CN111101414A - Concrete overhead brick with drainage buffering function - Google Patents

Concrete overhead brick with drainage buffering function Download PDF

Info

Publication number
CN111101414A
CN111101414A CN202010115729.9A CN202010115729A CN111101414A CN 111101414 A CN111101414 A CN 111101414A CN 202010115729 A CN202010115729 A CN 202010115729A CN 111101414 A CN111101414 A CN 111101414A
Authority
CN
China
Prior art keywords
drainage
brick
overhead
drainage channel
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010115729.9A
Other languages
Chinese (zh)
Inventor
吴秀峰
李龙飞
张桐瑞
刘继远
金旭
雷文骏
张广厚
孙铭崧
段永旭
张智硕
夏冬
荣俊玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN202010115729.9A priority Critical patent/CN111101414A/en
Publication of CN111101414A publication Critical patent/CN111101414A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/005Individual couplings or spacer elements for joining the prefabricated units
    • E01C5/006Individual spacer elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a concrete overhead brick with a drainage buffering function, which comprises a brick body and a support. The brick body is provided with a water drainage hole, a clamping groove and a positioning rib; the support is provided with a drain hole, a clamping block, a vibration damping cushion layer, a vibration damping positioning rib, a diversion trench, an overhead positioning block, a drainage channel and a bottom plate. The drainage channel with the section of the pointed arch is arranged at the bottom of the overhead positioning block; the water drainage channel is positioned at the overhead position of the brick body. When precipitation occurs, rainwater flows into the drainage channel and the drainage channel through the drainage holes and the drainage holes, and then the purpose of drainage is achieved. The brick body and the support are both cast by concrete, and the damping cushion layer is made of rubber. The invention adopts the overhead mode of up-down separation, which not only can solve the brick cracking phenomenon caused by expansion stress generated by the icing of accumulated water in the brick, but also is convenient for maintenance and replacement; and the bottom plate can realize full pavement of the roadbed, so that the roadbed is prevented from being corroded by flowing water to reduce the strength. The invention is easy to construct and can obviously improve the drainage efficiency.

Description

Concrete overhead brick with drainage buffering function
Technical Field
The invention belongs to the municipal field, and particularly relates to a concrete overhead brick with a drainage buffering function.
Background
At present, the sidewalk is mostly paved by common concrete permeable pavement bricks. The permeable pavement bricks mostly use raw material proportioning and molding and curing technology to form fine pores in the products so as to achieve the purpose of water drainage. But its drainage ability is relatively poor, especially in rainy day, rainwater flows through the brick and can carry tiny silt to get into the internal gap of brick, if accumulate for a long time, can make the internal gap of brick block up, influences the road surface drainage. The function of pavement is for pedestrian's trip facilitates, nevertheless because pavement drainage function is relatively poor, has ponding to shelter from the sign on pavement, makes the sign fuzzy, influences pedestrian's trip. Most cities in China face the problem of ice and snow in winter, part of cities adopt the snow melting agent to treat ice and snow, the snow melting agent permeates into inner pores of the common concrete permeable pavement bricks, a large amount of salt crystals are precipitated in the common concrete pavement bricks during solidification, the common concrete permeable pavement bricks are corroded and damaged, and the common concrete permeable pavement bricks are cracked seriously.
The temperature of most cities in winter in China is below the freezing point, and if the sidewalks are not drained timely, the pavements can be frozen, so that inconvenience is brought to the traveling of pedestrians. And the problem of ice and snow can be faced, partial cities adopt the snow melting agent to treat the ice and snow, and the snow melting agent can permeate into the inner pores of the common concrete permeable pavement bricks, a large amount of salt crystals can be separated out from the common concrete permeable pavement bricks during solidification, so that the common concrete permeable pavement bricks are corroded and damaged, and the common concrete permeable pavement bricks are cracked in severe cases.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a concrete overhead brick with a drainage buffering function.
In order to achieve the purpose, the technical scheme provided by the invention is a concrete overhead brick with a drainage buffering function. It is characterized by comprising: brick body, support. The brick body is provided with a water drainage hole, a clamping groove and a positioning rib; the support is provided with a drain hole, a clamping block, a vibration damping cushion layer, a diversion trench, an overhead positioning block, a drainage channel and a bottom plate; the vibration damping cushion layer is provided with vibration damping positioning ribs; the drainage channel is arranged at the bottom of the overhead positioning block, and the section of the drainage channel is in a pointed arch shape; the overhead part of the brick body forms a water drainage channel.
Furthermore, the water drainage hole vertically penetrates through the brick body.
Furthermore, the clamping groove is formed in the center of each side face of the brick body.
Furthermore, the positioning ribs are arranged on the side face of the brick body.
Furthermore, the fixture block is arranged at the top of the support, and the drain hole is vertically arranged in the center of the fixture block and communicated with the drainage channel.
Furthermore, the damping cushion layer is arranged on the side surface of the fixture block, and the damping positioning ribs are arranged in the center of each side surface of the damping cushion layer.
Furthermore, the diversion trench is positioned at the joint of the fixture block and the overhead positioning block.
Furthermore, the overhead positioning block adopts the prismatic table with the rigidity angle of 34 degrees, so that the pressure can be dispersed, and the punching damage can be resisted.
Furthermore, the drainage channel is arranged at the bottom of the overhead positioning block, and the section of the drainage channel is in a pointed arch shape; the drainage channel is positioned at the overhead part of the brick body, so that the stress transmitted from the upper part can be uniformly distributed. On the premise of not losing strength, the drainage channel and the drainage channel form a drainage channel network.
Further, the damping cushion layer is made of rubber.
Furthermore, the diversion trench is positioned below a gap formed by the brick body and the vibration damping positioning rib, so that water flowing into the gap of the brick body can be drained into the drainage channel, and the service life of the vibration damping cushion layer is prolonged.
Furthermore, the brick body and the support are both cast by concrete and are separated from each other.
The brick body is laid in an overhead mode of separating the brick body from the drainage channel, and when accumulated water exists in the brick body, the drainage channel and the temperature reaches below the freezing point, the water in the brick body can be frozen and expanded, so that expansion stress is generated. By adopting the separating body mode, the energy generated by the freezing and expansion of the water can be dissipated by jacking the brick body, the cracking caused by expansion stress is prevented, and the durability of the invention is improved. In addition, when the brick body support is damaged and needs to be maintained or replaced, the brick body or the support can be integrally lifted out, and sundries can be conveniently cleaned.
The clamping groove, the clamping block and the vibration damping positioning block can provide three-dimensional displacement constraint for the brick body, and can effectively prevent the brick body from horizontally displacing.
The damping cushion layer can weaken the impact force transmitted by the brick body to the fixture block, reduce the damage caused by impact load or vibration and play a role in buffering.
The invention does not utilize aggregate gaps to realize drainage, so solid waste can be used as the aggregate, and the invention conforms to the concepts of environmental protection and sustainable development.
Drawings
Fig. 1 is a schematic overall structure diagram of a concrete overhead brick with a drainage buffer function.
Fig. 2 is a schematic view of a concrete overhead brick with a drainage buffer function.
Fig. 3 is a schematic view of a support of a concrete overhead brick with a drainage buffer function.
Fig. 4 is an overall plan view of a concrete overhead brick having a drainage buffer function.
Numbering shown in the figures: the brick comprises a brick body 1, a support 2, a water drainage hole 3, a clamping groove 4, a positioning rib 5, a water drainage hole 6, a clamping block 7, a vibration reduction cushion layer 8, a diversion trench 9, an overhead positioning block 10, a water drainage channel 11, a bottom plate 12, a vibration reduction positioning rib 13 and a water drainage channel 14.
Detailed Description
The present invention will be described in more detail with reference to the following embodiments and drawings.
The invention relates to a concrete overhead brick with a drainage buffering function, which is characterized in that: comprises a brick body 1 and a support 2. The brick body 1 is provided with a water drainage hole 3, a clamping groove 4 and a positioning rib 5; the support 2 is provided with a drain hole 6, a clamping block 7, a damping cushion layer 8, a diversion trench 9, an overhead positioning block 10, a drain channel 11 and a bottom plate 12; the damping cushion layer 8 is arranged on the side surface of the fixture block 7 and is provided with a damping positioning rib 13; the drainage channel 11 is arranged at the bottom of the overhead positioning block 10, and the section of the drainage channel 11 is in a pointed arch shape. The overhead part of the brick body 1 forms a drainage channel 14, and the drainage channel 11 and the drainage channel 14 form a drainage channel network. The fixture block 7 is provided with a drain hole 6 with the diameter of 10mm and is vertically communicated with the drain channel 11 downwards. The brick body 1 is provided with a drainage hole 3 with the diameter of 10mm, vertically and downwards penetrates through the brick body 1 and is communicated with a drainage channel 14. The brick body 1 and the support 2 are both poured by concrete. The damping cushion 8 is made of rubber.
When the brick is laid in a large area, the damping cushion layer is sleeved on the side surface of the fixture block 7, and then the support 2 and the brick body 1 are laid in sequence. The brick body 1 and the support 2 are connected in a splicing mode with the clamping block 7 through the clamping groove 5.
The brick body 1 of the invention is provided with the drainage hole 3, so that accumulated water on the upper surface of the brick body 1 can directly flow into the drainage channel 14 through the drainage hole 3. When the drainage channel 11 and the drainage channel 14 are blocked or the support 2 of the brick body 1 is damaged and needs to be maintained or replaced, the whole body can be lifted out, and sundries can be conveniently cleaned.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. The protection scope of the present invention is not limited to the above description, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that those skilled in the art should also realize that such alternative or equivalent arrangements are within the scope of the present invention without departing from the spirit of the present invention.

Claims (10)

1. The utility model provides a built on stilts brick of concrete with drainage buffer function which characterized in that: comprises a brick body 1, a support 2 and a water drainage channel 14; the brick body 1 is provided with a water drainage hole 3, a clamping groove 4 and a positioning rib 5; the support 2 is provided with a drain hole 6, a clamping block 7, a damping cushion layer 8, a diversion trench 9, an overhead positioning block 10, a drain channel 11 and a bottom plate 12; the damping cushion layer 8 is arranged on the side surface of the fixture block 7 and is provided with a damping positioning rib 13; the drainage channel 11 is arranged at the bottom of the overhead positioning block 10, and the section of the drainage channel 11 is in a pointed arch shape; the brick body 1 and the support 2 are both cast by concrete, and the brick body 1 is erected on the support 2; the damping cushion 8 is made of rubber.
2. The concrete overhead brick with the drainage and buffering functions is characterized in that the drainage holes 3 vertically penetrate through the brick body 1 and are communicated with the drainage channel 14 according to claim 1.
3. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the clamping groove 4 is formed in the center of each side of the brick body 1.
4. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the positioning ribs 5 are arranged on the side surface of the brick body 1.
5. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the drainage hole 6 vertically penetrates through the block 7 and is communicated with a drainage channel 11 at the bottom of the overhead positioning block 10.
6. The concrete overhead brick with the water drainage and buffering functions as claimed in claim 1, wherein the vibration-damping positioning ribs 13 are arranged in the center of each side of the vibration-damping cushion layer 8 and are spliced with the side clamping grooves 4 of the brick body 1.
7. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1 and claim 5, wherein the diversion trench 9 is formed at the connection between the fixture block 7 and the overhead positioning block 10.
8. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the overhead positioning block 10 is a frustum of a prism with a rigidity angle of 34 °.
9. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1 and claim 2, wherein the drainage channel 11 is arranged at the bottom of the overhead positioning block 10, the cross section of the drainage channel is in a pointed arch shape, the drainage channel 14 is arranged at the overhead position of the brick body 1, and the drainage channel 11 and the drainage channel 14 form a dense drainage channel network to improve drainage efficiency.
10. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the bottom plate 12 is capable of being fully paved, thereby ensuring that the roadbed is not eroded by flowing water to reduce the strength and improve the overall durability.
CN202010115729.9A 2020-02-25 2020-02-25 Concrete overhead brick with drainage buffering function Pending CN111101414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010115729.9A CN111101414A (en) 2020-02-25 2020-02-25 Concrete overhead brick with drainage buffering function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010115729.9A CN111101414A (en) 2020-02-25 2020-02-25 Concrete overhead brick with drainage buffering function

Publications (1)

Publication Number Publication Date
CN111101414A true CN111101414A (en) 2020-05-05

Family

ID=70428047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010115729.9A Pending CN111101414A (en) 2020-02-25 2020-02-25 Concrete overhead brick with drainage buffering function

Country Status (1)

Country Link
CN (1) CN111101414A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684735A (en) * 2021-09-07 2021-11-23 中冶武汉冶金建筑研究院有限公司 Concrete road surface brick that structure permeates water

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206448127U (en) * 2017-01-06 2017-08-29 深圳市升源园林生态有限公司 Draining paving brick
KR101845525B1 (en) * 2018-01-04 2018-04-04 주식회사 에이이 Water Permeability Sidewalk-Block Using Eco-Friendly Material Mixtures and Draining System having thesame
EP3569763A1 (en) * 2018-05-15 2019-11-20 Jing Si Pureland Co., Ltd. Linkage brick assembly
CN110820476A (en) * 2019-11-27 2020-02-21 辽宁工程技术大学 Concrete pavement brick with drainage and vibration reduction composite functions
CN212128702U (en) * 2020-02-25 2020-12-11 辽宁工程技术大学 Concrete overhead brick with drainage buffering function

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206448127U (en) * 2017-01-06 2017-08-29 深圳市升源园林生态有限公司 Draining paving brick
KR101845525B1 (en) * 2018-01-04 2018-04-04 주식회사 에이이 Water Permeability Sidewalk-Block Using Eco-Friendly Material Mixtures and Draining System having thesame
EP3569763A1 (en) * 2018-05-15 2019-11-20 Jing Si Pureland Co., Ltd. Linkage brick assembly
CN110820476A (en) * 2019-11-27 2020-02-21 辽宁工程技术大学 Concrete pavement brick with drainage and vibration reduction composite functions
CN212128702U (en) * 2020-02-25 2020-12-11 辽宁工程技术大学 Concrete overhead brick with drainage buffering function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684735A (en) * 2021-09-07 2021-11-23 中冶武汉冶金建筑研究院有限公司 Concrete road surface brick that structure permeates water

Similar Documents

Publication Publication Date Title
CN104652210B (en) Assembled concrete traffic pavement and construction method thereof
CN110820476A (en) Concrete pavement brick with drainage and vibration reduction composite functions
CN107237232B (en) high-durability cement concrete pavement expansion joint structure and construction method thereof
CN111101414A (en) Concrete overhead brick with drainage buffering function
CN212128702U (en) Concrete overhead brick with drainage buffering function
CN201553962U (en) U-shaped filter tank type curb stone made of reinforced concrete or natural stones
CN213448080U (en) Novel waterproof layer structure of highway bridge
CN211972949U (en) Urban paving brick with splash-proof function
CN206521696U (en) A kind of bridge drainage system
CN204475099U (en) A kind of assembly concrete traffic
CN214401389U (en) Longitudinal abutted seam structure of newly-built bridge and current bridge
CN205443854U (en) Notch cuttype curb
CN209907141U (en) Rigid-flexible transition section pavement structure of cement concrete and asphalt concrete
CN203411895U (en) Drainage facility for highway bridge floor
CN220166564U (en) Combined floor tile
CN207109995U (en) A kind of town road drainage arrangement
CN111676755A (en) Prefabricated assembly type pavement structure and construction method thereof
CN219862367U (en) Built-in drainage structure for municipal bridge
CN113737596B (en) Tramcar track construction method using high-performance cement concrete as lap joint material
CN219430520U (en) Road surface capable of rapidly draining rainwater on road surface
CN108797258A (en) One kind is from the permeable whole road surface of catchmenting of snow melt
CN215518195U (en) Bay type stop station with sponge city function
CN217758167U (en) Urban road curb foundation
CN220521079U (en) Novel ECC cover-NC combined expansion joint
CN215104368U (en) Highway road surface with water storage and permeability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination