CN1112051A - Capsule shaping process - Google Patents

Capsule shaping process Download PDF

Info

Publication number
CN1112051A
CN1112051A CN 94105148 CN94105148A CN1112051A CN 1112051 A CN1112051 A CN 1112051A CN 94105148 CN94105148 CN 94105148 CN 94105148 A CN94105148 A CN 94105148A CN 1112051 A CN1112051 A CN 1112051A
Authority
CN
China
Prior art keywords
capsule
watt
sections
double
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 94105148
Other languages
Chinese (zh)
Inventor
贾立成
贾宝瑜
刘振忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAOYUAN POWER PLANT
Original Assignee
LIAOYUAN POWER PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAOYUAN POWER PLANT filed Critical LIAOYUAN POWER PLANT
Priority to CN 94105148 priority Critical patent/CN1112051A/en
Publication of CN1112051A publication Critical patent/CN1112051A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)
  • Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)

Abstract

The one-pass vulcanization shaping technology for rubber bag used in water treating apparatus includes sticking raw rubber plates onto upper and lower internal wooden moulds, releasing the internal moulds, lap-joining, charging steam into sandwich of double-layer automatically vulcanizing external mould to substitute air pressure for internal wooden mould. Obtained rubber bag has the advantages of uniform wall thickness, no lap-joined trace, high density and tension strength and long service life increased by 4 times.

Description

Capsule shaping process
The present invention relates to an a kind of sulfidization molding new technology that is used for the capsule of water treatment facilities, belong to the rubber processing forming technique.
Capsule is the critical piece in the water treatment facilities, require the even good springiness of wall thickness, hypertonic performance strong, but existing capsule can only adopt wooden internal mold to divide two sections sulfidization moldings, again with the bonding integral body that becomes of cold glue, otherwise closing up because of the capsule two ends can't the demoulding, make that capsule abutting edge wall unevenness is spared, hardened, the hypertonic poor-performing, be not durable, manufacturing process complexity simultaneously.
The present invention is directed to the problems referred to above, provide a kind of employing double-deck two to open in the autovulcanization external mold interlayer and fill steam, replace the capsule one-shot forming new technology of wooden internal mold with air pressure.
Task of the present invention is finished as follows:
1. moulding process a. peace sticks on the rubber plate on upper and lower two sections wooden internal molds, and will prepare bond end and cut out the inclined-plane according to traditional method; B. withdraw from internal mold, two sections are overlapped at overlap joint place, inclined-plane, at first with a detachable support inner ring that connects and composes by three sections circular arcs, bolt and nuts, the overlap joint inclined-plane of half capsule is gone in support, smoothens adhesive paste, puts second half capsule, and the reality that strikes with a stick, hand is stretched into the capsule inner chamber by the end, and the rotation nut unloads to tear open and supports inner ring and be three sections and taken out by the capsule end;
2. sulfuration process a. smears silicone oil on double-deck two that drive the autovulcanization external mold and capsule contact-making surfaces, to be silicone oil use after 1-2 days by mixing at 1: 10 to place with gasoline this silicone oil, capsule is put into double-deck two drive following watt of autovulcanization external mold, and make that the two ends ring flange is parallel to fall into following watt of corresponding component, buckle watt, behind the centering, on upper and lower Wa Bianer, penetrate screw tightening, two ends also use screw fastening with the sub-fixed head of belt carcass with upper and lower watt of flange web ear, wherein an end fuse is hollow, as air-filled pore; B. start the air pump inflation and check that its pressure is 3kg/cm 2, termination of pumping checks that each parts has or not leakage, treats can carry out next procedure after 10 minutes; C. open in the autovulcanization external mold interlayer to double-deck two and slowly send vapour, steam pressure is raised to 1kg/cm 2The time, check that comprehensively tight again end screw kept 45-50 minute when continuing to be warming up to 140-150 ℃, during this period, empty steam pressure can reach 4.5-4.8kg/cm in the capsule 2; D. steam off valve, breakdown Inflation door, discharged steam and air are waited not have when pressure and can be unloaded each parts screw by pine, take out finished capsule product then.
The present invention is because employing replaces wooden internal mold with air pressure, filling steam in the external mold interlayer heats, realize the technology of overlap joint after cure earlier, make that the capsule wall thickness is even, do not have cold bonding lap-joint, air themperature raises with vapor (steam) temperature in the external mold in the capsule, to capsule material density is increased, experimental result shows that hot strength and elongation at break all surpass more than a times of national technical stipulation standard, improves 4 times service life, because of its good springiness can improve the water treatment rate again.
Below in conjunction with accompanying drawing the present invention is described in further details
Fig. 1 is bladder curing moulding figure
Fig. 2 is for supporting the inner ring structure chart
, the rubber plate is sticked on upper and lower two sections wooden internal molds, and will prepare bond end and cut out the inclined-plane according to traditional method with reference to accompanying drawing 1.2,1. moulding process: a. peace; B. withdraw from internal mold, two sections are overlapped at overlap joint place, inclined-plane, at first with a detachable support inner ring that connects and composes by three sections circular arcs [1], screw rod [2], nut [3], the overlap joint inclined-plane of half capsule is gone in support, smoothens adhesive paste, puts second half capsule, and the reality that strikes with a stick, hand is stretched into the capsule inner chamber by the end, and rotation nut [3] unloads to tear open and supports inner ring and be three sections and taken out by the capsule end;
2. sulfuration process: a. smears silicone oil on double-deck two that open the autovulcanization mould and capsule contact-making surfaces, to be silicone oil use after 1-2 days by mixing at 1: 10 to place with gasoline this silicone oil, capsule [4] is put into double-deck two drive following watt of autovulcanization external mold [5], and make that the two ends ring flange is parallel to fall into following watt of [5] corresponding component, buckle watt [6], behind the centering, on upper and lower Wa Bianer [7], penetrate screw tightening, two ends also use screw fastening with the sub-fixed head of belt carcass [8] with upper and lower watt of flange web ear, wherein an end fuse is hollow, as the capsule air-filled pore; B. start the air pump inflation and check that its pressure is 3kg/cm 2, termination of pumping checks that each position has or not leakage, treats can carry out next procedure after 10 minutes; C. open in the upper and lower watt of interlayer of autovulcanization external mold [9] to double-deck two and slowly send vapour, steam pressure is raised to 1kg/cm 2The time, check that comprehensively tight again end screw kept 45 minutes when continuing to be warming up to 145 ℃, during this, the pressure of air [10] can reach 4.5-4.8kg/cm in the capsule 2; D. steam off valve, breakdown Inflation door, discharged steam and air are waited not have when pressure and can be unloaded each position screw by pine, take out finished capsule product then.

Claims (1)

1, a kind of capsule shaping process: it is at first pacified according to traditional method, the rubber plate is sticked on, on following two sections wooden internal molds, and will prepare bond end and cut out the inclined-plane, it is characterized in that: after withdrawing from internal mold, two sections are overlapped at overlap joint place, inclined-plane, at first with one by three sections circular arcs [1], screw rod [2], the detachable support inner ring that nut [3] connects and composes, the overlap joint inclined-plane of half capsule is gone in support, smoothen adhesive paste, put second half capsule, and the reality that strikes with a stick, hand is stretched into the capsule inner chamber by the end, rotation nut [3] unloads to tear open and supports inner ring and be three sections and taken out by the capsule end; Sulfuration process: a. smears silicone oil on double-deck two that open the autovulcanization mould and capsule contact-making surfaces, to be silicone oil use after 1-2 days by mixing at 1: 10 to place with gasoline this silicone oil, capsule [4] is put into double-deck two drive following watt of autovulcanization external mold [5], and make that the two ends ring flange is parallel to fall into following watt of [5] corresponding site, buckle watt [6], behind the centering, on upper and lower Wa Bianer [7], penetrate screw tightening, two ends also use screw fastening with the sub-fixed head of belt carcass [8] with upper and lower watt of flange web ear, wherein an end fuse is hollow, as the capsule air-filled pore; B. start the air pump inflation and check that its pressure is 3kg/cm 2, termination of pumping checks that each position has or not leakage, treats can carry out next procedure after 10 minutes; C. open in the upper and lower watt of interlayer of autovulcanization external mold [9] to double-deck two and slowly send vapour, steam pressure is raised to 1kg/cm 2The time, check that comprehensively tight again end screw kept 45 minutes when continuing to be warming up to 145 ℃, d. steam off valve, breakdown Inflation door, discharged steam and air are waited not have when pressure and can be unloaded each position screw by pine, take out finished capsule product then.
CN 94105148 1994-05-18 1994-05-18 Capsule shaping process Pending CN1112051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94105148 CN1112051A (en) 1994-05-18 1994-05-18 Capsule shaping process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94105148 CN1112051A (en) 1994-05-18 1994-05-18 Capsule shaping process

Publications (1)

Publication Number Publication Date
CN1112051A true CN1112051A (en) 1995-11-22

Family

ID=5031930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94105148 Pending CN1112051A (en) 1994-05-18 1994-05-18 Capsule shaping process

Country Status (1)

Country Link
CN (1) CN1112051A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113547675A (en) * 2021-07-27 2021-10-26 中国化工集团曙光橡胶工业研究设计院有限公司 Method for preventing crease from appearing on shoulder in tire when large-size radial aircraft tire is vulcanized and taken out of boiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113547675A (en) * 2021-07-27 2021-10-26 中国化工集团曙光橡胶工业研究设计院有限公司 Method for preventing crease from appearing on shoulder in tire when large-size radial aircraft tire is vulcanized and taken out of boiler

Similar Documents

Publication Publication Date Title
CN1933951A (en) Method of vulcanization molding of rubber material
US5240669A (en) Method for vulcanizing an elastomeric product including alternate heating and pressurizing steps
US4130619A (en) Apparatus and method of making hollow articles
CN102054546B (en) Preparation method for rubber cable connector
EP0333538B1 (en) Method and appararus for producing a gasket on the marginal part of a glazing, and glazing obtained
CN206106422U (en) Novel vacuum bag shaping device
CN1112051A (en) Capsule shaping process
CN109719971A (en) A kind of mold and its upper male mould manufacturing method for vacuum infusion molding
CN111113950A (en) Bag pressing forming process of carbon fiber product
CN101885226B (en) Freezing material clamping and taking device
CN110901126B (en) Auxiliary shaping process method for fully-cured aramid fiber honeycomb
CN111878577A (en) Hollow structure rubber and fabric composite sealing element and forming method thereof
CN1559778A (en) Injection type capsule mould and method for producing capsule by same
US20160242898A1 (en) Method For Forming Bilayer Patches
CN208305496U (en) A kind of vulcanization processing mold of washing machine feet
CN204471907U (en) A kind of tyre surface curing system
CN2701616Y (en) Injection type capsule mould
CN102303410A (en) Method for molding core and cavity of corner sealing element
FI59551B (en) FREQUENCY REQUIREMENT FOR FRAMING OF PNEUMATIC SHEET
CN1336276A (en) Production process of rubber diaphragm for vapor chamber
CN112060624A (en) Compression molding process method for manufacturing composite material product
CN201151175Y (en) Compression molding die of seal strip of heat radiator for engine cooling system
CN103612356A (en) Method for vulcanizing solid tires in tank-type variable-pressure variable-temperature manner
CN100448654C (en) Process for preparing high pressure capsule
JP2912218B2 (en) How to repair the cap of composite insulators

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication