CN111172995A - 一种基坑支护的施工工艺 - Google Patents
一种基坑支护的施工工艺 Download PDFInfo
- Publication number
- CN111172995A CN111172995A CN202010035578.6A CN202010035578A CN111172995A CN 111172995 A CN111172995 A CN 111172995A CN 202010035578 A CN202010035578 A CN 202010035578A CN 111172995 A CN111172995 A CN 111172995A
- Authority
- CN
- China
- Prior art keywords
- plate
- locking
- reinforcement cage
- guide groove
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 19
- 230000002787 reinforcement Effects 0.000 claims abstract description 103
- 230000007246 mechanism Effects 0.000 claims abstract description 44
- 238000004140 cleaning Methods 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 70
- 239000010959 steel Substances 0.000 claims description 70
- 238000009412 basement excavation Methods 0.000 claims description 6
- 239000002689 soil Substances 0.000 claims description 4
- 238000005056 compaction Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 10
- 230000000087 stabilizing effect Effects 0.000 description 32
- 238000003780 insertion Methods 0.000 description 15
- 230000037431 insertion Effects 0.000 description 15
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 10
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000003466 welding Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010035578.6A CN111172995B (zh) | 2020-01-14 | 2020-01-14 | 一种基坑支护的施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010035578.6A CN111172995B (zh) | 2020-01-14 | 2020-01-14 | 一种基坑支护的施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111172995A true CN111172995A (zh) | 2020-05-19 |
CN111172995B CN111172995B (zh) | 2021-05-07 |
Family
ID=70649432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010035578.6A Active CN111172995B (zh) | 2020-01-14 | 2020-01-14 | 一种基坑支护的施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111172995B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111749526A (zh) * | 2020-07-09 | 2020-10-09 | 丁晟 | 一种5g通讯通信线路杆塔安装施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0267763A2 (en) * | 1986-11-10 | 1988-05-18 | Paul Anthony Dowdle | Method and apparatus for emplacing horizontal arcuate re-inforcing rods |
JPH1177206A (ja) * | 1997-09-01 | 1999-03-23 | Asahi Chem Ind Co Ltd | パイル鉄筋籠編成機及びその編成方法 |
CN203145480U (zh) * | 2013-04-08 | 2013-08-21 | 河北杭萧钢构有限公司 | 可调节导向轮 |
CN207223802U (zh) * | 2017-08-28 | 2018-04-13 | 华飞燕 | 一种建筑用钢筋笼固定支撑装置 |
CN110374337A (zh) * | 2019-08-02 | 2019-10-25 | 江苏建筑职业技术学院 | 一种建筑施工用多用夹持和固定装置 |
-
2020
- 2020-01-14 CN CN202010035578.6A patent/CN111172995B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0267763A2 (en) * | 1986-11-10 | 1988-05-18 | Paul Anthony Dowdle | Method and apparatus for emplacing horizontal arcuate re-inforcing rods |
JPH1177206A (ja) * | 1997-09-01 | 1999-03-23 | Asahi Chem Ind Co Ltd | パイル鉄筋籠編成機及びその編成方法 |
CN203145480U (zh) * | 2013-04-08 | 2013-08-21 | 河北杭萧钢构有限公司 | 可调节导向轮 |
CN207223802U (zh) * | 2017-08-28 | 2018-04-13 | 华飞燕 | 一种建筑用钢筋笼固定支撑装置 |
CN110374337A (zh) * | 2019-08-02 | 2019-10-25 | 江苏建筑职业技术学院 | 一种建筑施工用多用夹持和固定装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111749526A (zh) * | 2020-07-09 | 2020-10-09 | 丁晟 | 一种5g通讯通信线路杆塔安装施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111172995B (zh) | 2021-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107313431B (zh) | 临近不等高基坑同步施工方法 | |
CN108412505A (zh) | 顶管施工结构与顶管施工方法 | |
CN105178968B (zh) | 隧道掘进机顶推支撑装置及施工方法 | |
WO2020198897A1 (zh) | 一种沉墙施工法 | |
CN105970916B (zh) | 一种深基坑素混凝土地下连续墙的施工方法 | |
CN111172995B (zh) | 一种基坑支护的施工工艺 | |
CN108999225B (zh) | 旋转移位砖混结构建筑物纠倾法 | |
JP2717874B2 (ja) | オープンケーソンの施工方法及びその装置 | |
CN108951647A (zh) | 明挖隧道的坑中坑挖掘支护施工方法 | |
CN205152942U (zh) | 一种新型组合钢板桩及应用于该钢板桩的施工导向架 | |
CN213448514U (zh) | 一种咬合桩施工槽道模板结构 | |
CN106087996B (zh) | 基于自我调平反压装置的人工挖孔桩施工方法 | |
CN102434718B (zh) | 一种顶管机始发的端头加固方法 | |
CN110374109B (zh) | 一种工法桩围护在综合管廊基坑的应用方法 | |
CN210106749U (zh) | 一种软土地基超大断面顶管顶进作业的反力结构 | |
CN112627840A (zh) | 顶管工程前置引导机构 | |
CN108708397A (zh) | 地下管廊标准节的铺架方法 | |
CN117049382A (zh) | 地下大管径管道安装铺设施工方法及系统 | |
CN111576440B (zh) | 一种深基坑支护植筋挂网固定装置 | |
CN210507414U (zh) | 一种用于地下连续墙钢筋笼的定位导向装置 | |
CN214695638U (zh) | 一种新型水冲成孔型钢基坑支护装置 | |
CN212336065U (zh) | 适用于地下井筒群施工的导沉系统 | |
CN209724366U (zh) | 一种用于隧道台阶法施工钢拱架固定装置 | |
CN109653213B (zh) | 一种地连墙成槽施工方法 | |
CN216240718U (zh) | 一种抗震抗压防护型通信管道施工用支护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Huaizhu Inventor after: Zhou Zhuna Inventor after: Wang Wenjing Inventor after: Zhou Gui Inventor after: Zhao Li Inventor after: Zhu Chang Inventor before: Zhao Li Inventor before: Zhu Chang |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210420 Address after: No.30 Duyun Road, Guiyang National High tech Industrial Development Zone, Guiyang City, 550000 Guizhou Province Applicant after: Tonghao Construction Group No.1 Engineering Co.,Ltd. Address before: 024000, Yingbin Road, Hongshan District, the Inner Mongolia Autonomous Region, Chifeng, 1, Chifeng University Applicant before: Zhao Li |
|
GR01 | Patent grant | ||
GR01 | Patent grant |