CN111236407A - Drainage device and method for floor accumulated water in super high-rise building construction - Google Patents

Drainage device and method for floor accumulated water in super high-rise building construction Download PDF

Info

Publication number
CN111236407A
CN111236407A CN202010048285.1A CN202010048285A CN111236407A CN 111236407 A CN111236407 A CN 111236407A CN 202010048285 A CN202010048285 A CN 202010048285A CN 111236407 A CN111236407 A CN 111236407A
Authority
CN
China
Prior art keywords
barrel
rod
floor
gear
super high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010048285.1A
Other languages
Chinese (zh)
Inventor
胡力绳
郭伟强
李伟文
叶孟文
程允贵
全圣
卢晴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju Co Ltd
Shenzhen China Railway Second Bureau Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
Shenzhen China Railway Second Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, Shenzhen China Railway Second Bureau Engineering Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN202010048285.1A priority Critical patent/CN111236407A/en
Publication of CN111236407A publication Critical patent/CN111236407A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • E03C1/122Pipe-line systems for waste water in building
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F7/00Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The invention relates to a drainage device for accumulated water of floors during construction of super high-rise buildings, which comprises a plurality of floors, wherein a plurality of drainage holes are formed in each floor, a filtering piece is arranged on each drainage hole and comprises a barrel body inserted into the drainage holes, a plurality of filtering holes are formed in the barrel body, a plate body is arranged at one end of the barrel body, rod bodies used for supporting the plate body to the floors are arranged on the surfaces, away from the barrel body, of the plate body and positioned on two sides of the plate body, a cleaning piece used for moving in the circumferential direction of the barrel body to scrape off impurities on the barrel body is arranged on the plate body, and the cleaning piece can scrape off the impurities accumulated around the barrel body, so that the filtering effect of the barrel body on the impurities in the accumulated water is improved.

Description

Drainage device and method for floor accumulated water in super high-rise building construction
Technical Field
The invention relates to the technical field of building construction, in particular to a device and a method for draining water accumulated on floors during super high-rise building construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. When the super high-rise building is constructed, ponding can be generated in floors without curtain walls due to factors such as rainfall and the like.
Chinese patent No. CN103882918B discloses a method and apparatus for draining water accumulated on floors during super high-rise building construction, wherein a water pool is built at the pipe mouth of a construction water supply pipe on each floor, a vertical drainage pipe leading to the water pool on a lower floor is arranged at the bottom of the water pool, and water leaked from the water supply pipe is drained to a drainage ditch on the bottom layer by layer through the vertical drainage pipe; a group of floor drains are arranged at intervals on the edge of the floor slab of each floor, the floor drains are connected with a horizontal drainage pipe below the floor slab, and the horizontal drainage pipe is connected with a vertical drainage pipe; accumulated water or rainwater in the construction process is drained to the drainage ditch at the bottom layer by layer through the floor drain.
But its shortcoming lies in, has more dust and impurity such as other building materials on the floor, and the floor drain has simple filtering capability, but can be blockked up in long-term use to make ponding can't flow to each pond through the floor drain, reduced drainage device's drainage effect.
Disclosure of Invention
The first purpose of the present invention is to provide a drainage device for water accumulated on floors during super high-rise building construction, which can prevent blockage during drainage and improve drainage effect of the drainage device.
The above object of the present invention is achieved by the following technical solutions:
a drainage device for floor accumulated water during super high-rise building construction comprises multiple floors, wherein each floor is provided with a water pool, a pipeline extending into the water pool on the next floor is arranged on each water pool in a communication manner, the floor is provided with a plurality of drainage holes, each drainage hole is provided with a connecting pipe in a communication manner, the end parts, away from the drainage hole, of the connecting pipes are communicated with the connecting pipes to form drainage pipes, one end of each drainage pipe is communicated with the pipeline, each drainage hole is provided with a filtering piece for filtering the accumulated water entering the drainage hole, each filtering piece comprises a barrel body inserted into the drainage hole, the barrel body is provided with a plurality of filtering holes, one end of the barrel body is provided with a plate body, the surface of the plate body, which is opposite to the barrel body, and two sides of the plate body are provided with connecting rods for supporting the floor, the cleaning piece is arranged on the plate body and used for moving circumferentially along the circumferential position of the cylinder body so as to scrape impurities on the cylinder body.
Through adopting above-mentioned technical scheme, ponding when the floor flows when the position at barrel place, the impurity of filter pore pair ponding aquatic on the accessible barrel filters, thereby prevent that the impurity of ponding aquatic from leading to the pipeline, connecting pipe and drain pipe jam, after the barrel is using a period, around the barrel is piled up to impurity on the floor, make the barrel can't filter the impurity of ponding aquatic, the clearance piece can strike off accumulational impurity around the barrel, thereby the filter effect of barrel to impurity in the ponding has been improved, drainage device's drainage effect has been improved.
The invention is further configured to: the clearance piece is including being used for with the clearance pole of the outer wall butt of barrel, the length direction of barrel axis is followed to the length direction setting of clearance pole, be provided with the driving piece that is used for driving the circumferential position hoop movement of clearance pole along the barrel on the plate body.
Through adopting above-mentioned technical scheme, when needs strike off accumulational impurity around the barrel, can drive the circumferential position hoop removal of clearance pole along the barrel through the driving piece to make the clearance pole strike off accumulational impurity around the barrel, thereby make the impurity around the barrel scrape and get to be in the same place, improved the filter effect of barrel to ponding.
The invention is further configured to: the driving piece is established and is rotated the ring gear of connecting on the barrel including the cover, the ring gear is located the position setting that is close to the plate body on the barrel, the fixed motor that is provided with on the face that the plate body deviates from the barrel, the drive end of motor is worn to establish the plate body and is extended to the position setting at ring gear place, the cover is established and fixed the gear that is used for with the ring gear meshing on the drive end of motor, the setting of clearance pole is on the face that the ring gear deviates from the plate body.
Through adopting above-mentioned technical scheme, when the circumference position hoop removal of needs drive clearance pole along the barrel, drive gear through the motor and rotate, because of ring gear and gear engagement, make the ring gear rotate on the barrel, thereby make the ring gear drive the circumference position hoop removal of clearance pole along the barrel, make clearance pole strike off accumulational impurity around with the barrel, the circumference position hoop removal of convenient drive clearance pole along the barrel of the mode that adopts gear and ring gear engagement, the drive process is steady, the drive effect to the clearance pole has been improved.
The invention is further configured to: the tooth ring is provided with a rod body at a position where the cleaning rod is located, the length direction of the rod body is arranged along the length direction of the cleaning rod, a plurality of springs are arranged between the cleaning rod and the rod body along the length direction of the rod body, one end of each spring is connected to the cleaning rod, the other end of each spring is connected to the rod body, and the cleaning rod resists the elastic force of each spring and abuts against the outer wall of the barrel.
Through adopting above-mentioned technical scheme, the elasticity butt that the spring can be resisted to the clearance pole is to the outer wall of barrel on to improved the clearance effect of clearance pole to accumulational impurity around the barrel, further improved the filter effect of barrel to impurity in the ponding.
The invention is further configured to: the utility model discloses a cleaning rod, including the body of rod, every spring is located the position of every spring place and all is provided with the dead lever, peg graft and sliding connection have the telescopic link in the dead lever, the end connection that the dead lever was kept away from to the clearance pole is gone up to the telescopic link, the spring is located the body of rod, the both ends of spring are connected to respectively on dead lever and the telescopic link are kept away from and the diapire of grafting position.
Through adopting above-mentioned technical scheme, dead lever and telescopic link can play the effect of direction to the extension and the compression of spring, prevent that the ring gear from driving the clearance pole slope when driving the clearance pole and rotate, improved the clearance pole along barrel circumference position hoop when rotating with the butt effect of barrel outer wall, further improved the effect of striking off to piling up impurity around the barrel to dead lever and telescopic link can play the effect of protection to the spring, prolonged the life of spring.
The invention is further configured to: the outer wall of the barrel is annularly provided with a sliding groove along the circumferential position of the barrel, the rod body is provided with a sliding block connected in the sliding groove in a sliding mode, the cross section of the sliding groove is in a T-shaped arrangement, and the sliding block is matched with the T-shaped sliding groove.
By adopting the technical scheme, the arrangement of the sliding groove and the sliding block can play a further guiding role in the movement of the rod body and the cleaning rod along the circumferential position of the cylinder body, so that the cleaning rod is further prevented from inclining, the abutting effect of the cleaning rod and the outer wall of the cylinder body is further improved, and the scraping effect of the cleaning rod on impurities is improved; the cross section of the sliding groove is set to be T-shaped, so that the sliding block and the sliding groove can be prevented from being separated, and the scraping effect of the cleaning rod on impurities is further improved.
The invention is further configured to: the bearing is arranged at the position, where the toothed ring is located, on the barrel body, the inner ring of the bearing is sleeved with the bearing and fixedly connected to the barrel body, the toothed ring is sleeved with the bearing and fixedly connected to the outer ring of the bearing, and the sliding block is embedded in a clamping manner and is rotatably connected with a ball which is used for being abutted to the inner wall of the sliding groove.
By adopting the technical scheme, the arrangement of the bearing improves the rotating effect of the gear ring on the cylinder body, and prevents the gear ring from inclining when rotating on the cylinder body, thereby indirectly improving the meshing effect of the gear and the gear ring; the setting of ball has improved the slip effect of slider in the spout to the indirect drive effect that has improved gear and ring gear to the clearance pole.
The invention is further configured to: the end part of the connecting rod, far away from the plate body, is perpendicular to the connecting rod and is provided with a butt plate, the butt plate is provided with a screw rod in a penetrating and threaded connection mode, and the end part of the screw rod, far away from the plate body, is provided with a sucker.
By adopting the technical scheme, the connecting rod can be fixed on the floor slab by the sucker, so that the cylinder body is fixed in the drainage hole, and the cylinder body is prevented from being separated from the drainage hole when impurities are filtered; the screw rod is arranged so that the suction cup can be detachably connected to the abutting plate, and the suction cup can be taken down from the abutting plate when the suction cup is not required to be used.
A second object of the present invention is to provide a method for draining water accumulated in floors during super high-rise building construction, which can prevent clogging during drainage and improve the drainage effect of a drainage device.
The above object of the present invention is achieved by the following technical solutions:
a method for draining floor ponding during super high-rise building construction comprises a drainage device for floor ponding during super high-rise building construction, and is characterized in that: the method comprises the following steps:
s1, selecting whether a sucker is needed to be used according to the condition of a floor, screwing the sucker driving screw rod into the abutting plate when the sucker is needed to be used, and unscrewing the sucker driving screw rod from the abutting plate when the sucker is not needed to be used so that the connecting rod drives the abutting plate to abut against the floor or drives the sucker to adsorb to the floor, wherein the cylinder is fixed to be inserted into the drainage hole;
s2, the gear is driven to rotate by the motor, the gear can drive the gear ring to rotate on the cylinder body due to the meshing of the gear and the gear ring, at the moment, the gear ring can drive the sliding block on the rod body to move in the sliding groove, so that the gear ring drives the rod body to move annularly along the circumferential position of the cylinder body, and the cleaning rod resists the elastic force of the spring and abuts against the outer wall of the cylinder body, so that the cleaning rod moves annularly along the circumferential position of the cylinder body to scrape off impurities on the cylinder body.
Through adopting above-mentioned technical scheme, the circumference position hoop removal of barrel can be followed to the clearance pole for the clearance pole strikes off accumulational impurity around with the barrel, prevents that impurity from blockking up the filtration pore on the barrel, thereby has indirectly improved the filter effect of barrel to impurity in the ponding, has indirectly improved drainage device's drainage effect.
In conclusion, the beneficial technical effects of the invention are as follows:
the gear is driven to rotate through the motor, the gear can drive the gear ring to rotate on the barrel due to the meshing of the gear and the gear ring, so that the gear ring drives the cleaning rod to move along the circumferential position of the barrel in the circumferential direction, accumulated impurities around the barrel are scraped by the cleaning rod, the filter holes of the barrel are prevented from being blocked by the impurities in accumulated water, the filtering effect of the barrel on the impurities is improved, and the drainage effect of the drainage device is indirectly improved.
Drawings
FIG. 1 is a schematic overall structure of the present invention;
FIG. 2 is a schematic structural view of the filter element of the present invention;
fig. 3 is a schematic diagram of an exploded structure of the present invention for showing a spring.
In the figure, 1, a floor slab; 11. a pool; 12. a pipeline; 13. a drain hole; 131. a connecting pipe; 132. a drain pipe; 14. a barrel; 141. a filtration pore; 142. a plate body; 143. a connecting rod; 144. cleaning the rod; 145. a toothed ring; 146. a motor; 147. a gear; 15. a rod body; 151. a spring; 152. fixing the rod; 153. a telescopic rod; 16. a chute; 161. a slider; 162. a ball bearing; 17. a bearing; 18. a butt joint plate; 181. a screw; 182. and (4) sucking discs.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the drainage device for floor accumulated water during super high-rise building construction disclosed by the invention comprises multiple floors 1, a water pool 11 is arranged on each floor 1, a pipeline 12 extending into the water pool 11 on the next floor 1 is arranged on the water pool 11 and communicated with the water pool 11, a plurality of drainage holes 13 are arranged on the floor 1, a connecting pipe 131 is arranged on each drainage hole 13 and communicated with the drainage hole 13, a drainage pipe 132 is arranged at the end part of each connecting pipe 131 far away from the drainage hole 13 and communicated with the connecting pipe 131, and one end of the drainage pipe 132 is communicated with the pipeline 12.
When water is accumulated on the floor slab 1, the accumulated water flows into the connecting pipe 131 through the water discharge hole 13, flows into the water discharge pipe 132 through the connecting pipe 131, flows into the pipeline 12 through the water discharge pipe 132, flows into the water pool 11 through the pipeline 12, and is communicated through the pipeline 12 due to the fact that the water tanks on the multi-layer floor slab 1 are communicated, so that the water in the water pool 11 on the floor slab 1 on the uppermost layer can flow into the water pool 11 on the floor slab 1 on the lowermost layer through the plurality of pipelines 12 and the water pool 11, and the water discharge effect of the super high building is.
Referring to fig. 1 and 2, each drainage hole 13 is provided with a filtering member for filtering accumulated water entering the drainage hole 13, the filtering member includes a barrel 14 inserted into the drainage hole 13, the barrel 14 is provided with a plurality of filtering holes 141, one end of the barrel 14 is provided with a plate body 142, and the plate body 142 deviates from the surface of the barrel 14 and is provided with connecting rods 143 for supporting the floor slab 1 on two sides of the plate body 142.
The filter hole 141 on the ponding accessible barrel 14 for impurity in the ponding is blocked outside the barrel 14, prevents that impurity in the ponding from blockking up pipeline 12, connecting pipe 131 and drain pipe 132, has improved the drainage effect of pipeline 12, connecting pipe 131 and drain pipe 132.
As shown in fig. 2, in order to fix the connecting rod 143 with the cylinder 14 into the drainage hole 13, an abutting plate 18 is disposed perpendicular to the connecting rod 143 at an end of the connecting rod 143 away from the plate body 142, a screw 181 is threaded on the abutting plate 18, and a suction cup 182 is disposed at an end of the screw 181 away from the plate body 142; when the suction cup 182 is needed, the screw 181 of the suction cup 182 can be screwed into the contact plate 18, and when the suction cup 182 is not needed, the suction cup 182 drives the screw 181 to be screwed off the contact plate 18.
The cylinder 14 can pile up more impurity around the cylinder 14 after using for a period of time and thereby influence the filter effect of cylinder 14, in order to scrape away the impurity that piles up around the cylinder 14 to improve the filter effect of cylinder 14 to impurity, has cleaning rod 144 with cylinder 14 butt on the outer wall of cylinder 14, and the length direction of cleaning rod 144 sets up along the length direction of cylinder 14 axis.
As shown in fig. 2, in order to drive the cleaning rod 144 to move circumferentially along the circumferential position of the cylinder 14, so that the cleaning rod 144 scrapes off impurities accumulated around the cylinder 14, a toothed ring 145 is sleeved and rotatably connected on the cylinder 14, the toothed ring 145 is located on the cylinder 14 and is arranged near the plate 142, a motor 146 is fixedly arranged on the surface of the plate 142 departing from the cylinder 14, the driving end of the motor 146 penetrates through the plate 142 and extends to the position of the toothed ring 145, a gear 147 used for meshing with the toothed ring 145 is sleeved and fixedly arranged on the driving end of the motor 146, and the cleaning rod 144 is arranged on the surface of the toothed ring 145 departing from the plate 142.
When the circumferential position hoop rotation of barrel 14 is followed to needs drive clearance pole 144, drive gear 147 through motor 146 and rotate, rotate because of ring gear 145 and connect on barrel 14 for gear 147 can drive ring gear 145 and rotate on barrel 14, thereby make ring gear 145 drive clearance pole 144 hoop movement on the outer wall of barrel 14, make clearance pole 144 clear up the accumulational impurity around the barrel 14, thereby improved the filter effect of barrel 14 to impurity.
As shown in fig. 2, in the present embodiment, in order to improve the rotation effect of the gear ring 145 on the cylinder 14, a bearing 17 is disposed on the cylinder 14 at the position of the gear ring 145, an inner ring of the bearing 17 is sleeved and fixedly connected to the cylinder 14, and the gear ring 145 is sleeved and fixedly connected to an outer ring of the bearing 17; the bearing 17 is a ball bearing 17.
With reference to fig. 2 and 3, in order to improve the abutting effect between the cleaning rod 144 and the cylinder 14 and further improve the cleaning effect of the cleaning rod 144 on impurities around the cylinder 14, a rod body 15 is disposed on the toothed ring 145 and at the position of the cleaning rod 144, the length direction of the rod body 15 is arranged along the length direction of the cleaning rod 144, a plurality of springs 151 are disposed between the cleaning rod 144 and the rod body 15 along the length direction of the rod body 15, one end of each spring 151 is connected to the cleaning rod 144, and the other end of each spring 151 is connected to the rod body 15; the cleaning rod 144 abuts against the outer wall of the cylinder 14 against the elastic force of the spring 151, thereby improving the cleaning effect of the cleaning rod 144 on the impurities around the cylinder 14.
With reference to fig. 2 and 3, in order to prevent the cleaning rod 144 from driving the spring 151 to incline when moving circumferentially along the circumferential position of the barrel 14, a fixing rod 152 is disposed on the rod body 15 and at the position of each spring 151, a telescopic rod 153 is inserted into the fixing rod 152 and slidably connected to the fixing rod 152, the end of the telescopic rod 153 far away from the fixing rod 152 is connected to the cleaning rod 144, the spring 151 is located in the rod body 15, and two ends of the spring 151 are respectively connected to the bottom walls of the positions far away from and inserted by the fixing rod 152 and the telescopic rod 153.
When the body of rod 15 drives clearance pole 144 along the circumferential position hoop removal of barrel 14, can drive telescopic link 153 and remove in dead lever 152 for dead lever 152 and telescopic link 153 play the effect of direction to the extension and the compression of spring 151, prevent that spring 151 from inclining when extension and compression, thereby improved the butt effect of clearance pole 144 with the barrel 14 outer wall.
Referring to fig. 2 and 3, in order to improve the moving effect of the rod 15 moving along the circumferential direction of the cylinder 14, a sliding groove 16 is formed in the outer wall of the cylinder 14 along the circumferential direction of the cylinder 14, and a sliding block 161 slidably connected to the sliding groove 16 is disposed on the rod 15.
With reference to fig. 2 and 3, in order to prevent the sliding block 161 from separating from the sliding slot 16, the sliding slot 16 is arranged in a "T" shape in cross section, and the sliding block 161 is arranged in cooperation with the "T" shaped sliding slot 16; in order to enhance the sliding effect of the slider 161 in the chute 16, a ball 162 is rotatably connected to the slider 161 so as to be engaged with the inner wall of the chute 16.
A method for draining water accumulated on floors during super high-rise building construction comprises a drainage device for water accumulated on floors during super high-rise building construction, and comprises the following steps:
s1, selecting whether the suction cup 182 is needed to be used or not according to the condition of the floor, when the suction cup 182 is needed to be used, screwing the suction cup 182 to drive the screw 181 to the abutting plate 18, when the suction cup 182 is not needed to be used, screwing the suction cup 182 to drive the screw 181 to be screwed off from the abutting plate 18, so that the connecting rod 143 drives the abutting plate 18 to abut to the floor slab 1, or the connecting rod 143 drives the suction cup 182 to adsorb to the floor slab 1, and at the moment, the cylinder 14 is fixed to be inserted into the drainage hole 13;
s2, the gear 147 is driven to rotate by the motor 146, the gear 147 drives the gear ring 145 to rotate on the cylinder 14 due to the engagement between the gear 147 and the gear ring 145, at this time, the gear ring 145 drives the slider 161 on the rod body 15 to move in the chute 16, so that the gear ring 145 drives the rod body 15 to move circumferentially along the circumferential position of the cylinder 14, and the cleaning rod 144 resists the elastic force of the spring 151 to abut against the outer wall of the cylinder 14, so that the cleaning rod 144 moves circumferentially along the circumferential position of the cylinder 14 to scrape off impurities on the cylinder 14.
Constantly drive clearance pole 144 through motor 146 and follow the circumferential position hoop of barrel 14 and remove for clearance pole 144 strikes off the accumulational impurity around the barrel 14, has improved the filter effect of barrel 14 to impurity in the ponding, has indirectly improved drainage device's drainage effect.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (9)

1. The utility model provides a drainage device of floor ponding during super high-rise building construction, includes multilayer floor (1), all is provided with pond (11) on every layer of floor (1), be provided with pipeline (12) that extend to in pond (11) on next floor (1) with pond (11) intercommunication on pond (11), a plurality of wash ports (13) have been seted up on floor (1), every wash port (13) are gone up and all communicate with wash port (13) and are provided with connecting pipe (131), and the tip that wash port (13) were kept away from in a plurality of connecting pipes (131) is provided with drain pipe (132) with connecting pipe (131) intercommunication, the one end and pipeline (12) intercommunication setting of drain pipe (132), its characterized in that: every all be provided with on wash port (13) and be used for carrying out filterable filter piece to the ponding that gets into in wash port (13), filter piece including pegging graft barrel (14) in wash port (13), a plurality of filtration holes (141) have been seted up on barrel (14), the one end of barrel (14) is provided with plate body (142), on the face that plate body (142) deviate from barrel (14) and the both sides that are located plate body (142) are provided with connecting rod (143) that are used for supporting to floor (1), be provided with on plate body (142) and be used for along the circumferential position hoop removal of barrel (14), with the clearance piece of scraping off the impurity on barrel (14).
2. The drainage device for floor water accumulation during super high-rise building construction according to claim 1, characterized in that: the clearance piece is including being used for with clearance pole (144) of the outer wall butt of barrel (14), the length direction of clearance pole (144) sets up along the length direction of barrel (14) axis, be provided with the driving piece that is used for driving clearance pole (144) along the circumferential position hoop displacement of barrel (14) on plate body (142).
3. The drainage device for floor water accumulation during super high-rise building construction according to claim 2, characterized in that: the driving piece is established and is rotated ring gear (145) of connecting on barrel (14) including the cover, ring gear (145) are located barrel (14) and are close to the position setting of plate body (142), fixed motor (146) that is provided with on the face that plate body (142) deviate from barrel (14), the drive end of motor (146) is worn to establish plate body (142) and is extended to the position setting at ring gear (145) place, the cover is established and fixed gear (147) that are used for with ring gear (145) meshing on the drive end of motor (146), clearance pole (144) set up on ring gear (145) deviate from the face of plate body (142).
4. The drainage device for floor water accumulation during super high-rise building construction according to claim 3, characterized in that: the utility model discloses a cleaning rod, including the body of rod (15), the length direction of the body of rod (15) sets up along the length direction of clearance pole (144), just be located the position at clearance pole (144) place on ring gear (145), the length direction of the body of rod (15) along clearance pole (144) sets up, be provided with a plurality of springs (151) between clearance pole (144) and the body of rod (15) along the length direction of the body of rod (15), the one end of spring (151) is connected to clearance pole (144) on, the other end is connected to the body of rod (15), the elasticity that clearance pole (144) resisted spring (151) is supported to the outer wall of barrel (14) on.
5. The drainage device for floor water accumulation during super high-rise building construction according to claim 4, characterized in that: the utility model discloses a cleaning rod, including the body of rod (15), the body of rod (15) just is located the position at every spring (151) and all is provided with dead lever (152), peg graft and sliding connection has telescopic link (153) in dead lever (152), the end connection that dead lever (152) were kept away from in telescopic link (153) is to clearance pole (144), spring (151) are located the body of rod (15), the both ends of spring (151) are connected to dead lever (152) and telescopic link (153) respectively and keep away from and peg graft on the diapire of position.
6. The drainage device for floor water accumulation during super high-rise building construction according to claim 5, characterized in that: the outer wall of the barrel body (14) is provided with a sliding groove (16) along the circumferential position of the barrel body (14) in the circumferential direction, the rod body (15) is provided with a sliding block (161) connected in the sliding groove (16) in a sliding mode, the cross section of the sliding groove (16) is arranged in a T shape, and the sliding block (161) is matched with the T-shaped sliding groove (16).
7. The drainage device for floor water accumulation during super high-rise building construction according to claim 6, characterized in that: the bearing (17) is arranged on the barrel (14) and located at the position of the gear ring (145), the inner ring of the bearing (17) is sleeved with and fixedly connected to the barrel (14), the gear ring (145) is sleeved with and fixedly connected to the outer ring of the bearing (17), and the sliding block (161) is clamped and rotatably connected with a ball (162) used for being abutted to the inner wall of the sliding groove (16).
8. The drainage device for floor water accumulation during super high-rise building construction according to claim 7, characterized in that: the end part, far away from the plate body (142), of the connecting rod (143) is perpendicular to the connecting rod (143) and is provided with a butt plate (18), the butt plate (18) is provided with a screw rod (181) in a penetrating mode and in threaded connection, and the end part, far away from the plate body (142), of the screw rod (181) is provided with a sucker (182).
9. A method for draining water accumulated on floors during the construction of super high-rise buildings, comprising the device for draining water accumulated on floors during the construction of super high-rise buildings according to any one of claims 1 to 7, characterized in that: the method comprises the following steps:
s1, selecting whether the suction cup (182) needs to be used or not according to the condition of the floor, when the suction cup (182) needs to be used, screwing the suction cup (182) to drive the screw rod (181) to the abutting plate (18), when the suction cup (182) does not need to be used, screwing the suction cup (182) to drive the screw rod (181) to be screwed off from the abutting plate (18), so that the connecting rod (143) drives the abutting plate (18) to abut to the floor (1), or the connecting rod (143) drives the suction cup (182) to be adsorbed to the floor (1), and at the moment, the cylinder (14) is fixed to be inserted into the drainage hole (13);
s2, the gear (147) is driven to rotate by the motor (146), the gear (147) can drive the gear ring (145) to rotate on the cylinder (14) due to the meshing of the gear (147) and the gear ring (145), at the moment, the gear ring (145) can drive the sliding block (161) on the rod body (15) to move in the sliding groove (16), so that the gear ring (145) drives the rod body (15) to move annularly along the circumferential position of the cylinder (14), and the cleaning rod (144) resists the elastic force of the spring (151) to abut against the outer wall of the cylinder (14) so that the cleaning rod (144) moves annularly along the circumferential position of the cylinder (14) to scrape impurities on the cylinder (14).
CN202010048285.1A 2020-01-16 2020-01-16 Drainage device and method for floor accumulated water in super high-rise building construction Pending CN111236407A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010048285.1A CN111236407A (en) 2020-01-16 2020-01-16 Drainage device and method for floor accumulated water in super high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010048285.1A CN111236407A (en) 2020-01-16 2020-01-16 Drainage device and method for floor accumulated water in super high-rise building construction

Publications (1)

Publication Number Publication Date
CN111236407A true CN111236407A (en) 2020-06-05

Family

ID=70869642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010048285.1A Pending CN111236407A (en) 2020-01-16 2020-01-16 Drainage device and method for floor accumulated water in super high-rise building construction

Country Status (1)

Country Link
CN (1) CN111236407A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794516A (en) * 2020-07-28 2020-10-20 浙江润泰建设有限公司 Indoor decoration method

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201981593U (en) * 2010-12-22 2011-09-21 上海市宝山区青少年科学技术指导站 Sucker-type floor drain
CN103882918A (en) * 2012-12-20 2014-06-25 中建四局第一建筑工程有限公司 Method for draining accumulated floor water during super high-rise building construction, and apparatus thereof
CN204570851U (en) * 2015-04-30 2015-08-19 范瑞金 A kind of blockage of sewer thing cutting and grinding device
CN106592741A (en) * 2016-11-08 2017-04-26 东莞市天合机电开发有限公司 Cleaning device with rotating filter screen
CN106638924A (en) * 2016-09-21 2017-05-10 东莞市联洲知识产权运营管理有限公司 Waste cleaning equipment
CN107190821A (en) * 2017-07-07 2017-09-22 吴冰滢 A kind of anti-blocking easy to clean sewer
CN107268731A (en) * 2017-07-07 2017-10-20 中铁二局集团有限公司 A kind of voltage regulation type drainage arrangement and construction method
CN206916915U (en) * 2017-07-03 2018-01-23 安徽江皖机械制造有限公司 A kind of Floor drain against counter-flow cover plate
CN207499120U (en) * 2017-11-01 2018-06-15 新昌县双彩乡凯大模具厂 A kind of Novel rotary floor drain
CN108487436A (en) * 2018-03-26 2018-09-04 中山市浩翔电气工程有限公司 A kind of floor drain apparatus of automatic cleaning hair
CN108532693A (en) * 2018-06-27 2018-09-14 成都言行果科技有限公司 A kind of waste water processing kitchen basin convenient for cleaning
CN108678095A (en) * 2018-06-20 2018-10-19 郭昕 A kind of family life anti-clogging duct cap
CN108824546A (en) * 2018-06-09 2018-11-16 安徽科创生产力促进中心有限责任公司 A kind of household water reusing device
CN208183926U (en) * 2018-04-13 2018-12-04 王洪亮 A kind of Novel drain
CN208685727U (en) * 2018-08-13 2019-04-02 浙江省天台圣象滤料织造有限公司 A kind of strainer being convenient to clean
CN109736394A (en) * 2018-03-16 2019-05-10 陆映红 A kind of service sink anti-block apparatus
CN110005041A (en) * 2019-04-29 2019-07-12 佛山科学技术学院 A kind of floor drain
CN209333305U (en) * 2018-11-12 2019-09-03 江苏兴科制药设备制造有限公司 A kind of decompressor of self-cleaning filter
CN209475730U (en) * 2019-01-25 2019-10-11 伽诺(杭州)净化系统装备有限公司 Automatic compensation scraper cleaning assembly

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201981593U (en) * 2010-12-22 2011-09-21 上海市宝山区青少年科学技术指导站 Sucker-type floor drain
CN103882918A (en) * 2012-12-20 2014-06-25 中建四局第一建筑工程有限公司 Method for draining accumulated floor water during super high-rise building construction, and apparatus thereof
CN204570851U (en) * 2015-04-30 2015-08-19 范瑞金 A kind of blockage of sewer thing cutting and grinding device
CN106638924A (en) * 2016-09-21 2017-05-10 东莞市联洲知识产权运营管理有限公司 Waste cleaning equipment
CN106592741A (en) * 2016-11-08 2017-04-26 东莞市天合机电开发有限公司 Cleaning device with rotating filter screen
CN206916915U (en) * 2017-07-03 2018-01-23 安徽江皖机械制造有限公司 A kind of Floor drain against counter-flow cover plate
CN107190821A (en) * 2017-07-07 2017-09-22 吴冰滢 A kind of anti-blocking easy to clean sewer
CN107268731A (en) * 2017-07-07 2017-10-20 中铁二局集团有限公司 A kind of voltage regulation type drainage arrangement and construction method
CN207499120U (en) * 2017-11-01 2018-06-15 新昌县双彩乡凯大模具厂 A kind of Novel rotary floor drain
CN109736394A (en) * 2018-03-16 2019-05-10 陆映红 A kind of service sink anti-block apparatus
CN108487436A (en) * 2018-03-26 2018-09-04 中山市浩翔电气工程有限公司 A kind of floor drain apparatus of automatic cleaning hair
CN208183926U (en) * 2018-04-13 2018-12-04 王洪亮 A kind of Novel drain
CN108824546A (en) * 2018-06-09 2018-11-16 安徽科创生产力促进中心有限责任公司 A kind of household water reusing device
CN108678095A (en) * 2018-06-20 2018-10-19 郭昕 A kind of family life anti-clogging duct cap
CN108532693A (en) * 2018-06-27 2018-09-14 成都言行果科技有限公司 A kind of waste water processing kitchen basin convenient for cleaning
CN208685727U (en) * 2018-08-13 2019-04-02 浙江省天台圣象滤料织造有限公司 A kind of strainer being convenient to clean
CN209333305U (en) * 2018-11-12 2019-09-03 江苏兴科制药设备制造有限公司 A kind of decompressor of self-cleaning filter
CN209475730U (en) * 2019-01-25 2019-10-11 伽诺(杭州)净化系统装备有限公司 Automatic compensation scraper cleaning assembly
CN110005041A (en) * 2019-04-29 2019-07-12 佛山科学技术学院 A kind of floor drain

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794516A (en) * 2020-07-28 2020-10-20 浙江润泰建设有限公司 Indoor decoration method

Similar Documents

Publication Publication Date Title
CN110093931B (en) Civil construction foundation pit drainage structure and construction method thereof
CN211097825U (en) Oil field water injection recoil type filtering dirt remover
CN209411945U (en) A kind of waste water treatment box uninterruptedly continuously filtered
CN213452377U (en) Water conservancy embedded pipeline capable of effectively preventing sediment deposition
CN105498341A (en) Filter
CN111236407A (en) Drainage device and method for floor accumulated water in super high-rise building construction
CN214302062U (en) Municipal drainage system
CN214033960U (en) Construction rainfall drainage structures
CN212200239U (en) Drainage device for hydraulic engineering construction
CN111705642A (en) Hidden drainage system of municipal administration bridge
CN109469191A (en) A kind of reservoir for being convenient to clean and filtering and its construction and application method
CN214695997U (en) Stifled cistern is prevented to hydraulic engineering
CN113235719B (en) Municipal drainage system
CN213836975U (en) Sewer entry cleaning device for municipal construction
CN212941817U (en) Water conservancy device for removing silt and impurities
CN209620233U (en) A kind of reservoir for being convenient to clean and filtering
CN209011808U (en) A kind of oil extraction sand prevention device
CN221001130U (en) Retaining wall for roadbed engineering
CN215669951U (en) Prevent drainage pipe for municipal works of stifled type
CN114288726B (en) Gardens are with automatic retaining irrigation system of environment-friendly
CN213173535U (en) Waterproof drainage device of hydraulic engineering construction
CN219261273U (en) Sewage inspection well
CN212104480U (en) A prevent stifled cistern for hydraulic engineering
CN220377333U (en) Water conservancy tunnel groundwater accuse device of arranging
CN112813760B (en) Construction structure and construction method for roadbed earthwork engineering in rainy season

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200605

RJ01 Rejection of invention patent application after publication