CN111369214A - Mine construction supervision system - Google Patents

Mine construction supervision system Download PDF

Info

Publication number
CN111369214A
CN111369214A CN202010142773.9A CN202010142773A CN111369214A CN 111369214 A CN111369214 A CN 111369214A CN 202010142773 A CN202010142773 A CN 202010142773A CN 111369214 A CN111369214 A CN 111369214A
Authority
CN
China
Prior art keywords
module
work
employee
information
staff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010142773.9A
Other languages
Chinese (zh)
Inventor
乐立强
宗悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kangdi Construction Engineering Consultants Co ltd
Original Assignee
Beijing Kangdi Construction Engineering Consultants Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kangdi Construction Engineering Consultants Co ltd filed Critical Beijing Kangdi Construction Engineering Consultants Co ltd
Priority to CN202010142773.9A priority Critical patent/CN111369214A/en
Publication of CN111369214A publication Critical patent/CN111369214A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/953Querying, e.g. by the use of web search engines
    • G06F16/9535Search customisation based on user profiles and personalisation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/953Querying, e.g. by the use of web search engines
    • G06F16/9537Spatial or temporal dependent retrieval, e.g. spatiotemporal queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06314Calendaring for a resource
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1093Calendar-based scheduling for persons or groups
    • G06Q10/1097Task assignment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining
    • G06Q50/40

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Databases & Information Systems (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Accounting & Taxation (AREA)
  • General Engineering & Computer Science (AREA)
  • Finance (AREA)
  • Animal Husbandry (AREA)
  • Mining & Mineral Resources (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Agronomy & Crop Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a mine construction supervision system, which belongs to the technical field of mine engineering supervision and comprises a master control end and a staff end, wherein the master control end comprises a staff information system and a work arrangement system; the employee information system comprises an employee data storage module, an employee state storage module and a log storage module; the work arrangement system comprises an order loading module, an automatic scheduling module, a work indication module and a temporary transferring module; the employee side comprises an information uploading system; the information uploading system comprises the positioning module, the state uploading module and the work uploading module, and the system has the effects of automatically scheduling again when the staff temporarily needs to be replaced, avoiding manual operation, effectively improving the working efficiency and reducing the labor cost.

Description

Mine construction supervision system
Technical Field
The invention relates to the technical field of mine engineering supervision, in particular to a mine construction supervision system.
Background
At present, mine engineering supervision refers to an engineering supervision enterprise with corresponding qualifications, receives the entrustment of a construction unit, undertakes project management work of coal mine engineering, metallurgical mine engineering, chemical mine engineering, uranium mine engineering or building material non-metal mine engineering and the like, and represents the construction unit to the construction unit.
In the prior art, reference may be made to the chinese patent application publication No. CN108960451A, which discloses a mine enterprise production scheduling information management system. The management system includes: the system comprises a production management module, an equipment management module, a production progress control module, a quality control module, a project comprehensive information management module, a transverse information exchange module and a Dimine model docking module. The design structure of the production scheduling information management system is combined with the production and management characteristics of mine management type enterprises, the composition and the functions of each module in the system are briefly explained, finally, the problem that important attention needs to be paid in the operation process of the system is provided, the actual application effect of the system is improved, the complex logic of production process management is solved through system construction, the full-process management informatization of safe production is realized, the static and dynamic data and information acquisition, analysis and warning are realized, the technical and economic indexes are optimized, and the production efficiency and the benefits are finally improved.
The above prior art solutions have the following drawbacks: mine engineering supervision enterprise is carrying out the in-process of production supervision to the mine enterprise, because the supervision time is long, the supervision process divide into a plurality of stages and is responsible for by different personnel, at long-time supervision in-process, the staff can be because of all kinds of emergency and can't take over work, and the personnel of dispatching temporarily need carry out various complicated preparation work, and the handing-over process is easily chaotic.
Disclosure of Invention
The invention aims to provide a mine construction supervision system which can automatically carry out rescheduling when employees need to be replaced temporarily, does not need manual operation, effectively improves the working efficiency and reduces the labor cost.
The technical purpose of the invention is realized by the following technical scheme:
a mine construction supervision system comprising: a master control end and a staff end;
the master control end comprises an employee information system and a work arrangement system;
the employee information system comprises an employee data storage module, an employee state storage module and a log storage module;
the employee data storage module stores personal information of employees;
the employee state storage module stores employee working states and current positions of employees, the employee working states comprise working, idle, vacation and leaving, and the employee working states are stored in a form of a time table;
the log storage module stores a working log of the employee;
the work arrangement system comprises an order loading module, an automatic scheduling module, a work indication module and a temporary transferring module;
the order loading module is used for storing a task list, receiving order information input from the outside and loading the order information into the task list;
the automatic scheduling module is used for storing a scheduling template, calling order information in the task list, calling the working state of the staff according to the order information, filling the scheduling template and generating a scheduling table;
the work instruction module calls a scheduling list and sends the scheduling list to the employee end of the corresponding employee;
the temporary transferring module calls a scheduling list and monitors the working state of the staff in the staff state storage module according to the scheduling list, when the working state of the staff is switched to leave or leave, the working time of the staff is searched in the scheduling list, if the time in the leave or leave covers part or all of the working time of the staff, the working state of the staff and the current position of the staff in the staff state storage module are searched again, the staff information of the staff with the idle working state and the nearest current position in the vacant time in the scheduling list is called and filled in the scheduling list, and the work indicating module sends the new scheduling list to the staff end of the corresponding staff in the scheduling list;
the employee side comprises an information uploading system and a work notification system;
the information uploading system comprises a positioning module, a state uploading module and a work uploading module;
the positioning module collects the current position information and sends the position information to the employee state storage module;
the state uploading module receives an externally input instruction and sends state information to the employee state storage module according to the instruction;
and the work uploading module receives information input from the outside and sends the information to the log storage module.
Through adopting above-mentioned scheme, total accuse end can real time monitoring all staff's state, the schedule is formulated automatically, if there is staff to ask for leave or leave work, also can be automatically be responsible for the staff of the post rearrangement that this staff is responsible for, and still can consider current staff's geographical position when reforming the schedule, guarantee planning scientific and reasonable, simultaneously can inform the staff automatically and carry out work, and directly send work information and handing-over information to the staff, be convenient for the staff to take over work fast, the whole journey need not the manual staff of arrangement of user or sends work information, effectively improve work efficiency, reduce the human cost.
The invention is further configured to: the system comprises a master control end and a client end, wherein the master control end also comprises a client docking system, and the client docking system comprises a plan notification module and a work notification module;
the plan notification module calls a scheduling list of the automatic scheduling module and a scheduling list of the temporary scheduling module, retrieves personal information stored in the employee data storage module according to the scheduling lists, and sends the personal information and the scheduling lists to the client;
the work notification module calls the daily work logs stored by the log storage module, summarizes the work logs into a work log summary table and sends the work log summary table to the client;
the client comprises a work progress confirmation system;
and the work progress confirmation system receives and stores the work log summary table and the scheduling table.
By adopting the scheme, the master control end can automatically arrange the working logs into the working log summary and send the working log summary to the client, the client can confirm the working completion condition of each day through the working log summary, and meanwhile, the master control end can automatically send information such as a new scheduling list and contact modes of staff to the client when the scheduling list is changed every time, so that the client and the staff can conveniently carry out work butt joint.
The invention is further configured to: and the plan notification module adds the personal information into the shift schedule according to the employee name and labels the modified employee name.
By adopting the scheme, the client can check the personal information of the staff from the received scheduling list, and meanwhile, the scheduling module can automatically mark the modified staff name when sending the modified scheduling list, so that the client can conveniently and quickly know the change condition of the staff.
The invention is further configured to: the employee side further comprises a work notification system, and the work notification system comprises an information receiving module;
the information receiving module receives the scheduling list sent by the master control end and sends out warning when receiving the scheduling list.
By adopting the scheme, the information receiving module can automatically remind the staff of new work arrangement, and the problem of the staff appearing due to leakage is avoided.
The invention is further configured to: the work notification system also comprises a work handover module;
the temporary transferring module transfers the working log of the staff before modification in the log storage module when sending the shift schedule and sends the working log to the staff end of the corresponding staff;
and the work handover module receives and stores the work log.
Through adopting above-mentioned scheme, work handing-over module can provide staff's the work log before for the staff is automatic, and the staff of being convenient for meets the hands work fast.
The invention is further configured to: the work notification system also comprises a traffic recommendation module;
the traffic recommendation module receives the schedule list and calls the working time and the working place corresponding to the employee in the schedule list, and the traffic recommendation module retrieves the matched traffic tools on the Internet according to the working time and the working place and displays the retrieval result.
By adopting the scheme, the work notification system can automatically plan traffic routes and vehicles for workers, and the workers can conveniently carry out work.
The invention is further configured to: the work notification system also comprises a traffic setting module;
the traffic setting module receives the input confirmation signal, locks the vehicle according to the confirmation signal, and purchases bills of all the locked vehicles.
By adopting the scheme, the staff can quickly lock the travel route and purchase the corresponding traffic bill through the traffic setting module, and the work content of the staff is simplified.
The invention is further configured to: the work notification system further comprises a manual modification module;
the manual modification module calls a scheduling list of the automatic scheduling module, receives externally input information, modifies the scheduling list according to the information, and sends the modified information to the work indication module.
By adopting the scheme, the user can modify the shift schedule manually through the manual modification module.
In conclusion, the invention has the following beneficial effects:
1. the master control end can monitor the states of all employees in real time, automatically formulate a scheduling list, automatically rearrange the responsibility of the staff for the post in charge of the employees if the employees ask for leave or leave, and consider the geographical position of the current employees when the scheduling list is reformed, so that the planning is scientific and reasonable, and simultaneously, the employees can be automatically informed to work, and work information and handover information are directly sent to the employees, so that the employees can conveniently and quickly take over to work, and the employees are not required to be manually arranged or sent by a user in the whole project, so that the working efficiency is effectively improved, and the labor cost is reduced;
2. the master control end can automatically arrange the working logs into a working log summary and send the working log summary to the client, the client can confirm the working completion condition of each day through the working log summary, and meanwhile, the master control end can automatically send information such as a new shift schedule, a contact mode of staff and the like to the client when the shift schedule is changed each time, so that the client and the staff can conveniently carry out working butt joint;
3. the staff can quickly lock the travel route and purchase corresponding traffic tickets through the traffic setting module, and the work content of the staff is simplified.
Drawings
FIG. 1 is an overall system block diagram of an embodiment;
FIG. 2 is a system block diagram highlighting a master control end and an employee end in an embodiment;
FIG. 3 is a system block diagram highlighting the job progress confirmation system, job notification system, and customer docking system in an embodiment.
In the figure, 1, a master control end; 11. an employee information system; 111. an employee data storage module; 112. an employee status storage module; 113. a log storage module; 12. a work scheduling system; 121. an order loading module; 122. an automatic shift arrangement module; 123. a temporary mobilization module; 124. a manual modification module; 125. a work indication module; 13. a customer docking system; 131. a plan notification module; 132. a work notification module; 2. an employee end; 21. an information uploading system; 211. a positioning module; 212. a state uploading module; 213. a work upload module; 22. a work notification system; 221. an information receiving module; 222. a work handover module; 223. a traffic recommendation module; 224. a traffic setting module; 3. a client; 31. work progress confirmation system.
Detailed Description
Example (b): a mine construction supervision system is shown in figure 1 and comprises a master control end 1, an employee end 2 and a client end 3. The master control end 1 comprises an employee information system 11, a work arrangement system 12 and a client docking system 13. The employee side 2 includes an information upload system 21 and a work schedule system 12. The client 3 comprises a work progress confirmation system 31.
As shown in fig. 2 and 3, the employee information system 11 includes an employee profile storage module 111, an employee status storage module 112, and a log storage module 113. The work scheduling system 12 includes an order loading module 121, an automatic scheduling module 122, a manual modification module 124, a work instruction module 125, and a temporary mobilization module 123. The customer docking system 13 includes a schedule notification module 131 and a job notification module 132. The information upload system 21 includes a location module 211, a status upload module 212, and a job upload module 213. The job notification system 22 includes an information receiving module 221, a job handover module 222, a traffic recommendation module 223, and a traffic setting module 224.
As shown in fig. 2, the employee data storage module 111 stores personal information of an employee, where the personal information includes a name, a job number, a job title, a contact address, and the like. The employee status storage module 112 stores employee working statuses and current positions of the employees, wherein the employee working statuses include working, idle, vacation and leaving, and the employee working statuses are stored in a form of a schedule. The log storage module 113 stores work logs of employees, and the work logs are divided according to employee groups and sorted in time sequence.
As shown in fig. 2 and 3, the positioning module 211 collects current location information and sends the location information to the employee status storage module 112. The state uploading module 212 receives an instruction input from the outside and sends state information to the employee state storage module 112 according to the instruction. The job uploading module 213 receives information inputted from the outside and transmits the information to the log storing module 113. The staff can send information such as position, state, etc. to the company through the information uploading system 21, and upload work contents through the information uploading system 21.
As shown in fig. 2 and 3, the order loading module 121 stores a task list, and the order loading module 121 receives order information input from the outside and loads the order information into the task list. The automatic scheduling module 122 stores a scheduling template, and the automatic scheduling module 122 calls order information in the task list, and calls the working state of the staff according to the order information to fill in the scheduling template, so as to generate a scheduling list. The work instruction module 125 calls the shift schedule and sends the shift schedule to the employee side 2 of the corresponding employee. The master control end 1 can automatically arrange the shift according to the order without manual operation.
As shown in fig. 2 and 3, the schedule notification module 131 calls the schedule of the automatic scheduling module 122 and the schedule of the temporary scheduling module 123, retrieves the personal information stored in the employee data storage module 111 according to the schedules, and sends the personal information and the schedules to the client 3. The work notification module 132 calls the work logs of the current day stored by the log storage module 113, and summarizes the work logs into a work log summary table and sends the work log summary table to the client 3. The work progress confirmation system 31 receives and stores the work log summary table and the shift schedule table. The master control end can automatically arrange the working logs into a working log summary and send the working log summary to the client, the client can confirm the working completion condition of each day through the working log summary, and meanwhile, the master control end can automatically send information such as a new scheduling list and the contact mode of staff to the client when the scheduling list is changed every time, so that the client and the staff can conveniently carry out work butt joint.
As shown in fig. 2 and 3, the temporary mobilization module 123 invokes the shift schedule and monitors the employee work status in the employee status storage module 112 according to the shift schedule. And when the working state of the employee is switched to vacation or leave, searching the working time of the employee in the schedule. If the time of vacation or leaving covers part or all of the working time of the employee, the working state and the current position of the employee in the employee state storage module 112 are retrieved again, the employee information of the employee with the working state of idle and the current position nearest in the vacant time in the shift schedule is called, and the employee information is filled in the shift schedule. The work instruction module 125 sends the new shift schedule to employee end 2 of the corresponding employee in the shift schedule. When the employee asks for leave or leaves, the system can automatically rearrange the responsibility of the staff for the position in charge of the employee, and the geographic position of the current employee can be considered when the schedule is reformed, so that the scientific and reasonable planning is ensured. The plan notification module 131 adds the personal information to the shift list according to the employee name, and labels the modified employee name. The client can check the personal information of the staff from the received scheduling list, and meanwhile, the scheduling module can automatically mark the modified staff names when sending the modified scheduling list, so that the client can conveniently and quickly know the change condition of the staff.
As shown in fig. 2, the information receiving module 221 receives the shift schedule sent by the master control end 1 and sends an alert when receiving the shift schedule. The information receiving module 221 can automatically remind the staff of new work arrangement, and avoid the staff from missing the existing problems.
As shown in fig. 2, the temporary mobilizing module 123 invokes the work log of the employee before modification in the log storage module 113 when sending the shift schedule, and sends the work log to the employee terminal 2 of the corresponding employee. The job handover module 222 receives and stores the job log. The work handing-over module 222 can automatically provide the work log of the previous employee for the employee, so that the employee can take over the work quickly.
As shown in fig. 2, the traffic recommendation module 223 receives the shift list and calls the work time and work place corresponding to the employee in the shift list. The traffic recommendation module 223 retrieves the matched vehicles on the internet according to the working time and the working place and displays the retrieval result. Work notification system 22 is capable of automatically planning traffic routes and vehicles for the workers to facilitate their work. The traffic setup module 224 receives the input confirmation signal and locks the vehicle according to the confirmation signal and purchases tickets for all locked vehicles. The employee can quickly lock the travel route and purchase the corresponding traffic ticket through the traffic setting module 224, and the work content of the employee is simplified.
As shown in fig. 2, the manual modification module 124 calls the shift schedule of the automatic shift schedule module 122, and the manual modification module 124 receives information input from the outside, modifies the shift schedule according to the information, and sends the modified information to the work instruction module 125. The user may manually modify the shift schedule via manual modification module 124.
The use method comprises the following steps: the master control end 1 can monitor the states of all the employees in real time, automatically formulate a schedule, automatically rearrange the employees responsible for the posts of the employees if the employees leave or leave, and consider the geographical positions of the current employees when reforming the schedule, thereby ensuring scientific and reasonable planning. The system can automatically inform the staff to work, and directly send work information and handover information to the staff, so that the staff can conveniently and quickly take over the work. The system can automatically send work progress and work handover items to the client, and the client service experience is improved. Need not manual operation, effectively improve work efficiency, reduce the human cost.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. A mine construction supervision system, comprising: a master control end (1) and an employee end (2);
the master control end (1) comprises an employee information system (11) and a work arrangement system (12);
the employee information system (11) comprises an employee data storage module (111), an employee state storage module (112) and a log storage module (113);
the employee data storage module (111) stores personal information of employees;
the employee state storage module (112) stores employee working states and current positions of employees, wherein the employee working states comprise working, idle, vacation and leaving, and the employee working states are stored in a form of a time table;
the log storage module (113) stores a work log of the employee;
the work scheduling system (12) comprises an order loading module (121), an automatic scheduling module (122), a work instruction module (125) and a temporary transferring module (123);
the order loading module (121) stores a task list, and the order loading module (121) receives order information input from the outside and loads the order information into the task list;
the automatic scheduling module (122) stores a scheduling template, the automatic scheduling module (122) calls order information in the task list, and calls the working state of staff to fill in the scheduling template according to the order information to generate a scheduling list;
the work instruction module (125) calls a scheduling list and sends the scheduling list to the employee end (2) of the corresponding employee;
the temporary transferring module (123) calls a shift schedule and monitors the working state of the staff in the staff state storage module (112) according to the shift schedule, when the working state of the staff is switched to leave or leave, the working time of the staff is searched in the shift schedule, if the time in the leave or leave covers part or all of the working time of the staff, the working state and the current position of the staff in the staff state storage module (112) are searched again, the staff information of the staff with the working state of being idle and the current position being nearest in the vacant time in the shift schedule is called and filled in the shift schedule, and the working indication module (125) sends the new shift schedule to the staff end (2) of the corresponding staff in the shift schedule;
the employee end (2) comprises an information uploading system (21);
the information uploading system (21) comprises a positioning module (211), a state uploading module (212) and a work uploading module (213);
the positioning module (211) collects the current position information and sends the position information to the employee state storage module (112);
the state uploading module (212) receives an instruction input from the outside and sends state information to the employee state storage module (112) according to the instruction;
the work uploading module (213) receives information input from the outside and sends the information to the log storage module (113).
2. The mine construction supervision system according to claim 1, characterized in that: the system also comprises a client (3), the general control end (1) also comprises a client docking system (13), and the client docking system (13) comprises a plan notification module (131) and a work notification module (132);
the schedule notification module (131) calls a schedule of the automatic schedule module (122) and a schedule of the temporary scheduling module (123), retrieves personal information stored in the employee data storage module (111) according to the schedules, and sends the personal information and the schedules to the client (3);
the work notification module (132) calls the work logs of the current day stored by the log storage module (113), summarizes the work logs into a work log summary table and sends the work log summary table to the client (3);
the client (3) comprises a work progress confirmation system (31);
and the work progress confirmation system (31) receives and stores the work log summary table and the scheduling table.
3. The mine construction supervision system according to claim 2, characterized in that: the plan notification module (131) adds the personal information into the shift list according to the employee name, and marks the modified employee name.
4. The mine construction supervision system according to claim 1, characterized in that: the employee end (2) further comprises a work notification system (22), wherein the work notification system (22) comprises an information receiving module (221);
the information receiving module (221) receives the scheduling list sent by the master control end (1) and sends out an alarm when receiving the scheduling list.
5. The mine construction supervision system according to claim 4, characterized in that: the job notification system (22) further includes a job handover module (222);
the temporary transferring module (123) transfers the work logs of the modified employees in the log storage module (113) when sending the shift schedule, and sends the work logs to the corresponding employee ends (2) of the employees;
the work handover module (222) receives and stores the work log.
6. The mine construction supervision system according to claim 4, characterized in that: the job notification system (22) further comprises a traffic recommendation module (223);
the traffic recommendation module (223) receives the shift schedule and calls the working time and the working place corresponding to the employee in the shift schedule, and the traffic recommendation module (223) retrieves the matched traffic tools on the Internet according to the working time and the working place and displays the retrieval result.
7. The mine construction supervision system according to claim 5, characterized in that: the work notification system (22) further includes a traffic setting module (224);
the traffic setup module (224) receives the input confirmation signal and locks the vehicle according to the confirmation signal and purchases tickets for all locked vehicles.
8. The mine construction supervision system according to claim 1, characterized in that: the job notification system (22) further includes a manual modification module (124);
the manual modification module (124) calls a scheduling list of the automatic scheduling module (122), the manual modification module (124) receives information input from the outside, modifies the scheduling list according to the information, and sends the modified information to the work indication module (125).
CN202010142773.9A 2020-03-04 2020-03-04 Mine construction supervision system Pending CN111369214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010142773.9A CN111369214A (en) 2020-03-04 2020-03-04 Mine construction supervision system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010142773.9A CN111369214A (en) 2020-03-04 2020-03-04 Mine construction supervision system

Publications (1)

Publication Number Publication Date
CN111369214A true CN111369214A (en) 2020-07-03

Family

ID=71210225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010142773.9A Pending CN111369214A (en) 2020-03-04 2020-03-04 Mine construction supervision system

Country Status (1)

Country Link
CN (1) CN111369214A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112070465A (en) * 2020-08-26 2020-12-11 中铁济南工程建设监理有限公司 OA cooperative office system for supervision
CN113327046A (en) * 2021-06-16 2021-08-31 上海电科智能系统股份有限公司 Rail transit station scheduling and post-arranging system and method based on Bluetooth positioning
CN116384702A (en) * 2023-04-17 2023-07-04 点米(北京)科技有限公司 Enterprise personnel management method and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006268722A (en) * 2005-03-25 2006-10-05 Fujitsu General Ltd Shift table formation system
US8401884B1 (en) * 2005-11-07 2013-03-19 Avantas L.L.C. Electronic scheduling for work shifts
CN103325024A (en) * 2013-07-18 2013-09-25 北京影合众新媒体技术服务有限公司 Intelligent scheduling system
CN109165848A (en) * 2018-08-24 2019-01-08 北京中联环建设工程管理有限公司 Project supervision supervisory systems
CN109598423A (en) * 2018-11-21 2019-04-09 北京域天科技有限公司 A method of on duty arrange an order according to class and grade of meeting an urgent need
CN110400040A (en) * 2019-06-06 2019-11-01 中国南方电网有限责任公司 A kind of quick transmission system of management and running information based on mobile Internet
CN110458395A (en) * 2019-07-05 2019-11-15 中电科新型智慧城市研究院有限公司 A kind of system on duty in contingency management work

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006268722A (en) * 2005-03-25 2006-10-05 Fujitsu General Ltd Shift table formation system
US8401884B1 (en) * 2005-11-07 2013-03-19 Avantas L.L.C. Electronic scheduling for work shifts
CN103325024A (en) * 2013-07-18 2013-09-25 北京影合众新媒体技术服务有限公司 Intelligent scheduling system
CN109165848A (en) * 2018-08-24 2019-01-08 北京中联环建设工程管理有限公司 Project supervision supervisory systems
CN109598423A (en) * 2018-11-21 2019-04-09 北京域天科技有限公司 A method of on duty arrange an order according to class and grade of meeting an urgent need
CN110400040A (en) * 2019-06-06 2019-11-01 中国南方电网有限责任公司 A kind of quick transmission system of management and running information based on mobile Internet
CN110458395A (en) * 2019-07-05 2019-11-15 中电科新型智慧城市研究院有限公司 A kind of system on duty in contingency management work

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112070465A (en) * 2020-08-26 2020-12-11 中铁济南工程建设监理有限公司 OA cooperative office system for supervision
CN113327046A (en) * 2021-06-16 2021-08-31 上海电科智能系统股份有限公司 Rail transit station scheduling and post-arranging system and method based on Bluetooth positioning
CN116384702A (en) * 2023-04-17 2023-07-04 点米(北京)科技有限公司 Enterprise personnel management method and system
CN116384702B (en) * 2023-04-17 2023-12-29 点米(北京)科技有限公司 Enterprise personnel management method and system

Similar Documents

Publication Publication Date Title
CN111369214A (en) Mine construction supervision system
CN105303306B (en) Electric power material dispatching platform system
CN111667165A (en) Intelligent mobile application service system based on electric power and application
CN101216926A (en) An urban emergency commanding operation system and the corresponding implementation method
Garrison et al. Travel, work, and telecommunications: a view of the electronics revolution and its potential impacts
CN110717642B (en) Dispatching method and system for cross-regional comprehensive transportation network emergency aid decision
CN112434980A (en) Efficient automatic dispatching method and system for public service vehicles
EP3579159A1 (en) Dock management system, reservation management server, ship manager terminal, and dock manager terminal
CN101161527A (en) Method and apparatus for security controlling railway station train reception and departure
CN113205197A (en) Vehicle warehousing reservation management system based on logistics data
Huang et al. Preliminary analysis and simulation of railroad dispatcher workload
CN113971506A (en) Whole vehicle logistics information intelligent management platform based on big data
KR100584903B1 (en) System for real time controlling driving data of power plant
JP2001052285A (en) Device for preparing vehicle allocation
CN114707870A (en) Information management system and method for maintenance support service of nuclear power plant
DE112021000464T5 (en) PLATFORM AND METHOD FOR OPTIMIZING MANAGEMENT OF A HYDROGEN SUPPLY NETWORK
Pollard Issues in locomotive crew management and scheduling
CN112906965A (en) Rush-repair path planning method based on power map
JP5036776B2 (en) Blackout plan evaluation system and blackout plan evaluation program
JP2007172364A (en) Accident prevention supporting delivery and vehicle allocation method and system
Lam et al. Design and development of a KBES for planning and scheduling ready-mixed concrete supply
RATTI Analysis, evaluation and selection of the WAREHOUSE MANAGEMENT SYSTEM in a manufacturing company
JPH09244922A (en) Maintenance operation management device for elevator
CN116629828A (en) Line operation inspection data visualization method
CN114971281A (en) Self-contained vehicle management system and method based on comprehensive dispatching command platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20231229