CN111197613A - Hoop for installing communication equipment - Google Patents

Hoop for installing communication equipment Download PDF

Info

Publication number
CN111197613A
CN111197613A CN201911348592.5A CN201911348592A CN111197613A CN 111197613 A CN111197613 A CN 111197613A CN 201911348592 A CN201911348592 A CN 201911348592A CN 111197613 A CN111197613 A CN 111197613A
Authority
CN
China
Prior art keywords
hoop
arc
area
communication equipment
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201911348592.5A
Other languages
Chinese (zh)
Inventor
敬晓宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou 7u Communication Technologies Co ltd
Original Assignee
Hangzhou 7u Communication Technologies Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou 7u Communication Technologies Co ltd filed Critical Hangzhou 7u Communication Technologies Co ltd
Priority to CN201911348592.5A priority Critical patent/CN111197613A/en
Publication of CN111197613A publication Critical patent/CN111197613A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/065Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using screw-thread elements
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q1/00Details of, or arrangements associated with, antennas
    • H01Q1/12Supports; Mounting means

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

A hoop for installing communication equipment comprises at least two hoop units, an inner connecting piece, an edge connecting piece and a locking device; the hoop units are connected pairwise through internal connecting pieces to form hoop chains, edge connecting pieces are arranged at the head end and the tail end of each hoop chain, and the edge connecting pieces are connected with locking devices; the hoop unit is formed by processing sheet plates through a sheet metal process, and the sheet metal process comprises the following steps: stamping process, bending process, the hoop unit includes three parts: a first connection region, a second connection region, a third connection region. The hoop provided by the invention can be used for increasing or reducing hoop units at will, and can meet the installation requirements of pipe towers with different sizes without customized processing; the hoop with the hoop chain structure can enable the gravity of the communication equipment to be well dispersed on the whole hoop chain, and the bearing capacity of the pipe tower is improved.

Description

Hoop for installing communication equipment
Technical Field
The invention relates to the technical field of communication equipment, in particular to a hoop for mounting communication equipment.
Background
The existing communication pipe tower is shared by a mobile network 2G device, a mobile network 3G device and a mobile network 4G device, several networks need a sky space with antennas, and the existing sky space is seriously insufficient along with the preparation of the 5G devices for market.
The existing communication equipment is generally installed by adopting two installation modes: firstly, equipment is bound on a pipe tower by using a steel binding belt, and when the pipe tower adopts the installation mode, the pipe tower is small in bearing capacity and only can be used for fixing light equipment, and potential safety hazards exist when heavy equipment is fixed; secondly, according to the pipe tower customization steel band, weld into equipment fixing platform, install on the pipe tower, when adopting this kind of mode to fix, although solved the little problem of bearing, because pipe tower scheme is various, all need measure the pipe diameter before every pipe tower installation, there is the customization cycle length, the loaded down with trivial details problem of processing, in addition, when carrying out the installation of large batch pipe tower, every pipe tower all will weld, and efficiency is slow, in addition through the installation platform that the welding formed, the dead weight is great, and corrosion resistance is poor, needs frequently to go up the tower and maintains, has increased work load and potential safety hazard in the intangible.
Disclosure of Invention
The present invention is directed to a hoop for installing communication equipment, so as to solve the problems mentioned in the above background art.
The technical scheme adopted by the invention for realizing the aim is that the hoop for installing the communication equipment comprises at least two hoop units, an internal connecting piece, an edge connecting piece and a locking device;
the hoop unit is formed by sheet-shaped plates through sheet metal processing: punching press earlier, back bending shaping, including three parts: the first connecting area, the second connecting area and the third connecting area are connected by the second connecting area; the second connecting area and the first connecting area are provided with a first bend, the second connecting area and the third connecting area are provided with a second bend, the sheet-shaped plate is bent along the first bend and the second bend through the bending machine, the hoop unit is hollow in the middle, and compared with a solid part, the hoop unit can greatly reduce the overall gravity of the hoop and reduce the load carried by an installer when climbing the pipe tower.
Furthermore, the first connection area and the third connection area are the same in shape, the plane of the first connection area is parallel to the plane of the third connection area, the plane of the second connection area is perpendicular to the first connection area, and the first connection holes are formed in the two ends of the first connection area and the two ends of the third connection area.
Furthermore, the two ends of the second connecting area are bent and embedded between the first connecting area and the third connecting area, so that the strength between the first connecting area and the third connecting area can be enhanced.
Further, the edge of the first connecting area and the edge of the third connecting area, which is far away from one side of the second connecting area, are arc-shaped, the arc opening direction faces away from the second connecting area, the contact area between the hoop unit and the communication tower can be increased by the arc-shaped edge, the fixing of the hoop is facilitated, and the hoop after the fixing is not easy to drop.
Furthermore, the hoop unit is provided with four expanding connecting holes which can be used for other parts and used for expanding the functions of the hoop, and the four expanding connecting holes are respectively arranged on the first connecting area and the third connecting area in pairs as a preferred technical scheme; as a preferred technical scheme, two expanded connecting holes are arranged and are arranged on the second connecting area; as a preferred technical scheme, four expansion connecting holes are arranged and are respectively arranged on the first connecting area and the second connecting area in pairs; as an optimal technical scheme, four expansion connecting holes are arranged, and every two expansion connecting holes are respectively arranged on the second connecting area and the third connecting area.
Furthermore, the hoop unit is a symmetrical piece, and the installation direction of the hoop unit is not distinguished, so that the hoop chain is convenient to assemble.
Furthermore, the internal connecting piece is provided with at least two second connecting holes, the aperture size of the second connecting holes is the same as that of the first connecting holes, and the internal connecting piece is a symmetrical piece, so that the installation direction of the internal connecting piece is not distinguished, and the hoop chain is convenient to assemble.
Further, the edge of the inner joint member is formed in an arc shape, and it is necessary to ensure that the arc opening direction of the inner joint member is the same as the arc opening direction of the second joint region at the time of assembly.
Furthermore, at least two holes are formed in the edge connecting piece, one hole is used for being connected with the first connecting hole and is the same as the first connecting hole, the other hole is used for fixing the locking device, the size of the hole is not limited, but in production, the holes in the edge connecting piece are generally processed into holes with the same size for convenience in processing, so the holes are collectively referred to as third connecting holes, as a preferred technical scheme, the edge connecting piece is a symmetrical piece and is not distinguished in the installation direction per se, the assembly is convenient, four third connecting holes are formed in the edge connecting piece, and the hole size of each third connecting hole is the same as that of the first connecting hole; as a preferred technical scheme, the edge connecting piece is a symmetrical piece, and two third connecting holes are formed in the edge connecting piece; as a preferred technical scheme, the edge connecting piece is an asymmetric piece, and three third connecting holes are formed in the edge connecting piece, wherein one of the three third connecting holes is used for being connected with the first connecting hole, and the other two third connecting holes are used for being connected with the locking device.
Furthermore, the locking device comprises a connecting clamping block which is in a U shape, a fourth connecting hole is arranged on the connecting clamping block, the aperture size of the fourth connecting hole is the same as that of the third connecting hole, symmetrical arc edges are arranged on two side walls of the U shape of the connecting clamping block, a rotatable arc piece is assembled on the arc edges, the arc piece is also in the U shape, a slotted hole is arranged at the bottom of the U shape of the connecting clamping block, a through hole is arranged at the bottom of the U shape of the arc piece, the locking device also comprises a connecting pin penetrating through the through hole and the slotted hole, threads are tapped at two ends of the connecting pin, nuts can be rotatably assembled, the two arc edges can be slowly closed by rotating the nuts at two ends of the connecting pin, the hoop chain is driven to contract until the hoop chain is firmly fixed on the communication iron tower, in the process that the two arc edges are closed to each other, the two arc pieces are slowly rotate along the arc edges all the, meanwhile, the axis of the connecting pin and the plane where the bottoms of the two arc pieces are located keep a vertical relation, so that the nut assembled on the connecting pin can be in full contact with the arc pieces all the time, namely the nut can be attached to the arc pieces, the tightened nut is not easy to rotate, and a hoop chain cannot fall off.
Furthermore, two nuts are respectively assembled at two ends of the connecting pin, the nut on the inner side mainly plays a fastening role, and the nut on the outer side mainly generates an axial force between the nut on the inner side and the nut on the inner side after being screwed down so as to increase the friction force between the nut teeth and the bolt teeth of the inner side nut and the connecting pin, thereby achieving the effect of preventing the nut from being automatically loosened.
Furthermore, in the assembling process of the hoop, the first connecting hole, the second connecting hole, the third connecting hole and the fourth connecting hole can be assembled in a bolt and nut mode, the assembling mode of the bolt and nut is convenient to assemble and disassemble, and the number of hoop units on the hoop chain is increased or reduced conveniently.
Furthermore, when the hoop is installed on the pipe tower, the first connecting hole and the second connecting hole are located on the same circumference, so that the gravity of the equipment can be uniformly dispersed to the whole hoop chain, and the weighing capacity and the safety are improved.
Furthermore, hoop unit, internal connection spare, edge connector, connect the fixture block, circular arc spare all can select for use the sheet metal component that is formed by sheet metal processing (grinding apparatus punching press, bending) by the sheet metal, and the sheet metal component has tensile strength height, characteristics that bearing capacity is big in intensity, and the sheet metal component has the characteristics that the material is few, material utilization is high, low in production cost, machining efficiency is high on the material, can reduce the manufacturing cost of enterprise to the staple bolt to shorten the production cycle of staple bolt.
Furthermore, the hoop unit, the internal connecting piece, the edge connecting piece, the connecting clamping block and the arc piece can be made of common cold-rolled sheets, galvanized steel sheets, hot-dip galvanized steel sheets, stainless steel sheets and the like.
Furthermore, the arc groove is formed in the position, located at the arc edge, of the connecting clamping block, the corresponding arc protrusion is arranged on the arc piece, the arc protrusion can be embedded into the arc groove, the arc piece can be prevented from falling off from the connecting clamping block when the connecting clamping block is installed, and locking of the locking device is facilitated.
In conclusion, the beneficial effects of the invention are as follows: the hoop provided by the invention can be used for increasing or reducing hoop units at will, and can meet the installation requirements of pipe towers with different sizes without customized processing; the hoop with the hoop chain structure can well disperse the gravity of the communication equipment to the whole hoop chain, thereby increasing the bearing capacity of the pipe tower; the hoop adopts a combined assembly form of the sheet metal part and the bolt and the nut, has the characteristics of less material consumption, high material utilization rate, low production cost and high processing efficiency, can reduce the production cost of enterprises for the hoop, and shortens the production period of the hoop; the arc-shaped edge inside the hoop can increase the contact area between the hoop unit and the communication tower, so that the hoop is convenient to fix, and the fixed hoop is not easy to fall off; the hoop product provided by the invention has no welding spot, has strong corrosion resistance, and avoids the trouble of frequent maintenance; locking device can fix the staple bolt fast, simple to operate greatly reduces the engineering time.
Drawings
Fig. 1 is a schematic view of the overall structure of the anchor ear in embodiment 1;
FIG. 2 is a schematic structural view of a hoop unit;
FIG. 3 is a schematic view of the internal connection;
FIG. 4 is a schematic view of the structure of the edge connector;
FIG. 5 is an exploded view of the locking device;
FIG. 6 is a schematic view of the locking device;
fig. 7 is an overall configuration diagram of the anchor ear in embodiment 2.
Detailed Description
Embodiments of the invention are described in further detail below with reference to the accompanying drawings, it being noted that the examples are merely illustrative of the invention and should not be considered as limiting, and that all features disclosed in the examples of the invention, or steps in all methods or processes disclosed, may be combined in any way, except for mutually exclusive features and/or steps.
Example 1, refer to fig. 1-6.
The present embodiment provides a hoop for installing communication equipment, comprising at least two hoop units 10, an inner connector 20, an edge connector 30 and a locking device;
wherein, connecting through two liang of internal connection spare 20 between the hoop unit 10 and forming the hoop chain, hoop chain's head and the tail both ends installation edge connecting piece 30, locking device is connected to edge connecting piece 30, and hoop unit 10 can arbitrary increase or reduce for satisfy the not pipe tower installation demand of equidimension, adopt the fixed of hoop chain form in addition, can make the fine dispersion of the gravity of equipment to a whole hoop chain.
The hoop unit 10 is formed by sheet metal processing of sheet-like plates (generally, the thickness is less than or equal to 6 mm): punching press earlier, back bending shaping, including three parts: a first connection area 11, a second connection area 12, a third connection area 13, the second connection area 12 connecting the first connection area 11 and the third connection area 13; wherein, second connection region 12 is equipped with first bending 14 with 11 contact position of first connection region, and second connection region 12 is equipped with second bending 15 with third connection region 13 contact position, buckles slice panel along first bending 14, second bending 15 through the bender, realizes that hoop unit 10 is middle empty, for solid spare, the whole gravity of reduction staple bolt that can be very big reduces the heavy burden that carries when installer climbs the tubular tower.
Preferably, the first connection region 11 and the third connection region 13 have the same shape, the plane of the first connection region 11 is parallel to the plane of the third connection region 13, the plane of the second connection region 12 is perpendicular to the first connection region 11, and the first connection hole 16 is disposed on both ends of the first connection region 11 and the third connection region 13.
Preferably, the second connection region 12 is bent at both ends and embedded between the first connection region 11 and the third connection region 13, so that the strength between the first connection region 11 and the third connection region 13 can be enhanced.
Preferably, the edge of the first connecting area 11 and the third connecting area 13 away from the second connecting area 12 is arc-shaped, the arc opening direction faces away from the second connecting area 12, the arc-shaped edge can increase the contact area between the hoop unit 10 and the communication tower, the fixing of the hoop is facilitated, and the hoop after the fixing is not easy to fall off.
Preferably, the hoop unit 10 is provided with four expanding connection holes 17, which can be used for other parts and for expanding the functions of the hoop, and in this embodiment, every two expanding connection holes 17 are respectively arranged on the first connection region 11 and the third connection region 13; in some other embodiments, there are two extended connection holes 17, both provided on the second connection region 12; in some other embodiments, four expanded connection holes 17 are provided, and two expanded connection holes are respectively provided on the first connection region 11 and the second connection region 12; in some other embodiments, four expanded connection holes 17 are provided, two by two on the second connection region 12 and the third connection region 13, respectively.
Preferably, the hoop unit 10 is a symmetrical piece, and has no distinction of installation direction per se, so that the assembly of the hoop chain is convenient.
Preferably, at least two second connection holes 21 are formed in the inner connection member 20, the aperture size of the second connection holes 21 is the same as that of the first connection holes 16, and the inner connection member 20 is a symmetrical member without distinguishing the installation direction thereof, so as to facilitate the assembly of the hoop chain.
Preferably, the edge of the inner joint 20 is formed in an arc shape, and it is necessary to ensure that the arc opening direction of the inner joint 20 is the same as the arc opening direction of the second connection region 12 at the time of assembly.
Preferably, at least two holes are formed in the edge connector 30, one hole is used for connecting with the first connection hole 16 and has the same aperture size as the first connection hole 16, and the other hole is used for fixing the locking device and has no limitation on the aperture size, but in production, the holes in the edge connector 30 are generally processed into holes with the same size and are therefore collectively referred to as third connection holes 31, in this embodiment, the edge connector 30 is a symmetrical piece and has no distinction in the installation direction, so that the assembly is facilitated, four third connection holes 31 are formed in the edge connector 30, and the aperture of the third connection holes 31 is the same as the first connection hole 16; in some other embodiments, the edge connector 30 is a symmetrical piece, and two third connecting holes 31 are formed thereon; in some other embodiments, the edge connector 30 is an asymmetric piece, and three third connection holes 31 are provided on the edge connector 30, wherein one is used for connecting with the first connection hole 16, and the other two are used for connecting with the locking device.
Preferably, the locking device comprises a connecting clamping block 40, the connecting clamping block 40 is U-shaped, a fourth connecting hole 47 is arranged on the connecting clamping block 40, the aperture size of the fourth connecting hole 47 is the same as that of the third connecting hole 31, symmetrical circular arc edges 41 are arranged on two side walls of the U-shaped connecting clamping block 40, a rotatable circular arc piece 43 is arranged on the circular arc edge 41, the circular arc piece 43 is also U-shaped, a slotted hole 42 is arranged at the bottom of the U-shaped connecting clamping block 40, a through hole 44 is arranged at the bottom of the U-shaped circular arc piece 43, the locking device further comprises a connecting pin 45 penetrating through the through hole 44 and the slotted hole 42, threads are tapped at two ends of the connecting pin 45, a nut 46 can be rotatably matched, the two circular arc edges 41 can slowly approach each other by rotating the nuts 46 at two ends of the connecting pin 45, and simultaneously, the hoop chain is driven to shrink until the hoop chain is firmly fixed, the two arc pieces 43 are rotated slowly along the arc edge 41 all the time, so that the U-shaped bottoms of the two arc pieces 43 are kept parallel, meanwhile, the axis of the connecting pin 45 is kept perpendicular to the plane where the bottoms of the two arc pieces 43 are located, the nut 46 assembled on the connecting pin 45 can be in full contact with the arc pieces 43 all the time, namely, the nut 46 can be attached to the arc pieces 43, the tightened nut 46 is not easy to rotate, and a hoop chain cannot fall off.
Preferably, the two nuts 46 are respectively assembled at both ends of the connecting pin 45, the inner nut 46 mainly plays a fastening role, and the outer nut 46 mainly generates an axial force with the inner nut 46 after being tightened so as to increase the friction force between the inner nut 46 and the nut teeth and bolt teeth of the connecting pin 45, thereby achieving the function of preventing the nut from automatically loosening.
Preferably, during the assembly of the hoop, the first connecting hole 16, the second connecting hole 21, the third connecting hole 31 and the fourth connecting hole 47 can be assembled in the form of bolts and nuts, which is convenient for assembly and disassembly, thereby facilitating the increase or decrease of the number of hoop units 10 on the hoop chain.
Preferably, when the hoop is installed on the pipe tower, the first connecting holes 16 and the second connecting holes 21 are located on the same circumference, so that the gravity of the equipment can be uniformly dispersed on the whole hoop chain, and the weighing capacity and the safety are improved.
Preferably, hoop unit 10, internal connection spare 20, edge connector 30, connect fixture block 40, circular arc piece 43 all can select for use the sheet metal component that is formed by sheet metal processing (grinding apparatus punching press, bending) by sheet metal, and the sheet metal component has tensile strength height, characteristics that bearing capacity is big in intensity, and the sheet metal component has few materials, material utilization rate is high, low in production cost, characteristics that machining efficiency is high on the materials, can reduce the manufacturing cost of enterprise to the staple bolt to shorten the production cycle of staple bolt.
Preferably, the hoop unit 10, the inner connecting member 20, the edge connecting member 30, the connecting blocks 40, and the arc members 43 can be made of a common cold-rolled sheet, a galvanized steel sheet, a hot-dip galvanized steel sheet, a stainless steel sheet, or the like.
Example 2, refer to fig. 7.
In this embodiment, the connecting latch 40 is provided with an arc groove 48 at the position of the arc edge 41, the arc piece 43 is provided with a corresponding arc protrusion 49, the arc protrusion 49 can be embedded into the arc groove 48, and the arc piece 43 can be prevented from falling off from the connecting latch 40 during installation, so that the locking of the locking device is facilitated.
Other embodiments of this example are the same as example 1.
The above description is only an embodiment of the invention, but the scope of the invention is not limited thereto, and any changes or substitutions that are not thought of through the inventive work should be included in the scope of the invention, and therefore, the scope of the invention should be subject to the scope defined by the claims.

Claims (10)

1. A hoop for installing communication equipment is characterized by comprising at least two hoop units, an inner connecting piece, an edge connecting piece and a locking device;
the hoop units are connected pairwise through internal connecting pieces to form hoop chains, edge connecting pieces are arranged at the head end and the tail end of each hoop chain, and the edge connecting pieces are connected with locking devices;
the hoop unit is formed by processing sheet plates through a sheet metal process, and the sheet metal process comprises the following steps: stamping process, bending process, the hoop unit includes three parts: the connecting structure comprises a first connecting area, a second connecting area and a third connecting area, wherein the second connecting area is connected with the first connecting area and the third connecting area, a first bend is arranged at the contact position of the second connecting area and the first connecting area, and a second bend is arranged at the contact position of the second connecting area and the third connecting area;
the locking device comprises a connecting clamping block and an arc-shaped piece.
2. The hoop for mounting communication equipment as claimed in claim 1, wherein the first connection area and the third connection area are the same in shape, the plane of the first connection area is parallel to the plane of the third connection area, the plane of the second connection area is perpendicular to the first connection area, and the first connection holes are formed in the first connection area and the third connection area.
3. The hoop for installing communication equipment as claimed in claim 1, wherein the hoop unit is provided with an expanded connection hole.
4. The hoop for installing communication equipment as claimed in claim 2, wherein the inner connecting member is provided with at least two second connecting holes, and the second connecting holes have the same aperture size as the first connecting holes.
5. The hoop for installing communication equipment as claimed in claim 2, wherein the edge connector has at least two third connecting holes, and the third connecting holes have the same diameter as the first connecting holes.
6. A hoop for mounting communication equipment as claimed in claim 1, 4 or 5, wherein the hoop unit, the inner connector and the edge connector are symmetrical pieces.
7. The hoop for installing the communication equipment as claimed in claim 1, wherein the connecting fixture block is U-shaped, the connecting fixture block is provided with a fourth connecting hole, the connecting fixture block is located on two side walls of the U-shaped and provided with symmetrical arc edges, the arc piece is assembled on the arc edges and can rotate, the arc piece is also U-shaped, the connecting fixture block is located at the bottom of the U-shaped and provided with a slot, the arc piece is located at the bottom of the U-shaped and provided with a through hole, the locking device further comprises a connecting pin penetrating through the through hole and the slot, and two ends of the connecting pin are tapped with threads to be capable of being matched with nuts.
8. The hoop for installing the communication equipment as claimed in claim 4, 5 or 7, wherein the first connecting hole, the second connecting hole, the third connecting hole and the fourth connecting hole are assembled through bolts and nuts.
9. The hoop for installing communication equipment as claimed in claim 1, wherein the hoop units, the inner connectors, the edge connectors, the connecting blocks and the arc members are sheet metal members formed by processing sheet metal through sheet metal processing.
10. The hoop for installing communication equipment as claimed in claim 7, wherein the connecting blocks are provided with arc grooves at the edge of the arc, and the arc pieces are provided with corresponding arc protrusions capable of being inserted into the arc grooves.
CN201911348592.5A 2019-12-24 2019-12-24 Hoop for installing communication equipment Withdrawn CN111197613A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911348592.5A CN111197613A (en) 2019-12-24 2019-12-24 Hoop for installing communication equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911348592.5A CN111197613A (en) 2019-12-24 2019-12-24 Hoop for installing communication equipment

Publications (1)

Publication Number Publication Date
CN111197613A true CN111197613A (en) 2020-05-26

Family

ID=70744402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911348592.5A Withdrawn CN111197613A (en) 2019-12-24 2019-12-24 Hoop for installing communication equipment

Country Status (1)

Country Link
CN (1) CN111197613A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113104725A (en) * 2021-04-13 2021-07-13 上海杰碧管道工程有限公司 Novel deepwater salvage is with hanging clamping utensil

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180133526A1 (en) * 2015-05-13 2018-05-17 Rapid Rail International Limited Step-bolt adaptor
CN208423173U (en) * 2018-07-18 2019-01-22 河北省景县宏远通讯有限公司 Antenna holder based on steel tube tower
CN208474253U (en) * 2018-07-17 2019-02-05 杭州七友通信科技有限公司 A kind of quick anchor ear support arm of chain type
CN110332186A (en) * 2019-08-02 2019-10-15 杭州上诠光纤通信设备有限公司 A kind of communication anchor ear of adjustable rotary support arm
CN209819182U (en) * 2019-05-18 2019-12-20 浙江融达通讯器材有限公司 Communication hoop

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180133526A1 (en) * 2015-05-13 2018-05-17 Rapid Rail International Limited Step-bolt adaptor
CN208474253U (en) * 2018-07-17 2019-02-05 杭州七友通信科技有限公司 A kind of quick anchor ear support arm of chain type
CN208423173U (en) * 2018-07-18 2019-01-22 河北省景县宏远通讯有限公司 Antenna holder based on steel tube tower
CN209819182U (en) * 2019-05-18 2019-12-20 浙江融达通讯器材有限公司 Communication hoop
CN110332186A (en) * 2019-08-02 2019-10-15 杭州上诠光纤通信设备有限公司 A kind of communication anchor ear of adjustable rotary support arm

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113104725A (en) * 2021-04-13 2021-07-13 上海杰碧管道工程有限公司 Novel deepwater salvage is with hanging clamping utensil

Similar Documents

Publication Publication Date Title
US8739492B2 (en) Space frame connector
CN111197613A (en) Hoop for installing communication equipment
US7603752B2 (en) Compression or expansion mountable support band
WO2008112381A2 (en) Industrial hangers for framing and method of fabricating the same
CN211951072U (en) Hoop
CN111174065A (en) Adjusting support arm for adjusting chain type hoop of holding pole
CN111765153A (en) Fixing device
CN109915718B (en) Adjustable installation system of 5G equipment
CN217939146U (en) Shadowless net convenient to dismouting
CN216711249U (en) Deformation-resistant spool
RU2394324C1 (en) Tension wedge clamp
CN212004583U (en) Fixing device is laid to fire control pipeline
US20080252553A1 (en) Antenna Mounting Foot and Method of Manufacture
CN211951071U (en) Adjusting support arm
CN212455080U (en) Mounting structure of holding pole on angle steel tower
CN209855240U (en) Building support structure
CN220204270U (en) Self-locking hoop device capable of self-adapting to diameter of main cable
CN219492798U (en) Aluminum profile capable of being spliced rapidly
CN214467649U (en) Support arm for mounting holding pole
CN220566504U (en) Node for connecting flexible cable
CN219013922U (en) Three-pipe tower pole mounting device
CN111577719B (en) Dovetail type hoop of fixing equipment for angle steel tower body
CN212272738U (en) Fixing device
CN214849916U (en) Nuclear-grade switch cabinet damping device
CN212956975U (en) Building steel structure convenient to installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200526