CN111335303A - Prefabricated building structure - Google Patents
Prefabricated building structure Download PDFInfo
- Publication number
- CN111335303A CN111335303A CN202010226414.1A CN202010226414A CN111335303A CN 111335303 A CN111335303 A CN 111335303A CN 202010226414 A CN202010226414 A CN 202010226414A CN 111335303 A CN111335303 A CN 111335303A
- Authority
- CN
- China
- Prior art keywords
- building structure
- prefabricated building
- cage
- axial
- rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003780 insertion Methods 0.000 claims description 37
- 230000037431 insertion Effects 0.000 claims description 37
- 230000001012 protector Effects 0.000 claims description 25
- 210000003205 muscle Anatomy 0.000 claims description 12
- 230000002093 peripheral effect Effects 0.000 claims description 4
- 239000003054 catalyst Substances 0.000 claims description 3
- 239000011541 reaction mixture Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 abstract description 18
- 238000004519 manufacturing process Methods 0.000 abstract description 17
- 239000002994 raw material Substances 0.000 abstract description 10
- 229910000831 Steel Inorganic materials 0.000 description 31
- 239000010959 steel Substances 0.000 description 31
- 239000004567 concrete Substances 0.000 description 22
- 239000002689 soil Substances 0.000 description 20
- 238000010276 construction Methods 0.000 description 19
- 238000003032 molecular docking Methods 0.000 description 16
- 238000000034 method Methods 0.000 description 14
- 239000011324 bead Substances 0.000 description 12
- 230000002829 reductive effect Effects 0.000 description 12
- 230000005540 biological transmission Effects 0.000 description 10
- 238000012545 processing Methods 0.000 description 10
- 230000002787 reinforcement Effects 0.000 description 8
- 230000006378 damage Effects 0.000 description 7
- 238000003466 welding Methods 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 239000011513 prestressed concrete Substances 0.000 description 5
- 229910001220 stainless steel Inorganic materials 0.000 description 5
- 239000010935 stainless steel Substances 0.000 description 5
- 238000003672 processing method Methods 0.000 description 4
- 230000035939 shock Effects 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000009435 building construction Methods 0.000 description 3
- 230000000670 limiting effect Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 229910052751 metal Inorganic materials 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 230000035515 penetration Effects 0.000 description 3
- 238000007493 shaping process Methods 0.000 description 3
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- 229910000975 Carbon steel Inorganic materials 0.000 description 2
- 229910001209 Low-carbon steel Inorganic materials 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 239000010962 carbon steel Substances 0.000 description 2
- 239000003518 caustics Substances 0.000 description 2
- 239000011372 high-strength concrete Substances 0.000 description 2
- 210000001503 joint Anatomy 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 229910000851 Alloy steel Inorganic materials 0.000 description 1
- 229910001065 Chromium-vanadium steel Inorganic materials 0.000 description 1
- 229910000976 Electrical steel Inorganic materials 0.000 description 1
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 1
- 229910000797 Ultra-high-strength steel Inorganic materials 0.000 description 1
- GYIFSXKTFMKQNG-UHFFFAOYSA-N [Si][Mn][Cr] Chemical compound [Si][Mn][Cr] GYIFSXKTFMKQNG-UHFFFAOYSA-N 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000005267 amalgamation Methods 0.000 description 1
- 230000004323 axial length Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- VNTLIPZTSJSULJ-UHFFFAOYSA-N chromium molybdenum Chemical compound [Cr].[Mo] VNTLIPZTSJSULJ-UHFFFAOYSA-N 0.000 description 1
- OGSYQYXYGXIQFH-UHFFFAOYSA-N chromium molybdenum nickel Chemical compound [Cr].[Ni].[Mo] OGSYQYXYGXIQFH-UHFFFAOYSA-N 0.000 description 1
- VNNRSPGTAMTISX-UHFFFAOYSA-N chromium nickel Chemical compound [Cr].[Ni] VNNRSPGTAMTISX-UHFFFAOYSA-N 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000000994 depressogenic effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000006261 foam material Substances 0.000 description 1
- 238000000265 homogenisation Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/34—Foundations for sinking or earthquake territories
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/223—Details of top sections of foundation piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/58—Prestressed concrete piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a prefabricated building structure. The invention provides a prefabricated building structure, wherein a first cage body and an embedded pipe are arranged in the prefabricated building structure, the embedded pipe is arranged in the middle of the prefabricated building structure, the embedded pipe is hollow inside, and the first cage body surrounds the embedded pipe. The embedded pipe divides the prefabricated building structure into a solid part and a hollow part, reduces the use of raw materials compared with the existing solid part, lightens the weight of the prefabricated building structure and saves the manufacturing cost; compared with the existing hollow pile, the bearing capacity and the service life of the prefabricated building structure can be improved, so that the application range of the prefabricated building structure is wider; the bearing capacity of the prefabricated building structure can be further improved by arranging the first cage body.
Description
Technical Field
The invention relates to the technical field of buildings, in particular to a prefabricated building structure.
Background
In the field of building technology, in order to facilitate production and processing and reduce construction time, a prefabricated building structure is generally manufactured in a factory and then transported to a construction site for use. Most of the existing prefabricated building structures are solid structures or hollow structures, but the solid structures have the problems of overlarge weight, difficulty in transportation, waste of raw materials and the like; on the other hand, although the hollow structure can save raw materials, the shock resistance mechanical property and durability of the hollow structure cannot be guaranteed. Therefore, there is a need for an improved prefabricated building structure that can not only reduce weight and save raw materials, but also ensure its seismic mechanical properties and durability.
Disclosure of Invention
In view of the above, there is a need for an improved prefabricated building structure.
The invention provides a prefabricated building structure, wherein a first cage body and an embedded pipe are arranged in the prefabricated building structure, the embedded pipe is arranged in the middle of the prefabricated building structure, the embedded pipe is hollow inside, and the first cage body surrounds the embedded pipe.
The prefabricated building structure provided by the invention is provided with the embedded pipe, so that the prefabricated building structure is divided into the solid part and the hollow part, the use of raw materials is reduced compared with the existing solid pile, the weight of the prefabricated building structure is reduced, and the manufacturing cost is saved; compared with the existing hollow pile, the bearing capacity and the service life of the prefabricated building structure can be improved, so that the application range of the prefabricated building structure is wider; the bearing capacity of the prefabricated building structure can be further improved by arranging the first cage body. When the prefabricated building structure is buried underground, the central part is positioned in a depth area (generally 2-15 meters below the foundation) with the highest earthquake wave occurrence frequency below the foundation, so that the earthquake resistance of the prefabricated building structure can be ensured, and the reliability of the prefabricated building structure in service is ensured; and the construction is facilitated, the penetration of a geological soil layer is facilitated, the construction speed is higher, the damage rate is lower, the project construction period is facilitated to be saved, and the engineering quality is guaranteed. Meanwhile, underground water or corrosive substances cannot enter the prefabricated building structure, so that the durability of the prefabricated building structure is effectively guaranteed, and the quality safety of the building engineering is guaranteed.
In one embodiment of the invention, said first cage comprises a first radial rib and a plurality of first axial ribs, said first axial ribs being arranged axially of said prefabricated building structure; the first axial rib bodies form a frame of the first cage body, the first radial rib bodies spirally surround the frame of the first cage body, and the first radial rib bodies are fixedly connected with the first axial rib bodies.
Due to the arrangement, the first cage body is high in bearing strength and simple to process, and only a plurality of first axial rib bodies are required to be axially transported, and the first radial rib bodies are wound on the frame formed by the first axial rib bodies, so that the working hours are saved; and can increase the number of turns and the encryption length that first radial muscle body spiral was around at the great position of atress degree as required, if increase the number of turns and the encryption length that first radial muscle body spiral was around at the both ends of first cage body, prevent that prefabricated building structure from suffering structural damage too big bearing when burying underground.
In an embodiment of the present invention, a second cage is further disposed in the prefabricated building structure, the second cage is disposed at an end of the embedded pipe in the axial direction, the second cage is accommodated in the first cage, and the second cage includes a second radial rib and a plurality of second axial ribs, and the second axial ribs are disposed along the axial direction of the prefabricated building structure; and the second axial ribs form a frame of a second cage body, the second radial ribs spirally surround the frame of the second cage body, and the second radial ribs are fixedly connected with the second axial ribs.
So set up, the setting of the second cage body has improved the local arrangement of reinforcement rate of solid portion, make vertical atress ability and anti-shear force ability for solid prefabricated building structure do not fall the adverse rise, improve prefabricated building structure's tensile ability, compressive capacity, shock resistance and durability, and the second cage body processing method is simple and convenient, easily production, the combination between the radial muscle body of second axial muscle body and second simultaneously, make the intensity of the second cage body improve, bearing capacity in the use improves, non-deformable.
In an embodiment of the present invention, the prefabricated building structure further includes an embedded connector, the first axial rib extends to an end of the prefabricated building structure, and the embedded connector is disposed at the end of the first axial rib; and/or the second axial rib body extends to the end part of the prefabricated building structure, and the embedded connecting piece is arranged at the end part of the second axial rib body.
So set up, when the building construction, prefabricated building structure usually need with another prefabricated building structure amalgamation in order to prolong prefabricated building structure's length, perhaps pour the cushion cap behind prefabricated building structure's top connecting reinforcement in order to undertake superstructure load. The embedded connecting piece is arranged on the first axial rib body or the second axial rib body, so that the combination rate between the two prefabricated building structures can be increased; or the reinforcement ratio of the bearing platform is improved, the connection mode between the prefabricated building structure and the bearing platform is simplified, the force transmission link in the stress process is reduced, the integral vertical stress capacity of the prefabricated building structure is improved, and the mechanical property of the prefabricated building structure and the bearing platform is guaranteed.
In one embodiment of the invention, said second cage is connected to said pre-buried pipe; or, the second cage is connected to the first cage; or, prefabricated building structure still includes the mounting panel, the mounting panel sets up the tip of embedded pipe axial direction, the second cage body is connected in the mounting panel.
According to the arrangement, the second cage body can be provided with multiple fixing modes, one end, far away from the end part of the prefabricated building structure, of the second cage body extends to the embedded pipe and is connected with the embedded pipe, and the second cage body is connected to the embedded pipe to enable the second cage body to be fixed;
the second cage body is connected with the first cage body, so that the second cage body and the first cage body are connected into a whole. The yield strength of the second cage body can be improved, and the connection strength and the bearing capacity of the prefabricated building structure can be improved;
the prefabricated building structure further comprises an installation plate, the installation plate is arranged at the end part of the axial direction of the embedded pipe, and the second cage body extends to the installation plate and is connected with the installation plate.
So set up, not only can make the second cage body fixed, prevent that the second cage body is out of shape and dislocation at the in-service process, can also share the power that the second axial muscle body bore, increase prefabricated building structure's bearing capacity and wholeness.
In one embodiment of the invention, the prefabricated building structure further comprises corner protectors arranged on the peripheral wall of the ends of the prefabricated building structure.
So set up, can make prefabricated building structure at the in-process of burying underground or at the in-process of being in service, prevent that the concrete on the prefabricated building structure tip from droing, cause first cage or the second cage to expose and suffer the corruption outside for prefabricated building structure's intensity descends.
In one embodiment of the present invention, the corner protector comprises at least one first hoop section recessed toward the axial direction of the prefabricated building structure, and at least one second hoop section protruding outward relative to the first hoop section, wherein the first hoop section and the second hoop section are arranged at a distance.
By the arrangement, the corner protection sleeve can be prevented from shifting relative to the prefabricated building structure during production, and the fixing performance is good; in addition, redundant concrete residual slurry can be removed from the die along with the corner protection sleeve during production, so that the die is convenient to clean and maintain; the angle bead sleeve can wrap the end part of the prefabricated building structure, so that the surface of the prefabricated building structure is smoother and tidier, and concrete at the end part of the prefabricated building structure can be prevented from falling off when the prefabricated building structure is used; because the angle bead cover has wrapped the tip of prefabricated building structure, can make when filling the concrete vibrate more fully, prefabricated building structure's breakage rate is lower, and the prefabricated building structure who makes intensity is high, of high quality. When the prefabricated building structure is embedded into the soil body, the inwards concave first hoops can increase the wrapping force of the rebounded soil body, so that the force borne by the prefabricated building structure can be transferred to the soil body, and the bearing force of a single pile is improved; when the prefabricated building structure is used for supporting the bearing platform, the inwards concave first hoop can increase the engaging force between the prefabricated building structure and concrete in the bearing platform, and the force borne by the bearing platform is favorably transmitted to the prefabricated building structure, so that the bearing capacity and integrity of the bearing platform are increased.
In one embodiment of the present invention, the first hoop section and the second hoop section extend along the circumferential direction of the prefabricated building structure, and both the first hoop section and the second hoop section are annular; alternatively, the first hoop section extends in the axial direction of the prefabricated building structure.
With the arrangement, the first hoop section and the second hoop section can enable the angle bead sleeve to have a determined position in the circumferential direction under the state of extending along the circumferential direction of the prefabricated building structure, so that the angle bead sleeve is prevented from moving axially; under the condition that the first hoop section extends along the axial direction of the prefabricated building structure, the corner protection sleeve and the prefabricated building structure can be prevented from rotating relatively.
In one embodiment of the present invention, the corner protector further comprises a positioning ring, the positioning ring is located at the end of the corner protector and is fixedly connected to the first cage; and/or, the prefabricated building structure further comprises a positioning rib, and the positioning rib is fixedly connected with the first cage body and the corner protection sleeve.
So set up, the position relatively fixed between angle bead cover and the location muscle, the shaping of prefabricated building structure of not only being convenient for can also strengthen prefabricated building structure's intensity, prevents that prefabricated building structure angle bead cover from taking place deformation when being in active service.
In one embodiment of the present invention, one end of the prefabricated building structure is provided with an insertion groove, and the other end of the prefabricated building structure extends outwards to form an insertion block, and the size of the periphery of the insertion block is smaller than or equal to the size of the insertion groove.
So set up, a plurality of prefabricated building structures when the collective installation effect, different prefabricated building structures can mutually support and mutual location installation through the inserting groove and the grafting piece of tip, the combined use between a plurality of prefabricated building structures of being convenient for.
Drawings
FIG. 1 is a schematic view of a prefabricated building structure according to a first embodiment of the present invention;
FIG. 2 is a cross-sectional view of the prefabricated building structure of FIG. 1 taken along section A-A;
FIG. 3 is a cross-sectional view of the prefabricated building structure of FIG. 1 taken at section B-B;
FIG. 4 is a cross-sectional view of a pre-buried connector of the prefabricated building structure of FIG. 1;
FIG. 5 is a schematic diagram of a quick docking assembly according to one embodiment;
FIG. 6 is a schematic structural view of a quick docking assembly according to another embodiment;
FIG. 7 is a schematic view of a prefabricated building structure according to a second embodiment of the present invention;
fig. 8 is a schematic view of a prefabricated building structure according to a third embodiment of the present invention;
FIG. 9 is an enlarged view taken at X in FIG. 1;
FIG. 10 is a schematic view of a corner protector according to a fourth embodiment of the present invention;
fig. 11 is a schematic view of a prefabricated building structure according to a fifth embodiment of the present invention;
fig. 12 is a schematic view of a prefabricated building structure according to a sixth embodiment of the present invention;
FIG. 13 is a schematic view of the use of two prefabricated building structures in abutting joint;
FIG. 14 is an enlarged view at Y of FIG. 13;
FIG. 15 is a schematic view of a retaining ring of the prefabricated building structure of FIG. 13;
FIG. 16 is a schematic view of a partially prefabricated building structure according to a seventh embodiment of the present invention;
FIG. 17 is a schematic view of a prefabricated building structure and a cap;
fig. 18 is a partially enlarged view of a portion C shown in fig. 17.
100. Prefabricating a building structure; 10. a hollow portion; 20. a solid portion; 30. a first cage; 40. a second cage; 31. a first axial rib body; 32. a first radial rib; 41. a second axial rib; 42. a second radial rib body; 50. mounting a plate; 60. a corner protecting sleeve; 61 positioning a ring; 70. pre-burying a connecting piece; 80. pre-burying a pipe; 90. positioning ribs; 311. heading; 71. a constriction; 72. an annular projection; 101. chamfering; 1011. an insertion block; 1012 inserting grooves; 200. a quick docking assembly; 210. a first insert table; 211. a first fixed part; 212. a first insertion part; 213. a first extension portion; 214. a first step surface; 220. a first base; 221. a second fixed part; 222. a fin; 230. a second insert table; 231. a third fixed part; 232. a second insertion part; 233. a first groove; 240. a second base; 241. a first end face; 242. a second end face; 250. looping; 300. a pile hoop; 400. a bearing platform; 410. force transmission rib body.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It will be understood that when an element is referred to as being "mounted on" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. When an element is referred to as being "secured to" another element, it can be directly secured to the other element or intervening elements may also be present.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "or/and" includes any and all combinations of one or more of the associated listed items.
The prefabricated building structure 100 refers to various prefabricated building structures which are manufactured in advance and then transported to a construction site for use. The prefabricated building structure 100 may be produced centrally in a factory or prefabricated around a site. The axial length and the radial circumference of the prefabricated building structure 100 can be made as required, and the reinforcement ratio can be designed according to the stress during the transportation, hoisting and pressing of the pile, so that the flexibility is high. In addition, the prefabricated building structure 100 belongs to soil-squeezing piles, so that the cross-sectional area of the bearing platform 400 is effectively saved, the manufacturing cost is saved, the penetration of a geological soil layer during construction is facilitated, the construction speed is higher, the damage rate is lower, the project construction period is facilitated to be saved, and the engineering quality is guaranteed.
Referring to fig. 1 to 3, fig. 1 is a schematic view illustrating a prefabricated building structure according to a first embodiment of the present invention; FIG. 2 is a cross-sectional view of the prefabricated building structure of FIG. 1 taken along section A-A; fig. 3 is a cross-sectional view of the prefabricated building structure shown in fig. 1, taken along section B-B.
The present invention provides a prefabricated building structure 100 for use in a foundation building in the field of construction technology. In this embodiment, the prefabricated building structure 100 is used to prefabricate a vertically stressed pile. It is understood that in other embodiments, the prefabricated building structure 100 may also be used in other engineering fields, such as fabricated buildings, etc., and may also be used for horizontal load-bearing piles or composite load-bearing piles, etc.
Most of the existing prefabricated building structures are solid structures or hollow structures, but the solid structures have the problems of overlarge weight, difficulty in transportation, waste of raw materials and the like; on the other hand, although the hollow structure can save raw materials, the shock resistance mechanical property and durability of the hollow structure cannot be guaranteed.
The invention provides a prefabricated building structure 100, wherein a first cage body 30 and an embedded pipe 80 are arranged in the prefabricated building structure 100, the embedded pipe 80 is arranged in the middle of the prefabricated building structure 100, the embedded pipe 80 is hollow, and the embedded pipe 80 is surrounded by the first cage body 30.
Referring to fig. 1, the present invention provides a prefabricated building structure 100, in which a pre-buried pipe 80 is provided, the pre-buried pipe 80 dividing the prefabricated building structure 100 into a hollow part 10 and a solid part 20; compared with the existing solid pile, the solid pile has the advantages that the consumption of raw materials is reduced, the weight is reduced, and the manufacturing cost is saved; compared with the existing hollow pile, the bearing capacity and the service life of the prefabricated building structure 100 can be improved, so that the application range of the prefabricated building structure 100 is wider; the arrangement of the first cage 30 can further improve the bearing capacity of the prefabricated building structure 100. When the prefabricated building structure 100 is buried underground, the central part 20 is located in a depth area (generally 2 meters to 15 meters below the foundation) with the highest seismic wave occurrence frequency below the foundation, so that the seismic capacity of the prefabricated building structure 100 can be ensured, and the reliability of the prefabricated building structure 100 in service is ensured; and the construction is facilitated, the penetration of a geological soil layer is facilitated, the construction speed is higher, the damage rate is lower, the project construction period is facilitated to be saved, and the engineering quality is guaranteed. Meanwhile, underground water or corrosive substances cannot enter the prefabricated building structure, so that the durability of the prefabricated building structure is effectively guaranteed, and the quality safety of the building engineering is guaranteed.
It is understood that the pre-buried pipe 80 may be disposed at the midpoint of the prefabricated building structure 100, or may be partially offset, and may be selected differently according to actual needs; the embedded pipe 80 can be a metal pipe, a plastic pipe or a ceramic pipe; the embedded pipe 80 can also be a pipe member arranged in other shapes, such as a circular pipe, a corrugated pipe or other polygonal prism; the interior of the embedded pipe 80 may be hollow, or may be filled with a foam material, concrete, a cushion material, or the like.
So set up, can so that prefabricated building structure 100 bearing capacity improves, can satisfy the demand of different operating modes, when satisfying the shock strength requirement and the durability of reality, also reduced the use of raw and other materials, alleviateed prefabricated building structure 100 self weight to the cost of manufacture has been saved.
In one embodiment, the prefabricated building structure 100 is a square pile having a chamfer 101.
In one embodiment of the invention, chamfer 101 is a fillet.
Due to the arrangement of the round corners, coarse aggregates (such as stones) in the raw materials are not easy to concentrate at the edges and corners during pile forming, mortar is distributed more uniformly, and the strength of concrete is higher; the pile is not easy to damage when being hung out of the die after being formed, and the integrity of the pile body is effectively protected; during transportation and construction, the fillet has strong capacity of resisting collision, and stress concentration is not easy to generate; during construction, when the pile body enters the soil, the destructive effect on the soil body can be greatly reduced, the soil body can rebound, and the effect that the soil body exerts friction resistance on the side surface of the prefabricated building structure 100 is ensured.
In one embodiment of the invention, the radius of the rounded corners is 1mm to 100 mm.
Preferably, the radius of the rounded corners is 10mm to 70 mm.
So set up, the radius of fillet is applicable to common square pile model in this within range, and processing is simple and convenient, easy to carry out.
It is understood that in other embodiments, chamfer 101 may also be other common shapes, such as a beveled shape.
In one embodiment, the radius of the chamfer 101 is 1/100 to 1/10 of the minor side length of the cross-section of the prefabricated building structure 100 in its radial direction.
With the arrangement, the occupation ratio of the chamfer 101 can play the roles of raw material homogenization, breakage prevention and friction resistance increase in the range, and the strength of the pile body cannot be influenced.
In one embodiment of the present invention, the prefabricated building structure 100 is a square pile.
By the arrangement, the square pile has large outer surface area and is square or polygonal, and the repose angle between the pile body and the soil in the soil layer is much larger than that of a round outer surface, so that the hollow square pile can obtain larger bearing capacity than a tubular pile under the same geological conditions, and a large amount of basic funds are saved for engineering; by contrast, the bearing capacity of the square pile is larger, and the manufacturing cost of the bearing capacity per kilo-newton (KN) is lower than that of the prestressed concrete pipe pile, so that a designer can prefer the square pile under the same design bearing capacity, and the fund is saved; the theoretically calculated shearing resistance of the square pile is 2-3 times of that of the equivalent tubular pile, which shows that the square pile has excellent seismic performance and is suitable for building foundations of areas with multiple earthquakes, high-rise buildings and large-area basements; the local hollow square pile inherits and develops the characteristic of low construction breakage rate of the original concrete square pile, and the high-strength concrete is matched with the square head, so that the high-strength concrete has better impact resistance and much lower pile head breakage rate than the tubular pile.
In one embodiment of the invention, the first cage 30 comprises a first radial rib 3 and 2 first axial ribs 31, the first axial ribs 31 forming the framework of the first cage 30, the first radial rib 32 being screwed around the framework of the first cage 30; the first radial rib 32 is fixedly connected with the first axial rib 31.
With the arrangement, the first cage body 30 has high bearing strength and simple processing, and only the first radial rib bodies 32 are wound on the frame formed by the first axial rib bodies 31 while the plurality of first axial rib bodies 31 are axially conveyed, so that the working hours are saved; and the number of turns and the encryption length that first radial muscle body 32 spirals around can be increased at the position that the atress degree is great as required for first cage 30, for example increase the number of turns and the encryption length that first radial muscle body 32 spirals around at the both ends of first cage 30, prevent that prefabricated building structure 100 from suffering destruction because of the atress is too big when burying underground.
It is understood that, in other embodiments, the first radial rib 32 and the first axial rib 31 may be fixed by welding, clamping, binding, etc., which are not listed here.
In one embodiment, the first axial reinforcement 31 is made of at least one of a steel bar for prestressed concrete (PC steel bar), a stainless steel bar, a hot rolled steel bar, a medium strength prestressed wire, a stress relief wire, a stranded wire, and a prestressed twisted steel; and/or the presence of a catalyst in the reaction mixture,
the first radial rib 32 is made of at least one of a steel bar for prestressed concrete (PC steel bar), a stainless steel bar, a hot rolled steel bar, a medium strength prestressed wire, a stress-relief wire, a strand, a prestressed twisted steel, a low carbon hot rolled steel disc strip, and a cold drawn low carbon wire for concrete products.
The shape of the outer edge of the cross section of the first cage 30 is circular or polygonal, and the polygonal shape is triangular, square/rectangular, pentagonal, hexagonal, etc., which are not listed here.
In one embodiment of the present invention, a second cage 40 is further disposed in the prefabricated building structure 100, the second cage 40 is disposed at an end of the embedded pipe 80 in the axial direction, and the second cage 40 is accommodated in the first cage 30.
With such an arrangement, the arrangement of the second cage body 40 improves the local reinforcement ratio of the solid portion 20, so that the longitudinal stress capacity and the anti-shearing force capacity do not fall or rise reversely relative to the solid prefabricated building structure, and the tensile capacity, the compressive capacity, the seismic capacity and the durability of the prefabricated building structure 100 are improved.
It is understood that, in other embodiments, only the first cage 30 and no second cage 40 may be disposed in the prefabricated building structure 100, that is, both ends of the embedded pipe 80 are made of pure concrete; the second cage 40 can be arranged at one end of the embedded pipe 80, and can also be arranged at two ends of the embedded pipe 80; when the second cages 40 are provided at both ends of the embedded pipe 80, the lengths of the two second cages 40 may be the same or different, and the specific configurations of the two second cages 40 may be the same or different.
The shape of the outer edge of the cross section of the second cage 40 is circular or polygonal, and the polygonal shape is triangular, square/rectangular, pentagonal, hexagonal, etc., which are not listed here.
With the arrangement, the second cages 40 in different shapes can be designed according to the practical application and the corresponding stress condition of the prefabricated building structure 100, so as to achieve different force bearing effects.
In one embodiment, second cage 40 comprises second radial ribs 42 and a plurality of second axial ribs 41, second axial ribs 41 being arranged along the axial direction of prefabricated building structure 100; the second axial ribs 41 form a framework of the second cage 40, the second radial ribs 42 spirally surround the framework of the second cage 40, and the second radial ribs 42 are fixedly connected with the second axial ribs 41.
Due to the arrangement, the second cage body 40 is simple and convenient in processing method and easy to produce, and meanwhile, the second axial rib body 41 and the second radial rib body 42 are combined, so that the strength of the second cage body 40 is improved, the bearing capacity in the using process is improved, and the second cage body is not easy to deform.
It is understood that the second radial rib 42 and the second axial rib 41 can be fixed by welding, clamping, binding, etc., which are not listed here.
The second cage body 40 and the first cage body 30 are simple and convenient in processing method and easy to produce, and meanwhile, the binding force between the axial rib bodies and the radial rib bodies is strong, so that the cage body is high in strength and not easy to deform in the using process.
In one embodiment, the second axial rib body 41 is made of at least one of deformed steel bars, steel bars for prestressed concrete (PC steel bars), stainless steel bars, hot rolled steel bars, medium strength prestressed wires, stress relief wires, steel strands, and prestressed deformed steel bars; and/or the presence of a catalyst in the reaction mixture,
the second radial rib 42 is made of at least one of deformed steel bars, prestressed concrete steel bars (PC steel bars), stainless steel bars, hot-rolled steel bars, medium-strength prestressed steel wires, stress-relief steel wires, steel strands, prestressed twisted steel bars, low-carbon steel hot-rolled disc strips, and cold-drawn low-carbon steel wires for concrete products.
Referring to fig. 4, fig. 4 is a schematic structural diagram of the embedded connector 70 shown in fig. 1.
In an embodiment of the present invention, the prefabricated building structure 100 further includes a pre-buried connector 70, the first axial rib 31 extends to an end of the prefabricated building structure 100, and the pre-buried connector 70 is disposed at the end of the first axial rib 31; and/or, the second cage body 40 is provided with an embedded connector 70, the second axial rib body 41 extends to the end of the prefabricated building structure 100, and the embedded connector 70 is arranged at the end of the second axial rib body 41.
So configured, at the time of building construction, the prefabricated building structure 100 is generally required to be spliced with another prefabricated building structure 100 to extend the length of the prefabricated building structure 100, or a cap 400 is poured after reinforcing bars are connected to the top of the prefabricated building structure 100 to bear superstructure. The second cage body 40 is provided with the embedded connecting piece 70, so that the combination rate of the two prefabricated building structures 100 can be increased; or the reinforcement ratio of the bearing platform 400 is improved, the connection mode between the prefabricated building structure 100 and the bearing platform 400 is simplified, the force transmission link in the stress process is reduced, the integral vertical stress capacity of the prefabricated building structure 100 is improved, and the mechanical property of the prefabricated building structure 100 and the bearing platform 400 is guaranteed.
In one embodiment, the embedded connector 70 has an internal thread, the first axial rib 31 and/or the second axial rib 41 has an external thread, and the first axial rib 31 and/or the second axial rib 41 are connected to the embedded connector 70 through the thread.
In one embodiment, the embedded connector 70 has a shrink mouth 71 as shown in fig. 4, for connecting with the second axial rib 41 or the first axial rib 31; the end of the second axial rib 41 or the first axial rib 31 connected with the embedded connector 70 is provided with an upset 311, and the contraction opening 7171 is used for limiting the upset 311.
In one embodiment of the present invention, the embedded connector 70 is further protruded with an annular protrusion 72 on the outer circumferential wall relatively near the end of the prefabricated building structure 100. Preferably, the outer diameter of the annular protrusion 72 is gradually reduced from the end part of the embedded connector 70 to the middle part; the outer peripheral wall of the annular projection 72 is an arc surface.
With such an arrangement, the annular protrusion 72 can homogenize the prestress, so that the prestress which can be borne by the second cage 40 and/or the first cage 30 during the pre-stretching is larger, and the damage of the pre-buried connecting piece 70 is prevented.
It should be noted that the embedded connectors 70 in the two prefabricated building structures 100 may be of the same type or different types, and may be selected according to the working conditions.
In one embodiment of the present invention, the embedded connector 70 is formed together with the prefabricated building structure 100. It is understood that in other embodiments, the pre-embedded connectors 70 may be later connected to the second cage 40 or the first cage 30. The operation steps are that firstly, the concrete at the end part of the prefabricated building structure 100 is chiseled to expose the first axial rib body 31 or the second axial rib body 41, then the embedded connecting piece 70 is connected to the end part of the first axial rib body 31 or the second axial rib body 41, and then the end part of the first axial rib body 31 or the second axial rib body 41 is formed with an upset 311 through hot working, so that the connection is completed.
The prefabricated building structures 100 may be used not only alone, but in combination with a plurality of prefabricated building structures 100. For example, two, three, four or even more prefabricated building structures 100 may be docked for use as required by the operating conditions.
In one embodiment, the first cage 30 of each of the two prefabricated building structures 100 is provided with a quick connector, and the two quick connectors can be connected by a quick docking assembly 200 to extend the length of the prefabricated building structure 100.
In one embodiment, the quick docking assembly 200 is a ferrous metal. Preferably, the quick dock assembly 200 is carbon steel or alloy steel. Specifically, the quick butt joint assembly 200 is carbon steel, chromium vanadium steel, chromium nickel steel, chromium molybdenum steel, chromium nickel molybdenum steel, chromium manganese silicon steel, ultra-high strength steel or stainless steel. It is understood that in other embodiments, the quick dock assembly 200 may be constructed of other materials.
Referring to fig. 5, fig. 5 is a schematic structural diagram of a quick docking assembly 200 according to an embodiment.
The quick docking assembly 200 in the first embodiment includes a first docking station 210 and a first base 220, the first docking station 210 includes a first fixing portion 211, a first inserting portion 212 and a first extending portion 213 located between the first fixing portion 211 and the first inserting portion 212, the first base 220 includes a second fixing portion 221 and a plurality of fins 222 connected to the second fixing portion 221, the first docking station 210 is connected to the quick connector of one of the prefabricated building structures 100 through the first fixing portion 211, and the first base 220 is connected to the quick connector of another prefabricated building structure 100 through the second fixing portion 221; the first plug part 212 is convexly arranged on the first extension part 213, and a first step surface 214 is formed between the first plug part 212 and the first extension part 213; the plurality of fins 222 are arranged around each other; the first inserting stage 210 can pass through the openings defined by the plurality of fins 222 through elastic expansion of the fins 222, the fins 222 can elastically contract and enclose the first extending portion 213, and the end surfaces of the fins 222 and the first step surface 214 of the first inserting stage 210 are oppositely arranged.
In this embodiment, the rapid docking assembly 200 is used in a process that the first socket 210 is connected to the embedded connector 70 in one prefabricated building structure 100 through the first fixing portion 211, the first base 220 is connected to the embedded connector 70 in the other prefabricated building structure 100 through the second fixing portion 221, the first inserting portion 212 and the first extending portion 213 of the first socket 210 extend into the inner wall of the first base 220 and move along the inserting direction α, the first inserting portion 212 of the first socket 210 applies pressure to the fin 222 so that the fin 222 elastically expands until the first inserting portion 212 passes through the fin 222, the fin 222 elastically contracts and encloses the first extending portion 213 at the moment when the first inserting portion 212 passes through the fin 222, and when a force in a direction opposite to the inserting direction α is applied to the first socket 210, the end of the fin 222 abuts against the first step surface 214 between the first inserting portion 212 and the first extending portion 213 and limits the first socket 210.
The rapid docking assembly 200 and the embedded connector 70 provided by the embodiment are simple and convenient to mount, after the first plugging portion 212 of the first plugging platform 210 is inserted into the first base 220, the fin 222 can elastically contract and close the extension portion of the first base 220, the end portion of the fin 222 abuts against the step surface of the first plugging platform 210, and the abutting surface between the end portion of the fin 222 and the first step surface 214 of the first plugging platform 210 is approximately annular, so that the abutting area is large, the joint strength between two prefabricated building structures 100 can be ensured, and particularly, the vertical stress performance is greatly improved; the fins 222 not only can enclose the first extension part 213 of the insert table, but also can limit the first extension part 213, and prevent the first extension part 213 from shaking in the radial direction. In addition, the rapid docking assembly 200 provided by the embodiment has the advantages of simple processing technology, low cost and wide application range.
Referring to fig. 6, fig. 6 is a schematic structural diagram of another embodiment of a quick docking assembly 200.
The quick docking assembly 200 of the second embodiment includes a second socket 230, a second base 240 and a ring buckle 250, wherein the second socket 230 includes a third fixing portion 231 and a second plugging portion 232 disposed oppositely, and the second plugging portion 232 is formed with a first groove 233; the second base 240 includes a first end surface 241 and a second end surface 242 which are oppositely arranged; the ring buckle 250 has an opening (not shown) and can be elastically contracted, and the ring buckle 250 is sleeved on the second insert stage 230 and accommodated in the first groove 233; the ring buckle 250 can be inserted into the second base 240 along the insertion direction together with the second insertion portion 232 of the second socket 230, and the ring buckle 250 can abut against the second end surface 242 of the second base 240 through elastic expansion and limit the reverse movement of the second socket 230 along the insertion direction.
After the second inserting portion 232 of the second inserting stage 230 is inserted into the second base 240, the ring buckle 250 can be ejected out of the first groove 233 through the elastic expansion portion and abuts against the second end face 242 of the second base 240, an abutting surface between the ring buckle 250 and the second end face 242 is approximately annular, an abutting area is large, the joint strength between two embedded connectors 70 can be ensured, and particularly, the vertical stress performance is greatly improved. In addition, the rapid docking assembly 200 provided by the embodiment has the advantages of simple processing technology, low cost and wide application range.
It is understood that the insertion direction α may be, but is not limited to, the above-described directions, and that even partial angular offsets are intended to be within the scope of the present invention.
In one embodiment, after the two prefabricated building structures 100 are butted, a pile collar 300 is disposed on the peripheral wall of the junction between the two prefabricated building structures, and the pile collar 300 is used for fastening the butted joint of the two prefabricated building structures 100 to prevent the two prefabricated building structures 100 from being dislocated during use or service.
It is understood that the two prefabricated building structures 100 may be the same prefabricated pile or different prefabricated piles; the pile can be a solid pile, a hollow pile or a local hollow pile; can be a square pile or a tubular pile.
In one embodiment of the invention, the second cage 40 is connected to the pre-buried pipe 80; alternatively, the second cage 40 is connected to the first cage 30; or, the prefabricated building structure 100 further includes a mounting plate 50, the mounting plate 50 is disposed at an end of the embedded pipe 80 in the axial direction, and the second cage 40 is connected to the mounting plate 50. So set up for the fixed mode of second cage 40 has more selectivity, can select according to operating condition.
Referring to fig. 1, in one embodiment of the present invention, the end of the second cage 40 remote from the end of the prefabricated building structure 100 extends to the embedded pipe 80 and is connected with the embedded pipe 80.
So set up, the second cage 40 is connected in the embedded pipe 80 and not only can make the second cage 40 fixed, but also can improve the joint strength of the second cage 40, can prevent the second cage 40 from taking place deformation and dislocation in the in-service process.
Specifically, the embedded pipe 80 is a metal pipe, and the second cage body 40 is connected with the embedded pipe 80 by welding.
Referring to FIG. 7, in one embodiment of the present invention, the second cage 40 is connected to the first cage 30 such that the second cage 40 is integrally connected to the first cage 30.
So set up, second cage 40 is connected in first cage 30, not only can improve the yield strength of second cage 40, can improve the joint strength and the bearing capacity of prefabricated building structure 100 moreover.
Specifically, the second cage 40 is locally and flexibly connected with the first cage 30 through binding steel bars.
Referring to fig. 8, in one embodiment of the present invention, the prefabricated building structure 100 further includes a mounting plate 50, the mounting plate 50 is disposed at an end of the embedded pipe 80 in the axial direction, and the second cage 40 extends to the mounting plate 50 and is connected to the mounting plate 50.
So set up, the second cage body 40 is connected and can also be in mounting panel 50, not only can make the second cage body 40 fixed, prevents that the second cage body 40 from warping and misplacing at the in-service in-process, can also share the power that the second axial muscle body 42 bore, increases prefabricated building structure 100's bearing capacity and wholeness.
Specifically, the mounting plate 50 is a steel plate. The second cage 40 is welded to the mounting plate 50.
Referring to fig. 9 to 12, fig. 9 is an enlarged view of the position X shown in fig. 1; FIG. 10 is a schematic view of a corner protector according to a fourth embodiment of the present invention; fig. 11 is a schematic view of a prefabricated building structure according to a fifth embodiment of the present invention; fig. 12 is a schematic view of a prefabricated building structure according to a sixth embodiment of the present invention.
In one embodiment of the present invention, the prefabricated building structure 100 further includes corner protectors 60, the corner protectors 60 being provided on the outer circumferential wall of the end of the prefabricated building.
With such an arrangement, the prefabricated building structure 100 can be prevented from falling off the concrete on the end of the prefabricated building structure 100 during the process of being buried underground or in service, so that the first cage 30 or the second cage 40 is exposed to corrosion, and the strength of the prefabricated building structure 100 is reduced.
In one embodiment of the present invention, as shown in fig. 9 and 10, the corner protector 60 includes at least one first hoop section 111 depressed toward the axial direction of the prefabricated building structure 100, and at least one second hoop section 112 protruded outwardly with respect to the first hoop section 111, and the first hoop section 111 and the second hoop section 112 are spaced apart from each other.
With such an arrangement, the corner protector 60 can be prevented from being displaced relative to the prefabricated building structure 100 during production, and the fixing performance is good; in addition, redundant concrete residual slurry can be removed from the die along with the corner protection sleeve 60 during production, so that the die is convenient to clean and maintain; the corner protection sleeve 60 can wrap the end part of the prefabricated building structure 100, so that the surface of the prefabricated building structure 100 is smoother and tidier, and concrete at the end part of the prefabricated building structure 100 can be protected from falling off when the prefabricated building structure 100 is used; because the angle bead cover 60 has wrapped the tip of prefabricated building structure 100, can make when filling the concrete vibrate more fully, prefabricated building structure 100's breakage rate is lower, and the prefabricated building structure 100 who makes is high, of high quality. When the prefabricated building structure 100 is buried in a soil body, the inward-concave first hoop section 111 can increase the wrapping force of the rebounded soil body, and is beneficial to transferring the bearing force of the prefabricated building structure 100 to the soil body, so that the bearing force of a single pile is improved; when the prefabricated building structure 100 is used for supporting the platform 400, the concave first hoop section 111 can increase the engaging force of the prefabricated building structure 100 and the concrete in the platform 400, which is beneficial for the force borne by the platform 400 to be transferred to the prefabricated building structure 100, thereby increasing the bearing capacity and integrity of the platform 400.
In one embodiment of the present invention, the first and second hoop sections 111 and 112 extend in the circumferential direction of the prefabricated building structure 100.
By the arrangement, the engaging force between the prefabricated building structure and the soil body or between the prefabricated building structure 100 and the bearing platform 400 can be increased, and the bearing capacity of the prefabricated building structure 100 is improved.
In one embodiment of the present invention, the first and second hoop sections 111 and 112 are both annular.
With such an arrangement, the prefabricated building structure 100 is less likely to generate stress concentration, which affects the use strength thereof. And the processing method is simple and the cost is low.
It is understood that the first hoop section 111 may be one circular groove, or a plurality of circular grooves may be uniformly arranged along the axial direction of the prefabricated building structure 100, or a plurality of square/circular/irregular grooves may be uniformly arranged along the radial direction of the prefabricated building structure 100, as long as the anchoring effect is achieved.
In one embodiment of the present invention, the width of the first cuff section 111 is 1mm to 100mm, and/or the depth of the first cuff section 111 is 0.1mm to 50 mm. It is understood that the width of the first hoop section 111 herein refers to the width of the first hoop section 111 that is concave in the axial direction of the prefabricated building structure 100; the depth of the first hoop section 111 refers to the depth of the first hoop section 111 that is concave in the radial direction of the prefabricated building structure 100.
So set up, neither can influence prefabricated building structure 100's bearing capacity, can make again to have higher snap-in force between prefabricated building structure 100 and the soil body to processing technology is simple, is favorable to the outflow of mix water in the concrete during production.
In one embodiment of the invention, the outer edge of the cross-section of the second hoop section 112 is the same as the outer edge of the cross-section of the prefabricated building structure 100.
So set up, prefabricated building structure 100 is the same with the biggest external diameter of angle bead cover 60 among the prefabricated building structure 100, can not produce the hindrance when burying the soil body to do not have unnecessary edges and corners in the mould of the prefabricated building structure 100 that corresponds, prevent to persist the surplus thick liquid of concrete in the mould.
In one embodiment of the present invention, as shown in fig. 11, a first hoop section 111 extends in the axial direction of the prefabricated building structure 100; the height of the first cuff section 111 is 10mm to 500mm, and/or the depth of the first cuff section 111 is 0.1mm to 50 mm. It is understood that the height of the first hoop section 111 herein refers to the height of the first hoop section 111 that is concave along the axial direction of the prefabricated building structure 100; the depth of the first hoop section 111 refers to the depth of the first hoop section 111 that is concave in the radial direction of the prefabricated building structure 100.
By the arrangement, the processing technology is simple, the bearing capacity of the single pile cannot be damaged, the resistance in underground water discharge can be reduced during construction, and the soil stress can be released; the size of the prefabricated building structure does not influence the bearing capacity of the prefabricated building structure 100, and the prefabricated building structure 100 and a soil body have higher engaging force, so that the prefabricated building structure is beneficial to the outflow of mixing water in concrete during production and the drainage of underground water during construction.
Preferably, the first hoop sections 111 are a plurality of rectangular grooves, and the plurality of first hoop sections 111 are uniformly distributed on the outer circumferential wall of the prefabricated building structure 100 around the axial center of the prefabricated building structure 100. It is understood that the first hoop section 111 may also be circular in shape as shown in fig. 10. In other embodiments, the anchor may also be in other common shapes such as wave shape, triangle shape, trapezoid shape, etc., or may be non-uniformly distributed, as long as the anchoring effect is achieved.
In one embodiment of the present invention, the prefabricated building structure 100 is a pipe pile or a square pile.
The device has the advantages of simple manufacturing process, short production period, high single-pile bearing capacity, low unit bearing capacity manufacturing cost, good bending resistance and tensile property, reliable pile forming quality, convenient hoisting and wide application range.
Referring to fig. 13 to 16, fig. 13 is a schematic view illustrating the butt joint of two prefabricated building structures; FIG. 14 is an enlarged view at Y of FIG. 13; FIG. 15 is a schematic view of a retaining ring of the prefabricated building structure of FIG. 13; fig. 16 is a schematic view of a partially prefabricated building structure according to a seventh embodiment of the present invention.
In one embodiment of the present invention, the corner protector 60 further comprises a positioning ring 61, the positioning ring 61 being located at an end of the corner protector 60 and fixedly connected to the first cage 30.
So set up, the position relatively fixed between angle bead cover 60 and the first cage 30, just also with the relative position between the prefabricated building structure 100 is fixed, not only is convenient for prefabricated building structure 100's shaping, can also strengthen prefabricated building structure 100's intensity, prevents that prefabricated building structure 100 from taking place the deformation when being in service angle bead cover 60.
Specifically, in the present embodiment, the positioning ring 61 is sleeved on the embedded connector 70 at the end of the first axial rib 31, and the positioning ring 61 and the embedded connector 70 may be fixed only by sleeving or may be fixed by welding after sleeving. It is understood that in other embodiments, the positioning ring 61 may be directly sleeved on the first axial rib 31 without the embedded connector 70. As long as the position between the corner protector 60 and the first cage 30 can be relatively fixed by the positioning ring 61.
Furthermore, the number of the positioning rings 61 can be 1 or more, and each positioning ring 61 is sleeved with one embedded connecting piece 70 or one first axial rib body 31, so as to achieve a better fixing purpose.
In one embodiment, the pretensioning process for the first cage 30 in the prefabricated building structure 100 is: welding one end of the positioning ring 61, which is relatively far away from the ring shape, on the corner protector sleeve 60, sleeving and fixing the other end of the positioning ring 61 on the embedded connecting piece 70, then connecting the embedded connecting piece 70 with the end plate, wherein the positioning ring 61 cannot be separated from the embedded connecting piece 70 after connection, so that the relative fixation of the position between the corner protector sleeve 60 and the first cage body 30 is realized; and then moving the end plate to realize tensioning.
It is understood that the positioning ring 61 may also be circular, or may have other shapes, as long as it can be sleeved on the first axial rib 31 or the second axial rib 41.
In this embodiment, the positioning ring 61 is welded to the end of the corner protector 60. In other embodiments, the retaining ring 61 may also be integrally formed with the corner protector 60.
In one embodiment of the present invention, the prefabricated building structure 100 further comprises a positioning rib 90, and the positioning rib 90 is fixedly connected to the first cage 30 and the corner protector 60.
So set up, the position relatively fixed between angle bead cover 60 and the location muscle 90 not only is convenient for prefabricated building structure 100's shaping, can also strengthen prefabricated building structure 100's intensity, prevents that prefabricated building structure 100 from taking place deformation in angle bead cover 60 when being in service.
Specifically, one end of the positioning rib 90 is connected to the first cage 30, and the other end is connected to the corner protection sleeve 60; the connection mode can be welding, can also be through steel wire ligature connection, can also be other connection modes, as long as can play the fixed action.
It will be appreciated that in other embodiments, the locating ring 61 and the locating rib 90 may be used together to better determine the relative position between the corner protector 60 and the first cage 30.
In one embodiment of the present invention, the first and second hoop sections 111 and 112 are connected by a right angle or a circular arc.
So set up, can select the connected mode of first hoop section 111 and second hoop section 112 according to operating condition demand or processing conditions to right angle connection or circular arc are connected the processing cost and are lower, easy to carry out.
It is understood that the first and second hoop sections 111 and 112 may be connected in other ways, regardless of the processing cost.
Referring to fig. 1, 7, 8 and 12, in one embodiment of the present invention, an insertion groove 1012 is formed at one end of the prefabricated building structure 100, and an insertion block 1011 is formed at the other end of the prefabricated building structure, wherein the size of the outer circumference of the insertion block 1011 is smaller than or equal to the size of the insertion groove 1012.
An insertion groove 1012 is formed at one end of the prefabricated building structure 100, and the other end extends outwards to form an insertion block 1011, wherein the size of the outer periphery of the insertion block 1011 is smaller than or equal to that of the insertion groove 1012. So configured, at the time of building construction, the prefabricated building structure 100 is generally required to be spliced with another prefabricated building structure 100 to extend the length of the prefabricated building structure 100.
In one embodiment, the insertion slot 1012 at the end of the embedded building structure is configured as a cylindrical groove, and the insertion block 1011 at the other end is configured as a cylindrical boss, and the cylindrical boss and the cylindrical groove have the same size.
In one embodiment, the insertion groove 1012 at the end of the pre-cast building structure is configured as a cylindrical groove, and the insertion block 1011 at the other end is configured as a cylindrical boss, the size of the cylindrical boss is smaller than that of the cylindrical groove, but the cylindrical boss at the end of one prefabricated building structure 100 can be inserted into the cylindrical groove at the end of the other prefabricated building structure 100.
It is understood that in other embodiments, the insertion groove 1012 at the end of the pre-buried building structure may be configured as a groove with other shapes, and the insertion block 1011 is configured as a projection with the same size as the insertion groove 1012, as long as the size of the outer circumference of the insertion block 1011 at the end of the pre-buried building structure is smaller than or equal to the size of the insertion groove 1012, for example, the insertion groove 1012 is configured as a square groove, and the insertion block 1011 is configured as a square projection with the same size as the insertion groove 1012.
With such an arrangement, when the plurality of prefabricated building structures 100 are installed together, different prefabricated building structures 100 can be mutually matched and positioned and installed by the insertion grooves 1012 and the insertion blocks 1011 at the end parts, so that the combined use of the plurality of prefabricated building structures 100 is facilitated.
Referring to fig. 17, fig. 17 is a schematic structural diagram of the prefabricated building structure 100 and the platform 400.
In one embodiment, prefabricated building structure 100 is mated to a cap 400.
In this embodiment, the solid portion 20 of the prefabricated building structure 100 is connected to the cap 400. The ends of the second cage body 40 and the first cage body 30, which are relatively far away from the hollow part 10, are provided with pre-embedded connectors 70, the pre-embedded connectors 70 are fixedly connected with the force transmission rib bodies 410, a plurality of force transmission rib bodies 410 form a stress frame in the bearing platform 400, then concrete is poured into a mold, and the bearing platform 400 is formed after the concrete is dried and formed. In the embodiment, the second cage body 40 and the first cage body 30 are both provided with the embedded connecting pieces 70, so that the reinforcement ratio in the bearing platform 400 can be greatly improved, the bearing capacity of the bearing platform 400 can be improved, the force transmission link is reduced, and the method is safer and more reliable; but also better transfer the forces experienced by the cap 400 to the underlying foundation.
It is understood that in other embodiments, if the bearing platform 400 does not need to have very high bearing capacity, only the second cage 40 or the first cage 30 may be provided with the embedded connector 70 at the end relatively far from the hollow portion 10, and the embedded connector 70 is fixedly connected with the force transmission rib 410.
Referring to fig. 18, fig. 18 is a partially enlarged view of the portion C shown in fig. 17.
In one embodiment, the embedded connector 70 is provided with a through thread, one end of the embedded connector 70 is in threaded connection with the first axial rib 31 or the second axial rib 41, and the other end is in threaded connection with the force transmission rib 410.
Preferably, the force transmitting rib body 410 is a threaded steel.
It is understood that, in other embodiments, the embedded connector 70 may also be another type of steel bar, and the embedded connector 70 may also be fixedly connected to the first axial rib 31, the second axial rib 41, or the force transmission rib 410 by welding, clamping, or the like. Preferably, the embedded connector 70 is provided with an internal thread, the force transmission rib body 410 is provided with an external thread, and the two are connected in a threaded fit manner, so that the connection is simple and convenient, and the time cost during construction is saved.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.
Claims (10)
1. The prefabricated building structure (100) is characterized in that a first cage body (30) and a pre-buried pipe (80) are arranged in the prefabricated building structure (100), the pre-buried pipe (80) is arranged in the middle of the prefabricated building structure (100), the interior of the pre-buried pipe (80) is hollow, and the first cage body (30) surrounds the pre-buried pipe (80).
2. Prefabricated building structure (100) according to claim 1, characterised in that said first cage (30) comprises a first radial rib (32) and a plurality of first axial ribs (31), said first axial ribs (31) being arranged along the axial direction of said prefabricated building structure (100); the first axial rib bodies (31) form a framework of the first cage body (30), the first radial rib bodies (32) spirally surround the framework of the first cage body (30), and the first radial rib bodies (32) are fixedly connected with the first axial rib bodies (31).
3. The prefabricated building structure (100) of claim 2, wherein a second cage (40) is further arranged in said prefabricated building structure (100), said second cage (40) being arranged at an end of said embedded pipe (80) in an axial direction, and said second cage (40) being housed in said first cage (30), and said second cage (40) comprising a second radial rib (42) and a plurality of second axial ribs (41), said second axial ribs (41) being arranged along an axial direction of said prefabricated building structure (100); the second axial rib bodies (41) form a frame of the second cage body (40), the second radial rib bodies (42) spirally surround the frame of the second cage body (40), and the second radial rib bodies (42) are fixedly connected with the second axial rib bodies (41).
4. The prefabricated building structure (100) of claim 3, wherein the prefabricated building structure (100) further comprises a pre-buried connector (70), the first axial rib (31) extending to an end of the prefabricated building structure (100), the pre-buried connector (70) being disposed at the end of the first axial rib (31); and/or the second axial rib body (41) extends to the end part of the prefabricated building structure (100), and the embedded connecting piece (70) is arranged at the end part of the second axial rib body (41).
5. Prefabricated building structure (100) according to claim 3, characterized in that said second cage (40) is connected to said pre-buried pipe (80); or,
said second cage (40) being connected to said first cage (30); or,
prefabricated building structure (100) still includes mounting panel (50), mounting panel (50) set up buried pipe (80) axial direction's tip, second cage (40) are connected in mounting panel (50).
6. The prefabricated building structure (100) of claim 1, wherein the prefabricated building structure (100) further comprises corner protectors (60), the corner protectors (60) being provided on the peripheral wall of the end of the prefabricated building structure (100).
7. The prefabricated building structure (100) of claim 6, wherein said corner protector (60) comprises at least one first hoop section (111) recessed in the axial direction of said prefabricated building structure (100) and at least one second hoop section (112) protruding outwardly with respect to said first hoop section (111), said first hoop section (111) being spaced apart from said second hoop section (112).
8. The prefabricated building structure (100) of claim 7, wherein the first and second hoop sections (111, 112) extend in a circumferential direction of the prefabricated building structure (100), and the first and second hoop sections (111, 112) are each annular; or,
the first hoop section (111) extends in the axial direction of the prefabricated building structure (100).
9. Prefabricated building structure (100) according to claim 8, characterized in that said corner protector (60) further comprises a retaining ring (61), said retaining ring (61) being located at the end of said corner protector (60) and being fixedly connected to said first cage (30); and/or the presence of a catalyst in the reaction mixture,
prefabricated building structure (100) still includes location muscle (90), location muscle (90) fixed connection in first cage body (30) reach corner protector cover (60).
10. The prefabricated building structure (100) of claim 1, wherein one end of the prefabricated building structure (100) is provided with an insertion groove (1012), and the other end of the prefabricated building structure extends outwards to form an insertion block (1011), and the size of the outer periphery of the insertion block (1011) is smaller than or equal to the size of the insertion groove (1012).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010226414.1A CN111335303A (en) | 2020-03-26 | 2020-03-26 | Prefabricated building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010226414.1A CN111335303A (en) | 2020-03-26 | 2020-03-26 | Prefabricated building structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111335303A true CN111335303A (en) | 2020-06-26 |
Family
ID=71178514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010226414.1A Pending CN111335303A (en) | 2020-03-26 | 2020-03-26 | Prefabricated building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111335303A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11319689B1 (en) * | 2021-09-30 | 2022-05-03 | The Florida International University Board Of Trustees | NSMB pile splice system for precast concrete piles |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704471A (en) * | 2012-05-22 | 2012-10-03 | 张俊峰 | Prestress solid concrete preformed pile |
CN105040685A (en) * | 2015-06-09 | 2015-11-11 | 周兆弟 | Prefabricated member with hollow structure |
KR101612637B1 (en) * | 2014-12-18 | 2016-04-14 | 서울시립대학교 산학협력단 | Hollow PC column for saving construction period, SRC column with the hollow PC, joint structure of SRC and beam and method for constructing frame of buildings |
CN111206572A (en) * | 2020-02-28 | 2020-05-29 | 许顺良 | Prefabricated building structure |
-
2020
- 2020-03-26 CN CN202010226414.1A patent/CN111335303A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704471A (en) * | 2012-05-22 | 2012-10-03 | 张俊峰 | Prestress solid concrete preformed pile |
KR101612637B1 (en) * | 2014-12-18 | 2016-04-14 | 서울시립대학교 산학협력단 | Hollow PC column for saving construction period, SRC column with the hollow PC, joint structure of SRC and beam and method for constructing frame of buildings |
CN105040685A (en) * | 2015-06-09 | 2015-11-11 | 周兆弟 | Prefabricated member with hollow structure |
WO2016197596A1 (en) * | 2015-06-09 | 2016-12-15 | 周兆弟 | Prefabricated member having hollow structure |
CN111206572A (en) * | 2020-02-28 | 2020-05-29 | 许顺良 | Prefabricated building structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11319689B1 (en) * | 2021-09-30 | 2022-05-03 | The Florida International University Board Of Trustees | NSMB pile splice system for precast concrete piles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215052912U (en) | Prefabricated building structure | |
CN111335303A (en) | Prefabricated building structure | |
CN111335300A (en) | Prefabricated building structure | |
CN211898332U (en) | Prefabricated building structure | |
CN212294625U (en) | Prefabricated building structure | |
CN212294626U (en) | Prefabricated building structure | |
CN111335301A (en) | Prefabricated building structure | |
JPH09317008A (en) | Joint structure for concrete-filled steel pipe column | |
CN212477702U (en) | Prefabricated building structure | |
CN212294628U (en) | Prefabricated building structure | |
CN212452597U (en) | Prefabricated building structure | |
CN212294627U (en) | Prefabricated building structure | |
CN212714907U (en) | Prefabricated building structure | |
CN212452613U (en) | Pile body angle bead cover and prefabricated building structure | |
CN212294623U (en) | Prefabricated building structure | |
CN212452594U (en) | Prefabricated building structure | |
CN211898334U (en) | Prefabricated building structure | |
CN111441341A (en) | Prefabricated building structure | |
CN211898333U (en) | Prefabricated building structure | |
CN212294624U (en) | Prefabricated building structure | |
CN212452595U (en) | Prefabricated building structure | |
CN212452596U (en) | Prefabricated building structure | |
CN212452593U (en) | Prefabricated building structure | |
CN216422986U (en) | Precast pile | |
CN211898335U (en) | Prefabricated building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |