.
Disclosure of Invention
In view of the above, the invention provides a method for solving sand blockage in a casing of a brine well, which has low production cost and can greatly improve the blockage removal success rate.
In order to achieve the purpose, the invention adopts the following technical scheme:
a method for solving sand blocking in a brine well casing comprises the following steps in sequence:
1) injecting 100m into a smooth water injection well3The water is returned from the water injection well, and the flow rate of the returned water is not less than 60m3/h;
2) After 20 minutes, a groove building pump is used for injecting water into the brine returning well which is blocked by the sleeve and is horizontally communicated with the water injection well, and the flow is not less than 50m3And h, after at least 2 hours, the gravel in the casing is flushed into the dissolution cavity.
Further, the return flow rate in the step 1) is 70m3/h。
Further, the water injection flow rate in the step 2) is 60m3/h。
Furthermore, the water injection amount in the dissolving cavity is more than 50m3
By adopting the scheme, the invention has the beneficial effects that:
utilize the principle that can pour into a certain amount of water into when the cavity is great in the pit, pour into a certain amount of water into in the water injection well, under the one-way water injection production that can be in the water injection well, water is from the intraductal big discharge capacity of the cover that blocks up and is reversed to make the intraductal grit of cover scatter, carry out reverse water injection to returning the steamed well this moment, make the intraductal grit of cover enter into the cavity in proper order under certain pressure, thereby reach the purpose that the steamed well deblocked.
Further, step 2) also includes: and (5) releasing the pressure of the water injection well.
Adopt the beneficial effect that above-mentioned further technical scheme produced to do, can avoid the underground pressure too high.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment of the invention discloses a method for solving sand blockage in a casing of a brine well, which comprises the following steps in sequence:
1) injecting 100m into a smooth water injection well3The water is returned from the water injection well, and the flow rate of the returned water is not less than 60m3/h;
2) After 20 minutes, a groove building pump is used for injecting water into the brine returning well which is blocked by the sleeve and is horizontally communicated with the water injection well, and the flow is not less than 50m3And h, after at least 2 hours, the gravel in the casing is flushed into the dissolution cavity.
The invention utilizes the principle that a certain amount of water can be injected when the underground dissolving cavity is large, a certain amount of water is injected into the water injection well, and under the condition that the water injection well can be injected with water in one direction for production, the water is reversely discharged from the blocked sleeve with large discharge capacity, so that gravel in the sleeve is scattered, at the moment, the brine-returning well is injected with water in a reverse direction, and the gravel in the sleeve sequentially enters the dissolving cavity under certain pressure, so that the aim of unblocking the brine well is fulfilled.
Specifically, the return flow rate in the step 1) is 70m3/h。
Specifically, the water injection flow rate in the step 2) is 60m3/h。
Specifically, the water injection amount in the dissolving cavity is more than 50m3
Specifically, the step 2) further comprises: and (5) releasing the pressure of the water injection well.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (5)

1. A method for solving sand blocking in a brine well casing is characterized by comprising the following steps in sequence:
1) injecting 100m into a smooth water injection well3The water is returned from the water injection well, and the flow rate of the returned water is not less than 60m3/h;
2) After 20 minutes, a groove building pump is used for injecting water into the brine returning well which is blocked by the sleeve and is horizontally communicated with the water injection well, and the flow is not less than 50m3And h, after at least 2 hours, the gravel in the casing is flushed into the dissolution cavity.
2. The method for solving sand blockage in the casing of the brine well as recited in claim 1, wherein the flow rate of the return flow in the step 1) is 70m3/h。
3. The method for solving the sand blockage in the casing of the brine well according to the claim 1, wherein the water injection flow rate in the step 2) is 60m3/h。
4. The method for solving sand blocking in the casing of the brine well as recited in claim 1, wherein the amount of water injected into the dissolution cavity is more than 50m3
5. The method for solving sand blockage in the casing of the brine well according to claim 1, wherein the step 2) further comprises the following steps: and (5) releasing the pressure of the water injection well.
CN202010238934.4A 2020-03-30 2020-03-30 Method for solving sand blockage in casing of brine well Active CN111395980B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010238934.4A CN111395980B (en) 2020-03-30 2020-03-30 Method for solving sand blockage in casing of brine well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010238934.4A CN111395980B (en) 2020-03-30 2020-03-30 Method for solving sand blockage in casing of brine well

Publications (2)

Publication Number Publication Date
CN111395980A true CN111395980A (en) 2020-07-10
CN111395980B CN111395980B (en) 2022-10-11

Family

ID=71436770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010238934.4A Active CN111395980B (en) 2020-03-30 2020-03-30 Method for solving sand blockage in casing of brine well

Country Status (1)

Country Link
CN (1) CN111395980B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4594170A (en) * 1984-06-25 1986-06-10 Fmc Corporation Method for liquifying chloride-based heavy brine well completion fluids
CN102828777A (en) * 2012-09-19 2012-12-19 重庆大学 Double-vertical shaft horizontal butt joint salt cavern deposit construction method
US20130213650A1 (en) * 2010-07-06 2013-08-22 Jean-Francois Argillier Optimized chemical enhanced recovery method
CN104481541A (en) * 2014-11-27 2015-04-01 中盐勘察设计院有限公司 One-inclined multi-vertical cascaded well group salt mine mining method
CN205117313U (en) * 2015-11-28 2016-03-30 廖胜钢 Steamed well dissolves directional advancing device of buoyancy hose in rock mass of chamber
US20160251560A1 (en) * 2014-04-09 2016-09-01 Halliburton Energy Services, Inc. Water-soluble linear polyphosphazenes in water-based fluids for use in wells or pipelines
CN106194076A (en) * 2016-07-19 2016-12-07 中盐勘察设计院有限公司 A kind of ultra-deep salt mine horizontally-butted wells replaces mud and expanding method
CN107083942A (en) * 2017-06-20 2017-08-22 成都华宏博达科技有限公司 A kind of low-frequency pulse unblocking and injection increasing device
CN206429237U (en) * 2016-11-28 2017-08-22 中国科学院武汉岩土力学研究所 Salt mine horizontally-butted wells insoluble matter sand setting blocks up well simulation experiment device
CN109026002A (en) * 2018-09-20 2018-12-18 中盐勘察设计院有限公司 A kind of salt well accident method using horizontal branch hole docking well group
CN109630064A (en) * 2018-11-19 2019-04-16 湖北双环科技股份有限公司 A kind of old salt well remodeling method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4594170A (en) * 1984-06-25 1986-06-10 Fmc Corporation Method for liquifying chloride-based heavy brine well completion fluids
US20130213650A1 (en) * 2010-07-06 2013-08-22 Jean-Francois Argillier Optimized chemical enhanced recovery method
CN102828777A (en) * 2012-09-19 2012-12-19 重庆大学 Double-vertical shaft horizontal butt joint salt cavern deposit construction method
US20160251560A1 (en) * 2014-04-09 2016-09-01 Halliburton Energy Services, Inc. Water-soluble linear polyphosphazenes in water-based fluids for use in wells or pipelines
CN104481541A (en) * 2014-11-27 2015-04-01 中盐勘察设计院有限公司 One-inclined multi-vertical cascaded well group salt mine mining method
CN205117313U (en) * 2015-11-28 2016-03-30 廖胜钢 Steamed well dissolves directional advancing device of buoyancy hose in rock mass of chamber
CN106194076A (en) * 2016-07-19 2016-12-07 中盐勘察设计院有限公司 A kind of ultra-deep salt mine horizontally-butted wells replaces mud and expanding method
CN206429237U (en) * 2016-11-28 2017-08-22 中国科学院武汉岩土力学研究所 Salt mine horizontally-butted wells insoluble matter sand setting blocks up well simulation experiment device
CN107083942A (en) * 2017-06-20 2017-08-22 成都华宏博达科技有限公司 A kind of low-frequency pulse unblocking and injection increasing device
CN109026002A (en) * 2018-09-20 2018-12-18 中盐勘察设计院有限公司 A kind of salt well accident method using horizontal branch hole docking well group
CN109630064A (en) * 2018-11-19 2019-04-16 湖北双环科技股份有限公司 A kind of old salt well remodeling method

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
刘又涛: "浅谈对井连通开采中盐结晶堵管和砂堵成因及预防", 《中国井矿盐》 *
张续贤等: "水平对接连通井采卤技术在平顶山盐田的应用", 《中国井矿盐》 *
李文魁等: "浅谈卤井事故原因及其预防和处理方法", 《中国井矿盐》 *
王冰: "水平定向连通井砂堵解堵施工浅谈", 《中国井矿盐》 *
阎有韧等: "浅析平顶山盐田卤井事故原因及其预防和处理方法", 《河南地质》 *
陈俊晓: "中深盐矿定向井组的钻进施工及生产管理", 《中国井矿盐》 *
陈俊晓等: "连通井组采卤工艺在平顶山盐田的应用", 《中国井矿盐》 *
黄朝阳等: "伊陕斜坡气田压裂施工中泵压异常的技术对策", 《承德石油高等专科学校学报》 *

Also Published As

Publication number Publication date
CN111395980B (en) 2022-10-11

Similar Documents

Publication Publication Date Title
CN103696720A (en) Composite unblocking method
CN101078343A (en) Fracturing technique for relieving fracturing fluid pollution
CN110080771B (en) Method for preventing rock burst by modifying energy release of deep-well high-stress main roadway coal pillar
CN103694976A (en) Fiber temporary plugging agent for acidizing and fracturing
CN204753611U (en) Deep basal pit pressure -bearing water precipitation gas well gas bag plugging device
CN111621276A (en) Solid acid plugging agent and method for removing stratum plugging by using same
CN103725275A (en) Chemical sealing rubber plug in snubbing operation string as well as preparation method and application of chemical sealing rubber plug
CN110748324A (en) Composite blockage removal process for high-salinity oil reservoir
CN111395980B (en) Method for solving sand blockage in casing of brine well
CN110552675A (en) non-crack type water-breakthrough oil well repeated transformation method
CN101387190B (en) Well killing method using absorbent resin to protect low pressure oil and gas reservoir
CN107084123B (en) Fixed sand setting chamber Anti-sand oil pump
CN101016828A (en) Foam negative pressure mixed discharging plug removal method
CN111878052A (en) Erosion-resistant hydraulic fracturing jet device and fracturing method
CN111997576A (en) Supermolecule microcosmic blockage removing method for stratum reconstruction of oil and gas field
CN110410048B (en) Method for prolonging acidification validity period
CN111350468B (en) Method for releasing stuck coiled tubing in case of sticking in horizontal well
CN112727403B (en) Soft coal gas extraction drilling and injection inhibiting method with cooperation of bottom plate slot and acid invasion
CN204458368U (en) The horizontal cutting pump of polymer flooding injection well returns
CN104879105A (en) Continuous injecting and acidizing unit for water injection well
JP5990443B2 (en) Ground improvement material injection method
CN208966207U (en) Connection makees flow string
CN101769138A (en) Leak-proof method of circulating fluid of oil well
CN109083620B (en) Acidification method for oil well with water injected in crack direction and capable of entering suddenly
CN112709604A (en) Device and method for removing residues and brine in salt cavern gas storage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Feng

Inventor after: Sun Guangjian

Inventor after: Xu Yanpei

Inventor after: Zhang Wei

Inventor after: Liu Xuanyuan

Inventor after: Chen Weibin

Inventor after: Zheng Youheng

Inventor before: Li Feng

Inventor before: Xu Yanpei

Inventor before: Zhang Wei

Inventor before: Liu Xuanyuan

Inventor before: Chen Weibin

Inventor before: Zheng Youheng

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant