CN111244946A - Method and device for regulating and controlling power generation and utilization resources of self-contained power plant - Google Patents

Method and device for regulating and controlling power generation and utilization resources of self-contained power plant Download PDF

Info

Publication number
CN111244946A
CN111244946A CN202010098270.6A CN202010098270A CN111244946A CN 111244946 A CN111244946 A CN 111244946A CN 202010098270 A CN202010098270 A CN 202010098270A CN 111244946 A CN111244946 A CN 111244946A
Authority
CN
China
Prior art keywords
self
power plant
contained power
energy consumption
contained
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010098270.6A
Other languages
Chinese (zh)
Other versions
CN111244946B (en
Inventor
杨梓俊
李小荣
孙勇
于芮技
宋杰
邵军军
郑红娟
纪程
黄怡凡
高赐威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Southeast University
State Grid Jiangsu Electric Power Co Ltd
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
State Grid Corp of China SGCC
Southeast University
State Grid Jiangsu Electric Power Co Ltd
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Southeast University, State Grid Jiangsu Electric Power Co Ltd, NARI Group Corp, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202010098270.6A priority Critical patent/CN111244946B/en
Publication of CN111244946A publication Critical patent/CN111244946A/en
Application granted granted Critical
Publication of CN111244946B publication Critical patent/CN111244946B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a method and a device for regulating and controlling power generation and utilization resources of a self-contained power plant. The invention comprehensively considers the adjustable power generation and utilization resources of the self-contained power plant, including the generator, the adjustable load and the energy storage device, and the three are equivalent to be integrally involved in demand response, thereby fully exploiting the demand response potential of the self-contained power plant and remarkably lightening the peak regulation burden of the power grid.

Description

Method and device for regulating and controlling power generation and utilization resources of self-contained power plant
Technical Field
The invention belongs to the technical field of power systems and automation thereof, and particularly relates to a method and a device for regulating and controlling power generation and utilization resources of a self-contained power plant.
Background
The self-contained power plant refers to a power plant which is built by enterprises to meet the self power consumption demand. And the self-contained power plant generates power according to the standard meeting the production requirement of the unit, and partial power is purchased from the power grid when the self-contained power plant is insufficient. In contrast, utility power plants, i.e., power plants that provide electricity to the public, are known. The existing self-contained power plant management mode and means cannot meet the relevant requirements on the self-contained power plant standard management and flexible participation in trading under new situations, and a method with operability is urgently needed to further technically explore the function realization of the self-contained power plant in the fields of participation in demand response peak regulation, new energy consumption and the like under a new market environment. Meanwhile, the enterprise self-contained power plant can promote the comprehensive utilization efficiency of the overall resources of the society, and the installed power plant in the operation range of the national grid company can reach over 9000 ten thousand watts, so that the resource is an important resource for improving the operation flexibility of the power grid. Therefore, the self-contained power plant is a demand response resource with huge regulation potential, and due to the particularity of the power generation and utilization integration, the regulation and control method applicable to the conventional power plant and the conventional load is not applicable to the self-contained power plant, so that the regulation and control method for the power generation and utilization resources of the self-contained power plant needs to be provided.
Disclosure of Invention
In order to solve the technical problems mentioned in the background art, the invention provides a method and a device for regulating and controlling power generation and utilization resources of a self-contained power plant, each power generation and utilization resource of the self-contained power plant is equivalent to a whole under the condition of considering the constraint of each technical condition, and corresponding regulation and control schemes are provided for different requirements of a power grid.
In order to achieve the technical purpose, the technical scheme of the invention is as follows: a method for regulating and controlling power generation and utilization resources of a self-contained power plant comprises the following steps:
the method comprises the steps of obtaining a unit regulation energy consumption model of the self-contained power plant, a total response model of the self-contained power plant and total response times of the self-contained power plant through a pre-constructed regulation energy consumption model and response model of the self-contained power plant generator set output, a regulation energy consumption model and response model of the enterprise power utilization side adjustable load and a regulation energy consumption model and response model of the energy storage device, and solving an optimal power generation and utilization resource regulation strategy by taking the minimum power generation and utilization resource regulation energy consumption, the shortest response time and the minimum response times of the self-contained power plant as optimization targets.
Further, the energy consumption adjusting model for the output of the power generation unit of the self-contained power plant is as follows:
Figure BDA0002385980920000021
CG[i]=Czi+Cri+Cwi
Czi=C0
Figure BDA0002385980920000022
Cwi=KwipGit
Figure BDA0002385980920000023
wherein: CG is the total output of the self-contained power plant generator set to regulate energy consumption, CG i]Adjusting energy consumption, x, for the output of a self-contained power plant generator set iiFor the operating state of the generator i of the self-contained power plant, pGitIs the power of the self-provided power plant generator set i output, gammaiRegulating energy consumption per unit output, CziEnergy consumption for initial construction of self-contained power plant generator set i, C0Representing initial construction energy consumption, CriFor the unit operating energy consumption of the self-contained power plant generator unit i, ai、bi、ciIs the energy consumption coefficient of the self-contained power plant generator set i, CwiEnergy consumption for operation and maintenance of self-contained power plant generator set i, KwiThe operation maintenance coefficient of the self-contained power plant generator set i is obtained;
the constraints are as follows:
the unit output force when adjusted upwards is expressed as follows:
pGi(t+1)-pGit≤URi
the set output down adjustment is expressed as follows:
pGit-pGi(t+1)≤DRi
constraint of maximum and minimum output of the unit:
Figure BDA0002385980920000031
wherein: URiFor the maximum upward climbing speed of the self-contained power plant generator set i, DRiFor the self-contained power plant generator set i to have the maximum downward climbing speed pGitThe output of the self-contained power plant generator set i at the moment t, pGi(t+1)The output of the self-contained power plant generator set i at the moment t +1,
Figure BDA0002385980920000032
the minimum output of the self-contained power plant generator set i at the moment t,
Figure BDA0002385980920000033
the maximum output of the self-contained power plant generator set i at the moment t;
the demand response time model of the generator set of the self-contained power plant is as follows:
Figure BDA0002385980920000034
Figure BDA0002385980920000035
DRi≤Ri≤URi
in the above formula, the first and second carbon atoms are,
Figure BDA0002385980920000036
is the output limit, R, of the generator set iiFor the ramp rate, τ, of the generator set iiIs the response time of the genset i.
Further, the energy consumption adjusting model of the adjustable load at the power utilization side of the enterprise is as follows:
Figure BDA0002385980920000041
CL[j]=kjtμt(pj(t+1)-pjt)2·Δtj
Figure BDA0002385980920000042
Figure BDA0002385980920000043
wherein: j is the number of the controllable load, j is 1,2 …, m is the total number of the controllable load, CL [ j]The energy consumption, p, of the regulation of the controllable load j caused by the process regulation and the fluctuation of the running state of the equipmentjtThe capacity of the controllable load j at time t, pj(t+1)Adjusted capacity, gamma, for the controllable load j at time t +1jFor regulating the energy consumption, k, per unit power of the controllable loadjtFor the proportion of the load involved in the regulation at time t, μtIf the load running time is advanced when the controllable load participates in regulation for the time influence factor
Figure BDA0002385980920000044
Describing the lead time of the controllable load j, and defining if the running time of the load is moved
Figure BDA0002385980920000045
Description of the lag time, Δ t, of a controllable load jjAdjusting the time span, TS, for a controllable load jjFor the load to start the working time, TEjEnding the working time for the controllable load j, wherein T represents a time period;
the response model of the adjustable load is:
Figure BDA0002385980920000046
wherein: k is the number of the electric devices in the controllable load j, k is 1,2, …, p, p is the total number of the electric devices, and τ isjResponse time for controlled load,
Figure BDA0002385980920000047
For the demand response time of the kth consumer in the controllable load j,
Figure BDA0002385980920000048
the demand response time of the p-th electric equipment in the controllable load j.
Further, the energy consumption adjusting model of the energy storage device is as follows:
Figure BDA0002385980920000051
wherein p issFor the magnitude of the power of the energy storage device, gammasFor regulating energy consumption, k, per unit of stored energy powersFor the depreciation factor, gamma, of the energy storage devicepCoefficient of power consumption gammacIn order to obtain the capacity energy consumption coefficient,
Figure BDA0002385980920000052
is the upper limit of the energy storage capacity;
and (3) constraint of the capacity of the energy storage device:
Figure BDA0002385980920000053
wherein,
Figure BDA0002385980920000054
the maximum power of the energy storage device;
the response time model of the energy storage device is:
Figure BDA0002385980920000055
wherein, tausFor the response time of the energy storage device, τqThe response time of the q-th response is n.
Further, the self-contained power plant unit adjusts the energy consumption model gammaTComprises the following steps:
Figure BDA0002385980920000056
wherein:
Figure BDA0002385980920000057
respectively in the states of the generator set before adjustment and the controllable load switch,
Figure BDA0002385980920000058
respectively the regulated generator set and the controllable load switch state, PTIn order to comprehensively consider the unit output, the electric load and the equivalent load of the self-contained power plant obtained by the energy storage device,
Figure BDA0002385980920000059
in order to adjust the charging and discharging power of the pre-stored energy,
Figure BDA00023859809200000510
charge and discharge power, p, for regulated energy storagejtThe capacity of the controllable load j at the time t;
total response time model τ for self-contained power plantsTComprises the following steps:
Figure BDA00023859809200000511
wherein:
Figure BDA0002385980920000061
in order to adjust the on-off state of the front energy storage device,
Figure BDA0002385980920000062
the on-off state of the energy storage device is adjusted;
total number of responses J of self-contained power plantnum
Figure BDA0002385980920000063
The self-contained power plant adjusts the energy consumption CT to be:
Figure BDA0002385980920000064
further, with the optimization objectives of minimum energy consumption, shortest response time and minimum response times for adjusting the power generation and utilization resources of the self-contained power plant, an optimal power generation and utilization resource regulation strategy is solved, and the method specifically comprises the following steps:
Figure BDA0002385980920000065
Figure BDA0002385980920000066
Figure BDA0002385980920000067
the constraints are as follows:
Figure BDA0002385980920000068
Figure BDA0002385980920000069
pGi(t+1)-pGit≤URi
pGit-pGi(t+1)≤DRi
DRi≤Ri≤URi
Figure BDA00023859809200000610
and solving to obtain an optimal power generation and utilization resource adjustment strategy of the self-contained power plant according to the given objective function and constraint conditions.
A regulation and control device for power generation and utilization resources of a self-contained power plant comprises:
the system comprises a self-contained power plant unit adjusting energy consumption model, a total response model and a total response time calculating module, wherein the self-contained power plant unit adjusting energy consumption model, the total response model and the total response time calculating module are used for obtaining the self-contained power plant unit adjusting energy consumption model, the self-contained power plant total response time and the self-contained power plant total response time through a pre-constructed self-contained power plant generating set output adjusting energy consumption model and response model, an enterprise power side adjustable load adjusting energy consumption model and response model and an energy storage device adjusting energy consumption model and response model;
and the optimal regulation and control strategy solving module is used for solving the optimal regulation and control strategy of the power generation and utilization resources of the self-contained power plant by taking the minimum energy consumption, the shortest response time and the minimum response times of the regulation and control of the power generation and utilization resources of the self-contained power plant as optimization targets.
Further, the self-contained power plant unit adjusts the energy consumption model gammaTComprises the following steps:
Figure BDA0002385980920000071
wherein:
Figure BDA0002385980920000072
respectively in the states of the generator set before adjustment and the controllable load switch,
Figure BDA0002385980920000073
respectively the states of the regulated generator set and the controllable load switch,
Figure BDA0002385980920000074
in order to adjust the charging and discharging power of the pre-stored energy,
Figure BDA0002385980920000075
the charging and discharging power for the energy storage after adjustment;
total response model τ for self-contained power plantsTComprises the following steps:
Figure BDA0002385980920000076
wherein:
Figure BDA0002385980920000077
in order to adjust the on-off state of the front energy storage device,
Figure BDA0002385980920000078
the on-off state of the energy storage device is adjusted;
total number of responses J of self-contained power plantnum
Figure BDA0002385980920000079
The self-contained power plant adjusts the energy consumption CT to be:
Figure BDA00023859809200000710
further, with the optimization objectives of minimum energy consumption, shortest response time and minimum response times for adjusting the power generation and utilization resources of the self-contained power plant, an optimal power generation and utilization resource regulation strategy is solved, and the method specifically comprises the following steps:
Figure BDA0002385980920000081
Figure BDA0002385980920000082
Figure BDA0002385980920000083
the constraints are as follows:
Figure BDA0002385980920000084
Figure BDA0002385980920000085
pGi(t+1)-pGit≤URi
pGit-pGi(t+1)≤DRi
DRi≤Ri≤URi
Figure BDA0002385980920000086
and solving to obtain an optimal power generation and utilization resource adjustment strategy of the self-contained power plant according to the given objective function and constraint conditions.
The invention has the beneficial effects that:
according to the invention, a model for adjusting the output of the generator, the controllable load and the energy storage device is established, on the basis, the multi-objective optimization problem is solved to obtain an optimal strategy, and the rapidity and the high efficiency of the power generation and utilization resource response of the self-contained power plant are ensured. The invention equates the power generation and utilization resources of the self-contained power plant into a whole, provides an optimal regulation and control method under the condition of satisfying the constraints of various technical conditions, and fully excavates the regulation potential of the power generation and utilization resources of the self-contained power plant.
Drawings
FIG. 1 is a flow chart of a method of the present invention;
FIG. 2 is a model diagram of a generator set output constraint;
FIG. 3 is a classification chart of power generation and utilization resources of a self-contained power plant;
Detailed Description
The technical scheme of the invention is explained in detail in the following with the accompanying drawings.
Example 1:
as shown in fig. 1, the method for regulating and controlling power generation and utilization resources of a self-contained power plant of the present invention comprises the following steps:
step 1, on the power generation side of a self-contained power plant, establishing an energy consumption regulation model and a response model of the output of a generator set based on the characteristics of various generator sets in the self-contained power plant;
step 2, analyzing the adjustability of different power utilization links on the power utilization side of the enterprise based on the characteristics of the production process of the enterprise, and constructing an energy consumption adjustment model and a response model capable of adjusting the load;
step 3, from the energy storage angle of the enterprise, establishing an energy consumption regulation model and a response model of the energy storage device based on the type and the performance of the energy storage device;
and 4, solving an optimal power generation and utilization resource regulation strategy by taking the minimum energy consumption, the shortest response time and the minimum response times of power generation and utilization resource regulation of the self-contained power plant as optimization targets.
In this embodiment, the step 1 is implemented by the following preferred scheme:
1-1, establishing an energy consumption adjusting model of the output of the generator set:
the self-contained power plant power generation resources mainly comprise self-contained power plant coal-fired unit power generation, self-contained power plant cogeneration unit power generation and self-contained power plant waste heat and residual pressure unit power generation. According to the characteristics of natural resources, some natural resources have one-time consumption properties, such as non-renewable mineral resources, partially renewable forest resources and water resources, the use of the resources has an intermediate consumption property, and the resources consumed by the operation of the generating set are mainly coal and water. Therefore, the power generation energy consumption of the generator set can be mainly divided into initial construction energy consumption, unit operation energy consumption and operation and maintenance energy consumption. Assuming that the self-contained power plant comprises n generator sets, and the number of each generator set is i, establishing an energy consumption regulation model of the generator set output as follows:
CG[i]=Czi+Cri+Cwi(1)
Czi=C0(2)
Figure BDA0002385980920000091
Cwi=KwipGit(4)
Figure BDA0002385980920000101
Figure BDA0002385980920000102
wherein: CG is the total output of the self-contained power plant generator set to regulate energy consumption, CG i]For the output of self-contained power plant generator set iForce-regulated energy consumption, xiThe working state of the generator i of the self-contained power plant is 1, the normal operation of the generator is performed, 0 is the shutdown state of the generator, and p isGitIs the power of the self-provided power plant generator set i output, gammaiRegulating energy consumption per unit output, CziThe initial construction energy consumption of the generator set i of the self-contained power plant is determined by the factors of the self-contained power plant scale, the loading capacity, the type of the generator set and the like, wherein C is used in the formula0Indicating the initial construction energy consumption. CriThe unit operation energy consumption of the power generation unit i of the self-contained power plant is related to the real-time output of the unit, ai、bi、ciIs the energy consumption coefficient of the generator set i of the self-contained power plant. CwiMaintaining energy consumption for the operation of the generator set i of the self-contained power plant, wherein the energy consumption is determined by the using time length and the using mode of the generator set, KwiAnd the operation maintenance coefficient of the self-provided power plant generator set i.
1-2, constraint conditions of generator output:
in order to maintain real-time power balance, when the utility grid power fluctuation causes the system to have power surplus or shortage, the self-contained power plant unit can provide upward or downward flexible resources within the output range, and the constraint condition can be expressed as follows:
pGi(t+1)-pGit≤URi(7)
pGit-pGi(t+1)≤DRi(8)
Figure BDA0002385980920000103
wherein: URiFor the maximum upward climbing speed of the self-contained power plant generator set i, DRiFor the maximum downward climbing rate of the self-contained power plant generator set i, pGitThe output of the self-contained power plant generator set i at the moment t, pGi(t+1)The output of the generator set i of the self-contained power plant at the moment t +1,
Figure BDA0002385980920000104
for the minimum output of the generator i of the self-contained power plant,
Figure BDA0002385980920000105
the maximum output of the generator i of the self-prepared power plant.
As shown in fig. 2, it can be found that the upper limit of the point a when adjusted upward is the maximum output of the unit, the upper limit of the point B when adjusted upward is the upward climbing upper limit of the unit, the lower limit of the point C when adjusted downward is the downward climbing lower limit of the unit, and the lower limit of the point D when adjusted downward is the minimum output of the unit.
1-3, establishing a generator demand response time model:
Figure BDA0002385980920000111
Figure BDA0002385980920000112
DRi≤Ri≤URi(12)
wherein:
Figure BDA0002385980920000113
is the output limit, R, of the generator set iiFor the ramp rate, τ, of the generator set iiIs the response time of the generator i.
And determining a model of the unit output of the generator for regulating energy consumption and response time of the self-contained power plant in the process of participating in the demand response according to the equations (6) and (10), and considering the constraint conditions of the output of the generator in the actual regulating process, wherein the constraint conditions comprise the equations (7), (8), (9) and (12).
In this embodiment, the step 2 is implemented by the following preferred scheme:
2-1, establishing a controllable load regulation energy consumption model:
in electric devices electrical energy is converted into mechanical, thermal, optical, acoustical or chemical energy to achieve a specific purpose. The electric equipment of the enterprise load side with the self-contained power plant comprises a motor, electric lighting, an electric furnace, electric welding and electrolysis equipment, the electric equipment is divided into controllable load and uncontrollable load according to whether the electric equipment can be adjusted, the uncontrollable load belongs to the type of consuming flexible resources, therefore, the adjustable capacity provided by the load is zero, the controllable load can actively respond to the fluctuation of external power, namely, the adjustable capacity is supplied, the controllable load is similar to a conventional power supply of the electric side and can be adjusted within a certain power range, and the real-time requirement of a power grid is matched.
When controllable load adjustment is carried out in the self-contained power plant, the total output of enterprises on the day is required to be constant, so that the adjustable capacity of different power utilization links is determined according to the production process of the enterprise to which the self-contained power plant belongs, and if the production process of the enterprise comprises m controllable loads and the number of each controllable load is j, the controllable load adjustment energy consumption model can be expressed as follows:
CL[j]=kjtμt(pj(t+1)-pjt)2·Δtj(13)
Figure BDA0002385980920000121
Figure BDA0002385980920000122
Figure BDA0002385980920000123
wherein: j is the number of the controllable load, j is 1,2 …, m is the total number of the controllable load, CL [ j]For the technical regulation of energy consumption, p, brought by process regulation and equipment running state fluctuation after the regulation of the controllable load jjtThe capacity of the controllable load j at time t, pj(t+1)Adjusted capacity, gamma, for the controllable load j at time t +1jRegulating energy consumption, k, for controlled load per unit powerjtFor the proportion of the load involved in the regulation at time t, μtIf the load running time is advanced when the controllable load participates in regulation for the time influence factor
Figure BDA0002385980920000124
Describing the lead time of the controllable load j, and defining if the running time of the load is moved
Figure BDA0002385980920000125
Describing the lag time, Δ t, of a controllable load jjAdjusting the time span, TS, for a controllable load jjFor the load to start the working time, TEjThe working time is ended for a controllable load j, and T represents the time period, 24 hours a day.
2-2, establishing a controllable load response time model:
Figure BDA0002385980920000126
wherein: k is the number of the electric devices in the controllable load j, k is 1,2, …, p, p is the total number of the electric devices, and τ isjIn order to be able to control the response time of the load,
Figure BDA0002385980920000127
for the demand response time of the kth consumer in the controllable load j,
Figure BDA0002385980920000128
the demand response time of the p-th electric equipment in the controllable load j.
And (4) establishing a model for regulating energy consumption and response time in the process of participating in demand response by the controllable load in the enterprise to which the self-contained power plant belongs according to the formulas (14) and (17).
In this embodiment, the step 3 is implemented by the following preferred scheme:
3-1, establishing an energy consumption adjusting model of the energy storage device:
as a supplementary link of the operation of the power system, the energy storage has the characteristics of smooth output power and bidirectional adjustment, so that the energy storage is mainly used for compensating the under-cut or over-cut amount generated during the action of the load, and the production and the use of electric energy can be effectively isolated from time, thereby improving the accuracy of power adjustment and assisting in solving the execution principle of instantaneous balance of supply and demand of the power system. At the same time, energy storage devices are expensive, so that an enterprise to which a self-contained power plant belongs is usually equipped with an energy storage device, and the energy consumption regulation model is as follows:
Figure BDA0002385980920000131
wherein: p is a radical ofsFor the magnitude of the power of the energy storage device, gammasFor regulating energy consumption, k, per unit of stored energy powersFor the depreciation factor, gamma, of the energy storage devicepThe power consumption coefficient is determined by the charge and discharge power of the energy storage device. Gamma raycIs a capacity energy consumption coefficient, is determined by the capacity of the energy storage device,
Figure BDA0002385980920000132
is the upper limit of the energy storage capacity.
3-2, constraint of capacity of the energy storage device:
Figure BDA0002385980920000133
wherein:
Figure BDA0002385980920000134
is the maximum power of the energy storage device.
3-3, establishing the response time of the energy storage device:
Figure BDA0002385980920000135
wherein: tau issFor the response time of the energy storage device, τqThe response time of the q-th response is n.
And (3) establishing a model for regulating energy consumption and response time in the process of enabling the energy storage devices in the enterprises to which the self-contained power plants belong to participate in demand response according to the equations (18) and (20), and considering the constraint of the capacity of the energy storage devices according to the equation (19).
In this embodiment, the step 4 is implemented by adopting the following preferred scheme:
4-1, establishing an equivalent load model P of the self-contained power plantT
The self-contained power plant power generation and utilization resources comprise a power generating set, an enterprise power load and an energy storage device, wherein the power generation resources comprise pure coal-fired unit power generation, cogeneration unit power generation, waste heat and residual pressure unit power generation and the energy storage device, different types and installed capacities of the power generating set can result in different adjustable capacities, and different types and performances of the energy storage device can also influence the charging and discharging power of the energy storage device; the power utilization resources are mainly power utilization in the production process of enterprises, and the controllability of different power utilization environments in the production process is different, so that the analysis needs to be divided into controllable analysis and uncontrollable analysis, and the type, power and application scene of power utilization equipment can influence the controllable capacity of the power utilization equipment for controllable loads. As shown in fig. 3, when the self-contained power plant generator set, the controllable load of the enterprise to which the self-contained power plant generator set belongs, and the energy storage device are considered as an integral equivalent, and participate in demand response externally, the load can be considered as an equivalent load, and the regulation condition of the load is determined by the three, and can be expressed as follows:
Figure BDA0002385980920000141
wherein: pTEquivalent load of power resource for self-contained power plantjIs in the on-off state of the controllable load, 1 is the normal power consumption of the controllable load, 0 is the off state of the controllable load, and x0The state is the on-off state of the energy storage device, 1 is the normal work of the energy storage device, and 0 is the off-state of the energy storage device.
If the equivalent load obtained by the three components is integrated to output power to the power grid, which is equivalent to the output of a generator set in the power grid, the equivalent load can effectively participate in peak shaving during the power utilization peak of the power grid; if the equivalent load obtained by integrating the three components absorbs power from the power grid, which is equivalent to the power load in the power grid, the equivalent load can help the new energy to be consumed in the low ebb of the power grid.
4-2, establishing a self-contained power plant unit regulation energy consumption model gammaT
Calculating the unit regulation energy consumption of the power generation and utilization resources of the self-contained power plant according to the regulation energy consumption of the output of the generator set, the controllable load regulation energy consumption and the energy storage device regulation energy consumption, and can be expressed as follows:
Figure BDA0002385980920000142
wherein:
Figure BDA0002385980920000151
respectively in the states of the generator set before adjustment and the controllable load switch,
Figure BDA0002385980920000152
respectively the regulated generator set and the controllable load switch state PTIn order to comprehensively consider the unit output, the electrical load and the equivalent load of the self-contained power plant obtained by the energy storage device,
Figure BDA0002385980920000153
in order to adjust the charging and discharging power of the pre-stored energy,
Figure BDA0002385980920000154
charging and discharging power, p, for regulated stored energyjtThe power of the controllable load j at time t.
4-3, establishing a total response time model tau of the self-contained power plantT
Because the response time of the generator set, the controllable load and the stored energy in the enterprise to which the self-contained power plant belongs is different, the overall response time of the power generation and utilization resources of the self-contained power plant is the individual maximum response time, and can be expressed as follows:
Figure BDA0002385980920000155
wherein:
Figure BDA0002385980920000156
in order to adjust the on-off state of the front energy storage device,
Figure BDA0002385980920000157
for storing energy after regulationThe on-off state of the device.
4-4, calculating the total response times J of the self-contained power plantnum
Figure BDA0002385980920000158
4-5, solving an optimal regulation strategy:
the energy consumption CT for adjusting the power generation and utilization resources of the self-contained power plant can be obtained according to the energy consumption model for adjusting the power generation and utilization resources of the self-contained power plant and can be expressed as follows:
Figure BDA0002385980920000159
the optimization objectives of minimum energy consumption regulation, minimum total response time of each unit and minimum total response times of each unit of the power generation and utilization resources of the self-contained power plant can be expressed as follows:
Figure BDA00023859809200001510
Figure BDA00023859809200001511
Figure BDA00023859809200001512
simultaneously, the actual operation conditions of each unit are considered, and corresponding constraint conditions are listed as follows:
S.t:
Figure BDA0002385980920000161
Figure BDA0002385980920000162
pGi(t+1)-pGit≤URi(31)
pGit-pGi(t+1)≤DRi(32)
DRi≤Ri≤URi(33)
Figure BDA0002385980920000163
wherein: the target function minCT represents the total regulation of the equivalent load with the lowest energy consumption so as to ensure the economic and environmental operation of the equivalent whole, and the target function min tauTThe minimum number of times of unit and load actions is expressed to minimize the influence range of regulation and control, and the objective function min JnumThe response time of the equivalent whole is shown to be shortest so that the system can recover a stable state as soon as possible, and the listed constraints are respectively a power balance constraint, a unit output upper and lower limit constraint, a unit climbing rate constraint and an energy storage output power constraint.
And finally, solving to obtain an optimal strategy according to the given objective function and constraint conditions.
Example 2:
a regulation and control device for power generation and utilization resources of a self-contained power plant comprises:
the system comprises a self-contained power plant unit adjusting energy consumption model, a total response model and a total response time calculating module, wherein the self-contained power plant unit adjusting energy consumption model, the total response model and the total response time calculating module are used for obtaining the self-contained power plant unit adjusting energy consumption model, the self-contained power plant total response time and the self-contained power plant total response time through a pre-constructed self-contained power plant generating set output adjusting energy consumption model and response model, an enterprise power side adjustable load adjusting energy consumption model and response model and an energy storage device adjusting energy consumption model and response model;
and the optimal regulation and control strategy solving module is used for solving the optimal regulation and control strategy of the power generation and utilization resources of the self-contained power plant by taking the minimum energy consumption, the shortest response time and the minimum response times of the regulation and control of the power generation and utilization resources of the self-contained power plant as optimization targets.
Self-contained power plant unit regulation energy consumption model gammaTComprises the following steps:
Figure BDA0002385980920000171
wherein:
Figure BDA0002385980920000172
respectively in the states of the generator set before adjustment and the controllable load switch,
Figure BDA0002385980920000173
respectively the states of the regulated generator set and the controllable load switch,
Figure BDA0002385980920000174
in order to adjust the charging and discharging power of the pre-stored energy,
Figure BDA0002385980920000175
the charging and discharging power for the energy storage after adjustment;
total response time model τ for self-contained power plantsTComprises the following steps:
Figure BDA0002385980920000176
wherein:
Figure BDA0002385980920000177
in order to adjust the on-off state of the front energy storage device,
Figure BDA0002385980920000178
the on-off state of the energy storage device is adjusted;
total number of responses J of self-contained power plantnum
Figure BDA0002385980920000179
The self-contained power plant adjusts the energy consumption CT to be:
Figure BDA00023859809200001710
the method comprises the following steps of solving an optimal power generation and utilization resource regulation strategy by taking the minimum energy consumption, the shortest response time and the minimum response times of power generation and utilization resource regulation of a self-contained power plant as optimization targets, and specifically comprises the following steps:
Figure BDA00023859809200001711
Figure BDA00023859809200001712
Figure BDA00023859809200001713
the constraints are as follows:
Figure BDA00023859809200001714
Figure BDA00023859809200001715
pGi(t+1)-pGit≤URi
pGit-pGi(t+1)≤DRi
DRi≤Ri≤URi
Figure BDA0002385980920000181
and solving to obtain an optimal power generation and utilization resource adjustment strategy of the self-contained power plant according to the given objective function and constraint conditions.
The invention comprehensively considers the adjustable power generation and utilization resources of the self-contained power plant, including the generator, the adjustable load and the energy storage device, and the three are equivalent to be integrally involved in demand response, thereby fully exploiting the demand response potential of the self-contained power plant and remarkably lightening the peak load regulation of the power grid.
The embodiments are only for illustrating the technical idea of the present invention, and the technical idea of the present invention is not limited thereto, and any modifications made on the basis of the technical scheme according to the technical idea of the present invention fall within the scope of the present invention.

Claims (9)

1. A method for regulating and controlling power generation and utilization resources of a self-contained power plant is characterized by comprising the following steps:
the method comprises the steps of obtaining a unit regulation energy consumption model of the self-contained power plant, a total response model of the self-contained power plant and the total response times of the self-contained power plant through a pre-constructed regulation energy consumption model and response model of the self-contained power plant generator set output, a regulation energy consumption model and response model of the enterprise power utilization side adjustable load and a regulation energy consumption model and response model of the energy storage device, and solving an optimal power generation and utilization resource regulation strategy by taking the minimum power generation and utilization resource regulation energy consumption, the shortest response time and the minimum response times of the self-contained power plant as optimization targets.
2. The method for regulating and controlling the power generation and utilization resources of the self-contained power plant according to claim 1, wherein the model for regulating the energy consumption of the output of the generator set of the self-contained power plant is as follows:
Figure FDA0002385980910000011
CG[i]=Czi+Cri+Cwi
Czi=C0
Figure FDA0002385980910000012
Cwi=KwipGit
Figure FDA0002385980910000013
wherein: CG is the total output of the self-contained power plant generator set to regulate energy consumption, CG i]Adjusting energy consumption, x, for the output of a self-contained power plant generator set iiFor the operating state of the generator i of the self-contained power plant, pGitIs the power of the self-provided power plant generator set i output, gammaiRegulating energy consumption per unit output, CziIs self-provided with electricityInitial construction energy consumption of plant generator set i, C0Representing initial construction energy consumption, CriFor the unit operating energy consumption of the self-contained power plant generator unit i, ai、bi、ciIs the energy consumption coefficient of the self-contained power plant generator set i, CwiEnergy consumption for operation and maintenance of self-contained power plant generator set i, KwiThe operation maintenance coefficient of the self-contained power plant generator set i is obtained;
the constraints are as follows:
the unit output force when adjusted upwards is expressed as follows:
pGi(t+1)-pGit≤URi
the set output down adjustment is expressed as follows:
pGit-pGi(t+1)≤DRi
constraint of maximum and minimum output of the unit:
Figure FDA0002385980910000021
wherein: URiFor the maximum upward climbing speed of the self-contained power plant generator set i, DRiFor the self-contained power plant generator set i maximum downward climbing speed, pGitThe output of the self-contained power plant generator set i at the moment t, pGi(t+1)The output of the self-contained power plant generator set i at the moment t +1,
Figure FDA0002385980910000022
the minimum output of the self-contained power plant generator set i at the moment t,
Figure FDA0002385980910000023
the maximum output of the self-contained power plant generator set i at the moment t;
the demand response time model of the generator set of the self-contained power plant is as follows:
Figure FDA0002385980910000024
Figure FDA0002385980910000025
DRi≤Ri≤URi
in the above formula, the first and second carbon atoms are,
Figure FDA0002385980910000026
is the output limit, R, of the generator set iiFor the ramp rate, τ, of the generator set iiIs the response time of the genset i.
3. The method for regulating and controlling the power generation and utilization resources of the self-contained power plant according to claim 1, wherein the model for regulating the energy consumption of the adjustable load at the power utilization side of the enterprise is as follows:
Figure FDA0002385980910000027
CL[j]=kjtμt(pj(t+1)-pjt)2·Δtj
Figure FDA0002385980910000028
Figure FDA0002385980910000031
wherein: j is the number of the controllable load, j is 1,2 …, m is the total number of the controllable load, CL [ j]For the regulated energy consumption, p, of the controllable load j due to process regulation and equipment operating state fluctuationjtThe capacity of the controllable load j at time t, pj(t+1)Adjusted capacity, gamma, for the controllable load j at time t +1jFor regulating the energy consumption, k, per unit power of the controllable loadjtFor the proportion of the load involved in the regulation at time t, μtIf the load running time is advanced when the controllable load participates in regulation for the time influence factor
Figure FDA0002385980910000032
Describing the lead time of the controllable load j, and defining if the load running time is shifted
Figure FDA0002385980910000033
Describing the lag time, Δ t, of a controllable load jjAdjusting the time span, TS, for a controllable load jjFor the load to start the working time, TEjEnding the working time for the controllable load j, wherein T represents a time period;
the response model of the adjustable load is:
Figure FDA0002385980910000034
wherein: k is the number of the electric devices in the controllable load j, k is 1,2, …, p, p is the total number of the electric devices, and τ isjIn order to be able to control the response time of the load,
Figure FDA0002385980910000035
for the demand response time of the kth consumer in the controllable load j,
Figure FDA0002385980910000036
the demand response time of the p-th electric equipment in the controllable load j.
4. The method for regulating and controlling the power generation and utilization resources of the self-contained power plant according to claim 1, wherein the model for regulating the energy consumption of the energy storage device is as follows:
Figure FDA0002385980910000037
wherein p issFor the magnitude of the power of the energy storage device, gammasFor regulating energy consumption, k, per unit of stored energy powersFor the depreciation factor, gamma, of the energy storage devicepCoefficient of power consumption gammacIn order to obtain the capacity energy consumption coefficient,
Figure FDA0002385980910000038
is the upper limit of the energy storage capacity;
and (3) constraint of the capacity of the energy storage device:
Figure FDA0002385980910000039
wherein,
Figure FDA0002385980910000041
the maximum power of the energy storage device;
the response time model of the energy storage device is:
Figure FDA0002385980910000042
wherein, tausFor the response time of the energy storage device, τqThe response time of the q-th response is n.
5. The method for regulating power generation and utilization resources of the self-contained power plant as claimed in claim 1, wherein the self-contained power plant unit regulates the energy consumption model γTComprises the following steps:
Figure FDA0002385980910000043
wherein:
Figure FDA0002385980910000044
respectively in the states of the generator set before adjustment and the controllable load switch,
Figure FDA0002385980910000045
respectively the regulated generator set and the controllable load switch state PTIn order to comprehensively consider the unit output, the electrical load and the equivalent load of the self-contained power plant obtained by the energy storage device,
Figure FDA0002385980910000046
in order to adjust the charging and discharging power of the pre-stored energy,
Figure FDA0002385980910000047
charge and discharge power, p, for regulated energy storagejtThe capacity of the controllable load j at the time t;
total response time model τ for self-contained power plantsTComprises the following steps:
Figure FDA0002385980910000048
wherein:
Figure FDA0002385980910000049
in order to adjust the on-off state of the front energy storage device,
Figure FDA00023859809100000410
the on-off state of the energy storage device is adjusted;
total number of responses J of self-contained power plantnum
Figure FDA00023859809100000411
The self-contained power plant adjusts the energy consumption CT to be:
Figure FDA00023859809100000412
6. the method for regulating and controlling the power generation and utilization resources of the self-contained power plant as claimed in claim 5, wherein the optimal power generation and utilization resource regulation strategy is solved by taking the minimum energy consumption, the shortest response time and the minimum response times of the power generation and utilization resources of the self-contained power plant as optimization targets, and specifically comprises the following steps:
Figure FDA0002385980910000051
Figure FDA0002385980910000052
Figure FDA0002385980910000053
the constraints are as follows:
Figure FDA0002385980910000054
Figure FDA0002385980910000055
pGi(t+1)-pGit≤URi
pGit-pGi(t+1)≤DRi
DRi≤Ri≤URi
Figure FDA0002385980910000056
and solving to obtain an optimal power generation and utilization resource adjustment strategy of the self-contained power plant according to the given objective function and constraint conditions.
7. A regulation and control device for generating and using electricity resources of a self-contained power plant is characterized by comprising:
the system comprises a self-contained power plant unit adjusting energy consumption model, a total response model and a total response time calculating module, wherein the self-contained power plant unit adjusting energy consumption model, the total response model and the total response time calculating module are used for obtaining a self-contained power plant unit adjusting energy consumption model, a self-contained power plant total response time and a self-contained power plant total response time through a pre-constructed self-contained power plant generating set output adjusting energy consumption model and response model, an enterprise power side adjustable load adjusting energy consumption model and response model and an energy storage device adjusting energy consumption model and response model;
and the optimal regulation and control strategy solving module is used for solving the optimal regulation and control strategy of the power generation and utilization resources of the self-contained power plant by taking the minimum regulation and control energy consumption, the shortest response time and the minimum response times of the power generation and utilization resources of the self-contained power plant as optimization targets.
8. The device for regulating power generation and utilization resources of a self-contained power plant as claimed in claim 7, wherein the unit regulation energy consumption model γ of the self-contained power plantTComprises the following steps:
Figure FDA0002385980910000061
wherein:
Figure FDA0002385980910000062
respectively in the states of the generator set before adjustment and the controllable load switch,
Figure FDA0002385980910000063
respectively in the states of the regulated generator set and the controllable load switch,
Figure FDA0002385980910000064
in order to adjust the charging and discharging power of the pre-stored energy,
Figure FDA0002385980910000065
the charging and discharging power for the energy storage after adjustment;
total response model τ for self-contained power plantsTComprises the following steps:
Figure FDA0002385980910000066
wherein:
Figure FDA0002385980910000067
in order to adjust the on-off state of the front energy storage device,
Figure FDA0002385980910000068
the on-off state of the energy storage device is adjusted;
total number of responses J of self-contained power plantnum
Figure FDA0002385980910000069
The self-contained power plant adjusts the energy consumption CT to be:
Figure FDA00023859809100000610
9. the method for regulating and controlling the power generation and utilization resources of the self-contained power plant as claimed in claim 8, wherein the optimal power generation and utilization resource regulation strategy is solved by taking the minimum energy consumption, the shortest response time and the minimum response times of the power generation and utilization resources of the self-contained power plant as optimization targets, and specifically comprises the following steps:
Figure FDA00023859809100000611
Figure FDA00023859809100000612
Figure FDA00023859809100000613
the constraints are as follows:
Figure FDA0002385980910000071
Figure FDA0002385980910000072
pGi(t+1)-pGit≤URi
pGit-pGi(t+1)≤DRi
DRi≤Ri≤URi
Figure FDA0002385980910000073
and solving to obtain an optimal power generation and utilization resource adjustment strategy of the self-contained power plant according to the given objective function and constraint conditions.
CN202010098270.6A 2020-02-18 2020-02-18 Method and device for regulating and controlling power generation and utilization resources of self-contained power plant Active CN111244946B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010098270.6A CN111244946B (en) 2020-02-18 2020-02-18 Method and device for regulating and controlling power generation and utilization resources of self-contained power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010098270.6A CN111244946B (en) 2020-02-18 2020-02-18 Method and device for regulating and controlling power generation and utilization resources of self-contained power plant

Publications (2)

Publication Number Publication Date
CN111244946A true CN111244946A (en) 2020-06-05
CN111244946B CN111244946B (en) 2021-11-09

Family

ID=70880044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010098270.6A Active CN111244946B (en) 2020-02-18 2020-02-18 Method and device for regulating and controlling power generation and utilization resources of self-contained power plant

Country Status (1)

Country Link
CN (1) CN111244946B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113569380A (en) * 2021-06-22 2021-10-29 国网北京市电力公司 Method and device for correcting adjusting capability of building comprehensive energy consumption
CN114118800A (en) * 2021-11-26 2022-03-01 国网新疆电力有限公司电力科学研究院 Regulation and control method for participating in frequency modulation work of self-contained power plant
US20230021277A1 (en) * 2021-07-16 2023-01-19 Sollum Technologies Inc. Systems and methods for managing undesired effects produced by horticultural lighting sources in an electrical grid
CN115933503A (en) * 2023-03-10 2023-04-07 山东盛日电力集团有限公司 Intelligent adjustment control method and system for power generation equipment
US12082320B2 (en) 2021-07-16 2024-09-03 Sollum Technologies Inc. Systems and methods for monitoring and managing reactive power from horticultural lighting sources in an electrical grid

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715873A (en) * 1993-06-29 1995-01-17 Kawasaki Steel Corp Controlling method for generated energy
CN102185526A (en) * 2011-04-24 2011-09-14 薛建仁 Novel quasi-grid-connected wind-light-electricity complementary power station
CN102185316A (en) * 2011-05-24 2011-09-14 国网电力科学研究院 Conservative principle-based power system online stability analysis section data integrating method
CN102365593A (en) * 2009-02-03 2012-02-29 东能源公司 Distributed electrical power production system and method of control thereof
US20130001946A1 (en) * 2011-06-29 2013-01-03 Kaj Skov Nielsen Method and controller for controlling an electric power production unit, in particular a wind turbine
CN103346562A (en) * 2013-07-11 2013-10-09 江苏省电力设计院 Multi-time scale microgrid energy control method considering demand response
US20130278203A1 (en) * 2010-05-04 2013-10-24 Carlos James Coe Managing Renewable Power Generation
CN103441534A (en) * 2013-07-23 2013-12-11 清华大学 Strategy for controlling matching of traditional unit and energy storage system in AGC system
US20140277808A1 (en) * 2013-03-15 2014-09-18 Open Access Technology International, Inc. Use of Demand Response (DR) and Distributed Energy Resources (DER) to mitigate the impact of Variable Energy Resources (VER) in Power System Operation
WO2014156182A1 (en) * 2013-03-29 2014-10-02 パナソニック株式会社 Load control method, load control device, and electrical load device
CN104158231A (en) * 2014-08-13 2014-11-19 国电南瑞科技股份有限公司 Unit control mode dynamic conversion method based on real-time generation scheduling
CN104181898A (en) * 2014-09-01 2014-12-03 东北电力大学 Intelligent control method and system for interactive home appliances on basis of time-of-use electricity price response
CN104392334A (en) * 2014-12-12 2015-03-04 冶金自动化研究设计院 Joint optimized scheduling method for multiple types of generating sets of self-supply power plant of iron and steel enterprise
CN105631599A (en) * 2015-12-30 2016-06-01 国网甘肃省电力公司电力科学研究院 Multi-target operation scheduling method of virtual power plant
CN106300336A (en) * 2016-07-22 2017-01-04 华北电力大学 A kind of meter and the virtual plant Multiobjective Optimal Operation method of load side and mains side
CN106385039A (en) * 2016-10-17 2017-02-08 重庆大学 Design method of mixed energy storage system for inhibiting PV power fluctuation
CN107545364A (en) * 2017-08-25 2018-01-05 合肥工业大学 The user response policy optimization method of stimulable type electricity needs response
CN107591801A (en) * 2017-09-15 2018-01-16 东南大学 A kind of load participates in the polymerization potential appraisal procedure of demand response
CN107766976A (en) * 2017-10-17 2018-03-06 国网江苏省电力公司盐城供电公司 A kind of active demand response platform of electric power market
CN109167397A (en) * 2018-08-24 2019-01-08 中国电力科学研究院有限公司 A kind of energy storage control method for coordinating and system
CN110266061A (en) * 2019-07-24 2019-09-20 国网江苏省电力有限公司 A kind of harbour bank electricity participation power grid regulation method and system based on multi-agent system

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715873A (en) * 1993-06-29 1995-01-17 Kawasaki Steel Corp Controlling method for generated energy
CN102365593A (en) * 2009-02-03 2012-02-29 东能源公司 Distributed electrical power production system and method of control thereof
US20130278203A1 (en) * 2010-05-04 2013-10-24 Carlos James Coe Managing Renewable Power Generation
CN102185526A (en) * 2011-04-24 2011-09-14 薛建仁 Novel quasi-grid-connected wind-light-electricity complementary power station
CN102185316A (en) * 2011-05-24 2011-09-14 国网电力科学研究院 Conservative principle-based power system online stability analysis section data integrating method
US20130001946A1 (en) * 2011-06-29 2013-01-03 Kaj Skov Nielsen Method and controller for controlling an electric power production unit, in particular a wind turbine
US20140277808A1 (en) * 2013-03-15 2014-09-18 Open Access Technology International, Inc. Use of Demand Response (DR) and Distributed Energy Resources (DER) to mitigate the impact of Variable Energy Resources (VER) in Power System Operation
WO2014156182A1 (en) * 2013-03-29 2014-10-02 パナソニック株式会社 Load control method, load control device, and electrical load device
CN103346562A (en) * 2013-07-11 2013-10-09 江苏省电力设计院 Multi-time scale microgrid energy control method considering demand response
CN103441534A (en) * 2013-07-23 2013-12-11 清华大学 Strategy for controlling matching of traditional unit and energy storage system in AGC system
CN104158231A (en) * 2014-08-13 2014-11-19 国电南瑞科技股份有限公司 Unit control mode dynamic conversion method based on real-time generation scheduling
CN104181898A (en) * 2014-09-01 2014-12-03 东北电力大学 Intelligent control method and system for interactive home appliances on basis of time-of-use electricity price response
CN104392334A (en) * 2014-12-12 2015-03-04 冶金自动化研究设计院 Joint optimized scheduling method for multiple types of generating sets of self-supply power plant of iron and steel enterprise
CN105631599A (en) * 2015-12-30 2016-06-01 国网甘肃省电力公司电力科学研究院 Multi-target operation scheduling method of virtual power plant
CN106300336A (en) * 2016-07-22 2017-01-04 华北电力大学 A kind of meter and the virtual plant Multiobjective Optimal Operation method of load side and mains side
CN106385039A (en) * 2016-10-17 2017-02-08 重庆大学 Design method of mixed energy storage system for inhibiting PV power fluctuation
CN107545364A (en) * 2017-08-25 2018-01-05 合肥工业大学 The user response policy optimization method of stimulable type electricity needs response
CN107591801A (en) * 2017-09-15 2018-01-16 东南大学 A kind of load participates in the polymerization potential appraisal procedure of demand response
CN107766976A (en) * 2017-10-17 2018-03-06 国网江苏省电力公司盐城供电公司 A kind of active demand response platform of electric power market
CN109167397A (en) * 2018-08-24 2019-01-08 中国电力科学研究院有限公司 A kind of energy storage control method for coordinating and system
CN110266061A (en) * 2019-07-24 2019-09-20 国网江苏省电力有限公司 A kind of harbour bank electricity participation power grid regulation method and system based on multi-agent system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
YIFAN HUANG,ETC.: "The Quantitative Assessment Method for Flexibility Adjustment of Self-supplied Power Plants", 《PREPRINTS OF THE 3RD IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION》 *
华夏,等: "促进新能源消纳的自备电厂发电权交易模式可行性探讨", 《电力系统自动化》 *
吕梦璇,等: "含高比例风电的虚拟电厂多类型备用协调优化", 《中国电机工程学报》 *
高赐威 等: "自动需求响应的理论与实践综述", 《电网技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113569380A (en) * 2021-06-22 2021-10-29 国网北京市电力公司 Method and device for correcting adjusting capability of building comprehensive energy consumption
US20230021277A1 (en) * 2021-07-16 2023-01-19 Sollum Technologies Inc. Systems and methods for managing undesired effects produced by horticultural lighting sources in an electrical grid
US12082320B2 (en) 2021-07-16 2024-09-03 Sollum Technologies Inc. Systems and methods for monitoring and managing reactive power from horticultural lighting sources in an electrical grid
CN114118800A (en) * 2021-11-26 2022-03-01 国网新疆电力有限公司电力科学研究院 Regulation and control method for participating in frequency modulation work of self-contained power plant
CN115933503A (en) * 2023-03-10 2023-04-07 山东盛日电力集团有限公司 Intelligent adjustment control method and system for power generation equipment

Also Published As

Publication number Publication date
CN111244946B (en) 2021-11-09

Similar Documents

Publication Publication Date Title
CN111244946B (en) Method and device for regulating and controlling power generation and utilization resources of self-contained power plant
US10923919B2 (en) Method and apparatus for controlling power flow in a hybrid power system
CN105140936B (en) A kind of micro-capacitance sensor frequency modulation control method for minimizing cost of electricity-generating
CN110807588B (en) Optimized scheduling method of multi-energy coupling comprehensive energy system
CN111400641A (en) Day-ahead optimal scheduling method for comprehensive energy system containing heat accumulation type electric heating
WO2021179678A1 (en) Composite power supply system and power supply regulation and control method thereof
CN111555366B (en) Multi-time scale-based microgrid three-layer energy optimization management method
CN108521132A (en) The Multiple Time Scales optimal control method that support mains frequency of providing multiple forms of energy to complement each other is adjusted
CN110930188A (en) New energy and thermal power bundling transaction pricing method considering resource complementary characteristics
CN110880761A (en) P2P platform-based wind-solar pumped storage hybrid system joint scheduling method
WO2022054442A1 (en) Power regulation method and power regulation device
CN114648250A (en) Park comprehensive energy system planning method considering comprehensive demand response and carbon emission
EP2330679B1 (en) Method for controlling sodium-sulfur battery
JP6764769B2 (en) Power supply control device, power supply control program, power rate setting system
JP2017184595A (en) Hybrid power storage apparatus
el Harry Mhamdi et al. A power management strategy for hybrid photovoltaic diesel system with battery storage
JP2018014775A (en) Integrated controller, integrated control system, integrated control method and integrated control program
WO2022054441A1 (en) Power adjustment method and power adjustment device
Xia et al. Energy storage sizing and operation of an integrated utility-scale PV+ ESS power plant
JP2022037494A (en) Energy supply system, and device and method for controlling the same
Tak et al. Simulation of Grid Supported PV/Wind/Battery Hybrid System with Variable Load
Fedotov et al. Utilization of electrochemical energy storage devices in autonomous power supply systems
Li et al. Day-head Peak-shaving Model for Coordinated Wind-photovoltaic-pumped-storage-hydropower Generation Systems
KR20200129554A (en) System and method for smoothing output of the renewable energy
CN114421523B (en) Multi-scene step-by-step optimized power generation regulation and control system and method based on source load uncertainty

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant