CN111390210A CN202010173859.8A CN202010173859A CN111390210A CN 111390210 A CN111390210 A CN 111390210A CN 202010173859 A CN202010173859 A CN 202010173859A CN 111390210 A CN111390210 A CN 111390210A
Authority
CN
China
Prior art keywords
mounting
boring
pipe section
mounting piece
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010173859.8A
Other languages
Chinese (zh)
Other versions
CN111390210B (en
Inventor
杨会
米彪
陈冲
焦玲玲
袁冬冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN202010173859.8A priority Critical patent/CN111390210B/en
Publication of CN111390210A publication Critical patent/CN111390210A/en
Application granted granted Critical
Publication of CN111390210B publication Critical patent/CN111390210B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B29/00Holders for non-rotary cutting tools; Boring bars or boring heads; Accessories for tool holders
    • B23B29/04Tool holders for a single cutting tool
    • B23B29/12Special arrangements on tool holders

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a boring tool rest, which belongs to the technical field of marine seawater pipe boring tools and comprises a mounting component, a first adjusting component, a second adjusting component and a cutter fixing component. The mounting assembly comprises a first mounting piece and a second mounting piece which are fixedly connected into a whole; the first adjustment assembly comprises a third mounting member, a first tube segment and a fourth mounting member; the second adjustment assembly includes a fifth mount and a second tube segment; the cutter holder is attached to the other end of the second tube section. The first pipe section and the second pipe section with different lengths can adapt to water pipes with different processing pipe diameters, so that the first adjusting assembly and/or the second adjusting assembly with different lengths can be replaced to adapt to the water pipes with different processing pipe diameters, and the defect that the whole water pipes with different pipe diameters need to be replaced when the existing boring tool rest cannot adjust the lengths is overcome.

Description

Boring tool rest
Technical Field
The invention relates to a marine seawater pipe boring tool, in particular to a water pipe boring tool rest.
Background
In the boring technology, a boring rod is connected with a cutter through a boring cutter rest. The marine seawater pipe is usually larger in inner diameter, and during processing, the seawater pipe is vertically arranged, and correspondingly, the boring bar is also vertically arranged and is coaxial with the seawater pipe; the boring cutter rest is vertical to the boring rod, and a cutter is arranged at the free end of the boring cutter rest. As shown in fig. 1, a conventional boring holder is composed of a mounting plate, a boring bar connected to a lower end of the mounting plate via a fastening member, and a tool fixing body, which is fixed to an upper end of the mounting plate and fixes a tool.
However, there are a number of problems with existing boring tool holders: firstly, the length of the boring cutter holder cannot be adjusted, so that the boring cutter holder is in one-to-one correspondence with water pipes with different processing pipe diameters, and when the water pipes with different inner diameters are processed, the whole boring cutter holder is replaced; second, to provide sufficient torque, the mounting plate is typically relatively thick, making the boring tool holder relatively bulky.
Disclosure of Invention
The invention provides a boring tool rest which aims to overcome the defect that the whole boring tool rest needs to be replaced when water pipes with different pipe diameters are machined due to the fact that the length of the existing boring tool rest cannot be adjusted.
The invention solves the technical problems through the following technical scheme:
a boring tool holder, characterized in that the boring tool holder comprises:
the mounting assembly comprises a first mounting piece and a second mounting piece which are fixedly connected into a whole, and the first mounting piece is detachably connected with the boring rod;
the first adjusting assembly comprises a third mounting piece, a first pipe section and a fourth mounting piece, the third mounting piece is fixedly connected to one end of the first pipe section and detachably connected with the second mounting piece, and the fourth mounting piece is fixedly connected to the other end of the first pipe section;
the second adjusting assembly comprises a fifth mounting piece and a second pipe section, and the fifth mounting piece is fixedly connected to one end of the second pipe section and detachably connected with the fourth pipe section; and the number of the first and second groups,
and the cutter fixing piece is connected with the other end of the second pipe section.
Preferably, the second installation part and the third installation part and the fourth installation part and the fifth installation part are connected through fasteners, so that the installation and the disassembly are facilitated.
Preferably, the second mounting element, the third mounting element, the fourth mounting element and the fifth mounting element are all flanges.
Preferably, the tool fixing member includes a tool fixing portion which is a three-sided groove-shaped body and has an opening facing the side surface.
Preferably, the tool fixing member further comprises a sixth mounting member, and the tool fixing portion is fixedly connected to the second pipe section through the sixth mounting member, so as to improve stability between the tool fixing portion and the second pipe section.
Preferably, the first mounting part is an arc-shaped plate, and the curved surface of the first mounting part is in surface contact with the boring bar.
Preferably, the first mounting part is connected with the boring bar through a fastener so as to be convenient to disassemble and assemble.
On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the invention.
The positive progress effects of the invention are as follows:
in the invention, a boring tool rest is connected to a boring bar through a mounting assembly; the both ends of first adjusting part can be dismantled with installation component and second adjusting part respectively and be connected, wherein, the first pipeline section in the first adjusting part of different length, and the second pipeline section in the second adjusting part of different length all can adapt to the water pipe of different processing pipe diameters, consequently, the accessible is changed the first adjusting part of different length or/and the second and is mediated the subassembly and adapt to the water pipe of different processing pipe diameters, thereby overcome because current bore hole knife rest can not adjust length and will change its whole defect when leading to processing the water pipe of different pipe diameters.
Drawings
FIG. 1 is a schematic view of a prior art boring tool holder;
fig. 2 is a schematic structural diagram according to an embodiment of the present invention.
Description of reference numerals:
mounting assembly 10
First mounting part 11
Second mounting member 12
First mediation assembly 20
First pipe section 21
Third mount 22
Fourth mount 23
Second mediation assembly 30
Second pipe section 31
Fifth mount 32
Tool holder 40
Tool fixing portion 41
Sixth mounting member 42
Tool holder 50
Mounting plate 60
Fastener 70
Detailed Description
The present invention is further illustrated by the following examples, but is not limited thereby in the scope of the examples described below.
Referring to fig. 2, an embodiment of the present invention provides a boring tool holder for use in an apparatus for boring a marine sea water pipe. The boring holder includes a mounting assembly 10, a first adjustment assembly 20, a second adjustment assembly, and a tool mount 40.
Specifically, the boring tool rest is connected to the boring bar through a mounting assembly 10; the two ends of the first adjusting component are detachably connected with the mounting component 10 and the second adjusting component respectively, so that water pipes with different processing pipe diameters can be adapted by replacing the first adjusting component or/and the second adjusting component 30 with different lengths, and the first adjusting component is preferably replaced to adapt to the water pipes with different processing pipe diameters in consideration of the fact that the mounting requirement between the tool fixing component 40 and the second adjusting component is better than that of the second adjusting component 30 and the first adjusting component, and correspondingly, the tool fixing component 40 is more time-consuming and labor-consuming to mount on the second adjusting component.
The mounting assembly 10 comprises a first mounting part 11 and a second mounting part 12 which are fixedly connected into a whole, and the first mounting part 11 is detachably connected with the boring bar. The first adjustment assembly comprises a third mount 22, a first tube section 21 and a fourth mount 23; the third installation part 22 is fixedly connected to one end of the first pipe section 21 and detachably connected with the second installation part 12; the fourth mounting member 23 is fixedly connected to the other end of the first pipe section 21. The second adjustment assembly comprises a fifth mounting member 32 and a second pipe section 31, wherein the fifth mounting member 32 is fixedly connected to one end of the second pipe section 31 and detachably connected to the fourth mounting member 23. A cutter holder 40 is attached to the other end of the second tube section 31.
Specifically, the first and second mounting members 11 and 12 may be integrally provided through a process such as welding. The first mounting member 11 is used as a separate component and mounted on the boring bar, so that the range of the load actually borne by the first mounting member 11 can be determined in conjunction with the parameters of the pipe diameter to be machined of the water pipe, the self weight of the boring cutter holder, and the like, thereby enhancing the rigidity, strength, and stability of the boring cutter holder in view of the design parameters of the first mounting member 11 itself without thickening the entire mounting plate 6050 as in the prior art.
The two ends of the first pipe section 21 can also be respectively connected with the third installation part 22 and the fourth installation part 23 through a welding process, and the first pipe sections 21 with different lengths can adapt to water pipes with different processing pipe diameters.
The two ends of the second pipe section 31 can also be respectively connected with the fifth mounting part 32 and the cutter fixing part 40 through a welding process, and the second pipe sections 31 with different lengths can adapt to water pipes with different processing pipe diameters.
With continued reference to fig. 2, in one embodiment, the second mounting element 12 and the third mounting element 22, and the fourth mounting element 23 and the fifth mounting element 32 are connected by fasteners 70 to facilitate assembly and disassembly.
With continued reference to fig. 2, in one embodiment, the second mounting element 12, the third mounting element 22, the fourth mounting element 23, and the fifth mounting element 32 are flanges, which are illustrated simply as square flanges in fig. 2, but in other embodiments, the shape of the flanges is not limited.
With continued reference to fig. 2, in one embodiment, tool holder 40 includes a tool holding portion 41, wherein tool holding portion 41 is a three-sided slot-shaped body and opens to the side. In other words, the tool fixing portion 41 is a through groove having three side walls, wherein the opening of the tool fixing portion 41 faces one side; further, one end of the tool fixing portion 41 is connected to the second pipe section 31, and the other end is connected to the outside.
Further, the cutter holder 40 further includes a sixth mounting member 42, and the cutter-fixing portion 41 is fixed to the second pipe section 31 by the sixth mounting member 42. In detail, the sixth mounting member 42 may have a plate-like structure, and the tool fixing portion 41 and the second pipe section 31 are respectively fixed to both sides of the sixth mounting member 42, which makes the installation area between the tool fixing portion 41 and the second pipe section 31 larger, thereby making the connection more stable. Of course, in other embodiments, it is within the scope of the present invention to directly fasten the tool-securing portion 41 to the second tube section 31.
With reference to fig. 2, in any of the above embodiments, the first mounting member 11 is an arc-shaped plate, and the curved surface of the first mounting member 11 contacts the boring bar surface. Specifically, the curved surface of the outer ring of the first mounting member 11 may be partially flattened and then fixed to the second mounting member 12, or may be welded directly to the second mounting member 12 without flattening, and the two members may be partially filled with a solder to reinforce the connection between the two members. In addition, the surface contact here can be understood as the direct contact between the first mounting part 11 and the boring bar; it is also understood that the two are in indirect contact, for example, a mounting structure is also provided on the boring bar for connecting the boring holder, with which mounting structure the curved surface of the inner ring of the first mounting part 11 is in direct contact.
With continued reference to fig. 2, in accordance with any of the above embodiments, the first mounting member 11 is connected to the boring bar by a fastener 70. In detail, the first mounting member 11 has mounting holes on both sides thereof, and boring bars are connected to the mounting holes.
While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that this is by way of example only, and that the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the invention, and these changes and modifications are within the scope of the invention.

Claims (7)

1. A boring tool holder, comprising:
the mounting assembly comprises a first mounting piece and a second mounting piece which are fixedly connected into a whole, and the first mounting piece is detachably connected with the boring rod;
the first adjusting assembly comprises a third mounting piece, a first pipe section and a fourth mounting piece, the third mounting piece is fixedly connected to one end of the first pipe section and detachably connected with the second mounting piece, and the fourth mounting piece is fixedly connected to the other end of the first pipe section;
the second adjusting assembly comprises a fifth mounting piece and a second pipe section, and the fifth mounting piece is fixedly connected to one end of the second pipe section and detachably connected with the fourth pipe section; and the number of the first and second groups,
and the cutter fixing piece is connected with the other end of the second pipe section.
2. The boring tool holder of claim 1 wherein the second mount and the third mount and the fourth mount and the fifth mount are connected by fasteners.
3. The boring tool holder of claim 1 wherein the second, third, fourth and fifth mounting members are flanges.
4. The boring tool holder of claim 1, wherein the tool securing member comprises a tool securing portion, the tool securing portion being a three-sided channel body and opening to the side.
5. The boring tool holder of claim 4 wherein the tool securing member further comprises a sixth mounting member by which the tool securing portion is secured to the second tubular segment.
6. The boring tool holder of any of claims 1-5, wherein the first mounting member is an arcuate plate and the curved surface of the first mounting member is in face contact with the boring bar.
7. The boring tool holder of any one of claims 1 to 5, wherein the first mounting member is connected to the boring bar by a fastener.
CN202010173859.8A 2020-03-13 2020-03-13 Boring tool rest Active CN111390210B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010173859.8A CN111390210B (en) 2020-03-13 2020-03-13 Boring tool rest

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010173859.8A CN111390210B (en) 2020-03-13 2020-03-13 Boring tool rest

Publications (2)

Publication Number Publication Date
CN111390210A true CN111390210A (en) 2020-07-10
CN111390210B CN111390210B (en) 2022-02-18

Family

ID=71416287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010173859.8A Active CN111390210B (en) 2020-03-13 2020-03-13 Boring tool rest

Country Status (1)

Country Link
CN (1) CN111390210B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6745858B1 (en) * 2001-08-24 2004-06-08 Rock Bit International Adjustable earth boring device
CN102069202A (en) * 2010-12-30 2011-05-25 宁波鸿达电机模具有限公司 Large-pore diameter precision boring tool for machining center
CN203076600U (en) * 2012-12-19 2013-07-24 天津思为机器设备有限公司 Adjustable boring cutter frame
CN206009874U (en) * 2016-07-01 2017-03-15 陕西北元化工集团有限公司 A kind of three-dimensional boring head
CN206622635U (en) * 2017-02-24 2017-11-10 上海芮豪石油设备有限责任公司 Multisection type precision boring cutter and lathe
CN206652984U (en) * 2017-04-07 2017-11-21 常州华德机械有限公司 Major diameter slide block type space aluminium boring cutter bar
JP3218690U (en) * 2018-08-22 2018-11-01 三菱日立パワーシステムズ株式会社 Machining tools
CN208408581U (en) * 2018-07-10 2019-01-22 光达传动股份有限公司 A kind of cutter for decelerator shell bore hole
CN209288291U (en) * 2019-01-03 2019-08-23 江苏博林机械制造有限公司 A kind of adjustable vehicle boring tool holder of scene processing

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6745858B1 (en) * 2001-08-24 2004-06-08 Rock Bit International Adjustable earth boring device
CN102069202A (en) * 2010-12-30 2011-05-25 宁波鸿达电机模具有限公司 Large-pore diameter precision boring tool for machining center
CN203076600U (en) * 2012-12-19 2013-07-24 天津思为机器设备有限公司 Adjustable boring cutter frame
CN206009874U (en) * 2016-07-01 2017-03-15 陕西北元化工集团有限公司 A kind of three-dimensional boring head
CN206622635U (en) * 2017-02-24 2017-11-10 上海芮豪石油设备有限责任公司 Multisection type precision boring cutter and lathe
CN206652984U (en) * 2017-04-07 2017-11-21 常州华德机械有限公司 Major diameter slide block type space aluminium boring cutter bar
CN208408581U (en) * 2018-07-10 2019-01-22 光达传动股份有限公司 A kind of cutter for decelerator shell bore hole
JP3218690U (en) * 2018-08-22 2018-11-01 三菱日立パワーシステムズ株式会社 Machining tools
CN209288291U (en) * 2019-01-03 2019-08-23 江苏博林机械制造有限公司 A kind of adjustable vehicle boring tool holder of scene processing

Also Published As

Publication number Publication date
CN111390210B (en) 2022-02-18

Similar Documents

Publication Publication Date Title
CN201915461U (en) Water pipe clamp
CN111390210B (en) Boring tool rest
CN205571809U (en) Flange rapid Assembly frock
CN211517278U (en) Support arrangement for pressure vessel processing usefulness
CN214222398U (en) Adjustable pipeline vibration absorber
CN210050404U (en) Pressure-resistant stainless steel single-wall corrugated pipe
CN211174794U (en) Waterproof buoy
CN210059957U (en) Novel titanium pipe making machine
CN214643240U (en) Adjustable fixing tool suitable for opposite installation of nodular cast iron pipe
CN215337158U (en) Hook end structure and stabilizing assembly for improving stability of metal pipe cleaning hook
CN213197338U (en) Adjusting clamp for pipeline installation
CN209125382U (en) Preceding hanging bracket clamp for machining
CN220688301U (en) Multitube type adaptation interface arrangement
CN220590997U (en) Detachable pipeline inner wall rust cleaning device
CN215521867U (en) Improved transmission device
CN219242829U (en) Fixing device for pipeline inside cold box
CN210600638U (en) Glass fiber reinforced plastic loose flange connection structure
CN217228762U (en) Adjustable supporting structure of inner extension pipe of large storage tank
CN212131674U (en) High-yield-strength high-pressure aluminum elbow
CN215719831U (en) Vibration reduction structure for mechanical seal flushing pipeline of centrifugal pump
CN217762515U (en) Town gas console mode regulator cubicle flange joint compensation arrangement
CN218751354U (en) Mounting seat for helicopter body partition frame
CN213115030U (en) Steel construction cable tube combination column for construction
CN111002252A (en) Support arrangement for pressure vessel processing usefulness
CN214947210U (en) Double-flow-path air conditioner metal pipeline joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant