CN111230070A - Casting process of rail transit derailing valve - Google Patents

Casting process of rail transit derailing valve Download PDF

Info

Publication number
CN111230070A
CN111230070A CN202010059170.2A CN202010059170A CN111230070A CN 111230070 A CN111230070 A CN 111230070A CN 202010059170 A CN202010059170 A CN 202010059170A CN 111230070 A CN111230070 A CN 111230070A
Authority
CN
China
Prior art keywords
valve
product
raw materials
rail transit
obtaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010059170.2A
Other languages
Chinese (zh)
Inventor
林富全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Yongsen Aviation Material Technology Co ltd
Original Assignee
Sichuan Yongsen Aviation Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Yongsen Aviation Material Technology Co ltd filed Critical Sichuan Yongsen Aviation Material Technology Co ltd
Priority to CN202010059170.2A priority Critical patent/CN111230070A/en
Publication of CN111230070A publication Critical patent/CN111230070A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D18/00Pressure casting; Vacuum casting
    • B22D18/02Pressure casting making use of mechanical pressure devices, e.g. cast-forging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/02Die forging; Trimming by making use of special dies ; Punching during forging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • B23P15/001Making specific metal objects by operations not covered by a single other subclass or a group in this subclass valves or valve housings
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0068Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for particular articles not mentioned below

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Forging (AREA)

Abstract

The invention relates to the technical field of rail transit, and discloses a rail transit derailing valve casting process which comprises the following steps of preparing raw materials, purchasing raw materials meeting national standards, removing impurities from the purchased raw materials, adding the raw materials into a melting device for melting treatment to form liquid metal, wherein the melting temperature is between one hundred fifty ℃ and two hundred fifty ℃; forging forming, pouring liquid metal into a corresponding forging die, obtaining a preliminary part with a certain shape after the liquid metal is solidified and formed, then carrying out punch forming on the preliminary part under a punch press, adopting a special stamping die during stamping, and obtaining a part blank of each part of the derailing valve after the stamping is finished. The casting process of the rail transit derailing valve can effectively eliminate casting stress, improve mechanical property and machinability, effectively improve material property and ensure the quality of parts.

Description

Casting process of rail transit derailing valve
Technical Field
The invention relates to the technical field of rail transit, in particular to a casting process of a rail transit derailing valve.
Background
The rail transit is a kind of transportation means or transportation system that an operating vehicle needs to run on a specific rail, the most typical rail transit is a railway system composed of a traditional train and a standard railway, with the diversified development of the train and the railway technology, the rail transit is more and more types, not only is distributed over long-distance land transportation, but also is widely applied to middle and short-distance urban public transportation, common rail transit includes traditional railways, subways, light rails and tramcars, novel rail transit includes a magnetic suspension rail system, a single rail system, a passenger automatic rapid transit system and the like, and the most important rail transit is safety, so that a set of derailment automatic braking device is installed at each axle, and the derailment valve is a core component of the derailment automatic braking device.
The existing derail valve is easy to cast by materials and inconvenient for users in the process of casting, and the quality problem is easy to occur after the casting is finished, so that the casting process of the derail valve for rail transit is provided.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a casting process of a rail transit derailing valve, which has the advantages of convenience in casting and the like, and solves the problems that the conventional derailing valve is inconvenient to cast materials in the casting process, inconvenience is brought to a user, and quality problems are easy to occur after casting is finished.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: a rail transit derailment valve casting process comprises the following steps:
1) preparing raw materials: purchasing raw materials meeting the national standard, removing impurities from the purchased raw materials, adding the raw materials into a melting device for melting treatment to form liquid metal, wherein the melting temperature is between one hundred and fifty ℃ and two hundred and fifty ℃;
2) forging and forming: pouring liquid metal into a corresponding forging die, obtaining a primary part with a certain shape after the liquid metal is solidified and formed, then carrying out punch forming on the primary part under a punch press, wherein a special punching die is adopted during punching, and obtaining a part blank of each part of the derailing valve after punching is finished;
3) and (3) heat treatment: heating the part blank to a proper temperature above a critical point AC3 or ACM, then cooling in the air after keeping for a certain time, heating the cooled part blank to a proper temperature below the critical point AC1 after cooling, then keeping for a certain time, then cooling in the air, and obtaining the heat-treated part blank after cooling;
4) and (3) processing and forming: respectively turning, milling, grinding and polishing the part blank after heat treatment to obtain a finished part product, detecting the finished part product in a high-precision measuring instrument, ensuring that each size error of the part is controlled within zero-five millimeters, marking a good product on the part meeting the requirement, marking a defective product on the part with the error between zero-five millimeters and zero-one millimeter, and marking a waste product with the error outside zero-one millimeter;
5) obtaining a finished product: respectively assembling the superior parts and the inferior parts to obtain a valve product, scrapping the waste parts, detecting the valve product after the assembly, including the air tightness and the precision of the valve, then spraying paint to mark the qualified valve product, and finally boxing for sale.
Preferably, the raw material can be carbon steel and alloy steel, and the removed impurities comprise dust, plastic paper products, rust possibly existing and the like.
Preferably, in the process of transferring the preliminary part to the punching machine, the preliminary part is clamped by long-handled pliers, and the length of the long-handled pliers is not less than one meter.
(III) advantageous effects
Compared with the prior art, the invention provides a casting process of a rail transit derailing valve, which has the following beneficial effects:
1. the rail transit derailing valve casting process comprises the steps of preparing raw materials, purchasing raw materials meeting national standards, removing impurities from the purchased raw materials, removing impurities, adding the raw materials into a melting device for melting to form liquid metal, wherein the melting temperature is between one hundred fifty ℃ and two hundred fifty ℃, forging and forming, pouring the liquid metal into a corresponding forging die, obtaining a primary part with a certain shape after the liquid metal is solidified and formed, performing punch forming on the primary part under a punch press, adopting a special punching die during punching, obtaining part blanks of various parts of the derailing valve after the punching is finished, performing heat treatment, heating the part blanks to a proper temperature above a critical point AC3 or ACM, cooling in the air after keeping for a certain time, and cooling, the part blank after will cooling heats to the suitable temperature below critical point AC1, then keep the certain time, cool off in the air afterwards, after the cooling is accomplished, obtain the part blank after the heat treatment, thereby after heat treatment, casting stress can be effectively eliminated, and can refine the tissue, improve mechanical properties and improve the machinability, not only effectively increased the performance of material, the processing of the later stage of still being convenient for, more convenient to use person carries out production and processing, raw and other materials can be carbon steel and alloy steel simultaneously, the impurity of getting rid of includes dust, plastic paper article and the rust stain that probably exists etc., only guaranteed the performance of raw and other materials, after getting rid of impurity, make the quality of product better.
2. The rail transit derailing valve casting process comprises the steps of respectively turning, milling, grinding and polishing a part blank after heat treatment through machining and forming to obtain a finished part product, detecting the finished part product in a high-precision measuring instrument to ensure that each size error of the part is controlled within zero-five millimeters, marking a good product on the part meeting the requirement, marking a defective product on the part between zero-five millimeters and zero-one millimeter, marking a waste product outside zero-one millimeter, obtaining a finished product, respectively assembling the good part and the defective part to obtain a valve product, scrapping the waste part, detecting the valve product after the assembly, wherein the valve product comprises the air tightness and the precision of the valve, spraying paint on the qualified valve product, boxing and marking, and finally waiting for sale, and accurately detecting each parameter of each part in the production process, the quality of part has been guaranteed to every part marks respectively, can effectively avoid appearing with the condition that fills in order, through at preliminary part in-process of shifting the punching machine, adopt long-handled pincers to carry out the centre gripping to preliminary part, long-handled pincers's length is not less than a meter, can guarantee user's safety, avoids the user to be scalded.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows: a rail transit derailment valve casting process comprises the following steps:
1) preparing raw materials: purchasing raw materials meeting the national standard, removing impurities from the purchased raw materials, adding the raw materials into a melting device for melting to form liquid metal, wherein the melting temperature is two hundred ℃;
2) forging and forming: pouring liquid metal into a corresponding forging die, obtaining a primary part with a certain shape after the liquid metal is solidified and formed, then carrying out punch forming on the primary part under a punch press, wherein a special punching die is adopted during punching, and obtaining a part blank of each part of the derailing valve after punching is finished;
3) and (3) heat treatment: heating the part blank to a proper temperature above a critical point AC3, then cooling in air after keeping for one and a half hours, heating the cooled part blank to a proper temperature below a critical point AC1 after cooling is completed, then keeping for one hour, then cooling in air, and obtaining a heat-treated part blank after cooling is completed;
4) and (3) processing and forming: respectively turning, milling, grinding and polishing the part blank after heat treatment to obtain a finished part product, detecting the finished part product in a high-precision measuring instrument, ensuring that each size error of the part is controlled within zero-five millimeters, marking a good product on the part meeting the requirement, marking a defective product on the part with the error between zero-five millimeters and zero-one millimeter, and marking a waste product with the error outside zero-one millimeter;
5) obtaining a finished product: respectively assembling the superior parts and the inferior parts to obtain a valve product, scrapping the waste parts, detecting the valve product after the assembly, including the air tightness and the precision of the valve, then spraying paint to mark the qualified valve product, and finally boxing for sale.
The raw material can be carbon steel and alloy steel, and the removed impurities comprise dust, plastic paper products, possible rust and the like.
And in the process of transferring the primary part to the punching machine, clamping the primary part by using long-handle pliers, wherein the length of the long-handle pliers is not less than one meter.
Example two: a rail transit derailment valve casting process comprises the following steps:
1) preparing raw materials: purchasing raw materials meeting the national standard, removing impurities from the purchased raw materials, adding the raw materials into a melting device for melting to form liquid metal, wherein the melting temperature is two hundred and thirty ℃;
2) forging and forming: pouring liquid metal into a corresponding forging die, obtaining a primary part with a certain shape after the liquid metal is solidified and formed, then carrying out punch forming on the primary part under a punch press, wherein a special punching die is adopted during punching, and obtaining a part blank of each part of the derailing valve after punching is finished;
3) and (3) heat treatment: heating the part blank to a suitable temperature above the critical point ACM, then cooling in air after holding for seventy minutes, when cooling is completed, heating the cooled part blank to a suitable temperature below the critical point AC1, then holding for ninety minutes, then cooling in air, and after cooling is completed, obtaining a heat treated part blank;
4) and (3) processing and forming: respectively turning, milling, grinding and polishing the part blank after heat treatment to obtain a finished part product, detecting the finished part product in a high-precision measuring instrument, ensuring that each size error of the part is controlled within zero-five millimeters, marking a good product on the part meeting the requirement, marking a defective product on the part with the error between zero-five millimeters and zero-one millimeter, and marking a waste product with the error outside zero-one millimeter;
5) obtaining a finished product: respectively assembling the superior parts and the inferior parts to obtain a valve product, scrapping the waste parts, detecting the valve product after the assembly, including the air tightness and the precision of the valve, then spraying paint to mark the qualified valve product, and finally boxing for sale.
The raw material can be carbon steel and alloy steel, and the removed impurities comprise dust, plastic paper products, possible rust and the like.
And in the process of transferring the primary part to the punching machine, clamping the primary part by using long-handle pliers, wherein the length of the long-handle pliers is not less than one meter.
Example three: a rail transit derailment valve casting process comprises the following steps:
1) preparing raw materials: purchasing raw materials meeting the national standard, removing impurities from the purchased raw materials, adding the raw materials into a melting device for melting to form liquid metal, wherein the melting temperature is one hundred eighty ℃;
2) forging and forming: pouring liquid metal into a corresponding forging die, obtaining a primary part with a certain shape after the liquid metal is solidified and formed, then carrying out punch forming on the primary part under a punch press, wherein a special punching die is adopted during punching, and obtaining a part blank of each part of the derailing valve after punching is finished;
3) and (3) heat treatment: heating the part blank to a suitable temperature above the critical point ACM, then cooling in air after holding for one hour, when cooling is complete, heating the cooled part blank to a suitable temperature below the critical point AC1, then holding for ninety minutes, then cooling in air, after cooling is complete, obtaining a heat treated part blank;
4) and (3) processing and forming: respectively turning, milling, grinding and polishing the part blank after heat treatment to obtain a finished part product, detecting the finished part product in a high-precision measuring instrument, ensuring that each size error of the part is controlled within zero-five millimeters, marking a good product on the part meeting the requirement, marking a defective product on the part with the error between zero-five millimeters and zero-one millimeter, and marking a waste product with the error outside zero-one millimeter;
5) obtaining a finished product: respectively assembling the superior parts and the inferior parts to obtain a valve product, scrapping the waste parts, detecting the valve product after the assembly, including the air tightness and the precision of the valve, then spraying paint to mark the qualified valve product, and finally boxing for sale.
The raw material can be carbon steel and alloy steel, and the removed impurities comprise dust, plastic paper products, possible rust and the like.
And in the process of transferring the primary part to the punching machine, clamping the primary part by using long-handle pliers, wherein the length of the long-handle pliers is not less than one meter.
The invention has the beneficial effects that: the rail transit derailing valve casting process comprises the steps of preparing raw materials, purchasing raw materials meeting national standards, removing impurities from the purchased raw materials, removing impurities, adding the raw materials into a melting device for melting to form liquid metal, wherein the melting temperature is between one hundred fifty ℃ and two hundred fifty ℃, forging and forming, pouring the liquid metal into a corresponding forging die, obtaining a primary part with a certain shape after the liquid metal is solidified and formed, performing punch forming on the primary part under a punch press, adopting a special punching die during punching, obtaining part blanks of various parts of the derailing valve after the punching is finished, performing heat treatment, heating the part blanks to a proper temperature above a critical point AC3 or ACM, cooling in the air after keeping for a certain time, and cooling, heating the cooled part blank to a proper temperature below a critical point AC1, keeping for a certain time, cooling in the air, and after cooling, obtaining the heat-treated part blank, thereby effectively eliminating casting stress, refining tissue, improving mechanical property and machinability, effectively increasing material property, facilitating later processing, facilitating production and processing for users, simultaneously, the raw materials can be carbon steel and alloy steel, the removed impurities comprise dust, plastic paper products, possible rust stains and the like, only ensuring the performance of the raw materials, and after removing the impurity impurities, leading the product quality to be better, respectively carrying out turning, milling, grinding and polishing treatment on the heat-treated part blank through processing and forming, obtaining a part finished product, and then detecting the part finished product in a high-precision measuring instrument, ensuring that all size errors of parts are controlled within zero-five millimeters, marking good parts according to requirements, marking defective parts between zero-five millimeters and zero-one millimeter, marking waste parts outside zero-one millimeter, obtaining finished products, respectively assembling the good parts and the defective parts to obtain valve products, scrapping the waste parts, detecting the valve products after the assembly is finished, including the air tightness and the precision of the valves, spraying paint and marking the qualified valve products, finally boxing and waiting for sale, accurately detecting all parameters of all the parts in the production process, ensuring the quality of the parts, marking each part respectively, effectively avoiding the situation of being filled again, clamping the primary parts by using long-handle pliers in the process of transferring the primary parts to a punching machine, wherein the length of the long-handle pliers is not less than one meter, can guarantee user's safety, avoid the user to be scalded, solve current derail valve and in casting department process, appear the inconvenient casting of material easily, brought inconvenience for the user to the problem of quality problems appears after the casting is accomplished easily.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. The casting process of the rail transit derailment valve is characterized by comprising the following steps of:
1) preparing raw materials: purchasing raw materials meeting the national standard, removing impurities from the purchased raw materials, adding the raw materials into a melting device for melting treatment to form liquid metal, wherein the melting temperature is between one hundred and fifty ℃ and two hundred and fifty ℃;
2) forging and forming: pouring liquid metal into a corresponding forging die, obtaining a primary part with a certain shape after the liquid metal is solidified and formed, then carrying out punch forming on the primary part under a punch press, wherein a special punching die is adopted during punching, and obtaining a part blank of each part of the derailing valve after punching is finished;
3) and (3) heat treatment: heating the part blank to a proper temperature above a critical point AC3 or ACM, then cooling in the air after keeping for a certain time, heating the cooled part blank to a proper temperature below the critical point AC1 after cooling, then keeping for a certain time, then cooling in the air, and obtaining the heat-treated part blank after cooling;
4) and (3) processing and forming: respectively turning, milling, grinding and polishing the part blank after heat treatment to obtain a finished part product, detecting the finished part product in a high-precision measuring instrument, ensuring that each size error of the part is controlled within zero-five millimeters, marking a good product on the part meeting the requirement, marking a defective product on the part with the error between zero-five millimeters and zero-one millimeter, and marking a waste product with the error outside zero-one millimeter;
5) obtaining a finished product: respectively assembling the superior parts and the inferior parts to obtain a valve product, scrapping the waste parts, detecting the valve product after the assembly, including the air tightness and the precision of the valve, then spraying paint to mark the qualified valve product, and finally boxing for sale.
2. The process for casting the rail transit derailment valve according to claim 1, wherein the raw material is carbon steel and alloy steel, and the removed impurities comprise dust, plastic paper, and possible rust.
3. The rail transit derailment valve casting process according to claim 1, wherein the preliminary part is clamped by long-handled pliers during the transfer to the punch, and the length of the long-handled pliers is not less than one meter.
CN202010059170.2A 2020-01-18 2020-01-18 Casting process of rail transit derailing valve Pending CN111230070A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010059170.2A CN111230070A (en) 2020-01-18 2020-01-18 Casting process of rail transit derailing valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010059170.2A CN111230070A (en) 2020-01-18 2020-01-18 Casting process of rail transit derailing valve

Publications (1)

Publication Number Publication Date
CN111230070A true CN111230070A (en) 2020-06-05

Family

ID=70866899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010059170.2A Pending CN111230070A (en) 2020-01-18 2020-01-18 Casting process of rail transit derailing valve

Country Status (1)

Country Link
CN (1) CN111230070A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112238330A (en) * 2020-09-27 2021-01-19 祥安消防科技有限公司 Forming process of fire safety valve
CN112264589A (en) * 2020-09-14 2021-01-26 襄阳顺特阳光科技有限公司 Manufacturing and forming method of stainless steel intercooling air inlet pipe
CN116373812A (en) * 2023-05-29 2023-07-04 四川永森航空材料科技有限公司 Automatic train derailment braking device and braking method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103659188A (en) * 2013-12-13 2014-03-26 重庆布莱迪仪器仪表有限公司 Machining process of valve body of single-base adjusting valve
CN107716858A (en) * 2017-11-14 2018-02-23 张剑 A kind of production technology of carbon steel valve
CN109382483A (en) * 2018-11-14 2019-02-26 安徽应流集团霍山铸造有限公司 A kind of casting method of the big valve castings of the narrow thickness of intracavity space
KR20190066944A (en) * 2017-12-06 2019-06-14 (주)태상 Manufacturing method of forged ball for ball valve
CN109877274A (en) * 2019-03-23 2019-06-14 江苏亿阀股份有限公司 A kind of casting technique of cryogenic valve casting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103659188A (en) * 2013-12-13 2014-03-26 重庆布莱迪仪器仪表有限公司 Machining process of valve body of single-base adjusting valve
CN107716858A (en) * 2017-11-14 2018-02-23 张剑 A kind of production technology of carbon steel valve
KR20190066944A (en) * 2017-12-06 2019-06-14 (주)태상 Manufacturing method of forged ball for ball valve
CN109382483A (en) * 2018-11-14 2019-02-26 安徽应流集团霍山铸造有限公司 A kind of casting method of the big valve castings of the narrow thickness of intracavity space
CN109877274A (en) * 2019-03-23 2019-06-14 江苏亿阀股份有限公司 A kind of casting technique of cryogenic valve casting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈琦等: "《中外铸件材料速查手册》", 28 February 2015, 辽宁科学技术出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112264589A (en) * 2020-09-14 2021-01-26 襄阳顺特阳光科技有限公司 Manufacturing and forming method of stainless steel intercooling air inlet pipe
CN112238330A (en) * 2020-09-27 2021-01-19 祥安消防科技有限公司 Forming process of fire safety valve
CN116373812A (en) * 2023-05-29 2023-07-04 四川永森航空材料科技有限公司 Automatic train derailment braking device and braking method
CN116373812B (en) * 2023-05-29 2023-09-05 四川永森航空材料科技有限公司 Automatic train derailment braking device and braking method

Similar Documents

Publication Publication Date Title
CN111230070A (en) Casting process of rail transit derailing valve
CN102228956B (en) Precision fire mould casting process of series sliding bed bedplates for turnouts of high-speed railway lines for passenger transport and special die
CN110157981B (en) Production method for improving section hardness uniformity of NSM30 plastic die steel
CN104759848A (en) Manufacturing method of axle for low-floor vehicle
CN110904311B (en) Anti-out-of-roundness wheel steel, wheel and preparation method of wheel
CN107414057B (en) The manufacturing method of whole composite casting high-speed railway track switch slider bed platen
CN106544671A (en) A kind of renovation technique of automobile die
CN105149892A (en) Precise forming method for steel-forged wheel-mounted disc brake of rail train
CN105063392A (en) Hub casting and forming technology
CN104789873A (en) Rolling mill segmentation wheel and regeneration manufacturing process thereof
CN104911500B (en) Manufacturing method of low-temperature wear-resistant carriage
CN106825473A (en) The method for improving high-strength weathering H profile steel surface quality
CN105252961B (en) A kind of processing method of rubber tire rail wheel
CN206779683U (en) A kind of steel alloy track switch and the welding model of groove-shape rail
CN109093071A (en) A kind of casting of traction seat and treatment process
CN104646965A (en) Machining process of housing frame of twenty-high roll mill
CN112355210A (en) Forging method for automobile hub
CN106427379B (en) A kind of spoke plate
CN107841683A (en) High speed heavy rail head edger roll ring and its preparation technology
CN113523911A (en) Method for solving 10Cr17 steel head and tail billet cracks
CN113369446A (en) Preparation method of automobile hub
CN107552764B (en) A kind of rheology forging rotation production method of rail wheel
CN107175402A (en) A kind of steel alloy track switch and the welding model and welding method of groove-shape rail
SU818717A1 (en) Method of producing railway wheel workpiecies
CN106002104A (en) Production process for hub

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200605