CN111373697A - 网络流传输控制方法及相关装置和设备 - Google Patents
网络流传输控制方法及相关装置和设备 Download PDFInfo
- Publication number
- CN111373697A CN111373697A CN201780097201.XA CN201780097201A CN111373697A CN 111373697 A CN111373697 A CN 111373697A CN 201780097201 A CN201780097201 A CN 201780097201A CN 111373697 A CN111373697 A CN 111373697A
- Authority
- CN
- China
- Prior art keywords
- target
- time
- network
- routing rule
- time period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/22—Alternate routing
Abstract
本发明实施例公开了一种网络流传输控制方法及相关装置和设备,其中,该网络流传输控制方法包括:接收发送端发送的路由请求,计算网络中目的地址和源地址之间最短的N个备选路由规则,根据N个备选路由规则上的交换设备在不同时间段的工作状态以及交换设备的端口在不同时间段的工作状态,在N个备选路由规则中选择能耗增量最小的目标路由规则并确定发送时刻,将目标路由规则和发送时刻发送至发送端。通过以上方案,可避免重复计算路由规则的情况发生,并降低实时计算能力的要求。
Description
PCT国内申请,说明书已公开。
Claims (11)
- PCT国内申请,权利要求书已公开。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2017/112983 WO2019100355A1 (zh) | 2017-11-25 | 2017-11-25 | 网络流传输控制方法及相关装置和设备 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111373697A true CN111373697A (zh) | 2020-07-03 |
CN111373697B CN111373697B (zh) | 2021-10-22 |
Family
ID=66631756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201780097201.XA Active CN111373697B (zh) | 2017-11-25 | 2017-11-25 | 网络流传输控制方法及相关装置和设备 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN111373697B (zh) |
WO (1) | WO2019100355A1 (zh) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102326361A (zh) * | 2011-08-10 | 2012-01-18 | 华为技术有限公司 | 一种数据流传送方法、设备及系统 |
CN102413509A (zh) * | 2011-11-09 | 2012-04-11 | 中国科学院上海微系统与信息技术研究所 | 一种wsn中的时延受限能耗均衡数据采集树构建方法 |
CN102546391A (zh) * | 2010-11-19 | 2012-07-04 | 马维尔以色列(M.I.S.L.)有限公司 | 高能效组网 |
US20160028612A1 (en) * | 2013-02-01 | 2016-01-28 | Telefonaktiebolaget L M Ericsson (Publ) | Method and system of shortest path bridging (spb) enhanced resilience with loop mitigation |
US20160050115A1 (en) * | 2014-08-13 | 2016-02-18 | Vmware, Inc. | Networking component management in host computing systems in a virtual computing environment |
CN105392170A (zh) * | 2015-09-30 | 2016-03-09 | 联想(北京)有限公司 | 一种信息处理方法和电子设备 |
CN105429876A (zh) * | 2015-11-04 | 2016-03-23 | 上海斐讯数据通信技术有限公司 | 基于sdn的数据转发方法 |
CN105429766A (zh) * | 2015-11-04 | 2016-03-23 | 上海科技网络通信有限公司 | 一种云计算数据中心能耗优化方法 |
CN106411770A (zh) * | 2016-09-08 | 2017-02-15 | 重庆邮电大学 | 一种基于sdn架构的数据中心网络节能路由算法 |
CN106533743A (zh) * | 2016-10-24 | 2017-03-22 | 上海斐讯数据通信技术有限公司 | 一种基于sdn的全网络低能耗选路方法、装置和系统 |
-
2017
- 2017-11-25 WO PCT/CN2017/112983 patent/WO2019100355A1/zh active Application Filing
- 2017-11-25 CN CN201780097201.XA patent/CN111373697B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102546391A (zh) * | 2010-11-19 | 2012-07-04 | 马维尔以色列(M.I.S.L.)有限公司 | 高能效组网 |
CN102326361A (zh) * | 2011-08-10 | 2012-01-18 | 华为技术有限公司 | 一种数据流传送方法、设备及系统 |
CN102413509A (zh) * | 2011-11-09 | 2012-04-11 | 中国科学院上海微系统与信息技术研究所 | 一种wsn中的时延受限能耗均衡数据采集树构建方法 |
US20160028612A1 (en) * | 2013-02-01 | 2016-01-28 | Telefonaktiebolaget L M Ericsson (Publ) | Method and system of shortest path bridging (spb) enhanced resilience with loop mitigation |
US20160050115A1 (en) * | 2014-08-13 | 2016-02-18 | Vmware, Inc. | Networking component management in host computing systems in a virtual computing environment |
CN105392170A (zh) * | 2015-09-30 | 2016-03-09 | 联想(北京)有限公司 | 一种信息处理方法和电子设备 |
CN105429876A (zh) * | 2015-11-04 | 2016-03-23 | 上海斐讯数据通信技术有限公司 | 基于sdn的数据转发方法 |
CN105429766A (zh) * | 2015-11-04 | 2016-03-23 | 上海科技网络通信有限公司 | 一种云计算数据中心能耗优化方法 |
CN106411770A (zh) * | 2016-09-08 | 2017-02-15 | 重庆邮电大学 | 一种基于sdn架构的数据中心网络节能路由算法 |
CN106533743A (zh) * | 2016-10-24 | 2017-03-22 | 上海斐讯数据通信技术有限公司 | 一种基于sdn的全网络低能耗选路方法、装置和系统 |
Also Published As
Publication number | Publication date |
---|---|
CN111373697B (zh) | 2021-10-22 |
WO2019100355A1 (zh) | 2019-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109981753B (zh) | 一种面向物联网的软件定义的边缘计算的系统及资源分配方法 | |
US10756910B2 (en) | Dynamic power management | |
US7916676B2 (en) | Method and system for holistic energy management in ethernet networks | |
US20160162004A1 (en) | Technologies for out-of-band power-based task scheduling for data centers | |
US20160378570A1 (en) | Techniques for Offloading Computational Tasks between Nodes | |
CN113485822A (zh) | 内存管理方法、系统、客户端、服务器及存储介质 | |
TW201638800A (zh) | 計算系統、電腦實現方法及其非暫態電腦可讀取媒體 | |
CN112822050A (zh) | 用于部署网络切片的方法和装置 | |
CN114630401A (zh) | 能量感知网络切分 | |
CN105144109A (zh) | 分布式数据中心技术 | |
US20170093975A1 (en) | Technologies for managing data object requests in a storage node cluster | |
CN115454589A (zh) | 一种任务调度方法、装置及Kubernetes调度器 | |
JP6263995B2 (ja) | 情報処理システム、管理装置、情報処理システムの制御方法及び管理装置の制御プログラム | |
CN114143270A (zh) | 一种带宽调整方法及装置 | |
Li et al. | The service computational resource management strategy based on edge-cloud collaboration | |
CN110780986A (zh) | 一种基于移动边缘计算的物联网任务调度方法及系统 | |
WO2022142277A1 (zh) | 一种通信架构的动态调节方法及系统 | |
CN114691372A (zh) | 一种多媒体端边云系统的群体智能控制方法 | |
CN107301092B (zh) | 一种云计算资源池系统节能方法、装置及系统 | |
US10126808B2 (en) | Dynamic power management | |
CN111373697B (zh) | 网络流传输控制方法及相关装置和设备 | |
US20240054821A1 (en) | Management device, in-vehicle system, vehicle, communication management method and storage medium | |
WO2016115846A1 (zh) | 业务调度方法、装置、无线网络控制器及基站 | |
CN108933687A (zh) | 一种功耗控制方法及装置 | |
US11902167B2 (en) | Communication apparatus having delay guarantee shaping function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |