CN212452595U - Prefabricated building structure - Google Patents
Prefabricated building structure Download PDFInfo
- Publication number
- CN212452595U CN212452595U CN202020141089.4U CN202020141089U CN212452595U CN 212452595 U CN212452595 U CN 212452595U CN 202020141089 U CN202020141089 U CN 202020141089U CN 212452595 U CN212452595 U CN 212452595U
- Authority
- CN
- China
- Prior art keywords
- prefabricated building
- building structure
- cage
- steel
- axial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000007787 solid Substances 0.000 claims abstract description 51
- 230000002787 reinforcement Effects 0.000 claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 90
- 239000010959 steel Substances 0.000 claims description 90
- 239000004567 concrete Substances 0.000 claims description 21
- 239000010935 stainless steel Substances 0.000 claims description 14
- 229910001220 stainless steel Inorganic materials 0.000 claims description 14
- 239000011513 prestressed concrete Substances 0.000 claims description 12
- 230000001012 protector Effects 0.000 claims description 12
- 229910001209 Low-carbon steel Inorganic materials 0.000 claims description 10
- 239000003054 catalyst Substances 0.000 claims description 6
- 239000011541 reaction mixture Substances 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 abstract description 8
- 239000002994 raw material Substances 0.000 abstract description 5
- 238000010008 shearing Methods 0.000 abstract description 2
- 230000035882 stress Effects 0.000 description 20
- 238000000034 method Methods 0.000 description 19
- 239000003292 glue Substances 0.000 description 18
- 238000003032 molecular docking Methods 0.000 description 13
- 210000003205 muscle Anatomy 0.000 description 11
- 230000005540 biological transmission Effects 0.000 description 10
- 239000003822 epoxy resin Substances 0.000 description 10
- 230000002093 peripheral effect Effects 0.000 description 10
- 229920000647 polyepoxide Polymers 0.000 description 10
- 230000008569 process Effects 0.000 description 9
- 238000010276 construction Methods 0.000 description 8
- 210000001503 joint Anatomy 0.000 description 8
- 230000000694 effects Effects 0.000 description 7
- 238000003780 insertion Methods 0.000 description 7
- 230000037431 insertion Effects 0.000 description 7
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 239000000853 adhesive Substances 0.000 description 5
- 230000001070 adhesive effect Effects 0.000 description 5
- 239000011247 coating layer Substances 0.000 description 5
- 230000008602 contraction Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 239000002689 soil Substances 0.000 description 5
- RTZKZFJDLAIYFH-UHFFFAOYSA-N Diethyl ether Chemical compound CCOCC RTZKZFJDLAIYFH-UHFFFAOYSA-N 0.000 description 4
- 230000007797 corrosion Effects 0.000 description 4
- 238000005260 corrosion Methods 0.000 description 4
- 230000006378 damage Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 238000009435 building construction Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- 229910000975 Carbon steel Inorganic materials 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 239000010962 carbon steel Substances 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 238000001125 extrusion Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 238000003672 processing method Methods 0.000 description 2
- 238000009991 scouring Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910000851 Alloy steel Inorganic materials 0.000 description 1
- 229910001065 Chromium-vanadium steel Inorganic materials 0.000 description 1
- 229910000976 Electrical steel Inorganic materials 0.000 description 1
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 1
- 229910000797 Ultra-high-strength steel Inorganic materials 0.000 description 1
- GYIFSXKTFMKQNG-UHFFFAOYSA-N [Si][Mn][Cr] Chemical compound [Si][Mn][Cr] GYIFSXKTFMKQNG-UHFFFAOYSA-N 0.000 description 1
- 239000012790 adhesive layer Substances 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 230000004323 axial length Effects 0.000 description 1
- VNTLIPZTSJSULJ-UHFFFAOYSA-N chromium molybdenum Chemical compound [Cr].[Mo] VNTLIPZTSJSULJ-UHFFFAOYSA-N 0.000 description 1
- OGSYQYXYGXIQFH-UHFFFAOYSA-N chromium molybdenum nickel Chemical compound [Cr].[Ni].[Mo] OGSYQYXYGXIQFH-UHFFFAOYSA-N 0.000 description 1
- VNNRSPGTAMTISX-UHFFFAOYSA-N chromium nickel Chemical compound [Cr].[Ni] VNNRSPGTAMTISX-UHFFFAOYSA-N 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010292 electrical insulation Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 125000003700 epoxy group Chemical group 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 125000002887 hydroxy group Chemical group [H]O* 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 231100000252 nontoxic Toxicity 0.000 description 1
- 230000003000 nontoxic effect Effects 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000004383 yellowing Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a prefabricated building structure, which comprises a hollow part, a solid part and a first cage body, wherein the hollow part is connected with the solid part, a core groove is arranged in the hollow part, and the first cage body is arranged in the solid part and the hollow part; the prefabricated building structure further comprises an embedded connecting piece, and the embedded connecting piece is connected to the end portion of the first cage body in the axial direction. The utility model provides a prefabricated building structure includes solid portion and hollow portion to set up the second cage body in solid portion, improved the local arrangement of reinforcement rate of solid portion department. Therefore, the prefabricated building structure provided by the utility model not only reduces the consumption of raw materials, reduces the weight and saves the manufacturing cost; and the longitudinal stress capacity and the anti-shearing capacity are not reduced and reversely increased due to the arrangement of the second cage body, so that the tensile capacity, the compressive capacity and the seismic capacity of the prefabricated building structure are improved.
Description
Technical Field
The utility model relates to a building technical field especially relates to a prefabricated building structure.
Background
In the field of building technology, in order to facilitate production and processing and reduce construction time, a prefabricated building structure is generally manufactured in a factory and then transported to a construction site for use. Most of the existing prefabricated building structures are solid structures or hollow structures, but the solid structures have the problems of overlarge weight, difficulty in transportation, waste of raw materials and the like; on the other hand, the hollow structure can save raw materials, but the mechanical strength thereof cannot be ensured. Accordingly, there is a need for an improved prefabricated building structure that is both lightweight, material efficient, and mechanically strong.
SUMMERY OF THE UTILITY MODEL
In view of the above, there is a need for an improved prefabricated building structure.
The utility model provides a prefabricated building structure, which comprises a hollow part, a solid part and a first cage body, wherein the hollow part is connected with the solid part, a core groove is arranged in the hollow part, and the first cage body is arranged in the solid part and the hollow part; the prefabricated building structure further comprises a pre-buried connecting piece, and the pre-buried connecting piece is connected to the end portion of the first cage body in the axial direction.
The prefabricated building structure provided by the utility model comprises the hollow part and the solid part, thereby not only reducing the consumption of raw materials, reducing the weight and saving the manufacturing cost; when the prefabricated building structure is buried underground, the central part is located in a depth area (generally 2-15 meters below the foundation) with the highest seismic wave frequency below the foundation, so that the seismic capacity of the prefabricated building structure can be ensured, and the reliability of the prefabricated building structure in service is ensured. Simultaneously, in addition, when the core slot opening is used downwards, the prefabricated building structure exerts pressure to solid portion when burying underground, can avoid the phenomenon that too big prefabricated building structure of causing of pressure damages. When the core slot is blocked by external components such as a pile tip or the like or the opening of the core slot is upwards used, underground water can be prevented from entering the interior of the prefabricated building structure, the corrosion of the underground water to the interior of the prefabricated building structure is effectively resisted, and the durability of the prefabricated building structure is ensured. In addition, at the time of building construction, a prefabricated building structure is generally required to be spliced with another prefabricated building structure to extend the length of the prefabricated building structure, or a cap is poured after reinforcing bars are attached to the top of the prefabricated building structure to bear superstructure. The embedded connecting piece is arranged on the second cage body, so that the combination rate between two prefabricated building structures can be increased; or the reinforcement ratio of the bearing platform is improved, the connection mode between the prefabricated building structure and the bearing platform is simplified, the force transmission link in the stress process is reduced, the integral vertical stress capacity of the prefabricated building structure is improved, and the mechanical property of the prefabricated building structure and the bearing platform is guaranteed.
In an embodiment of the present invention, the first cage body includes a first axial rib body and a first radial rib body, and the first axial rib body is disposed along an axial direction of the prefabricated building structure; the first axial ribs form a frame of a first cage body, the first radial ribs spirally surround the frame of the first cage body, and the first radial ribs are fixedly connected with the first axial ribs; the embedded connecting piece is connected to the end part of the first axial rib body.
Due to the arrangement, the first cage body is high in bearing strength and simple to process, and only a plurality of first axial rib bodies are required to be axially transported, and meanwhile, the first radial rib bodies are wound on the frame formed by the first axial rib bodies, so that the working hours are saved; and can increase the number of turns that first radial muscle body spiral was around at the great position of atress degree as required, if increase the number of turns that first radial muscle body spiral was around at the both ends of first cage body, prevent that prefabricated building structure from suffering structural damage too big messenger's force when burying underground. In addition, the position of the first axial rib body can be fixed by the pre-buried connecting piece, the first cage body is assisted to be tensioned, and the tensioning effect is good.
In an embodiment of the present invention, the prefabricated building structure further includes a second cage, the second cage is disposed in the solid portion, and the second cage is surrounded by the first cage; the end part of the second cage body is provided with the embedded connecting piece.
So set up, the second cage body set up the local reinforcement rate that has heightened solid portion department for vertical atress ability and anti-shear force ability do not fall and rise conversely, improve prefabricated building structure's tensile ability, compressive capacity, shock resistance and durability. And, pre-buried connecting piece can be fixed the second cage to the end plate on, the location of the second cage of being convenient for, and the second cage also needs stretch-draw when necessary, and pre-buried connecting piece can also play the tensile effect of assistance second cage this moment.
In an embodiment of the present invention, the second cage body includes a second axial rib body and a second radial rib body, and the second axial rib body is disposed along an axial direction of the prefabricated building structure; the second axial ribs form a frame of a second cage body, the second radial ribs spirally surround the frame of the second cage body, and the second radial ribs are fixedly connected with the second axial ribs; the embedded connecting piece is arranged at the end part of the second axial rib body.
Due to the arrangement, the second cage body and the first cage body are simple and convenient in processing method and easy to produce, meanwhile, the binding force between the axial rib bodies and the radial rib bodies is strong, the strength of the cage body is high in the using process, and the cage body is not easy to deform. In addition, the embedded connecting piece can fix the position of the second axial rib body to assist the second cage body to stretch, and the stretching effect is good.
The utility model discloses an embodiment, the shrink mouth has been seted up to pre-buried connecting piece's one end, pre-buried connecting piece passes through the shrink mouth with first cage body or second cage body coupling.
The contraction port is arranged in such a way that the contraction port is used for connecting the first axial rib body or the second axial rib body; the connection method comprises the steps of sleeving the embedded connecting piece on the first axial rib body or the second axial rib body, and then forming an upset head at the end part of the first axial rib body or the second axial rib body by adopting a hot working method, so that the embedded connecting piece is limited. So connect, the connection of pre-buried connecting piece and first axial muscle body or second axial muscle body is simple and convenient and firm, can save the engineering time.
The utility model discloses an embodiment, pre-buried connecting piece is equipped with the internal thread with the one end of keeping away from relatively the shrink mouth.
So set up, the pre-buried connecting piece of being convenient for links to each other with the power muscle body of biography on quick butt joint subassembly or the cushion cap, has improved the efficiency of two prefabricated building structure docks to and the efficiency of biography power muscle body installation on pre-buried connecting piece, reduce and pass the power link, it is safe, reliable more.
In an embodiment of the present invention, the pre-buried connecting member is provided with a through thread.
So set up, between pre-buried connecting piece and the first axial muscle body/the second axial muscle body, perhaps all can adopt threaded connection's mode with the biography power muscle body on the cushion cap, connect portably and firmly.
In one embodiment of the present invention, the first axial reinforcement body is made of at least one of a steel bar for prestressed concrete, a stainless steel bar, a hot rolled steel bar, a medium strength prestressed wire, a stress-relief wire, a steel strand, a prestressed twisted steel; and/or the presence of a catalyst in the reaction mixture,
the first radial rib body is made of at least one of a steel bar for prestressed concrete, a stainless steel bar, a hot-rolled steel bar, a medium-strength prestressed steel wire, a stress-relieving steel wire, a steel strand, a prestressed twisted steel, a low-carbon steel hot-rolled disc strip and a cold-drawn low-carbon steel wire for a concrete product.
According to the arrangement, before the prefabricated building structure is used, prestress is applied to the steel bars in advance through a pre-tensioning method or a post-tensioning method to form prestressed steel bars, when the prefabricated building structure bears tension generated by external load, the existing prestress in concrete is firstly counteracted, then the prestressed steel bars are stressed, and finally the concrete is tensioned and then cracks appear along with the increase of the load, so that the appearance and the development of the cracks of the prefabricated building structure are delayed, and loads such as soil body extrusion, underground water scouring, earthquake load and self-gravity load which can be borne by the prefabricated building structure are improved. The deformed steel bar is a steel bar with a rib on the surface, and can better bear the action of external force due to the function of the rib and the larger bonding capacity of concrete. The first cage body comprises prestressed reinforcement, can make solid portion and hollow portion all have higher vertical atress ability, forms whole atress basis.
In one embodiment of the present invention, the second axial rib is made of at least one of a steel bar for prestressed concrete, a stainless steel bar, a hot rolled steel bar, a medium strength prestressed wire, a stress-relief wire, a steel strand, and a prestressed twisted steel; and/or the presence of a catalyst in the reaction mixture,
the second radial rib body is made of at least one of a steel bar for prestressed concrete, a stainless steel bar, a hot-rolled steel bar, a medium-strength prestressed steel wire, a stress-relieving steel wire, a steel strand, a prestressed twisted steel, a low-carbon steel hot-rolled disc strip and a cold-drawn low-carbon steel wire for a concrete product.
So set up, the second cage body can select prestressing steel or screw-thread steel as required, and prestressing steel can further improve prefabricated building structure's vertical atress ability, and the screw-thread steel can reduce prefabricated building structure's cost of manufacture.
In one embodiment of the present invention, the prefabricated building structure further comprises a corner protector; the corner protection sleeve is arranged on the end part of the solid part relatively far away from the hollow part, and/or the corner protection sleeve is arranged on the end part of the hollow part relatively far away from the solid part.
So set up, can prevent that prefabricated building structure from burying underground in-process or at the in-service in-process, the concrete on the prefabricated building structure tip drops, causes the second cage body or the first cage body to expose and suffer the corruption outside for prefabricated building structure's intensity descends.
Drawings
Fig. 1 is a schematic view of a prefabricated building structure according to a first embodiment of the present invention;
FIG. 2 is a cross-sectional view of the prefabricated building structure of FIG. 1 taken at section B-B;
fig. 3 is a schematic view of a prefabricated building structure according to a second embodiment of the present invention;
FIG. 4 is a cross-sectional view of the prefabricated building structure of FIG. 3 taken along section A-A;
FIG. 5 is a schematic view of the use of the pre-buried connector shown in FIG. 1;
FIG. 6 is a schematic view of the use of two prefabricated building structures in abutting joint;
FIG. 7 is a schematic diagram of a quick connect assembly according to one embodiment;
FIG. 8 is a schematic structural view of a quick docking assembly according to another embodiment;
FIG. 9 is a schematic view of a prefabricated building structure and a platform;
fig. 10 is a partially enlarged view of the portion C shown in fig. 9.
100. Prefabricating a building structure; 10. a hollow portion; 20. a solid portion; 30. a first cage; 40. a second cage; 11. a core groove; 50. mounting a plate; 31. a first axial rib body; 32. a first radial rib; 41. a second axial rib; 42. a second radial rib body; 60. a corner protecting sleeve; 70. pre-burying a connecting piece; 311. heading; 71. A constriction; 72. an annular projection; 200. a quick docking assembly; 210. a first insert table; 211. a first fixed part; 212. a first insertion part; 213. a first extension portion; 214. a first step surface; 220. a first base; 221. a second fixed part; 222. a fin; 230. a second insert table; 231. a third fixed part; 232. a second insertion part; 233. a first groove; 240. a second base; 241. a first end face; 242. a second end face; 250. looping; 300. a pile hoop; 400. a bearing platform; 410. force transmission rib body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
The prefabricated building structure 100 refers to various pile bodies which are transported to a construction site for use after being prefabricated. The prefabricated building structure 100 may be produced centrally in a factory or prefabricated around a site. The axial length and the radial circumference of the prefabricated building structure 100 can be made as required, and the reinforcement ratio can be designed according to the stress during the transportation, hoisting and pressing of the pile, so that the flexibility is high. In addition, the prefabricated building structure 100 belongs to a part of soil-squeezing piles, so that the cross-sectional area of a bearing platform is effectively saved, the manufacturing cost is saved, the stress release of soil bodies after the soil bodies are damaged is facilitated, the phenomena of pile body inclination and the like caused by soil body squeezing are reduced, and the construction of other nearby pile bodies is facilitated.
Referring to fig. 1 to 2, fig. 1 is a schematic view of a prefabricated building structure according to a first embodiment of the present invention; fig. 2 is a cross-sectional view of the prefabricated building structure shown in fig. 1, taken along section B-B.
The utility model provides a prefabricated building structure 100 is applied to the foundation building among the building technology field. In this embodiment, the prefabricated building structure 100 is used to prefabricate a vertically stressed pile. It is understood that in other embodiments, the prefabricated building structure 100 may also be used in other engineering fields, such as fabricated buildings, etc., and may also be used for horizontal load-bearing piles or composite load-bearing piles, etc.
The utility model provides a prefabricated building structure 100 includes hollow portion 10, solid portion 20 and first cage body 30, and hollow portion 10 connects in solid portion 20 and the inside of hollow portion 10 has seted up core slot 11, and first cage body 30 sets up in solid portion 20 and hollow portion 10; the prefabricated building structure further comprises an embedded connecting piece, and the embedded connecting piece is connected to the end portion of the first cage body in the axial direction.
The outer peripheral wall of the hollow portion 10 is substantially columnar, preferably columnar in shape of a cylinder or a polygon (such as a triangle, a quadrangle, etc.); the peripheral wall of the core hole 11 opened in the hollow portion 10 is substantially columnar, preferably columnar in a cylindrical shape or polygonal shape (e.g., triangular, quadrangular, etc.). The outer peripheral wall of the solid portion 20 is substantially columnar and has the same shape as the outer peripheral wall of the hollow portion 10.
Specifically, the hollow portion 10 and the solid portion 20 are made of a concrete material, and the outer peripheral walls of the hollow portion 10 and the solid portion 20 are substantially the same in shape.
The prefabricated building structure 100 provided by the utility model comprises a hollow part 10 and a solid part 20, which not only reduces the consumption of raw materials, reduces the weight and saves the manufacturing cost; when the prefabricated building structure 100 is buried underground, the central unit 20 is located in a depth region (generally 2 meters to 15 meters below the foundation) where the frequency of seismic waves is the highest below the foundation, so that the seismic capacity of the prefabricated building structure 100 can be ensured, and the reliability of the prefabricated building structure 100 in service is ensured. Meanwhile, in addition, when the core groove 11 is used with its opening facing downward, the prefabricated construction structure 100 applies pressure to the solid portion 20 when buried in the ground, and a phenomenon in which the prefabricated construction structure 100 is damaged due to excessive pressure can be avoided. When the core groove 11 is blocked by an external member such as a pile tip or the like or the opening of the core groove 11 is upward for use, groundwater can be prevented from entering the interior of the prefabricated building structure 100, the corrosion of groundwater to the interior of the prefabricated building structure 100 is effectively resisted, and the durability of the prefabricated building structure 100 is ensured without core filling treatment. In addition, at the time of building construction, the prefabricated building structure 100 is generally required to be spliced with another prefabricated building structure to extend the length of the prefabricated building structure 100, or the cap 400 is poured after reinforcing bars are attached to the top of the prefabricated building structure 100 to bear superstructure. The second cage body 40 is provided with the embedded connecting piece 70, so that the combination rate of the two prefabricated building structures 100 can be increased; or the reinforcement ratio of the bearing platform 400 is improved, the connection mode between the prefabricated building structure 100 and the bearing platform 400 is simplified, the force transmission link in the stress process is reduced, the integral vertical stress capacity of the prefabricated building structure 100 is improved, and the mechanical property of the prefabricated building structure 100 and the bearing platform is guaranteed.
It is understood that the outer edge of the cross section of the first cage 30 is circular or polygonal, and the polygonal is triangular, square/rectangular, pentagonal, hexagonal, etc., which are not listed here.
With such an arrangement, the first cages 30 of different shapes can be designed according to the practical application and the corresponding stress condition of the prefabricated building structure 100, so as to achieve different force bearing effects.
In one embodiment of the present invention, the first cage 30 is made of prestressed steel bars.
According to the arrangement, before the prefabricated building structure 100 is used, prestress is applied to the steel bars in advance through a pre-tensioning method or a post-tensioning method to form prestressed steel bars, when the prefabricated building structure 100 bears tensile force generated by external load, the existing prestress in concrete is firstly counteracted, then the prestressed steel bars are stressed, and finally, the concrete is tensioned and then cracks appear along with the increase of the load, so that the appearance and the development of the cracks of the prefabricated building structure 100 are delayed, and the loads such as soil body extrusion, underground water scouring, earthquake load and self-gravity load which can be borne by the prefabricated building structure 100 are improved. The deformed steel bar is a steel bar with a rib on the surface, and can better bear the action of external force due to the function of the rib and the larger bonding capacity of concrete. The first cage 30 is made of prestressed steel bars, so that the solid portion 20 and the hollow portion 10 both have high vertical stress capacity, and an integral stressed pile foundation is formed.
In an embodiment of the present invention, the first cage 30 includes a first axial rib 31 and a first radial rib 32, the first axial rib 31 is disposed along the axial direction of the prefabricated building structure 100; a plurality of first axial rib bodies 31 form a framework of the first cage body 30, a first radial rib body 32 spirally surrounds the framework of the first cage body 30, and the first radial rib body 32 is fixedly connected with the first axial rib bodies 31; the embedded connector 70 is connected to an end of the first axial rib 31.
Specifically, the first radial rib 32 and the first axial rib 31 are fixed by spot welding. It is understood that, in other embodiments, the first radial rib 32 and the first axial rib 31, and the second axial rib 41 and the second radial rib 42 may be fixed by snapping, binding, or the like, which is not listed here.
With the arrangement, the first cage body 30 has high bearing strength and simple processing, and only needs to wind the first radial rib bodies 32 on the frame formed by the first axial rib bodies 31 while carrying out axial transportation on the plurality of first axial rib bodies 31, so that the working hours are saved; and can increase the number of turns and the encryption length that first radial muscle body 32 spirals around at the great position of atress degree as required, for example increase the number of turns and the encryption length that first radial muscle body 32 spirals around at the both ends of first cage 30, prevent that prefabricated building structure 100 from suffering structural failure when burying underground the excessive strength of bearing. In addition, the embedded connecting piece 70 can fix the position of the first axial rib body 31 to assist the first cage body 30 in tensioning, and the tensioning effect is good.
In one embodiment, the first axial reinforcement 31 is made of at least one of a steel bar for prestressed concrete (PC steel bar), a stainless steel bar, a hot rolled steel bar, a medium strength prestressed wire, a stress relief wire, a stranded wire, and a prestressed twisted steel; and/or the presence of a catalyst in the reaction mixture,
the first radial rib 32 is made of at least one of a steel bar for prestressed concrete (PC steel bar), a stainless steel bar, a hot rolled steel bar, a medium strength prestressed wire, a stress-relief wire, a strand, a prestressed twisted steel, a low carbon hot rolled steel disc strip, and a cold drawn low carbon wire for concrete products.
Referring to fig. 3 and 4 together, fig. 3 is a schematic view of a prefabricated building structure according to a second embodiment of the present invention; fig. 4 is a sectional view of the prefabricated building structure shown in fig. 3, taken along section a-a.
In an embodiment of the present invention, the prefabricated building structure 100 further includes a second cage 40, the second cage 40 is disposed in the solid portion 20, and the second cage 40 is surrounded by the first cage 30; the end of the second cage 40 is fitted with an embedded connector 70.
With such an arrangement, the arrangement of the second cage body 40 increases the local reinforcement ratio at the solid part 20, so that the longitudinal stress capacity and the anti-shearing force capacity do not decrease and increase, and the tensile capacity, the compressive capacity, the seismic capacity and the durability of the prefabricated building structure 100 are improved. Moreover, the embedded connecting piece 70 can fix the second cage 40 to the end plate, so that the second cage 40 can be conveniently positioned, the second cage 40 also needs to be tensioned when necessary, and the embedded connecting piece 70 can also play a role in assisting the second cage 40 to be stretched.
In one embodiment, the prefabricated building structure 100 is a partially hollow square pile. At this time, the prefabricated building structure 100 is substantially rectangular parallelepiped, the hollow portion 10 and the solid portion 20 are also substantially rectangular parallelepiped and made of concrete, and a core groove 11 having a cylindrical peripheral wall is opened in the middle of the hollow portion 10; the second cage 40 and the first cage 30 are both substantially rectangular, the second cage 40 is disposed in the solid portion 20, the first cage 30 is disposed in the hollow portion 10 and the solid portion 20, and the second cage 40 is fitted over the first cage 30.
It is understood that in other embodiments, the prefabricated building structure 100 may also be substantially cylindrical or polygonal (e.g., triangular, pentagonal, hexagonal, octagonal, etc.) cylindrical; the peripheral wall of the core hole 11 may have a polygonal (e.g., triangular, square, rectangular, pentagonal, hexagonal, octagonal, etc.) cylindrical shape.
In one embodiment of the present invention, the second cage 40 extends to the end of the solid portion 20 relatively far from the hollow portion 10.
With such an arrangement, the end portion of the solid portion 20 relatively far away from the hollow portion 10 can be supported by the second cage 40, so as to prevent the end portion of the solid portion 20 from deforming and falling off during use or service, and the end portion of the solid portion 20 can bear larger pressure when the prefabricated building structure 100 is buried underground, and the prefabricated building structure 100 can be buried underground quickly.
In other embodiments, the second cage 40 may be located inside the solid portion 20, which may prevent the second cage 40 from being exposed to air and corroded.
It is understood that the outer edge of the cross-section of the second cage 40 is circular or polygonal, and the polygonal shape is triangular, square/rectangular, pentagonal, hexagonal, etc., which are not listed here.
With the arrangement, the second cages 40 in different shapes can be designed according to the practical application and the corresponding stress condition of the prefabricated building structure 100, so as to achieve different force bearing effects.
In one embodiment of the present invention, the second cage 40 is made of prestressed or deformed steel.
So set up, second cage 40 can select prestressing steel or screw-thread steel as required, and prestressing steel can further improve prefabricated building structure 100's vertical atress ability, and the screw-thread steel can reduce prefabricated building structure 100's cost of manufacture.
In an embodiment of the present invention, the second cage 40 includes a second axial rib 41 and a second radial rib 42, the second axial rib 41 is disposed along the axial direction of the prefabricated building structure 100; a plurality of second axial rib bodies 41 form a frame of the second cage body 40, a second radial rib body 42 spirally surrounds the frame of the second cage body 40, and the second radial rib body 42 is fixedly connected with the second axial rib bodies 41; the embedded connector 70 is mounted on the end of the second axial rib 41.
With the arrangement, the second cage body 40 and the first cage body 30 are simple and convenient in processing method and easy to produce, and meanwhile, the binding force between the axial rib bodies and the radial rib bodies is strong, so that the cage body is high in strength and not easy to deform in the using process. In addition, the embedded connecting piece 70 can fix the position of the second axial rib body 41 to assist the second cage body 40 to be tensioned, and the tensioning effect is good.
In one embodiment, the second axial rib body 41 is made of at least one of deformed steel bars, steel bars for prestressed concrete (PC steel bars), stainless steel bars, hot rolled steel bars, medium strength prestressed wires, stress relief wires, steel strands, and prestressed deformed steel bars; and/or the presence of a catalyst in the reaction mixture,
the second radial rib 42 is made of at least one of deformed steel bars, prestressed concrete steel bars (PC steel bars), stainless steel bars, hot-rolled steel bars, medium-strength prestressed steel wires, stress-relief steel wires, steel strands, prestressed twisted steel bars, low-carbon steel hot-rolled disc strips, and cold-drawn low-carbon steel wires for concrete products.
In an embodiment of the present invention, the prefabricated building structure 100 further includes a mounting plate 50, the mounting plate 50 is disposed on the wall surface of the core chase 11 near one end of the solid portion 20, and the second cage 40 extends to the mounting plate 50 and is connected to the mounting plate 50.
So set up, the mounting panel 50 not only can make the second cage body 40 fixed, prevents that the second cage body 40 from warping and misplacing in the in-service process, can also prevent that the core print 11 from being close to the lateral wall of solid portion 20 relatively on the concrete drops, avoids the second cage body 40 to expose in the air, prevents the corruption of the second cage body 40, influences the use strength of the second cage body 40.
Specifically, the mounting plate 50 is a steel plate. The second cage 40 is welded to the mounting plate 50.
In an embodiment of the present invention, the prefabricated building structure 100 further includes a corner protector 60, the corner protector 60 being disposed on an end of the solid portion 20 relatively far from the hollow portion 10, and/or the corner protector 60 being disposed on an end of the hollow portion 10 relatively far from the solid portion 20.
With such an arrangement, the precast building structure 100 can be prevented from falling off the concrete on the end of the precast building structure 100 during the process of being buried in the ground or during service, which causes the second cage 40 or the first cage 30 to be exposed to corrosion, so that the strength of the precast building structure 100 is reduced.
Specifically, the corner protector 60 is made of stainless steel; the thickness of the corner protector 60 is 0.5mm to 12mm, and the height of the corner protector 60 in the axial direction of the prefabricated building structure 100 is 60mm to 200 mm. Preferably, the corner protector 60 has a thickness of 1mm to 8mm, and the height of the corner protector 60 in the axial direction of the prefabricated building structure 100 is 80mm to 170 mm.
Referring to fig. 5, fig. 5 is a schematic structural diagram of the embedded connector 70 shown in fig. 1.
In an embodiment of the present invention, a contraction opening 71 is provided at one end of the pre-embedded connector 70, and the pre-embedded connector 70 is connected to the first cage 30 or the second cage 40 through the contraction opening 71.
So configured, the constrictions 70 are used to connect the first axial rib 31 or the second axial rib 41; the connection method is that after the embedded connector 70 is sleeved on the first axial rib body 31 or the second axial rib body 41, an upset 311 is formed at the end of the first axial rib body 31 or the second axial rib body 41 by adopting a hot working method, so that the embedded connector 70 is limited. Therefore, the connection between the embedded connector 70 and the first axial rib 31 or the second axial rib 41 is simple, convenient and firm, and the construction time can be saved.
In an embodiment of the present invention, the second cage 40 is provided with a pre-embedded connector 70, and the pre-embedded connector 70 is located at an end of the solid portion 20 relatively far away from the hollow portion 10.
So configured, at the time of building construction, the prefabricated building structure 100 is generally required to be spliced with another prefabricated building structure to extend the length of the prefabricated building structure 100, or a cap 400 is poured after reinforcing bars are connected to the top of the prefabricated building structure 100 to bear superstructure. The second cage body 40 is provided with the embedded connecting piece 70, so that the combination rate of the two prefabricated building structures 100 can be increased; or the reinforcement ratio of the bearing platform 400 is improved, the connection mode between the prefabricated building structure 100 and the bearing platform 400 is simplified, the force transmission link in the stress process is reduced, the integral vertical stress capacity of the prefabricated building structure 100 is improved, and the mechanical property of the prefabricated building structure 100 and the bearing platform is guaranteed.
In one embodiment, the embedded connector 70 has an internal thread, the second axial rib 41 has an external thread, and the second axial rib 41 is connected with the embedded connector 70 through a thread.
In one embodiment, the constriction 71 is intended to be connected to the second axial rib 41 or the first axial rib 31; the end of the second axial rib 41 or the first axial rib 31 connected with the embedded connector 70 is provided with an upset 311, and the contraction opening 71 is used for limiting the upset 311.
In one embodiment of the present invention, the embedded connector 70 is further protruded with an annular protrusion 72 on the outer peripheral wall relatively close to the end of the prefabricated building structure 100. Preferably, the outer diameter of the annular protrusion 72 is gradually reduced from the end part of the embedded connector 70 to the middle part; the outer peripheral wall of the annular projection 72 is an arc surface.
With such an arrangement, the annular protrusion 72 can homogenize the prestress, so that the prestress which can be borne by the second cage 40 and/or the first cage 30 during the pre-stretching is larger, and the damage of the pre-buried connecting piece 70 is prevented.
It should be noted that the embedded connectors 70 in the two prefabricated building structures 100 may be of the same type or different types, and may be selected according to the working conditions.
In one embodiment of the present invention, the pre-buried connector 70 is formed together with the prefabricated building structure 100. It is understood that in other embodiments, the pre-embedded connectors 70 may be later connected to the second cage 40 or the first cage 30. The operation steps are that the concrete at the end of the prefabricated building structure 100 is chiseled to expose the first axial direction reinforcing steel bar or the second axial direction reinforcing steel bar, then the embedded connector 70 is connected to the end of the first axial direction reinforcing steel bar or the second axial direction reinforcing steel bar, and then the end of the first axial direction reinforcing steel bar or the second axial direction reinforcing steel bar is formed with the upset 311 by hot working, thus completing the connection.
The prefabricated building structures 100 may be used not only alone, but in combination with a plurality of prefabricated building structures 100. For example, two, three, four or even more prefabricated building structures 100 may be docked for use as required by the operating conditions.
Referring to fig. 6, fig. 6 is a schematic view illustrating the butt joint of two prefabricated building structures 100.
In one embodiment, the first cage 30 of each of the two prefabricated building structures 100 is provided with a quick connector, and the two quick connectors can be connected by a quick docking assembly 200 to extend the length of the prefabricated building structure 100.
In one embodiment, the quick docking assembly 200 is a ferrous metal. Preferably, the quick dock assembly 200 is carbon steel or alloy steel. Specifically, the quick butt joint assembly 200 is carbon steel, chromium vanadium steel, chromium nickel steel, chromium molybdenum steel, chromium nickel molybdenum steel, chromium manganese silicon steel, ultra-high strength steel or stainless steel. It is understood that in other embodiments, the quick dock assembly 200 may be constructed of other materials.
Referring to fig. 7, fig. 7 is a schematic structural diagram of a quick connection assembly according to a first embodiment.
The quick docking assembly 200 in the first embodiment includes a first docking station 210 and a first base 220, the first docking station 210 includes a first fixing portion 211, a first inserting portion 212 and a first extending portion 213 located between the first fixing portion 211 and the first inserting portion 212, the first base 220 includes a second fixing portion 221 and a plurality of fins 222 connected to the second fixing portion 221, the first docking station 210 is connected to the quick connector of one of the prefabricated building structures 100 through the first fixing portion 211, and the first base 220 is connected to the quick connector of another prefabricated building structure 100 through the second fixing portion 221; the first plug part 212 is convexly arranged on the first extension part 213, and a first step surface 214 is formed between the first plug part 212 and the first extension part 213; the plurality of fins 222 are arranged around each other; the first inserting stage 210 can pass through the openings defined by the plurality of fins 222 through elastic expansion of the fins 222, the fins 222 can elastically contract and enclose the first extending portion 213, and the end surfaces of the fins 222 and the first step surface 214 of the first inserting stage 210 are oppositely arranged.
In this embodiment, the use process of the quick docking assembly 200 is as follows: the first plug 210 is connected with the embedded connector 70 in one prefabricated building structure 100 through a first fixing part 211, and the first base 220 is connected with the embedded connector 70 in the other prefabricated building structure 100 through a second fixing part 221; extending the first inserting-connecting part 212 and the first extending part 213 of the first inserting stage 210 into the inner wall of the first base 220 and moving along the inserting direction α, wherein the first inserting-connecting part 212 of the first inserting stage 210 applies pressure to the fin 222, so that the fin 222 elastically expands until the first inserting-connecting part 212 passes through the fin 222; when the first socket 210 is applied with a force in the direction opposite to the insertion direction α, the end of the fin 222 abuts against the first step surface 214 between the first socket 212 and the first extension 213 to limit the first socket 210.
After the first inserting portion 212 of the first inserting table 210 is inserted into the first base 220, the fin 222 can elastically contract and close the extension portion of the first base 220, the end portion of the fin 222 abuts against the step surface of the first inserting table 210, and the abutting surface between the end portion of the fin 222 and the first step surface 214 of the first inserting table 210 is approximately annular, so that the abutting area is large, the joint strength between two prefabricated building structures 100 can be ensured, and particularly the tensile performance is greatly improved; the fins 222 not only can enclose the first extension part 213 of the insert table, but also can limit the first extension part 213, and prevent the first extension part 213 from shaking in the radial direction. In addition, the rapid docking assembly 200 provided by the embodiment has the advantages of simple processing technology, low cost and wide application range.
Referring to fig. 8, fig. 8 is a schematic structural diagram of a quick docking assembly 200 according to a second embodiment.
The quick docking assembly 200 of the second embodiment includes a second socket 230, a second base 240 and a ring buckle 250, wherein the second socket 230 includes a third fixing portion 231 and a second plugging portion 232 disposed oppositely, and the second plugging portion 232 is formed with a first groove 233; the second base 240 includes a first end surface 241 and a second end surface 242 which are oppositely arranged; the ring buckle 250 has an opening (not shown) and can be elastically contracted, and the ring buckle 250 is sleeved on the second insert stage 230 and accommodated in the first groove 233; the ring buckle 250 can be inserted into the second base 240 along the insertion direction together with the second insertion portion 232 of the second socket 230, and the ring buckle 250 can abut against the second end surface 242 of the second base 240 through elastic expansion and limit the reverse movement of the second socket 230 along the insertion direction.
After the second inserting portion 232 of the second inserting stage 230 is inserted into the second base 240, the ring buckle 250 can be ejected out of the first groove 233 through the elastic expansion portion and abut against the second end face 242 of the second base 240, an abutting surface between the ring buckle 250 and the second end face 242 is approximately annular, an abutting area is large, the joint strength between two embedded connectors 70 can be ensured, and particularly, the tensile strength is greatly improved. In addition, the rapid docking assembly 200 provided by the embodiment has the advantages of simple processing technology, low cost and wide application range.
It is understood that the insertion direction α can be, but is not limited to, the above-mentioned directions, and even partial angular offsets should be included in the scope of the present invention.
In one embodiment, after the two prefabricated building structures 100 are butted, a pile collar 300 is disposed on the peripheral wall of the junction between the two prefabricated building structures, and the pile collar 300 is used for fastening the butted joint of the two prefabricated building structures 100 to prevent the two prefabricated building structures 100 from being dislocated during use or service.
It is understood that the two prefabricated building structures 100 may be the same prefabricated pile or different prefabricated piles; the pile can be a solid pile, a hollow pile or a local hollow pile; can be a square pile or a tubular pile.
In one embodiment, a glue coating (not shown) is also provided between two prefabricated building structures 100. The glue coating layer fills the gap between the two prefabricated building structures 100 and the gap between the prefabricated building structures 100 and the quick butt joint component 200, prevents water or oxygen from corroding the first cage body 30, the second cage body 40 and the quick butt joint component 200 after being immersed, and increases the corrosion resistance of the components; after the glue coating layer is cured, the two prefabricated building structures 100 can be shaken or rotated, the rapid butt joint assembly and the prefabricated building structures 100 can be prevented from shaking or rotating, and the stability of the prefabricated building structures 100 is improved; the cured glue coating layer can bear the force, so that the two prefabricated building structures 100 are combined more tightly and firmly, and the stress performance is better; in addition, the glue coating layer can also play a role in uniform stress after being cured, even if the situation that the stress is slightly uneven exists between the two prefabricated building structures 100 or between the prefabricated building structures 100 and the quick butt joint assembly 200, the cured glue coating layer can also balance the stress, the vertical stress capacity of the prefabricated building structures 100 is improved, and the service life of the prefabricated building structures 100 is prolonged.
In one embodiment of the present invention, the adhesive layer is a paste adhesive.
So set up, the glue of paste is convenient for attach to and is difficult for flowing on prefabricated building structure 100's section to the glue of paste can also be extruded to prefabricated building structure 100 and dock the subassembly 200 fast when the butt joint between, makes to dock closely between subassembly 200 and the prefabricated building structure 100 fast, and whole prefabricated building structure 100 stability in use is better.
In one embodiment of the present invention, the adhesive is a two-liquid hybrid hardened glue (AB glue).
So set up, AB glue has that warehousing and transportation performance is good, uses more in a flexible way, and bonding strength is high, has advantages such as good compressive property after the solidification.
In one embodiment of the present invention, the adhesive is an epoxy resin.
According to the arrangement, the epoxy resin has strong adhesive force, the chemical structure of the epoxy resin contains aliphatic hydroxyl, ether and extremely active epoxy groups, and the hydroxyl and the ether have high polarity, so that the epoxy resin has strong adhesive force, and the epoxy resin can firmly bond concrete, stone and various metal materials; the epoxy resin AB glue can be prepared into glue with different viscosities, the curing degree of the AB glue can be adjusted through normal-temperature curing, heating curing and other modes, and the curing time can be controlled within minutes to hours; in addition, the epoxy resin AB glue has good performance, and the cured epoxy resin AB glue has good performance, high mechanical strength, yellowing resistance, medium resistance, long aging resistance time, good electrical insulation, water resistance and moisture resistance and small volume shrinkage; the epoxy resin AB glue is nontoxic, has no three-waste emission in production, does not bring harm to the environment when in use, and meets the requirement of environmental protection; in addition, the epoxy resin AB glue has wide and easily available sources, low price and low cost.
Referring to fig. 9, fig. 9 is a schematic structural diagram of the prefabricated building structure 100 and the platform 400.
In one embodiment, prefabricated building structure 100 is mated to a cap 400.
In this embodiment, the solid portion 20 of the prefabricated building structure 100 is connected to the cap 400. The ends of the second cage body 40 and the first cage body 30, which are relatively far away from the hollow part 10, are provided with pre-embedded connectors 70, the pre-embedded connectors 70 are fixedly connected with the force transmission rib bodies 410, a plurality of force transmission rib bodies 410 form a stress frame in the bearing platform 400, then concrete is poured into a mold, and the bearing platform 400 is formed after the concrete is dried and formed. Because in this embodiment, all be provided with embedded connecting piece 70 on second cage 40 and the first cage 30, can improve the arrangement of reinforcement rate in the cushion cap 400 by a wide margin, not only can improve the bearing capacity of cushion cap 400, can also transmit the power that cushion cap 400 bore to the ground below better.
It is understood that in other embodiments, if the bearing platform 400 does not need to have very high bearing capacity, only the second cage 40 or the first cage 30 may be provided with the embedded connector 70 at the end relatively far from the hollow portion 10, and the embedded connector 70 is fixedly connected with the force transmission rib 410.
Referring to fig. 10, fig. 10 is a partially enlarged view of the portion C shown in fig. 9.
In one embodiment, the embedded connector 70 is provided with a through thread, one end of the embedded connector 70 is in threaded connection with the first axial rib 31 or the second axial rib 41, and the other end is in threaded connection with the force transmission rib 410.
Preferably, the force transmitting rib body 410 is a threaded steel.
It is understood that, in other embodiments, the embedded connector 70 may also be another type of steel bar, and the embedded connector 70 may also be fixedly connected to the first axial rib 31, the second axial rib 41, or the force transmission rib 410 by welding, clamping, or the like. Preferably, the embedded connector 70 is provided with an internal thread, the force transmission rib body 410 is provided with an external thread, and the two are connected in a threaded fit manner, so that the connection is simple and convenient, and the time cost during construction is saved.
In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the orientation words such as "front, back, up, down, left, right", "horizontal, vertical, horizontal" and "top, bottom" etc. are usually based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, and in the case of not making a contrary explanation, these orientation words do not indicate and imply that the device or element referred to must have a specific orientation or be constructed and operated in a specific orientation, and therefore, should not be interpreted as limiting the scope of the present invention; the terms "inner and outer" refer to the inner and outer relative to the profile of the respective component itself.
It will be appreciated by those skilled in the art that the above embodiments are only for illustrating the present invention and are not to be taken as limiting the present invention, and that suitable modifications and variations of the above embodiments are within the scope of the invention as claimed.
Claims (10)
1. A prefabricated building structure (100) comprising a hollow portion (10), a solid portion (20) and a first cage (30), wherein the hollow portion (10) is connected to the solid portion (20), a core slot (11) is opened in the hollow portion (10), and the first cage (30) is disposed in the solid portion (20) and the hollow portion (10);
prefabricated building structure (100) still includes pre-buried connecting piece (70), pre-buried connecting piece (70) connect in first cage body (30) axial direction's tip.
2. A prefabricated building structure (100) according to claim 1, wherein said first cage (30) comprises a first axial rib (31) and a first radial rib (32), said first axial rib (31) being arranged along an axial direction of said prefabricated building structure (100); the first axial ribs (31) form a framework of the first cage body (30), the first radial ribs (32) spirally surround the framework of the first cage body (30), and the first radial ribs (32) are fixedly connected with the first axial ribs (31);
the embedded connecting piece (70) is connected to the end part of the first axial rib body (31).
3. A prefabricated building structure (100) according to claim 1, wherein said prefabricated building structure (100) further comprises a second cage (40), said second cage (40) being arranged inside said solid portion (20), said first cage (30) enclosing said second cage (40);
the end part of the second cage body (40) is provided with the embedded connecting piece (70).
4. A prefabricated building structure (100) according to claim 3, wherein said second cage (40) comprises second axial ribs (41) and second radial ribs (42), said second axial ribs (41) being arranged along the axial direction of said prefabricated building structure (100); the second axial ribs (41) form a framework of a second cage body (40), the second radial ribs (42) spirally surround the framework of the second cage body (40), and the second radial ribs (42) are fixedly connected with the second axial ribs (41);
the embedded connecting piece (70) is arranged at the end part of the second axial rib body (41).
5. A prefabricated building structure (100) according to claim 3, wherein said pre-embedded connector (70) has a constriction (71) at one end thereof, said pre-embedded connector (70) being connected to said first cage (30) or said second cage (40) through said constriction (71).
6. Prefabricated building structure (100) according to claim 5, characterised in that said pre-embedded connectors (70) are internally threaded with respect to the end that is relatively far from said constriction (71).
7. The prefabricated building structure (100) of claim 1, wherein said pre-embedded connectors (70) are threaded.
8. A prefabricated building structure (100) according to claim 2, wherein said first axial reinforcement (31) is made of at least one of steel rods for prestressed concrete, stainless steel rods, hot rolled steel rods, medium strength prestressed wires, stress-relief wires, steel strands, prestressed threaded steel bars; and/or the presence of a catalyst in the reaction mixture,
the first radial rib body (32) is made of at least one of a steel bar for prestressed concrete, a stainless steel bar, a hot-rolled steel bar, a medium-strength prestressed steel wire, a stress-relieving steel wire, a steel strand, a prestressed twisted steel, a low-carbon steel hot-rolled disc strip and a cold-drawn low-carbon steel wire for a concrete product.
9. A prefabricated building structure (100) according to claim 4, wherein said second axial reinforcement (41) is made of at least one of steel rods for prestressed concrete, stainless steel rods, hot rolled steel rods, medium strength prestressed wires, stress-relief wires, steel strands, prestressed threaded steel bars; and/or the presence of a catalyst in the reaction mixture,
the second radial rib body (42) is made of at least one of a steel bar for prestressed concrete, a stainless steel bar, a hot-rolled steel bar, a medium-strength prestressed steel wire, a stress-relieving steel wire, a steel strand, a prestressed twisted steel, a low-carbon steel hot-rolled disc strip and a cold-drawn low-carbon steel wire for a concrete product.
10. Prefabricated building structure (100) according to claim 4, characterised in that both ends of the prefabricated building structure (100) are provided with corner protectors (60), which corner protectors (60) are provided on the end of the solid portion (20) relatively remote from the hollow portion (10) and/or which corner protectors (60) are provided on the end of the hollow portion (10) relatively remote from the solid portion (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020141089.4U CN212452595U (en) | 2020-01-21 | 2020-01-21 | Prefabricated building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020141089.4U CN212452595U (en) | 2020-01-21 | 2020-01-21 | Prefabricated building structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212452595U true CN212452595U (en) | 2021-02-02 |
Family
ID=74480329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020141089.4U Active CN212452595U (en) | 2020-01-21 | 2020-01-21 | Prefabricated building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212452595U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111172974A (en) * | 2020-01-21 | 2020-05-19 | 许顺良 | Prefabricated building structure |
-
2020
- 2020-01-21 CN CN202020141089.4U patent/CN212452595U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111172974A (en) * | 2020-01-21 | 2020-05-19 | 许顺良 | Prefabricated building structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112761138A (en) | Prefabricated building structure | |
CN211898332U (en) | Prefabricated building structure | |
CN212452595U (en) | Prefabricated building structure | |
CN111335300A (en) | Prefabricated building structure | |
CN212294623U (en) | Prefabricated building structure | |
CN212294622U (en) | Prefabricated building structure | |
CN212294624U (en) | Prefabricated building structure | |
CN212452596U (en) | Prefabricated building structure | |
CN212452594U (en) | Prefabricated building structure | |
CN212452593U (en) | Prefabricated building structure | |
CN211898333U (en) | Prefabricated building structure | |
CN212452597U (en) | Prefabricated building structure | |
CN211898334U (en) | Prefabricated building structure | |
CN212294628U (en) | Prefabricated building structure | |
CN212477702U (en) | Prefabricated building structure | |
CN211898335U (en) | Prefabricated building structure | |
CN212294625U (en) | Prefabricated building structure | |
CN212452598U (en) | Prefabricated building structure | |
CN111441341A (en) | Prefabricated building structure | |
CN111206570A (en) | Prefabricated building structure | |
CN111172974A (en) | Prefabricated building structure | |
CN211898327U (en) | Quick butt joint subassembly and quick butt joint mechanism | |
CN211690312U (en) | Quick butt joint subassembly and quick butt joint mechanism | |
CN111172975A (en) | Prefabricated building structure | |
CN211690304U (en) | Quick butt joint subassembly and quick butt joint mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240902 Address after: No. 31488, Jiaxing Road, Ningshan County, Zhejiang Province Patentee after: Xu Wanhao Country or region after: China Address before: No. 31488, Jiaxing Road, Ningshan County, Zhejiang Province Patentee before: Xu Shunliang Country or region before: China |
|
TR01 | Transfer of patent right |