CN111173283A - Construction method of glass guardrail for high-rise building - Google Patents

Construction method of glass guardrail for high-rise building Download PDF

Info

Publication number
CN111173283A
CN111173283A CN201910234768.8A CN201910234768A CN111173283A CN 111173283 A CN111173283 A CN 111173283A CN 201910234768 A CN201910234768 A CN 201910234768A CN 111173283 A CN111173283 A CN 111173283A
Authority
CN
China
Prior art keywords
glass
guardrail
construction method
stand
glass guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910234768.8A
Other languages
Chinese (zh)
Inventor
罗国华
赵卫
王常员
洗林波
程瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Zhenzhong Construction Co ltd
Original Assignee
Guangzhou Zhenzhong Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Zhenzhong Construction Co ltd filed Critical Guangzhou Zhenzhong Construction Co ltd
Priority to CN201910234768.8A priority Critical patent/CN111173283A/en
Publication of CN111173283A publication Critical patent/CN111173283A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1836Handrails of balustrades; Connections between handrail members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1842Balusters; Grille-type elements

Abstract

The invention discloses a construction method of a glass guardrail for a high-rise building, which belongs to the field of building guardrails and comprises the following steps: s1: performing orientation measurement and drawing a construction design drawing of the high-rise building glass guardrail and manufacturing patterns of various components, S2: manufacturing the components according to the patterns amplified in proportion, numbering after processing of the components is completed, checking and accepting by related personnel, distributing to a construction site, and transporting to the construction site, S3: whether the installation position of the guardrail is the same as the design drawing is checked, construction operation is carried out after no error is confirmed, and S4: installing each component according to a corresponding program, and performing design requirement checking after the installation is finished, S5: and (5) delivering and checking. The construction method can achieve the buffering effect through the combined action of the buffering cushion and the connecting rope, effectively prevent the situation that children collide with glass when moving on the balcony, and can disassemble the buffering cushion, so that the user can clean and maintain the buffering cushion conveniently.

Description

Construction method of glass guardrail for high-rise building
Technical Field
The invention relates to the field of building guardrails, in particular to a construction method of a glass guardrail for a high-rise building.
Background
The glass guardrail is a modern guardrail product with good decorative performance and is suitable for residential districts, villas, industrial parks, institutions and other places.
The air cushion film is made up by using a special process, and between two layers of plastic film the air is sealed, and on one surface the uniformly-continuous air bubbles are formed, and the air bubbles are respectively projected, and mainly have the form of cylinder, semi-circular and bell-jar. The air cushion film has good elasticity and heat insulation property because a large amount of air is sealed in; it has a very low density of between 0.008 and 0.03; the paint does not absorb moisture, is corrosion resistant and does not corrode packaged objects; good processing performance, easy manufacture into various shapes, heat sealing, impact energy absorption and excellent buffer performance.
The existing glass guardrail construction method is generally that the guardrail is directly installed outside glass, so that a user cannot clean and maintain the guardrail conveniently, and when children play on a balcony, the glass can be collided, so that the children are injured to a certain extent, and the service performance of the glass guardrail is reduced.
Disclosure of Invention
The invention aims to provide a construction method of a glass guardrail for a high-rise building, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a construction method of a glass guardrail for a high-rise building comprises the following steps:
s1: carrying out azimuth measurement and drawing a high-rise building glass guardrail construction design drawing and various aluminum alloy component manufacturing patterns;
s2: the glass guardrail for the high-rise building comprises upright posts, laminated glass, handrails and a cushion pad, wherein the laminated glass and the handrails are positioned between the two upright posts, and the handrails are positioned above the laminated glass;
s3: before the glass guardrail is installed, whether the installation position of the guardrail is consistent with a construction design drawing is checked, and then installation construction operation of the glass guardrail is carried out;
s4: installing upright columns in each section, then installing laminated glass between the two upright columns, fixedly connecting fixing strips on the outer surfaces of the peripheries of the cushion pads, fixedly connecting hanging rings on the outer surfaces of one ends of the fixing strips, fixedly connecting ropes between the cushion pads and the fixing strips, fixing the cushion pads between the two upright columns through the fixing strips and the hanging rings, enabling the cushion pads to be in an unfolded state, and checking whether the installation meets the design requirements;
s5: and (5) delivering, checking and accepting, and delivering the project after the acceptance is qualified.
Preferably, the outer surface of the lower end of the handrail is fixedly provided with fixing blocks close to the two ends, and the handrail and the fixing blocks are integrated components.
Preferably, the outer fixed surface of the front end of the stand column is provided with two groups of fixing rods, each group is provided with two groups, one group of fixing rods is in threaded connection with a first sleeve on the outer surface, the other group of fixing rods is in threaded connection with a second sleeve on the outer surface, and the second sleeve is identical to the first sleeve in specification.
Preferably, the outer surfaces of the two ends of the laminated glass are fixedly connected with limiting blocks, the outer surface of the upper end of the upright post is provided with a limiting groove, and the limiting groove is simultaneously positioned on the outer surface of one side of the upright post.
Preferably, the shape and size of the limiting block are matched with those of the limiting groove, and the limiting groove is formed by a circle and a rectangle.
Preferably, the number of the connecting ropes is several, and the connecting ropes are mutually perpendicularly and crossly arranged.
Preferably, the number of the stand columns is a plurality of groups, the number of each group is two, the clear distance between every two adjacent groups of the stand columns is smaller than 0.11 m, and the clear height of the stand columns is larger than 1.05 m.
Preferably, the material of the buffer pad is a transparent air cushion film.
Compared with the prior art, the invention has the beneficial effects that: can reach the effect of buffering through the combined action of blotter and connection rope, effectually prevent children from bumping glass's the condition when the balcony activity, protection children's safety, and the blotter be the personnel of transparent air cushion film material on can being convenient for the balcony outwards observe, with first sleeve and second sleeve from the dead lever spiral off, dismantle the link from the dead lever, can dismantle fixed strip and blotter, convenient to use person cleans and maintains it.
Drawings
FIG. 1 is a schematic flow diagram of the present invention;
FIG. 2 is a schematic view of the overall structure of the present invention;
FIG. 3 is a view of the invention showing the mating of the stud with laminated glass;
FIG. 4 is a view of the invention showing the mating of the post and armrest;
fig. 5 is a view showing the cushion and the connecting string of the present invention in cooperation.
In the figure: 1. a column; 2. laminated glass; 3. a handrail; 4. a cushion pad; 5. a first sleeve; 6. fixing the rod; 7. a limiting groove; 8. a limiting block; 9. hanging a ring; 10. a second sleeve; 11. a fixed block; 12. a fixing strip; 13. and connecting ropes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: a construction method of a glass guardrail for a high-rise building comprises the following steps:
s1: carrying out azimuth measurement and drawing a high-rise building glass guardrail construction design drawing and various aluminum alloy component manufacturing patterns;
s2: providing all aluminum alloy component patterns of the high-rise building glass guardrail system to an aluminum alloy component manufacturer, amplifying the patterns according to the manufacturing patterns by the aluminum alloy component manufacturer in proportion, respectively designing a mould according to the actual size of the amplified patterns, opening the mould for production, purchasing an aluminum alloy component, a square steel section and various related accessory materials according to the patterns, conveying the aluminum alloy component, the square steel section and the various related accessory materials to a raw material processing workshop, processing the raw material processing workshop according to the size of a processing drawing, numbering after the processing of all components is finished, and checking and accepting by related personnel and delivering to a construction site;
s3: before the glass guardrail is installed, checking whether the installation position of the guardrail is in accordance with a construction design drawing, and after the fact that the installation position of the guardrail is in accordance with the construction design drawing is confirmed, carrying out installation construction operation on the glass guardrail;
s4: installing upright posts 1 in each section, then sliding limiting blocks 8 at two ends of laminated glass 2 downwards along a limiting groove 7 until reaching the bottom end of the limiting groove 7, inserting a fixing block 11 into the limiting groove 7 to fix the laminated glass 2 in the limiting groove 7, wherein handrails 3 and the fixing block 11 are integrated components, so that the handrails 3 and the laminated glass 2 are jointly fixed between the two upright posts 1, then enabling a fixing rod 6 to penetrate through two corners on the same side of a fixing strip 12, then screwing a first sleeve 5 on the fixing rod 6 to fix the fixing strip 12 on the upright posts 1, hanging rings 9 on the fixing rod 6, screwing a second sleeve 10 on the corresponding fixing rod 6 to fix the fixing strip 12 between the two upright posts 1 in an extending state, and fixedly connecting a cushion 4 and a plurality of connecting ropes 13 with the inner side surface of the fixing strip 12, the connecting rope 13 is located inside the cushion pad 4, the connecting rope 13 has elasticity, the cushion effect can be achieved through the cushion pad 4 and the connecting rope 13, the situation that children collide with glass when moving on a balcony can be prevented, the safety of the children is protected, the cushion pad 4 is made of transparent materials, people on the balcony can observe the cushion pad outwards conveniently, the first sleeve 5 and the second sleeve 10 are screwed off from the fixing rod 6, the hanging ring 9 is detached from the fixing rod 6, the fixing strip 12 and the cushion pad 4 can be detached, a user can clean the cushion pad conveniently, and the cleaning and maintenance of the laminated glass 2 are facilitated;
s5: and (5) delivering, checking and accepting, and delivering the project after the acceptance is qualified.
Referring to fig. 2-5, the outer surface of the lower end of the handrail 3 near both ends is fixedly provided with a fixed block 11, the handrail 3 and the fixed block 11 are integrated components to increase the stability of the connection between the two, the outer surface of the front end of the upright post 1 is fixedly provided with a fixed rod 6, the number of the fixed rods 6 is two, each group is provided with two fixed rods, the outer surface of one fixed rod 6 is in threaded connection with a first sleeve 5, the outer surface of the other fixed rod 6 is in threaded connection with a second sleeve 10, the second sleeve 10 has the same specification as the first sleeve 5, so that a worker can conveniently fix the cushion 4, the outer surfaces of both ends of the laminated glass 2 are fixedly connected with limit blocks 8, the outer surface of the upper end of the upright post 1 is provided with limit grooves 7, the limit grooves 7 are simultaneously positioned on the outer surface of one side of the upright post 1, so that the, spacing groove 7's shape comprises circular and rectangle jointly, increase the compactness of connecting between the two, the quantity of connecting rope 13 is a plurality of, it is mutually perpendicular cross and places, the person of facilitating the use accomodates blotter 4, the quantity of stand 1 is a plurality of groups, the quantity of every group is two, net distance between adjacent two sets of stand 1 is less than 0.11 meter, stand 1's net height is greater than 1.05 meters, improve the security of its use, blotter 4's material is transparent air cushion film.
The invention achieves the buffering effect through the combined action of the cushion pad 4 and the connecting rope 13, effectively prevents the situation that children collide with glass when moving on a balcony, protects the safety of the children, and the cushion pad 4 is made of transparent air cushion film materials, so that the outward observation of personnel on the balcony can be facilitated, the first sleeve 5 and the second sleeve 10 are screwed down from the fixed rod 6, the hanging ring 9 is detached from the fixed rod 6, the fixed strip 12 and the cushion pad 4 can be detached, and the cleaning and the maintenance of the glass can be facilitated for users.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. A construction method of a glass guardrail for a high-rise building is characterized by comprising the following steps:
s1: carrying out azimuth measurement and drawing a high-rise building glass guardrail construction design drawing and various aluminum alloy component manufacturing patterns;
s2: the glass guardrail for the high-rise building comprises upright columns (1), laminated glass (2), handrails (3) and a cushion pad (4), wherein the laminated glass (2) and the handrails (3) are positioned between the two upright columns (1), and the handrails (3) are positioned above the laminated glass (2);
s3: before the glass guardrail is installed, whether the installation position of the guardrail is consistent with a construction design drawing is checked, and then installation construction operation of the glass guardrail is carried out;
s4: installing the stand columns (1) in each section, then installing laminated glass (2) between the two stand columns (1), fixedly connecting fixing strips (12) on the outer surfaces of the periphery of the cushion pad (4), fixedly connecting hanging rings (9) on the outer surfaces of one ends of the fixing strips (12), fixedly connecting ropes (13) between the cushion pad (4) and the fixing strips (12), fixing the cushion pad (4) between the two stand columns (1) through the fixing strips (12) and the hanging rings (9), enabling the cushion pad (4) to be in a spreading state, and checking whether installation meets design requirements;
s5: and (5) delivering, checking and accepting, and delivering the project after the acceptance is qualified.
2. The construction method of the glass guardrail for high-rise buildings according to claim 1, characterized in that: the outer surface of the lower end of the handrail (3) is provided with fixing blocks (11) close to the two ends, and the handrail (3) and the fixing blocks (11) are integrated components.
3. The construction method of the glass guardrail for high-rise buildings according to claim 1, characterized in that: the utility model discloses a fixing device for the column, including stand (1), the front end surface fixed mounting of stand (1) has dead lever (6), the quantity of dead lever (6) is two sets of, and the quantity of every group is two, and is a set of the surface threaded connection of dead lever (6) has first sleeve (5), another group the surface threaded connection of dead lever (6) has second sleeve (10), and second sleeve (10) is the same with the specification of first sleeve (5).
4. The construction method of the glass guardrail for high-rise buildings according to claim 1, characterized in that: the outer fixed surface in both ends of doubling glass (2) is connected with stopper (8), spacing groove (7) have been seted up to the upper end surface of stand (1), spacing groove (7) are located the one side surface of stand (1) simultaneously.
5. The construction method of the glass guardrail for high-rise buildings according to claim 4, characterized in that: the shape and size of the limiting block (8) are matched with those of the limiting groove (7), and the shape of the limiting groove (7) is composed of a circle and a rectangle.
6. The construction method of the glass guardrail for high-rise buildings according to claim 1, characterized in that: the number of the connecting ropes (13) is a plurality, and the connecting ropes are mutually perpendicular and crossed.
7. The construction method of the glass guardrail for high-rise buildings according to claim 1, characterized in that: the quantity of stand (1) is a plurality of groups, and the quantity of every group is two, and adjacent two sets of net distance between stand (1) is less than 0.11 meters, the net height of stand (1) is greater than 1.05 meters.
8. The construction method of the glass guardrail for high-rise buildings according to claim 1, characterized in that: the material of the buffer cushion (4) is a transparent air cushion film.
CN201910234768.8A 2019-03-26 2019-03-26 Construction method of glass guardrail for high-rise building Pending CN111173283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910234768.8A CN111173283A (en) 2019-03-26 2019-03-26 Construction method of glass guardrail for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910234768.8A CN111173283A (en) 2019-03-26 2019-03-26 Construction method of glass guardrail for high-rise building

Publications (1)

Publication Number Publication Date
CN111173283A true CN111173283A (en) 2020-05-19

Family

ID=70648679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910234768.8A Pending CN111173283A (en) 2019-03-26 2019-03-26 Construction method of glass guardrail for high-rise building

Country Status (1)

Country Link
CN (1) CN111173283A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001055522A1 (en) * 2000-01-27 2001-08-02 Lehigh Consumer Products Corporation Discrete anchor means for joining units of construction
DE20111872U1 (en) * 2001-07-18 2001-10-04 Arnold Gmbh Clamped railing
CN104533035A (en) * 2014-12-29 2015-04-22 北京港源建筑装饰工程有限公司 Glass guardrail system for high-rise buildings and construction method
CN206987130U (en) * 2017-07-17 2018-02-09 宁夏义盟达电子科技有限公司 A kind of anti-bird hits glass curtain wall
CN207630638U (en) * 2017-12-19 2018-07-20 武汉抱冰工业发展有限公司 A kind of protective film
CN108360770A (en) * 2018-03-08 2018-08-03 四川泰兴装饰工程有限责任公司 The construction method of skyscraper glass guardrail
CN208486474U (en) * 2018-05-07 2019-02-12 浙江中南建设集团有限公司 A kind of railing of balcony window system
CN208533361U (en) * 2018-03-29 2019-02-22 中交公路长大桥建设国家工程研究中心有限公司 The bridge floor wave resistance anticollision barrier of Oversea bridge

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001055522A1 (en) * 2000-01-27 2001-08-02 Lehigh Consumer Products Corporation Discrete anchor means for joining units of construction
DE20111872U1 (en) * 2001-07-18 2001-10-04 Arnold Gmbh Clamped railing
CN104533035A (en) * 2014-12-29 2015-04-22 北京港源建筑装饰工程有限公司 Glass guardrail system for high-rise buildings and construction method
CN206987130U (en) * 2017-07-17 2018-02-09 宁夏义盟达电子科技有限公司 A kind of anti-bird hits glass curtain wall
CN207630638U (en) * 2017-12-19 2018-07-20 武汉抱冰工业发展有限公司 A kind of protective film
CN108360770A (en) * 2018-03-08 2018-08-03 四川泰兴装饰工程有限责任公司 The construction method of skyscraper glass guardrail
CN208533361U (en) * 2018-03-29 2019-02-22 中交公路长大桥建设国家工程研究中心有限公司 The bridge floor wave resistance anticollision barrier of Oversea bridge
CN208486474U (en) * 2018-05-07 2019-02-12 浙江中南建设集团有限公司 A kind of railing of balcony window system

Similar Documents

Publication Publication Date Title
CN111173283A (en) Construction method of glass guardrail for high-rise building
CN107620271A (en) A kind of intelligent transportation Multifunctional protection handrail
CN111287535A (en) A fast-assembling safety device against wind for preventing short house of timber structure from suffering storm calamity
TWM588726U (en) Anti-smoke vertical wall device
CN207377160U (en) A kind of construction isolates railing with modular guard
CN108867474A (en) A kind of splicing guardrail of changeable protection height
CN206468084U (en) A kind of anti-climbing electric power pylon
CN206053269U (en) Bamboo ferrum mixing frame for building
CN107059641A (en) Goods-shelf type pier shaft external scaffolding
CN206722528U (en) A kind of gardens fence
Jianlong et al. Study on structural efficiency of super-tall buildings
CN219219401U (en) Temporary protection device for deformation joint in staggered floor construction of tower
CN203685012U (en) Safety ladder cage for high-altitude operation
CN207335956U (en) One kind bypass pressure release sensor shell
CN209212056U (en) A kind of isolation guardrail
CN207211947U (en) A kind of anticollision gardens guard rail
CN207332465U (en) A kind of compound guardrail easy to safeguard
CN208329667U (en) A kind of horizontal hard protection system of integrated form floor edge
CN206752425U (en) A kind of dyke energy-dissipating structure with water tank
CN206091566U (en) Zinc steel guardrail
CN218714986U (en) Totally-enclosed climbing frame pocket net structure of super high-rise building
CN208933835U (en) Pillar pier stud pours concrete construction protection device
CN207904821U (en) A kind of seat type road guardrail
CN217871480U (en) Novel concrete railing structure
CN108049706A (en) A kind of detachable assembled guardrail for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200519

WD01 Invention patent application deemed withdrawn after publication