CN111159873B - Method for calculating working flow of each cavity of thermal forming die - Google Patents

Method for calculating working flow of each cavity of thermal forming die Download PDF

Info

Publication number
CN111159873B
CN111159873B CN201911355271.8A CN201911355271A CN111159873B CN 111159873 B CN111159873 B CN 111159873B CN 201911355271 A CN201911355271 A CN 201911355271A CN 111159873 B CN111159873 B CN 111159873B
Authority
CN
China
Prior art keywords
flow
pressure
heat exchanger
cooling water
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911355271.8A
Other languages
Chinese (zh)
Other versions
CN111159873A (en
Inventor
刘迪辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Bohui Auto System Co ltd
Shanghai Bohui Mould Co ltd
Zhejiang Bohui Auto Parts Co ltd
Original Assignee
Shanghai Bohui Auto System Co ltd
Shanghai Bohui Mould Co ltd
Zhejiang Bohui Auto Parts Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Bohui Auto System Co ltd, Shanghai Bohui Mould Co ltd, Zhejiang Bohui Auto Parts Co ltd filed Critical Shanghai Bohui Auto System Co ltd
Priority to CN201911355271.8A priority Critical patent/CN111159873B/en
Publication of CN111159873A publication Critical patent/CN111159873A/en
Application granted granted Critical
Publication of CN111159873B publication Critical patent/CN111159873B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the technical field of mould manufacturing, in particular to a method for calculating the working flow of each cavity of a thermal forming mould, which comprises the steps of utilizing a water channel simulation model, taking an initial value of the working pressure of a water inlet of a module cooling water channel and recording the corresponding flow; fitting the recorded numerical values into a unitary quadratic curve, calculating a fitting constant according to an equation formula, and obtaining a calculation formula of the working pressure of the module and the corresponding cooling water flow; recording the pressure of the outlet and the inlet of the heat exchanger and the flow of the inlet of the heat exchanger, and performing the same fitting calculation on the recorded related numerical values to obtain a calculation formula of the corresponding cooling water flow under the working pressure of the heat exchanger; the working flow and the working pressure of the heat exchanger, the working pressure of the module cooling water channel and the flow of the cooling water channel in each cooling module are calculated, a large amount of analysis time is saved, the pressure and the flow of each cavity are quickly calculated, a water valve needing to be adjusted can be quickly found, and the size of the quantity needing to be adjusted is clearly and intuitively understood.

Description

Method for calculating working flow of each cavity of thermal forming die
Technical Field
The invention relates to the technical field of mold manufacturing, in particular to a method for calculating the working flow of each cavity of a thermal forming mold.
Background
Automobile hot forming parts are more and more widely applied, and when a hot forming die is developed, in order to avoid uneven temperature on the die and reduce the time of pressure maintaining and quenching, a water pipe is generally arranged in the die to carry heat on the die. The flow rate of a cooling system of a single set of die is generally analyzed by means of finite element and fluid analysis software to judge the rationality of water channel design; and (4) carrying out mold temperature analysis on the single set of mold, and analyzing the cooling uniformity and the pressure maintaining time.
Thermoforming consumes relatively high energy, and in order to reduce the production and manufacturing costs, a multi-cavity mold is generally adopted, and as shown in fig. 2, the multi-cavity mold can be combined into 2 cavities, 3 cavities, 4 cavities or more. The analysis and calculation of a single set of moulds may be without problems, but sets of moulds are combined, and the pump has a limited flow rate, which involves flow distribution problems in the mould cavities. Maldistribution may result in large mold cavity flow in some sections and small mold cavity flow, which may result in failure of a cavity to thermally form a part, or too long a dwell quench time. The flow distribution is reasonable, generally means that all cavity molds meet the cooling rate requirement, and the whole cooling time is minimum.
The multiple sets of dies are combined together, the flow of each water inlet can only be displayed on the press, and the flow of the upper die and the lower die of each set of die is unknown after the water inlets are redistributed by water valves. Even if the problem of the overheating of the mold is found, the debugging personnel can not know which water valve to adjust and what the adjustment amount is. The flow distribution of the multi-cavity mold is related to the operating characteristics of the pump, the resistance characteristics of each set of molds, and the like. The same pump needs to supply water to the upper die and the lower die of a plurality of sets of dies, the simulation calculation is adopted, the calculation amount is large, the consumed calculation resources are large, and even the model is too large, the simulation result cannot be obtained, so that a new flow distribution theoretical calculation method for the multi-cavity die is needed to be provided.
Disclosure of Invention
The invention breaks through the difficult problems in the prior art and designs a calculation method for calculating the working flow of each cavity of the thermal forming die by using a simulation model.
In order to achieve the purpose, the invention designs a method for calculating the working flow of each cavity of a thermal forming die, which is characterized by comprising the following steps: the calculation is carried out according to the following steps:
step 1: using a water channel simulation model, and taking i values between 0 and 0.5 as an initial working pressure p of the water inlet of the module cooling water channel i And recording the flow Q (p) of the module cooling water channel under the corresponding pressure initial value i );
Step 2: fitting the initial value of the working pressure of the water inlet of the module cooling water channel and the corresponding cooling water flow into a unitary quadratic curve;
and step 3: fitting the pressure and flow relation of the upper die and the lower die of each die cavity according to the step 2, and then obtaining a unitary quadratic equation formula
Figure 100002_DEST_PATH_IMAGE002
Calculating a fitting constant k 0 、k 1 、k 2 So as to obtain a calculation formula of the working pressure of the water inlet of the module cooling water channel and the corresponding cooling water flow:
Figure 100002_DEST_PATH_IMAGE004
wherein Q (p) i ) For module cooling channel inlet flow, p i Is an initial value of the working pressure k of the water inlet of the module cooling water channel 0 、k 1 、k 2 Are all formula fitting constants, Q i (p) is the water inlet flow of the ith module under the working pressure of the cooling water channel, and p is the working pressure of the cooling water channel of the module;
and 4, step 4: measuring heat exchanger inlet pressure p Ji And pressure p of the outlet Ji ', and inlet flow rate Q J And recording;
and 5: fitting the pressure at the inlet and outlet of the heat exchanger and the working flow of the heat exchanger into a unitary secondary curve, fitting the working pressure at the inlet of the heat exchanger and the corresponding cooling water flow into a unitary secondary curve, and fitting the unitary secondary curve according to a unitary quadratic equation formula
Figure 100002_DEST_PATH_IMAGE006
Calculating a fitting constant k 0 ’、k 1 ’、k 2 ', to obtain the calculation formula for the corresponding cooling water flow rate at the working pressure of the heat exchanger:
Figure 100002_DEST_PATH_IMAGE008
wherein Q is J (p Ji ) For heat exchangers at a pressure of p Ji Working at the time ofFlow rate, p Ji Operating pressure at the inlet of the heat exchanger, k 0 ’、k 1 ’、k 2 ' is a fitting constant, Q J Is the working flow of the heat exchanger, p J The working pressure for heat exchange;
step 6: according to the principle of conservation of fluid mass, the flow of the heat exchanger is equal to the sum of the water inflow of all the modules, and the working flow Q of the heat exchanger is calculated J (p J );
And 7: calculating the working pressure p of the heat exchanger J
And 8: performing combined calculation on the formulas in the steps to obtain the working pressure p of the module cooling water channel;
and step 9: according to the formula
Figure 100002_DEST_PATH_IMAGE010
Making a calculation judgment, wherein Q P Is the flow rate of the water pump, Q i (p) the water inlet flow of the ith module under the working pressure of the cooling water channel, n is the total number of the cooling modules, when the formula is established, the next step is carried out, and when the formula is not established, delta p is added to the obtained p value, wherein delta p is a pressure adjustment amount until the formula is met;
step 10: when the working pressure p of the die is obtained by calculation, the formula can be used
Figure 100002_DEST_PATH_IMAGE012
And calculating the flow Q (p) of the cooling water channel in each cooling module.
The specific calculation method of the step 6 is as follows: according to the principle of conservation of fluid mass, the flow rate of the heat exchanger is equal to the sum of the water flows of the modules, i.e.
Figure 100002_DEST_PATH_IMAGE014
Wherein Q is J (p J ) The flow rate of cooling water entering and exiting the heat exchanger is the working flow rate of the heat exchanger, n is the total number of modules, i is the module number, i =1,2,3 \8230:, n, Q i And (p) is the water inlet flow of the ith module under the working pressure of the cooling water channel.
The specific calculation method of the step 7 is as follows: p is a radical of J =P J (Q J ) Wherein p is J Is the working pressure of the heat exchanger, P J (Q J ) At a flow rate Q J The operating pressure of the heat exchanger.
The specific calculation mode of the step 8 is as follows: the working pressure of the pump is equal to the sum of the pressure of the water flow on the die and the pressure loss of the water flow on the heat exchanger, namely P = P J + P, where P is the operating pressure of the pump, P J The pressure loss caused by the heat exchanger is referred to as p as the module cooling water channel working pressure.
When the mold contains a water valve, the step 11 is added: according to the formula
Figure 100002_DEST_PATH_IMAGE016
Performing a calculation of where i The opening degree of the water valve is 0-1, Q (P) is the flow of the cooling water channel in each cooling module obtained by calculation, and Q i The flow of the cooling water channel in each cooling module is controlled by a water valve.
Compared with the prior art, the method saves a large amount of analysis time, rapidly calculates the pressure and flow of each cavity, can rapidly find the water valve to be adjusted, and clearly and intuitively understands the amount to be adjusted.
Drawings
FIG. 1 is a simplified schematic diagram of a multichamber model system.
FIG. 2 is a graph of the pressure in the present invention.
Detailed Description
The invention is further described with reference to the accompanying drawings.
The invention designs a method for calculating the working flow of each cavity of a thermal forming die, which comprises the steps of firstly utilizing a water channel simulation model, wherein the die consists of an upper die and a lower die, a plurality of die cavities are distributed in the upper die and the lower die, each die cavity consists of a plurality of modules, a cooling water channel is required to be arranged in each module, and firstly, taking i values between 0 and 0.5 as the initial working pressure p of a water inlet of a cooling water channel of the module 1 ~p i And recording the flow rate of the cooling water channel of the module under the corresponding pressure as followsTable:
TABLE 1 relationship of Water inlet pressure and flow obtained by simulation
Initial value of working pressure of water inlet of module cooling water channel p 1 p 2 …… p i
Module water inlet flow Q (p) i -- -- -- --
By the above table, the initial value of the working pressure of the water inlet of the module cooling water channel and the corresponding cooling water flow are fitted into a unitary secondary curve, and then the unitary secondary curve is obtained according to a formula
Figure 353954DEST_PATH_IMAGE002
The flow rate of each cavity mold at any pressure can be calculated, wherein Q (p) i ) For module cooling channel inlet flow, p i Is an initial value of the working pressure k of the water inlet of the module cooling water channel 0 、k 1 、k 2 All are formula fitting constants, and the pressure and flow relation of the upper die and the lower die of each cavity is fitted, so that the fitting constant k of the formula is obtained 0 、k 1 、k 2
Referring to fig. 2, since the cooling water first passes through the heat exchanger before reaching the mold. The heat exchanger is composed of a plurality of bent pipes, and the pressure loss is generated when flowing water passes through the heat exchanger, so that the working flow Q of the heat exchanger needs to be calculated J And the operating pressure loss p of the heat exchanger J . Because the structure of the heat exchanger is complex, the relationship between the pressure and the flow of the heat exchanger needs to be obtained by test, and the specific test mode is as follows: the pressures at the inlet and outlet of the heat exchanger, and the operating flow of the heat exchanger were measured and the values were recorded in the following table:
TABLE 2 relationship between pressure and flow at water inlet and outlet of heat exchanger
Working pressure at water inlet of heat exchanger p J1 p J2 …… p Ji
Working pressure at water outlet of heat exchanger p J1 p J2 …… p Ji
Working flow rate Q of heat exchanger J (p J -- -- -- --
By the above table, the pressure of the inlet and the outlet of the heat exchanger and the working flow of the heat exchanger are fitted into a primary secondary curve, then the working pressure of the inlet of the heat exchanger and the corresponding cooling water flow are fitted into a primary secondary curve, and the primary secondary curve is obtained according to a primary quadratic equation formula
Figure 536674DEST_PATH_IMAGE006
Calculating a fitting constant k 0 ’、k 1 ’、k 2 ' so as to obtain a calculation formula of the cooling water flow corresponding to the water inlet pressure of the heat exchanger, and calculating the working flow of the heat exchanger at any water inlet working pressure according to the formula.
The water in the water tank has higher temperature, enters the heat exchanger through the pump to reduce the temperature, then enters the die, and the temperature of the water from the die is increased. The heat of the thermoforming cooling system is continuously transferred into the refrigerating system through the heat exchanger.
The latter flows into the mold cooling circuit due to the flow through the heat exchanger. According to the principle of conservation of fluid mass, neglecting the leakage part of the pipeline, the flow of the heat exchanger is equal to the sum of the water inflow of each module, and the following formula is provided:
Figure 519674DEST_PATH_IMAGE014
wherein Q is J (p J ) The flow rate of cooling water entering and exiting the heat exchanger, namely the working flow rate of the heat exchanger, n is the total number of modules, i is the module number, i =1,2,3 \8230: (n, Q) is adopted i And (p) is the water inlet flow of the ith module under the working pressure of the cooling water channel.
Similarly, the working pressure of the cooling water pump is changed into single atmospheric pressure through the heat exchanger and the die. That is, the working pressure of the pump is equal to the pressure and heat on the moldThe sum of the pressures over the exchangers yields the formula P = P J + P, where P is the operating pressure of the pump, P J The pressure loss caused by the cooling water passing through the heat exchanger, namely the working pressure of the heat exchanger, and p is the working pressure of the module cooling water channel.
The pressure value of the outlet of the cooling water channel of the mold is zero without considering the action of the atmospheric pressure, so that the working pressure p value of the mold can be calculated.
Because the pressure characteristic curve of the pump and the pressure flow curve of the heat exchanger are obtained through experiments, the pressure flow curve of the mold cooling system can also be subjected to mapping solution, and the pressure flow curve is shown in fig. 2.
Then according to the formula
Figure 321408DEST_PATH_IMAGE010
Making a calculation judgment, wherein Q P Is the flow rate of the water pump, Q i And (p) is the water inlet flow of the ith module under the working pressure of the cooling water channel, n is the total number of the cooling modules, when the formula is established, the next step is carried out, and when the formula is not established, the value of p is increased by delta p, wherein delta p is a pressure adjustment amount, such as 0.01MPa, until the formula is satisfied.
When the working pressure p of the die is obtained by calculation, the formula can be used
Figure 604621DEST_PATH_IMAGE012
And calculating the flow Q (p) of the cooling water channel in each cooling module.
Referring to fig. 1, if the mold includes a water valve, the flow Q (p) of the cooling water channel in each cooling module obtained by the above calculation needs to be simply processed, and the specific formula is as follows:
Figure 895925DEST_PATH_IMAGE016
in which α is i The opening degree of the water valve is 0-1, Q (P) is the flow of the cooling water channel in each cooling module obtained by calculation, and Q i The flow of the cooling water channel in each cooling module is controlled by a water valve.
Since the present invention is implemented without involving complex calculations, it is only described how to quickly obtain the flow rate of each module on the die at a specific working pressure.
In the specific implementation, firstly, a simulation model is established, a mold with 3 mold cavities is adopted, the inlet pressure of a cooling system of each module of the mold is any 5 values between 0.1 and 0.5MPa, the flow of each module is calculated according to the invention, and the result is shown in table 3.
TABLE 3 flow of modules at inlet pressure
Pressure of 0.1MPa 0.2MPa 0.3MPa 0.4MPa 0.5MPa
Flow rate of mold on mold cavity 1 13.25 19.97 24.55 28.41 31.78
Mold cavity 1 lower mold flow 10.66 14.99 18.41 21.64 24.19
Flow rate of mold on mold cavity 2 20.42 28.56 34.78 40.31 45.14
Die cavity 2 lower die flow 14.01 20.31 24.96 28.91 32.45
Flow rate of mold on mold cavity 3 13.25 19.97 24.55 28.41 31.78
Mold cavity 3 lower mold flow 10.66 14.99 18.41 21.64 24.19
From the data in table 3, 6 mathematical polynomials can be built to obtain the parameters of the polynomial. Then, according to the method proposed by the present invention, the working pressure was calculated to be 0.04MPa.
The flow rate of the entire mold cavity can be rapidly calculated by fitting 6 polynomials as shown in table 4.
TABLE 4 flow rate (m) at operating pressure for the entire die cavities 3 /s)
Cavity 1 upper die Cavity 1 lower die Cavity 2 upper die Cavity 2 lower die Cavity 3 upper die Cavity 3 lower die Calculating time
The method of the invention 9.23 7.93 15.59 10.18 9.23 7.93 1s
Finite element simulation method 9.16 7.85 15.23 10.39 9.16 7.85 12 hours
* Computer configuration, 8 kernel, 16G adopted by finite element simulation method
As can be seen from table 4: the integral cooling water channel comprises an upper die cooling water channel, a lower die cooling water channel, a connecting water pipe and a water inlet. If a finite element simulation method is adopted, working pressure is set, and the whole working flow and the upper and lower mold flows of each cavity are calculated, the calculation time is very long due to the large number of model units. By adopting the method, the flow of the upper die and the lower die of each cavity can be calculated only by substituting each fitting parameter. The difference of the calculation results of the two methods is not large, but the method is far faster than a finite element simulation method in the aspect of calculation time. Moreover, the method can be used for debugging the actual die, and if only a finite element simulation method is adopted, the method cannot be applied to on-site die debugging.

Claims (5)

1. A method for calculating the working flow of each cavity of a thermal forming die is characterized by comprising the following steps: the calculation is carried out according to the following steps:
step 1: using a water channel simulation model, and taking i values between 0 and 0.5 as an initial working pressure p of the water inlet of the module cooling water channel i And recording the flow Q (p) of the module cooling water channel under the corresponding pressure initial value i );
Step 2: fitting the initial value of the working pressure of the water inlet of the module cooling water channel and the corresponding cooling water flow into a unitary quadratic curve;
and step 3: fitting the pressure and flow relation of the upper die and the lower die of each die cavity according to the step 2, and then obtaining a unitary quadratic equation formula
Figure DEST_PATH_IMAGE002
Calculating a fitting constant k 0 、k 1 、k 2 Thereby obtaining a moduleThe calculation formula of the working pressure of the water inlet of the cooling water channel and the corresponding cooling water flow is as follows:
Figure DEST_PATH_IMAGE004
wherein Q (p) i ) For module cooling channel inlet flow, p i Is an initial value of the working pressure k of the water inlet of the module cooling water channel 0 、k 1 、k 2 Are all formula fitting constants, Q i (p) is the water inlet flow of the ith module under the working pressure of the cooling water channel, and p is the working pressure of the cooling water channel of the module;
and 4, step 4: measuring heat exchanger inlet pressure p Ji And pressure p of the outlet Ji ', and inlet flow rate Q J And recording;
and 5: the pressure of the inlet and the outlet of the heat exchanger and the working flow of the heat exchanger are fitted into a unitary secondary curve, then the working pressure of the water inlet of the heat exchanger and the corresponding cooling water flow are fitted into a unitary secondary curve, and the unitary secondary curve is obtained according to a unitary quadratic equation formula
Figure DEST_PATH_IMAGE006
Calculating a fitting constant k 0 ’、k 1 ’、k 2 ', to obtain the calculation formula for the corresponding cooling water flow rate at the working pressure of the heat exchanger:
Figure DEST_PATH_IMAGE008
wherein Q is J (p Ji ) For heat exchangers at a pressure of p Ji Working flow of time, p Ji Operating pressure at the inlet of the heat exchanger, k 0 ’、k 1 ’、k 2 ' is a fitting constant, Q J Is the working flow of the heat exchanger, p J The working pressure for heat exchange;
step 6: according to the principle of conservation of fluid mass, the flow of the heat exchanger is equal to the sum of the water inflow of all the modules, and the working flow Q of the heat exchanger is calculated J (p J );
And 7: calculating the working pressure p of the heat exchanger J
And 8: performing combined calculation on the formulas in the steps to obtain the working pressure p of the module cooling water channel;
and step 9: according to the formula
Figure DEST_PATH_IMAGE010
Making a calculation judgment, wherein Q P Is the flow rate of the water pump, Q i (p) the water inlet flow of the ith module under the working pressure of the cooling water channel, n is the total number of the cooling modules, when the formula is established, the next step is carried out, and when the formula is not established, delta p is added to the obtained p value, wherein delta p is a pressure adjustment amount until the formula is met;
step 10: when the working pressure p of the die is obtained by calculation, the formula can be used
Figure DEST_PATH_IMAGE012
And calculating the flow Q (p) of the cooling water channel in each cooling module.
2. The method for calculating the working flow of each cavity of the hot forming die as claimed in claim 1, wherein: the specific calculation method of the step 6 is as follows: according to the principle of conservation of fluid mass, the flow rate of the heat exchanger is equal to the sum of the water inflow of the modules, i.e.
Figure DEST_PATH_IMAGE014
Wherein Q is J (p J ) The flow rate of cooling water entering and exiting the heat exchanger is the working flow rate of the heat exchanger, n is the total number of modules, i is the module number, i =1,2,3 \8230:, n, Q i And (p) is the water inlet flow of the ith module under the working pressure of the cooling water channel.
3. The method for calculating the working flow of each cavity of the hot forming die as claimed in claim 1, wherein: the specific calculation method of the step 7 is as follows: p is a radical of J =P J (Q J ) Wherein p is J Is the working pressure of the heat exchanger, P J (Q J ) At a flow rate Q J The operating pressure of the heat exchanger.
4. The method for calculating the working flow of each cavity of the hot forming die as claimed in claim 1, wherein: the specific calculation method of step 8 is as follows: the working pressure of the pump is equal to the sum of the pressure of the water flow on the die and the pressure loss of the water flow on the heat exchanger, namely P = P J + P, where P is the operating pressure of the pump, P J The pressure loss caused by the heat exchanger is referred to as p as the module cooling water channel working pressure.
5. The method for calculating the working flow of each cavity of the hot forming die as claimed in claim 1, wherein: when the mold contains a water valve, the step 11 is added: according to the formula
Figure DEST_PATH_IMAGE016
Performing a calculation of where i The opening degree of the water valve is 0-1, Q (P) is the flow of the cooling water channel in each cooling module obtained by calculation, and Q i The flow of the cooling water channel in each cooling module is controlled by a water valve.
CN201911355271.8A 2019-12-25 2019-12-25 Method for calculating working flow of each cavity of thermal forming die Active CN111159873B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911355271.8A CN111159873B (en) 2019-12-25 2019-12-25 Method for calculating working flow of each cavity of thermal forming die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911355271.8A CN111159873B (en) 2019-12-25 2019-12-25 Method for calculating working flow of each cavity of thermal forming die

Publications (2)

Publication Number Publication Date
CN111159873A CN111159873A (en) 2020-05-15
CN111159873B true CN111159873B (en) 2023-03-21

Family

ID=70558116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911355271.8A Active CN111159873B (en) 2019-12-25 2019-12-25 Method for calculating working flow of each cavity of thermal forming die

Country Status (1)

Country Link
CN (1) CN111159873B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113076703B (en) * 2021-03-02 2022-10-28 浙江博汇汽车部件有限公司 Hot stamping die water channel flow velocity analysis method based on database

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2824739A1 (en) * 2001-05-17 2002-11-22 Pierre Louis Marque Nasal and oral/nasal mask, for non-invasive artificial respiration, is molded from a synthetic material by heat and pressure, using numerical photographic data to shape the mold according to the patient's features
CN201808222U (en) * 2010-08-31 2011-04-27 浙江虹达特种橡胶制品有限公司 Manufacturing and molding equipment for microporous resin product
JP2011141072A (en) * 2010-01-06 2011-07-21 Hitachi Plant Technologies Ltd Cooling system and cooling method
CN102380954A (en) * 2010-08-31 2012-03-21 浙江虹达特种橡胶制品有限公司 Manufacturing and forming equipment for microporous resin products
CN102939488A (en) * 2010-04-16 2013-02-20 法商Bic公司 Pressure regulator assembly
CN109047522A (en) * 2018-08-22 2018-12-21 上海博汇模具有限公司 A kind of calculation method of hot-forming die type surface current speed uniformity

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2824739A1 (en) * 2001-05-17 2002-11-22 Pierre Louis Marque Nasal and oral/nasal mask, for non-invasive artificial respiration, is molded from a synthetic material by heat and pressure, using numerical photographic data to shape the mold according to the patient's features
JP2011141072A (en) * 2010-01-06 2011-07-21 Hitachi Plant Technologies Ltd Cooling system and cooling method
CN102939488A (en) * 2010-04-16 2013-02-20 法商Bic公司 Pressure regulator assembly
CN201808222U (en) * 2010-08-31 2011-04-27 浙江虹达特种橡胶制品有限公司 Manufacturing and molding equipment for microporous resin product
CN102380954A (en) * 2010-08-31 2012-03-21 浙江虹达特种橡胶制品有限公司 Manufacturing and forming equipment for microporous resin products
CN109047522A (en) * 2018-08-22 2018-12-21 上海博汇模具有限公司 A kind of calculation method of hot-forming die type surface current speed uniformity

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
樊阳文 ; 恽强龙 ; 张广泰 ; 张辉亮 ; .特高压换流阀冷却系统配水仿真及试验研究.2017,(10),全文. *

Also Published As

Publication number Publication date
CN111159873A (en) 2020-05-15

Similar Documents

Publication Publication Date Title
CN104441698B (en) A kind of method adjusting autoclave flow field temperature homogeneity
CN111159873B (en) Method for calculating working flow of each cavity of thermal forming die
CN109047522B (en) Method for adjusting flow velocity uniformity of profile of hot forming die
CN103778294B (en) A kind of numerical value general solution method of lines of thermal conduction source strength identification indirect problem
CN103335860B (en) Modular heat exchanger thermal performance online rating system
CN205128887U (en) Die casting die circulative cooling system
CN111136169B (en) Parameter calculation method for cooling water channel of thermal forming multi-cavity mold
CN112078806A (en) Helicopter liquid cooling integrated control system
CN208245631U (en) A kind of mold recycles cooling system
Huang et al. The study on the improvement of system uniformity flow rate for U-type compact heat exchangers
Arsenyeva et al. Mathematical modelling and optimal design of plate-and-frame heat exchangers
CN115017674A (en) Modelica-based shell-and-tube heat exchanger modeling simulation method
CN113386292A (en) Casting roller and three-factor parameter orthogonal experimental method
CN101592561A (en) Test method for equal-pressure difference type flow distribution of closed loop system
CN111159875B (en) Dynamic coupling mathematical model and modeling method for shell side and tube side of power station condenser
CN111625906B (en) Method for selecting fan type in power battery air cooling system by combining test and simulation
Mishra et al. The Effect of Temperature Nonuniformities on Transient Behaviour of Three-Fluid Crossflow Heat Exchanger.
Qiu et al. One-dimension and three-dimension collaborative simulation study of the influence of non-uniform inlet airflow on the heat transfer performance of automobile radiators
CN114091374A (en) Method for determining cross flow and blade leading edge impact heat exchange relational expression
CN111914389B (en) Cold end system operating point determining method based on curve fitting
CN2925828Y (en) Mold pipeline cooler
CN207535259U (en) A kind of intelligent temperature control injection mold
CN111059921A (en) Multi-connecting-platform cooling tower
CN113619810B (en) Method for carrying out scale test on aircraft fuel oil cooling system based on scale test model
CN209869322U (en) Circulating cooling structure of injection mold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant