CN111260285A CN202010042775.0A CN202010042775A CN111260285A CN 111260285 A CN111260285 A CN 111260285A CN 202010042775 A CN202010042775 A CN 202010042775A CN 111260285 A CN111260285 A CN 111260285A
Authority
CN
China
Prior art keywords
information
received
materials
receiving
material receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010042775.0A
Other languages
Chinese (zh)
Inventor
董永胜
周石磊
张可丰
刁建勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
CGN Power Co Ltd
Daya Bay Nuclear Power Operations and Management Co Ltd
Lingdong Nuclear Power Co Ltd
Guangdong Nuclear Power Joint Venture Co Ltd
Lingao Nuclear Power Co Ltd
Original Assignee
China General Nuclear Power Corp
CGN Power Co Ltd
Daya Bay Nuclear Power Operations and Management Co Ltd
Lingdong Nuclear Power Co Ltd
Guangdong Nuclear Power Joint Venture Co Ltd
Lingao Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, CGN Power Co Ltd, Daya Bay Nuclear Power Operations and Management Co Ltd, Lingdong Nuclear Power Co Ltd, Guangdong Nuclear Power Joint Venture Co Ltd, Lingao Nuclear Power Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN202010042775.0A priority Critical patent/CN111260285A/en
Publication of CN111260285A publication Critical patent/CN111260285A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/953Querying, e.g. by the use of web search engines
    • G06F16/9535Search customisation based on user profiles and personalisation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Public Health (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of intelligent storage of nuclear power stations, in particular to a method and a system for receiving materials of a nuclear power station and a storage medium. The method comprises the following steps: when determining that the material to be received as the special material of the nuclear power station is not a cross-base material, and meanwhile, the material to be received is a cross-power-station material and does not contain the material attribute which does not allow the cross-power-station material, determining an auditing party according to a preset value-auditing party matching list; automatically recommending material batches for the material to be received when approval passing information fed back by an auditing party is received; generating a material getting list according to the material getting application information, the approval passing information and the material recommendation information; and recording the actual material getting information after the material getting party gets the materials to be got according to the material getting list. The method has the advantages that the operation of the material receiving process is simple and convenient, the processing result of the material receiving data is accurate and effective, errors in the material approval and receiving process of the nuclear power station are avoided, and the safety of the nuclear power station is further guaranteed.

Description

Nuclear power station material receiving method and system and storage medium
Technical Field
The invention relates to the technical field of intelligent storage of nuclear power stations, in particular to a method and a system for receiving materials of a nuclear power station and a storage medium.
Background
At present, when a material receiving party of a nuclear power station needs to receive materials, the material receiving party usually searches for a corresponding approver to apply for the material receiving after approval according to different material types. In the process, since the approver does not know the inventory of the nuclear power station materials which are requested to be received currently in the warehouse of the power station, after the approval is passed, the nuclear power station materials do not exist in the power station, so that the cross-power-station material receiving is needed to be carried out, and the cross-power-station material receiving is controlled; moreover, some special nuclear power plant materials are subjected to special supervision, and can be sent out without being approved by an approver, so that special requirements are often met; thus, even if the material receiving in the prior art is approved by an approver, the material receiving is likely to be invalidated due to the fact that the material receiving does not meet special requirements, and the material receiving needs to be approved again, and the material receiving can not be smoothly carried out again (repeated approval and material receiving confirmation are needed, so that the operation process is complicated, the material using time is delayed, the construction period is delayed, the business income is lost, and even the delayed treatment of safety accidents is caused); on the other hand, due to the fact that a large number of personnel are involved in the manual approval and material receiving process, and the variety of materials is large, if the condition of supervision incapability occurs, for example, the materials are sent out under the condition that special requirements are not met, the materials are easily received and taken wrongly, even the controlled dangerous materials, nuclear supervision materials and the like can be in the condition that the materials cannot be monitored, and potential hazards are formed to the safety of the nuclear power station.
Disclosure of Invention
The embodiment of the invention provides a method and a system for receiving materials of a nuclear power station and a storage medium.
A material receiving method for nuclear power station materials comprises the following steps:
the method comprises the steps that a warehousing server receives a material receiving approval request containing material receiving application information sent by a material receiving party;
when the storage server determines that the material to be received corresponding to the material getting application information is the special material of the nuclear power station according to the material getting application information, whether the material to be received is the cross-base material getting is determined according to the material getting application information;
when confirming that the materials are not cross-base materials, the warehousing server determines whether the materials to be received are cross-station materials and whether the material attributes of the materials to be received contain material attributes which do not allow the cross-station materials to be received according to the material application information;
when the material to be received is a cross-power-station material and the material attribute of the material to be received does not contain the material attribute which does not allow the cross-power-station material to be received, the storage server determines an auditing party corresponding to the material value of the material to be received according to a preset value-auditing party matching list, and sends the material receiving application information to an auditing party of the SAP server;
when approval passing information of the material receiving application information fed back by an auditor of the SAP server is received, the storage server automatically recommends material batches for the material to be received according to a preset recommendation rule and generates material recommendation information;
the warehousing server generates a material getting list according to the material getting application information, the approval passing information and the material recommendation information;
after the material receiving party receives the materials to be received according to the material receiving list, the storage server records actual material receiving information, stores the actual material receiving information into a storage database of the storage server and then synchronizes the actual material receiving information to an SAP database of the SAP server.
In one embodiment, the nuclear power plant special materials include 3C-free materials, controlled materials, nuclear regulatory materials, and tax-free materials; the material properties that do not allow for material pickup across the power station include controlled properties of controlled materials and duty free properties of duty free materials.
In one embodiment, after the determining whether the material to be picked is cross-base material picking according to the material picking application information, the method comprises the following steps:
and when the cross-base material receiving is confirmed, the warehousing server prompts the violation of the material receiving at a material receiving terminal corresponding to the material receiving party, and sends a refute notification of refuting the approval request of the material receiving party in a preset mode.
In an embodiment, the determining whether the material to be picked up is cross-base material picking according to the material picking application information further includes:
when the storage server determines that the material to be received is a nuclear supervision material according to the material receiving application information, judging whether the material receiving application information contains a nuclear supervision filing material of the material to be received;
if the nuclear supervision filing materials of the materials to be received are not contained, extracting the information to be filed of the materials to be received in the material taking application information, sending the information to be filed to a pre-equipment filing party of a nuclear supervision filing server, and after receiving filing completion information fed back by the nuclear supervision filing server, determining whether the materials to be received are cross-base materials according to the material taking application information;
and if the nuclear supervision filing material of the material to be received is contained, determining whether the material to be received is cross-base material receiving or not according to the material receiving application information.
In an embodiment, after the warehousing server receives a material approval request containing material application information sent by a material receiving party, the warehousing server further includes:
when the materials to be received corresponding to the material getting application information are determined not to be special materials of the nuclear power station according to the material getting application information, the storage server determines an auditing party corresponding to the material value of the materials to be received according to a preset value-auditing party matching list, and sends the material getting application information to the auditing party of the SAP server.
In an embodiment, after the storage server determines whether the material to be received is a cross-station material and whether the material attribute of the material to be received includes a material attribute that does not allow the cross-station material, according to the material request information, the method further includes:
when the material to be received is cross-power-station material and the material attribute of the material to be received comprises the material attribute which does not allow cross-power-station material receiving, the storage server prompts the violation of the material receiving at a material receiving terminal corresponding to a material receiving party, and sends a refuting notice of refuting the examination and approval request of the material receiving party in a preset mode.
In an embodiment, after the storage server determines whether the material to be received is a cross-station material and whether the material attribute of the material to be received includes a material attribute that does not allow the cross-station material, according to the material request information, the method further includes:
and when the material to be received is not the cross-power-station material receiving, the storage server determines an auditing party corresponding to the material value of the material to be received according to a preset value-auditing party matching list, and sends the material receiving application information to an auditing party of the SAP server.
In an embodiment, the determining, according to a preset value-auditor matching list, an auditor corresponding to the material value of the material to be received includes:
when the material value of the material to be received is determined to exceed one ten thousand yuan, the storage server sends the material receiving application information to a first-level auditor;
and when the material value of the material to be received is determined not to exceed one ten thousand yuan, sending the material receiving application information to a second-level auditor, wherein the audit authority of the second-level auditor is higher than that of the first-level auditor.
In an embodiment, the step of generating, by the warehousing server, a material pickup list according to the material pickup application information, the approval pass information, and the material recommendation information includes:
the storage server sends the material recommendation information to the material receiving party and judges whether feedback information of the material receiving party to the material recommendation information is received within a preset time length;
when feedback information of the material receiving party on the material recommendation information is received within a preset time length, the warehousing server determines whether the feedback information contains replacement recommendation batch information or not, wherein the replacement recommendation batch information comprises a request for replacing a batch and a replacement reason;
if the recommended batch replacement information is not contained, the warehousing server generates a material getting list according to the material getting application information, the approval passing information and the material recommendation information;
if the information comprises the replacement recommended batch information, the warehousing server extracts key information in the replacement reason, generates new material recommendation information according to the replacement batch after confirming that the key information is successfully matched with a preset replacement reason allowed, and generates a material requisition list according to the material requisition information, the approval recommendation passing information and the new material recommendation information.
In an embodiment, after the determining whether the feedback information of the material obtaining party to the material recommendation information is received within a preset time period, the method further includes:
and when the feedback information of the material receiving party on the material recommendation information is not received within the preset time length, the warehousing server returns the material receiving party after marking the material receiving approval request as an interruption request.
A nuclear power plant material taking system comprises a storage server, wherein the storage server comprises a memory, a processor and computer readable instructions stored in the memory and capable of running on the processor, and the processor executes the computer readable instructions to realize a nuclear power plant material taking method.
A computer readable storage medium having computer readable instructions stored thereon which, when executed by a processor, implement a method for material handling in nuclear power plant material.
According to the method, the system and the storage medium for the nuclear power station material receiving, when the material to be received corresponding to the material receiving application information is determined to be the special material of the nuclear power station according to the material receiving application information, the material to be received is determined not to be the cross-base material receiving according to the material receiving application information, and meanwhile, when the material to be received is determined to be the cross-power station material receiving and the material attribute of the material to be received does not contain the material attribute which does not allow the cross-power station material receiving, an auditing party corresponding to the material value of the material to be received is determined according to a preset value-auditing party matching list, and the material receiving application information is sent to the auditing party of the SAP server; when approval passing information of the material receiving application information fed back by an auditor of the SAP server is received, automatically recommending material batches for the material to be received according to a preset recommendation rule, and generating material recommendation information; generating a material getting list according to the material getting application information, the approval passing information and the material recommendation information; and after the material receiving party receives the materials to be received according to the material receiving list, recording actual material receiving information, storing the actual material receiving information into a storage database of a storage server, and then synchronizing the actual material receiving information to an SAP database of the SAP server. The method has the advantages that the operation of the material receiving process is simple and convenient, different examination and approval operations are executed aiming at the special materials of the nuclear power station, so that the final processing result of the material receiving data is accurate and effective, and errors in the examination and approval and receiving processes of the materials of the nuclear power station are avoided; meanwhile, the material receiving of the nuclear power station materials can be completed at one time, repeated operation is not needed, the situations such as construction period delay and the like are avoided, and the safety of the nuclear power station is further guaranteed.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments of the present invention will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without inventive labor.
FIG. 1 is a flow chart of a method for receiving nuclear power plant material in accordance with an embodiment of the present invention;
FIG. 2 is a schematic diagram of a computer device in an embodiment of the invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The method for receiving the nuclear power plant material, as shown in fig. 1, comprises the following steps:
s10, the warehousing server receives a material receiving approval request containing material receiving application information sent by a material receiving party; in this step, the material application information includes material properties (such as those mentioned later: material properties of controlled materials marked as controlled properties, etc.), and further includes, but is not limited to, one or more of the following: material code, description, quantity, unit, application date, application quantity, material receiving purpose, required date, remark column, contact telephone, employee number (mailbox reminder) and the like. In the invention, the material getting application information can be automatically input by the material getting party on the material getting interface of the material getting terminal.
S20, when the storage server determines that the material to be received corresponding to the material getting application information is the special material of the nuclear power station according to the material getting application information, determining whether the material to be received is the cross-base material getting according to the material getting application information; the cross-base material receiving refers to cross-station material receiving between two power stations located in two different nuclear power bases.
In one embodiment, the nuclear power plant specific materials include, but are not limited to, 3C-free materials, controlled materials, nuclear regulatory materials, tax-free materials, and the like. Wherein:
the controlled material is a dangerous material which is easy to self-ignite and self-explode; the material property of the controlled material is marked as a controlled property; in the present invention, the controlled materials in the nuclear power plant do not allow for cross-base material pickup nor cross-station material pickup.
The tax-free material refers to the nuclear power station material which is free from tax due to tax policy inclination; the material attribute of the tax-free material is marked as tax-free attribute; in the present invention, the duty-free material in the nuclear power plant does not allow for cross-base material pickup, nor cross-station material pickup.
The nuclear supervision materials refer to materials needing to be put on record by a nuclear supervision mechanism; the material attribute of the nuclear supervision material is marked as a nuclear supervision attribute; in the present invention, the nuclear regulatory materials in a nuclear power plant do not allow for cross-base material pickup, allowing for cross-plant material pickup.
The 3C-free material refers to a material which can be free of 3C certification, and the material attribute of the 3C-free material is marked as a 3C-free attribute; in the invention, the 3C-free material in the nuclear power station does not allow cross-base material receiving and allows cross-power station material receiving.
Understandably, a particular material of a nuclear power plant may have one or more of the material properties described above. All the special materials of the nuclear power station are not allowed to be fed across the base, but the material attributes corresponding to part of the special materials of the nuclear power station are allowed to be fed across the power station, so that if the special materials of the nuclear power station have multiple material attributes, if one of the corresponding material attributes is allowed to be fed across the power station, and the other one is not allowed, the special materials of the nuclear power station are not allowed to be fed across the power station. In one embodiment, after the determining whether the material to be picked is cross-base material picking according to the material picking application information, the method comprises the following steps: and when the cross-base material receiving is confirmed, the warehousing server prompts the violation of the material receiving at a material receiving terminal corresponding to the material receiving party, and sends a refute notification of refuting the approval request of the material receiving party in a preset mode. That is, if the material to be received as the special material of the nuclear power plant needs to be received across the base, since all the special materials of the nuclear power plant do not allow the material to be received across the base, the warehousing server performs refund for the approval request of the material receiving, and meanwhile, an inconsistency is added to the refund notification, and a case description that the material to be received across the base does not meet the requirement of the material to be received across the base of the special material of the nuclear power plant is recorded in the inconsistency. Further, the warehousing server can call purchasing data of the power station, and when the power station is confirmed to purchase the material to be received, the warehousing server can prompt a user of purchasing information of the material to be received, so that the user can clearly determine a date of requesting for receiving the material again at the power station.
S30, when the materials are not confirmed to be cross-base materials, the warehousing server determines whether the materials to be received are cross-station materials and whether the material attributes of the materials to be received contain material attributes which do not allow the cross-station materials to be received according to the material application information; the inter-power-station material receiving refers to inter-power-station material receiving between two power stations located in the same nuclear power base. Preferably, the controlled material in the nuclear power plant does not allow for cross-base material pickup nor cross-station material pickup. The tax-free materials in the nuclear power plant are not allowed to be picked up across bases and across power stations. Thus, the material properties that do not allow for cross-plant material pickup include controlled properties of controlled materials and duty free properties of duty free materials.
Understandably, when a material receiving party automatically inputs material receiving application information in a material receiving interface of a material receiving terminal, the application of cross-station material receiving and cross-base material receiving of the material to be received in the material receiving application information can be automatically input in the material receiving application information when the material receiving party provides a material receiving approval request; or only inputting an application for the materials to be received of the power station into a receiving interface of a receiving terminal by a receiving party, and automatically generating a cross-station receiving application in receiving application information when a storage server acquires the stock of the materials to be received of the power station from a storage database and confirms that the stock of the materials to be received of the power station does not meet the required quantity of the materials to be received in the receiving application information; similarly, if it is further determined that the stocks of the materials to be received of other power stations in the nuclear power base to which the power station belongs also do not meet the required quantity, an application for cross-base material receiving is generated in the material receiving application information.
S40, when the material to be received is a cross-power-station material and the material attribute of the material to be received does not contain the material attribute which does not allow the cross-power-station material to be received, the storage server determines an auditor corresponding to the material value of the material to be received according to a preset value-auditor matching list, and sends the material receiving application information to the auditor of the SAP server; that is, the controlled material is a dangerous material which is easy to self-ignite and self-explode, so the controlled material is not allowed to be sent across the base and the power station (the dangerous material is prevented from being monitored); tax free material refers to nuclear power plant material that is tax free with a tax policy bias, and therefore does not allow for material distribution across bases, nor across power stations (avoiding that another power station would have no tax free policy and would evade tax in this way). Therefore, if the material to be received does not have the material attribute which does not allow the cross-station material receiving, the cross-station material sending can be performed, and at this time, an approver corresponding to the material value in the material receiving approval request needs to be notified to approve the material receiving approval request.
S50, when approval passing information of the material getting application information fed back by an auditor of the SAP server is received, automatically recommending a material batch for the material to be got by the storage server according to a preset recommendation rule, and generating material recommendation information; that is, in the present invention, the batch may be automatically recommended for the material-receiving approval request, and the preset recommendation rule may be set according to a user requirement, for example, the recommendation may be performed according to the principles of the shelf life of the material, the matching degree between the required quantity of the material and the material inventory in the batch, the distance between the material-receiving person and the warehouse, and the priority of the local power station (next across power stations).
S60, the warehousing server generates a material getting list according to the material getting application information, the approval passing information and the material recommendation information; that is, after all the approval passes, the warehousing server can generate a material getting list for a material getting party to get the material according to the approval information and the material getting application information; the content contained in the claim slip includes, but is not limited to, one or more of the following: 3C-free information (for characterizing whether the material is a 3C-free material), nuclear supervision information (for characterizing whether the material is a supervision material or not, and may also include a nuclear supervision filing material, etc.), ultra-ten-thousand-yuan information (i.e., information for characterizing whether the material value of the material in the nuclear power plant exceeds one thousand yuan or not, and if the material value can be set to other numbers according to the requirement), controlled information (for characterizing whether the material is a controlled material or not), tax-free information (for characterizing whether the material is a tax-free material or not), whether the material is delivered (self-service access locker/warehouse), material code, description, quantity, unit, remaining quantity of lot cargo space, consignment, warehouse, cargo space, actual material delivery quantity, warehouse, factory, work ticket number, material delivery certificate, material sender, material receiver, gate department, lot number, reservation number, work center, class-file modification, life sub-code, etc Application date, application number, batch number, approver, job responsibility, function location, job ticket status, approval date, required date, material picking purpose, remark column, material sending certificate, contact telephone, employee number (mailbox reminder), etc.
And S70, after the material obtaining party obtains the material to be obtained according to the material obtaining list, the warehousing server records the actual material obtaining information, stores the actual material obtaining information into a warehousing database of the warehousing server and then synchronizes the actual material obtaining information to an SAP (System Applications and Products, enterprise management System, in the invention, the SAP server refers to an SAP database of a server or a server cluster) server which is in communication connection with the warehousing server in the nuclear power station and can be used for managing all employee information. That is, after the material is received by the material receiving party, the storage server can record the actual material receiving information in the material receiving process, store the actual material receiving information into the storage database of the storage server, and then synchronize the actual material receiving information with the SAP database of the SAP server; the actual material getting information includes, but is not limited to, information of material getting personnel, material getting quantity, material getting type, material getting position, material getting date, material sending personnel, material sending voucher, etc. so as to trace the material getting process. Understandably, nuclear power plant materials are stored in a safe area (for example, a second area or a third area, due to the special administration regulation of the nuclear power plant, the third area or the second area is watched and checked by armed police personnel, so that the nuclear power plant materials are generally not counterfeited and taken by other personnel), therefore, when a material taking party takes the materials to be taken according to the material taking list, the materials can be taken only by swiping a corresponding employee card or an identity card, and more verification programs are not required to be set, so that the material taking process is simplified; of course, different verification procedures can be set for the nuclear power plant materials which are particularly important, for example, the materials are taken by the aid of verification means such as irises and voiceprints, so that the safety of material taking is ensured.
The method has the advantages that the operation of the material receiving process is simple and convenient, different examination and approval operations are executed aiming at the special materials of the nuclear power station, so that the final processing result of the material receiving data is accurate and effective, and errors in the examination and approval and receiving processes of the materials of the nuclear power station are avoided; meanwhile, the material receiving of the nuclear power station materials can be completed at one time, repeated operation is not needed, the situations such as construction period delay and the like are avoided, and the safety of the nuclear power station is further guaranteed.
In an embodiment, in the step S20, the determining whether the material to be picked up is cross-base material picking according to the material picking application information further includes:
when the storage server determines that the material to be received is a nuclear supervision material according to the material receiving application information, judging whether the material receiving application information contains a nuclear supervision filing material of the material to be received; that is, for the nuclear supervision material, the material can be retrieved after the material must be recorded first, and therefore, it is necessary to detect whether the nuclear supervision recorded material is included in the retrieval application information.
If the nuclear supervision filing materials of the materials to be received are not contained, extracting the information to be filed of the materials to be received in the material taking application information, sending the information to be filed to a pre-equipment filing party of a nuclear supervision filing server, and after receiving filing completion information fed back by the nuclear supervision filing server, determining whether the materials to be received are cross-base materials according to the material taking application information; that is, if the material receiving application information does not include the nuclear supervision filing material, it may be determined whether the material receiving application information has the information to be filed or not, and if not, the material receiving party is prompted to carry out filing or/and upload the information to be filed on the nuclear supervision material; and if so, sending the information to be recorded to a preset recording party of the nuclear supervision recording server for recording. And after the filing is finished, confirming whether the material to be received is cross-base material receiving according to the material receiving application information, if the filing is not passed, informing a material receiving party of filing failure information, and prompting to handle nuclear supervision filing materials by self.
And if the nuclear supervision filing material of the material to be received is contained, determining whether the material to be received is cross-base material receiving or not according to the material receiving application information. That is, if the material-taking application information includes the nuclear supervision filing material, it is sufficient to directly confirm whether the material to be taken is the cross-base material-taking according to the material-taking application information.
In an embodiment, after the step S10, that is, after the warehousing server receives the request for approval of the material containing the material application information sent by the material receiving party, the method further includes:
when the materials to be received corresponding to the material getting application information are determined not to be special materials of the nuclear power station according to the material getting application information, the storage server determines an auditing party corresponding to the material value of the materials to be received according to a preset value-auditing party matching list, and sends the material getting application information to the auditing party of the SAP server. Then, step S50 and the following steps are performed, specifically, when approval pass information of the material receiving application information fed back by the auditor of the SAP server is received, the storage server automatically recommends a material batch for the material to be received according to a preset recommendation rule, and generates material recommendation information; generating a material getting list according to the material getting application information, the approval passing information and the material recommendation information; after the material receiving party receives the materials to be received according to the material receiving list, the storage server records actual material receiving information, stores the actual material receiving information into a storage database of the storage server and then synchronizes the actual material receiving information to an SAP database of the SAP server. The specific process is not described herein again, that is, when the material to be received is not a special material of the nuclear power plant, a special treatment method for the special material of the nuclear power plant does not need to be considered.
In an embodiment, in step S30, after the step of determining, by the repository server, whether the material to be received is a cross-station material and whether the material attribute of the material to be received includes a material attribute that does not allow the cross-station material, the method further includes:
when the material to be received is cross-power-station material and the material attribute of the material to be received comprises the material attribute which does not allow cross-power-station material receiving, the storage server prompts the violation of the material receiving at a material receiving terminal corresponding to a material receiving party, and sends a refuting notice of refuting the examination and approval request of the material receiving party in a preset mode. That is, if the material receiving approval request of the material to be received is a cross-station material receiving request, but the material attribute of the material to be received includes a material attribute which does not allow the cross-station material receiving, at this time, the cross-station material receiving is not allowed, and therefore the material receiving approval request needs to be refuted. Preferably, the refund notification includes a description of a case where the material supply of the inter-power plant does not match the material supply requirement of the prohibited inter-power plant of the nuclear power plant specific material.
In an embodiment, in step S30, after the step of determining, by the repository server, whether the material to be received is a cross-station material and whether the material attribute of the material to be received includes a material attribute that does not allow the cross-station material, the method further includes:
and when the material to be received is not the cross-power-station material receiving, the storage server determines an auditing party corresponding to the material value of the material to be received according to a preset value-auditing party matching list, and sends the material receiving application information to an auditing party of the SAP server. That is, when the material to be received is not a cross-power-station material, whether the material attribute of the material to be received includes a material attribute that does not allow the cross-power-station material to be sent or not, the material attribute can be approved in this step, and then the process of determining the material value of the material to be received is entered, so as to notify an approver corresponding to the material value of the material to be received in the material approval request to approve the material approval request.
In an embodiment, in step S40, the determining, according to a preset value-reviewer matching list, a reviewer corresponding to the material value of the material to be received includes:
when the material value of the material to be received is determined to exceed one ten thousand yuan, the storage server sends the material receiving application information to a first-level auditor;
and when the material value of the material to be received is determined not to exceed one ten thousand yuan, sending the material receiving application information to a second-level auditor, wherein the audit authority of the second-level auditor is higher than that of the first-level auditor.
In the invention, whether the value of the material to be received exceeds a preset value threshold (in the embodiment, the value threshold is ten thousand yuan, but the value threshold can be set as other specific values) can be judged, and then according to the comparison between the value threshold and the material value of the material to be received, the approval party corresponding to the material value of the material to be received is determined to approve the material receiving approval request. Understandably, the higher the material value of the material to be received is, the greater the audit authority of the approver corresponding to the material to be received needs to be.
In an embodiment, in step S60, the generating, by the repository server, a material requisition form according to the material requisition information, the approval pass information, and the material recommendation information includes:
the storage server sends the material recommendation information to the material receiving party and judges whether feedback information of the material receiving party to the material recommendation information is received within a preset time length;
when feedback information of the material receiving party on the material recommendation information is received within a preset time length, the warehousing server determines whether the feedback information contains replacement recommendation batch information or not, wherein the replacement recommendation batch information comprises a request for replacing a batch and a replacement reason;
if the recommended batch replacement information is not contained, the warehousing server generates a material getting list according to the material getting application information, the approval passing information and the material recommendation information; in the above embodiment, the warehousing server may send the material recommendation information to the material receiving party for confirmation, and if the material receiving party confirms that there is no error, a material receiving list is generated according to the material receiving application information, the approval pass information, and the material recommendation information.
If the information comprises the replacement recommended batch information, the warehousing server extracts key information in the replacement reason, generates new material recommendation information according to the replacement batch after confirming that the key information is successfully matched with a preset replacement reason allowed, and generates a material requisition list according to the material requisition information, the approval recommendation passing information and the new material recommendation information. That is, if the material receiver wants to update the recommended batch in the material recommendation information to another replacement batch, at this time, the feedback information may be used to feed back the replacement recommended batch information (including the request replacement batch and the replacement reason) to the warehousing server, the warehousing server may automatically extract the key information in the replacement reason, for example, the reason such as the distance of the geographic location needs to be considered preferentially, at this time, the server may store some allowable replacement reasons for the allowable replacement batch in the database in advance, and if the extracted key information matches the preset allowable replacement reason, the server may automatically pass through the current replacement batch, and then generate a new material recommendation information according to the replacement batch, and then generate a material list according to the material requisition information, the approval recommendation pass information, and the new material recommendation information. Understandably, if the key information fails to be matched with a preset replacement permission reason, directly informing the material receiver that the batch replacement is not allowed at the time; if the material receiver still needs to change the batch for other reasons except the preset reason for allowing the batch to be changed, a request for changing the batch can be sent to a preset batch changing and approving party, and then the manual batch changing and approving process is entered.
In an embodiment, after the determining whether the feedback information of the material obtaining party to the material recommendation information is received within a preset time period, the method further includes:
and when the feedback information of the material receiving party on the material recommendation information is not received within the preset time length, the warehousing server returns the material receiving party after marking the material receiving approval request as an interruption request.
That is, in this embodiment, if the feedback information of the material receiving party is not received within the preset time period (one or more times of reminding may be performed within the preset time period), it is considered that the material receiving party' S material receiving approval request is interrupted, at this time, the material receiving party marks the material receiving approval request as an interruption request, and then recommends the material receiving party, and after receiving the returned material receiving approval request, the material receiving party may reinitiate a new material receiving approval request, or reinitiate the material receiving approval request from step S10.
In one embodiment, a nuclear power plant material getting system is provided, which includes a warehousing server including a memory, a processor, and computer readable instructions stored in the memory and executable on the processor, wherein the processor implements a nuclear power plant material getting method when executing the computer readable instructions. In this embodiment, the warehouse server is a computer device, and the internal structure thereof may be as shown in fig. 2. The warehouse server comprises a processor, a memory, a network interface and a database which are connected through a system bus. Wherein the processor of the warehouse server is used to provide computing and control capabilities. The storage of the warehouse server comprises a nonvolatile storage medium and an internal storage. The non-volatile storage medium stores an operating system, computer readable instructions, and a database. The internal memory provides an environment for the operating system and execution of computer-readable instructions in the non-volatile storage medium. The computer readable instructions, when executed by a processor, implement a method for nuclear power plant material picking. In the invention, the material taking system of the nuclear power station material corresponds to the material taking method of the nuclear power station material in the embodiment one by one. For specific limitations of the nuclear power plant material feeding system, reference may be made to the above limitations of the nuclear power plant material feeding method, and details are not repeated here.
In one embodiment, a computer readable storage medium is provided having computer readable instructions stored thereon which, when executed by a processor, implement a method for material handling in nuclear power plant materials.
It will be understood by those of ordinary skill in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware associated with computer readable instructions, which can be stored in a non-volatile computer readable storage medium, and when executed, can include processes of the embodiments of the methods described above. Any reference to memory, storage, databases, or other media used in embodiments provided herein may include non-volatile and/or volatile memory. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), Direct Rambus Dynamic RAM (DRDRAM), and Rambus Dynamic RAM (RDRAM).
It will be apparent to those skilled in the art that, for convenience and brevity of description, only the above-mentioned division of each functional unit or module is illustrated, and in practical applications, the above-mentioned function distribution may be performed by different functional units or modules according to requirements, that is, the internal structure of the apparatus is divided into different functional units or modules to perform all or part of the above-mentioned functions.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention.

Claims (12)

1. A material receiving method for nuclear power station materials is characterized by comprising the following steps:
the method comprises the steps that a warehousing server receives a material receiving approval request containing material receiving application information sent by a material receiving party;
when the storage server determines that the material to be received corresponding to the material getting application information is the special material of the nuclear power station according to the material getting application information, whether the material to be received is the cross-base material getting is determined according to the material getting application information;
when confirming that the materials are not cross-base materials, the warehousing server determines whether the materials to be received are cross-station materials and whether the material attributes of the materials to be received contain material attributes which do not allow the cross-station materials to be received according to the material application information;
when the material to be received is a cross-power-station material and the material attribute of the material to be received does not contain the material attribute which does not allow the cross-power-station material to be received, the storage server determines an auditing party corresponding to the material value of the material to be received according to a preset value-auditing party matching list, and sends the material receiving application information to an auditing party of the SAP server;
when approval passing information of the material receiving application information fed back by an auditor of the SAP server is received, the storage server automatically recommends material batches for the material to be received according to a preset recommendation rule and generates material recommendation information;
the warehousing server generates a material getting list according to the material getting application information, the approval passing information and the material recommendation information;
after the material receiving party receives the materials to be received according to the material receiving list, the storage server records actual material receiving information, stores the actual material receiving information into a storage database of the storage server and then synchronizes the actual material receiving information to an SAP database of the SAP server.
2. The method for nuclear power plant material Take in claim 1, wherein the nuclear power plant special materials include 3C-free materials, controlled materials, nuclear regulatory materials and tax-free materials; the material properties that do not allow for material pickup across the power station include controlled properties of controlled materials and duty free properties of duty free materials.
3. The method for receiving the nuclear power plant material as claimed in claim 1, wherein the step of confirming whether the material to be received is cross-base material receiving according to the material receiving application information comprises:
and when the cross-base material receiving is confirmed, the warehousing server prompts the violation of the material receiving at a material receiving terminal corresponding to the material receiving party, and sends a refute notification of refuting the approval request of the material receiving party in a preset mode.
4. The method for receiving nuclear power plant material as recited in claim 1, wherein the determining whether the material to be received is cross-base material based on the material receiving application information further comprises:
when the storage server determines that the material to be received is a nuclear supervision material according to the material receiving application information, judging whether the material receiving application information contains a nuclear supervision filing material of the material to be received;
if the nuclear supervision filing materials of the materials to be received are not contained, extracting the information to be filed of the materials to be received in the material taking application information, sending the information to be filed to a pre-equipment filing party of a nuclear supervision filing server, and after receiving filing completion information fed back by the nuclear supervision filing server, determining whether the materials to be received are cross-base materials according to the material taking application information;
and if the nuclear supervision filing material of the material to be received is contained, determining whether the material to be received is cross-base material receiving or not according to the material receiving application information.
5. The method for nuclear power plant material getting as claimed in claim 1, wherein after receiving the request for getting approval including the information of the material getting application from the material getting party, the warehousing server further comprises:
when the materials to be received corresponding to the material getting application information are determined not to be special materials of the nuclear power station according to the material getting application information, the storage server determines an auditing party corresponding to the material value of the materials to be received according to a preset value-auditing party matching list, and sends the material getting application information to the auditing party of the SAP server.
6. The method for receiving the nuclear power plant materials according to claim 1, wherein after the warehousing server determines whether the materials to be received are cross-station materials and whether the material attributes of the materials to be received include material attributes that do not allow cross-station materials reception according to the material request information, the method further comprises:
when the material to be received is cross-power-station material and the material attribute of the material to be received comprises the material attribute which does not allow cross-power-station material receiving, the storage server prompts the violation of the material receiving at a material receiving terminal corresponding to a material receiving party, and sends a refuting notice of refuting the examination and approval request of the material receiving party in a preset mode.
7. The method for receiving the nuclear power plant materials according to claim 1, wherein after the warehousing server determines whether the materials to be received are cross-station materials and whether the material attributes of the materials to be received include material attributes that do not allow cross-station materials reception according to the material request information, the method further comprises:
and when the material to be received is not the cross-power-station material receiving, the storage server determines an auditing party corresponding to the material value of the material to be received according to a preset value-auditing party matching list, and sends the material receiving application information to an auditing party of the SAP server.
8. The method for receiving the nuclear power plant material as recited in claim 1, wherein the determining the reviewer corresponding to the material value of the material to be received according to a preset value-reviewer matching list includes:
when the material value of the material to be received is determined to exceed one ten thousand yuan, the storage server sends the material receiving application information to a first-level auditor;
and when the material value of the material to be received is determined not to exceed one ten thousand yuan, sending the material receiving application information to a second-level auditor, wherein the audit authority of the second-level auditor is higher than that of the first-level auditor.
9. The nuclear power plant material getting method as claimed in claim 1, wherein the warehousing server generates a getting list according to the getting application information, the approval pass information and the material recommendation information, and comprises:
the storage server sends the material recommendation information to the material receiving party and judges whether feedback information of the material receiving party to the material recommendation information is received within a preset time length;
when feedback information of the material receiving party on the material recommendation information is received within a preset time length, the warehousing server determines whether the feedback information contains replacement recommendation batch information or not, wherein the replacement recommendation batch information comprises a request for replacing a batch and a replacement reason;
if the recommended batch replacement information is not contained, the warehousing server generates a material getting list according to the material getting application information, the approval passing information and the material recommendation information;
if the information comprises the replacement recommended batch information, the warehousing server extracts key information in the replacement reason, generates new material recommendation information according to the replacement batch after confirming that the key information is successfully matched with a preset replacement reason allowed, and generates a material requisition list according to the material requisition information, the approval recommendation passing information and the new material recommendation information.
10. The method for receiving the material from the nuclear power plant as recited in claim 9, wherein after determining whether the feedback information of the material receiver on the material recommendation information is received within a preset time period, the method further comprises:
and when the feedback information of the material receiving party on the material recommendation information is not received within the preset time length, the warehousing server returns the material receiving party after marking the material receiving approval request as an interruption request.
11. A material handling system for nuclear power plant material, comprising a warehouse server, wherein the warehouse server comprises a memory, a processor and computer readable instructions stored in the memory and executable on the processor, and the processor executes the computer readable instructions to implement the material handling method for nuclear power plant material according to any one of claims 1 to 10.
12. A computer readable storage medium storing computer readable instructions, wherein the computer readable instructions, when executed by a processor, implement a method for nuclear power plant material procurement as defined in any one of claims 1 to 10.
CN202010042775.0A 2020-01-15 2020-01-15 Nuclear power station material receiving method and system and storage medium Pending CN111260285A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010042775.0A CN111260285A (en) 2020-01-15 2020-01-15 Nuclear power station material receiving method and system and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010042775.0A CN111260285A (en) 2020-01-15 2020-01-15 Nuclear power station material receiving method and system and storage medium

Publications (1)

Publication Number Publication Date
CN111260285A true CN111260285A (en) 2020-06-09

Family

ID=70950569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010042775.0A Pending CN111260285A (en) 2020-01-15 2020-01-15 Nuclear power station material receiving method and system and storage medium

Country Status (1)

Country Link
CN (1) CN111260285A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112101848A (en) * 2020-08-11 2020-12-18 大亚湾核电运营管理有限责任公司 Nuclear power plant strategic material receiving method, device, equipment and medium for combined reserve
CN112101852A (en) * 2020-08-11 2020-12-18 大亚湾核电运营管理有限责任公司 Method, device, equipment and medium for recommending material sending batches of nuclear power station materials
CN112116287A (en) * 2020-08-11 2020-12-22 大亚湾核电运营管理有限责任公司 Multi-power station spare part borrowing method, system and medium based on heap clustering mode
CN112287190A (en) * 2020-11-03 2021-01-29 珠海格力电器股份有限公司 Replacement material recommendation method, device and equipment
CN113792014A (en) * 2021-08-05 2021-12-14 广东核电合营有限公司 Nuclear power station file management method and device, terminal equipment and storage medium
CN114548907A (en) * 2022-01-19 2022-05-27 北京得瑞领新科技有限公司 Test material management method and device, storage medium and computer equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458789A (en) * 2008-12-11 2009-06-17 金蝶软件(中国)有限公司 Material information management method and system
KR20140006691A (en) * 2012-07-06 2014-01-16 주식회사 우리은행 System for prior consultation and application service using the internet banking system and method therefor
CN104102977A (en) * 2014-07-23 2014-10-15 国家电网公司 Material information management platform and management method thereof
CN108921510A (en) * 2018-06-27 2018-11-30 中国建设银行股份有限公司 Banking remote auto checking method and system
CN109993479A (en) * 2019-02-13 2019-07-09 平安科技(深圳)有限公司 Procurement data processing method, device, storage medium and server
CN110046860A (en) * 2019-04-24 2019-07-23 广东电网有限责任公司 A kind of electric power enterprise first aid package management method and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101458789A (en) * 2008-12-11 2009-06-17 金蝶软件(中国)有限公司 Material information management method and system
KR20140006691A (en) * 2012-07-06 2014-01-16 주식회사 우리은행 System for prior consultation and application service using the internet banking system and method therefor
CN104102977A (en) * 2014-07-23 2014-10-15 国家电网公司 Material information management platform and management method thereof
CN108921510A (en) * 2018-06-27 2018-11-30 中国建设银行股份有限公司 Banking remote auto checking method and system
CN109993479A (en) * 2019-02-13 2019-07-09 平安科技(深圳)有限公司 Procurement data processing method, device, storage medium and server
CN110046860A (en) * 2019-04-24 2019-07-23 广东电网有限责任公司 A kind of electric power enterprise first aid package management method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘耿: "《生产现场管理细化量化与过程控制》", 广东经济出版社, pages: 193 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112101848A (en) * 2020-08-11 2020-12-18 大亚湾核电运营管理有限责任公司 Nuclear power plant strategic material receiving method, device, equipment and medium for combined reserve
CN112101852A (en) * 2020-08-11 2020-12-18 大亚湾核电运营管理有限责任公司 Method, device, equipment and medium for recommending material sending batches of nuclear power station materials
CN112116287A (en) * 2020-08-11 2020-12-22 大亚湾核电运营管理有限责任公司 Multi-power station spare part borrowing method, system and medium based on heap clustering mode
CN112101848B (en) * 2020-08-11 2024-06-07 大亚湾核电运营管理有限责任公司 Nuclear power station strategic material collecting method, device, equipment and medium for combined reserve
CN112287190A (en) * 2020-11-03 2021-01-29 珠海格力电器股份有限公司 Replacement material recommendation method, device and equipment
CN113792014A (en) * 2021-08-05 2021-12-14 广东核电合营有限公司 Nuclear power station file management method and device, terminal equipment and storage medium
CN113792014B (en) * 2021-08-05 2023-08-25 广东核电合营有限公司 Nuclear power station file management method and device, terminal equipment and storage medium
CN114548907A (en) * 2022-01-19 2022-05-27 北京得瑞领新科技有限公司 Test material management method and device, storage medium and computer equipment

Similar Documents

Publication Publication Date Title
CN111260285A (en) Nuclear power station material receiving method and system and storage medium
CN102947819B (en) Information tracking system and method
US8813178B1 (en) Systems and methods for preparing and submitting documents to comply with securities regulations
US9213540B1 (en) Automated workflow management system for application and data retirement
US8806656B2 (en) Method and system for secure and selective access for editing and aggregation of electronic documents in a distributed environment
EP2564560B1 (en) Information tracking system and method
US20160307156A1 (en) System and Method of Issuing and Monitoring Electronic Citations
CN101739441A (en) Method of image information input and system thereof
US20150127678A1 (en) Event triggered service for the lightweight directory access protocol
CN106775713B (en) File auditing method and device and file submitting control system
US20040098321A1 (en) Integrated inventory management system and method
US11989713B2 (en) System, method and device for processing a transaction
CN116562826B (en) Client ERP system management method, system and medium based on user demand
US11663593B2 (en) Hierarchy-based blockchain
US20230334609A1 (en) Information management method and non-transitory, computer readable, tangible storage medium storing information management program
WO2011136782A1 (en) Document registry system
CN116702110A (en) Method, device, equipment and storage medium for sharing big data of supply chain
CA3142579A1 (en) Method and apparatus for validation of event tracking acquired data
CN112101848A (en) Nuclear power plant strategic material receiving method, device, equipment and medium for combined reserve
US20140101676A1 (en) Publishing of an application program interface
US8190559B2 (en) Document management apparatus, storage medium storing program for document management apparatus, and method for managing documents
US20150317567A1 (en) Business Change Management System
CN114819896A (en) AI-based bill management system, method and storage medium
CN110457332B (en) Information processing method and related equipment
CN106600350A (en) Dealer supply platform based on B/S structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination