CN103882918A - Method for draining accumulated floor water during super high-rise building construction, and apparatus thereof - Google Patents

Method for draining accumulated floor water during super high-rise building construction, and apparatus thereof Download PDF

Info

Publication number
CN103882918A
CN103882918A CN201210557855.5A CN201210557855A CN103882918A CN 103882918 A CN103882918 A CN 103882918A CN 201210557855 A CN201210557855 A CN 201210557855A CN 103882918 A CN103882918 A CN 103882918A
Authority
CN
China
Prior art keywords
floor
water
pipe
construction
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210557855.5A
Other languages
Chinese (zh)
Other versions
CN103882918B (en
Inventor
袁茂生
曾平
谢翔
王皓
明睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201210557855.5A priority Critical patent/CN103882918B/en
Publication of CN103882918A publication Critical patent/CN103882918A/en
Application granted granted Critical
Publication of CN103882918B publication Critical patent/CN103882918B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for draining accumulated floor water during super high-rise building construction, and an apparatus thereof. The method comprises the following steps: building a water pool at the mouth of a construction water feeding pipe of each of floors, arranging a water draining standpipe connected with a water pool on a lower layer floor at the bottom of the water pool, and draining water leaked by the feeding pipes to a bottom waterway through the water drainage ditch layer by layer; setting a group of floor drain at the edges of floor slabs of each of the floor in an interval manner, connecting the floor drain with a water draining flat pipe below the floor slab, and connecting the water draining flat pipe with the water draining standpipe; and draining accumulated water in the construction process or rainwater to the bottom water drainage ditch through the floor drain layer by layer. Accumulated water generated by the floor during the super high-rise building construction or generated due to rain fall can be timely and orderly discharged from a construction site through the method and the apparatus without overturning the accumulated water out of the floor by directly utilizing a trolley through manpower drainage. The method and the apparatus have no influences on below construction workers, passing pedestrians and passing vehicles, are in favor of the onsite civilized construction, and can reduce the drainage cost.

Description

The water discharge method of floor ponding and device when construction of super highrise building
Technical field
the water discharge method of floor ponding and device while the present invention relates to a kind of construction of super highrise building, belong to building operations water discharge technology field.
Background technology
when construction of super highrise building, in the uninstalled floor of curtain wall, can produce ponding because of factors such as rainfalls, for addressing this problem, common practices is to adopt artificial drainage, directly utilizes trolley that ponding is toppled over outside floor, because super highrise building is generally all positioned at urban district, job site is narrow and small, the ponding of outwards pouring out is difficult to control, and easily below constructor and pedestrian and vehicle is impacted, and is unfavorable for on-the-spot civilized construction.And draining all needs to drop into a large amount of manpowers at every turn, has increased construction cost.
Summary of the invention
the object of the invention is to the water discharge method of floor ponding and device when a kind of construction of super highrise building is provided.Sewage and rainwater that discharge work progress that can be orderly in time produces, avoid ponding to impact constructor and pedestrian and vehicle, to overcome the deficiencies in the prior art.
technical scheme of the present invention:
the water discharge method of floor ponding when construction of super highrise building, the method is the block pond, mouth of pipe place at the construction water service pipe of each floor, basin bottom is provided with towards the soil stack in the pond on lower floor's floor, and the water of water service pipe being revealed by soil stack successively drains into the gutter of bottom; At the floor marginating compartment of each floor, one group of floor drain is set, floor drain is connected with the row of horizontal pipe of floor below, and row of horizontal pipe is connected with soil stack; By floor drain, the ponding in work progress or rainwater are successively drained into the gutter of bottom.
in preceding method, described row of horizontal pipe is connected with the floor slab bottoms of each floor by hanging piece.
in preceding method, the spacing of described floor drain is 5-7m, and the floor below of floor drain is provided with funnel, and funnel is connected with row of horizontal pipe through tube connector, and funnel is connected with floor slab bottoms through expansion bolt.By funnel, the ponding in work progress or rainwater are successively drained into the gutter of bottom.
in preceding method, described soil stack adopts the pvc pipe of diameter 150mm.
in preceding method, described row of horizontal pipe adopts the pvc pipe of diameter 100mm.
in preceding method, described tube connector adopts the pvc pipe of diameter 75mm.
form according to aforesaid method construction of super highrise building time floor Seeper discharge device, comprise and be located at one group of floor drain that each floor construction pond at water service pipe mouth of pipe place and the floor marginating compartment of each floor arrange; Basin bottom is provided with the soil stack communicating with lower floor pond; Soil stack is connected with row of horizontal pipe through threeway, and row of horizontal pipe is connected with the funnel that is positioned at floor drain below through tube connector.
in aforementioned dewatering installation, described row of horizontal pipe is connected with the floor slab bottoms of each floor through hanging piece.
in aforementioned dewatering installation, described tube connector is straight tube or the L pipe that couples together with bend pipe.
in aforementioned dewatering installation, described soil stack, threeway, row of horizontal pipe and tube connector are PVC material product.
compared with prior art, Main Function of the present invention is floor produces during by construction of super highrise building ponding or produces ponding orderly discharge job site in time because of rainfall.Without adopting again artificial drainage directly to utilize trolley that ponding is toppled over outside floor.Can not impact below constructor and pedestrian and vehicle.Be conducive to on-the-spot civilized construction.Can reduce draining cost.
Brief description of the drawings
fig. 1 is structural representation of the present invention;
fig. 2 is the below oblique view of Fig. 1.
being labeled as in figure: 1-construction water service pipe, 2-pond, 3-floor, 4-floor drain, 5-soil stack, 6-threeway, 7-row of horizontal pipe, 8-tube connector, 9-funnel, 10-hanging piece.
Detailed description of the invention
below in conjunction with accompanying drawing, the present invention is described in further detail, but not as any limitation of the invention.
the water discharge method of floor ponding when construction of super highrise building, as depicted in figs. 1 and 2.The method is the block pond, mouth of pipe place at the construction water service pipe of each floor, and pond height can be between 200-500mm, prevents that pipe leakage from flowing to flooring.Basin bottom is provided with towards the soil stack in the pond on lower floor's floor, and the water of water service pipe being revealed by soil stack successively drains into the gutter of bottom; At the floor marginating compartment of each floor, one group of floor drain is set, floor drain is connected with the row of horizontal pipe of floor below, and row of horizontal pipe is connected with soil stack; By floor drain, the ponding in work progress or rainwater are successively drained into the gutter of bottom.Row of horizontal pipe is connected with the floor slab bottoms of each floor by hanging piece.The spacing of floor drain is 5-7m, and the floor below of floor drain is provided with funnel, and funnel is connected with row of horizontal pipe through tube connector, and funnel is connected with floor slab bottoms through expansion bolt.By funnel, the ponding in work progress or rainwater are successively drained into the gutter of bottom.Soil stack adopts the pvc pipe of diameter 150mm.Row of horizontal pipe adopts the pvc pipe of diameter 100mm.Tube connector adopts the pvc pipe of diameter 75mm.
form according to aforesaid method construction of super highrise building time floor Seeper discharge device, as depicted in figs. 1 and 2.Comprise the one group of floor drain 4 that is located at each floor construction pond 2 at water service pipe 1 mouth of pipe place and the 3 marginating compartments settings of the floor of each floor; 2 bottoms, pond are provided with the soil stack 5 communicating with lower floor pond; Soil stack 5 is connected with row of horizontal pipe 7 through threeway 6, and row of horizontal pipe 7 is connected with the funnel 9 that is positioned at floor drain 4 belows through tube connector 8.Row of horizontal pipe 7 is connected with floor 3 bottoms of each floor through hanging piece 10.Tube connector 8 is straight tube or the L pipe that couples together with bend pipe.Soil stack 5, threeway 6, row of horizontal pipe 7 and tube connector 8 are PVC material product.

Claims (10)

1. the water discharge method of floor ponding when a construction of super highrise building, it is characterized in that: the method is the block pond, mouth of pipe place at the construction water service pipe of each floor, basin bottom is provided with towards the soil stack in the pond on lower floor's floor, and the water of water service pipe being revealed by soil stack successively drains into the gutter of bottom; At the floor marginating compartment of each floor, one group of floor drain is set, floor drain is connected with the row of horizontal pipe of floor below, and row of horizontal pipe is connected with soil stack; By floor drain, the ponding in work progress or rainwater are successively drained into the gutter of bottom.
2. method according to claim 1, is characterized in that: described row of horizontal pipe is connected with the floor slab bottoms of each floor by hanging piece.
3. method according to claim 1, is characterized in that: the spacing of described floor drain is 5-7m, and the floor below of floor drain is provided with funnel, and funnel is connected with row of horizontal pipe through tube connector, and funnel is connected with floor slab bottoms through expansion bolt,
By funnel, the ponding in work progress or rainwater are successively drained into the gutter of bottom.
4. method according to claim 1, is characterized in that: described soil stack adopts the pvc pipe of diameter 150mm.
5. method according to claim 1, is characterized in that: described row of horizontal pipe adopts the pvc pipe of diameter 100mm.
6. method according to claim 1, is characterized in that: described tube connector adopts the pvc pipe of diameter 75mm.
7. form according to method described in the arbitrary claim of claim 1-6 construction of super highrise building time a floor Seeper discharge device, it is characterized in that: comprise the one group of floor drain (4) that is located at each floor construction pond (2) at water service pipe (1) mouth of pipe place and the setting of floor (3) marginating compartment of each floor; Pond (2) bottom is provided with the soil stack (5) communicating with lower floor pond; Soil stack (5) is connected with row of horizontal pipe (7) through threeway (6), and row of horizontal pipe (7) is connected with the funnel (9) that is positioned at floor drain (4) below through tube connector (8).
8. dewatering installation according to claim 7, is characterized in that: described row of horizontal pipe (7) is connected bottom the floor (3) of hanging piece (10) and each floor.
9. dewatering installation according to claim 7, is characterized in that: described tube connector (8) is straight tube or the L pipe that couples together with bend pipe.
10. dewatering installation according to claim 7, is characterized in that: described soil stack (5), threeway (6), row of horizontal pipe (7) and tube connector (8) are PVC material product.
CN201210557855.5A 2012-12-20 2012-12-20 The water discharge method of floor hydrops and device during construction of super highrise building Active CN103882918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210557855.5A CN103882918B (en) 2012-12-20 2012-12-20 The water discharge method of floor hydrops and device during construction of super highrise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210557855.5A CN103882918B (en) 2012-12-20 2012-12-20 The water discharge method of floor hydrops and device during construction of super highrise building

Publications (2)

Publication Number Publication Date
CN103882918A true CN103882918A (en) 2014-06-25
CN103882918B CN103882918B (en) 2016-08-03

Family

ID=50952019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210557855.5A Active CN103882918B (en) 2012-12-20 2012-12-20 The water discharge method of floor hydrops and device during construction of super highrise building

Country Status (1)

Country Link
CN (1) CN103882918B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104455723A (en) * 2014-12-04 2015-03-25 陕西建工第三建设集团有限公司 Branch pipe assembly type prefabricating installation construction method for building pipeline clamp connection drainage system
CN111236407A (en) * 2020-01-16 2020-06-05 中铁二局集团有限公司 Drainage device and method for floor accumulated water in super high-rise building construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7401571B1 (en) * 2004-10-21 2008-07-22 Tony William Creed Gutter system indicator for indicating a clogged or partially clogged condition
CN201539021U (en) * 2009-10-30 2010-08-04 华煜建设集团有限公司 Drainage channel for corridor
CN201538994U (en) * 2009-10-30 2010-08-04 华煜建设集团有限公司 Floor waterlogging drainage system
CN201713887U (en) * 2010-05-19 2011-01-19 吴廷权 Settling box type drainage system
CN102127920A (en) * 2010-09-30 2011-07-20 广东联塑科技实业有限公司 Waterlogging draining method between floors

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7401571B1 (en) * 2004-10-21 2008-07-22 Tony William Creed Gutter system indicator for indicating a clogged or partially clogged condition
CN201539021U (en) * 2009-10-30 2010-08-04 华煜建设集团有限公司 Drainage channel for corridor
CN201538994U (en) * 2009-10-30 2010-08-04 华煜建设集团有限公司 Floor waterlogging drainage system
CN201713887U (en) * 2010-05-19 2011-01-19 吴廷权 Settling box type drainage system
CN102127920A (en) * 2010-09-30 2011-07-20 广东联塑科技实业有限公司 Waterlogging draining method between floors

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104455723A (en) * 2014-12-04 2015-03-25 陕西建工第三建设集团有限公司 Branch pipe assembly type prefabricating installation construction method for building pipeline clamp connection drainage system
CN111236407A (en) * 2020-01-16 2020-06-05 中铁二局集团有限公司 Drainage device and method for floor accumulated water in super high-rise building construction

Also Published As

Publication number Publication date
CN103882918B (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN107805990A (en) A kind of rainwater on road surface excludes purification self-cleaning system and its installation method
CN205857551U (en) A kind of Jing Qiang anti-stone material common fault structure of orientation water drainage of bearing down on one
CN109707117A (en) A kind of construction technology of siphon type rainwater discharging system
CN202380558U (en) Anti-water-logging system
CN209741602U (en) Drainage system for ground
CN103882918B (en) The water discharge method of floor hydrops and device during construction of super highrise building
CN106638919B (en) A kind of urban road rainwater recycling system and construction method
CN201137209Y (en) Underground drainage device
CN202969478U (en) Draining device for resisting water accumulation
CN205116580U (en) Flat roof deck drainage system
CN206477382U (en) Rainwater recycle comprehensively utilizes structure
CN110409830A (en) A kind of construction method that high layer main body subregion intercepts water and U-shaped shuting used
CN106677444B (en) House roof rainwater treatment system and construction method
CN201644490U (en) Concrete placing waste treatment and recovery system
CN213539517U (en) House construction roof seepage prevention structure
CN214006283U (en) Drainage structure for rainwater gravity flow crossing roof deformation joint
CN207760928U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING sponge gardens rainwater-collecting circulatory system
CN203756235U (en) Lateral drainage device of tunnel
CN207633477U (en) Sewerage system
CN202831102U (en) Frame used for toilet caisson and toilet caisson
CN202574148U (en) Water mist type automatic car washing platform
CN207727715U (en) Sponge Comprehensive Utilization System of Urban Rainwater
CN106703157B (en) Construction method of rainwater recycling and comprehensive utilizing structure
CN207672711U (en) A kind of equipment recycling clout in drag pump pump line
RU2504622C1 (en) Tank for accumulation and storage of surface, rain and process water and method of tank erection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant