CN212128702U - Concrete overhead brick with drainage buffering function - Google Patents

Concrete overhead brick with drainage buffering function Download PDF

Info

Publication number
CN212128702U
CN212128702U CN202020205929.9U CN202020205929U CN212128702U CN 212128702 U CN212128702 U CN 212128702U CN 202020205929 U CN202020205929 U CN 202020205929U CN 212128702 U CN212128702 U CN 212128702U
Authority
CN
China
Prior art keywords
drainage
brick
overhead
brick body
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020205929.9U
Other languages
Chinese (zh)
Inventor
吴秀峰
张桐瑞
刘继远
李龙飞
金旭
雷文骏
张广厚
孙铭崧
段永旭
夏冬
张智硕
荣俊玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN202020205929.9U priority Critical patent/CN212128702U/en
Application granted granted Critical
Publication of CN212128702U publication Critical patent/CN212128702U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a concrete built on stilts brick with drainage buffer function, including the brick body, support. The brick body is provided with a water drainage hole, a clamping groove and a positioning rib; the support is provided with a drain hole, a clamping block, a vibration damping cushion layer, a vibration damping positioning rib, a diversion trench, an overhead positioning block, a drainage channel and a bottom plate. The drainage channel with the section of the pointed arch is arranged at the bottom of the overhead positioning block; the water drainage channel is positioned at the overhead position of the brick body. When precipitation occurs, rainwater flows into the drainage channel and the drainage channel through the drainage holes and the drainage holes, and then the purpose of drainage is achieved. The brick body and the support are both cast by concrete, and the damping cushion layer is made of rubber. The utility model adopts the overhead mode of upper and lower separation, which can not only solve the brick cracking phenomenon caused by the expansion stress generated by the icing of the accumulated water inside, but also facilitate the maintenance and replacement; and the bottom plate can realize full pavement of the roadbed, so that the roadbed is prevented from being corroded by flowing water to reduce the strength. The utility model discloses easily be under construction, improvement drainage efficiency that can show.

Description

Concrete overhead brick with drainage buffering function
Technical Field
The utility model belongs to the municipal administration field, concretely relates to built on stilts brick of concrete with drainage buffer function.
Background
At present, the sidewalk is mostly paved by common concrete permeable pavement bricks. The permeable pavement bricks mostly use raw material proportioning and molding and curing technology to form fine pores in the products so as to achieve the purpose of water drainage. But its drainage ability is relatively poor, especially in rainy day, rainwater flows through the brick and can carry tiny silt to get into the internal gap of brick, if accumulate for a long time, can make the internal gap of brick block up, influences the road surface drainage. The function of pavement is for pedestrian's trip facilitates, nevertheless because pavement drainage function is relatively poor, has ponding to shelter from the sign on pavement, makes the sign fuzzy, influences pedestrian's trip. Most cities in China face the problem of ice and snow in winter, part of cities adopt the snow melting agent to treat ice and snow, the snow melting agent permeates into inner pores of the common concrete permeable pavement bricks, a large amount of salt crystals are precipitated in the common concrete pavement bricks during solidification, the common concrete permeable pavement bricks are corroded and damaged, and the common concrete permeable pavement bricks are cracked seriously.
The temperature of most cities in winter in China is below the freezing point, and if the sidewalks are not drained timely, the pavements can be frozen, so that inconvenience is brought to the traveling of pedestrians. And the problem of ice and snow can be faced, partial cities adopt the snow melting agent to treat the ice and snow, and the snow melting agent can permeate into the inner pores of the common concrete permeable pavement bricks, a large amount of salt crystals can be separated out from the common concrete permeable pavement bricks during solidification, so that the common concrete permeable pavement bricks are corroded and damaged, and the common concrete permeable pavement bricks are cracked in severe cases.
SUMMERY OF THE UTILITY MODEL
To the not enough of above-mentioned prior art, the utility model provides a concrete overhead brick with drainage buffer function.
In order to achieve the purpose, the utility model provides a technical scheme is a concrete overhead brick with drainage buffer function. It is characterized by comprising: brick body, support. The brick body is provided with a water drainage hole, a clamping groove and a positioning rib; the support is provided with a drain hole, a clamping block, a vibration damping cushion layer, a diversion trench, an overhead positioning block, a drainage channel and a bottom plate; the vibration damping cushion layer is provided with vibration damping positioning ribs; the drainage channel is arranged at the bottom of the overhead positioning block, and the section of the drainage channel is in a pointed arch shape; the overhead part of the brick body forms a water drainage channel.
Further, the vertical brick body that runs through of outlet.
Furthermore, the clamping groove is arranged in the center of each side of the brick body.
Furthermore, the positioning rib is arranged on the side surface of the brick body.
Further, the fixture block locate the support top, the wash port is vertical to be located fixture block central authorities, communicate with drainage channel.
Further, damping bed course locate the fixture block side surface, damping location rib locates each side central authorities of damping bed course.
Further, the guiding gutter be located fixture block and built on stilts locating piece junction.
Further, built on stilts locating piece adopt rigidity angle to be 34 prismatic table, but die-cut destruction is resisted to dispersible pressure.
Furthermore, the drainage channel of the utility model is arranged at the bottom of the overhead positioning block, and the cross section of the drainage channel is in a pointed arch shape; the drainage channel is positioned at the overhead part of the brick body, so that the stress transmitted from the upper part can be uniformly distributed. On the premise of not losing strength, the drainage channel and the drainage channel form a drainage channel network.
Furthermore, the damping cushion layer of the utility model is made of rubber.
Further, the guiding gutter lie in the brick body and the damping positioning rib under the gap that forms, can improve damping bed course life in the drainage channel with the log raft that flows in the brick body gap.
Further, the brick body and support by concrete placement, and adopt the mode of each partial separation.
The utility model has the advantages as follows:
the utility model discloses the built on stilts mode of separation is laid about the brick body adopts, when the brick body, drainage channel and sluicing passageway inside have ponding and temperature to reach below the freezing point, the water of the internal portion of brick can freeze the inflation, and then produces the expansion stress. Adopt the mode of the disjunctor, can make the frozen mode dissipation that the expansion produced of water passes through the jack-up brick body, prevent the fracture that arouses by expansion stress, improved the utility model discloses a durability. In addition, when the brick body support is damaged and needs to be maintained or replaced, the brick body or the support can be integrally lifted out, and sundries can be conveniently cleaned.
The utility model discloses the brick body draw-in groove and fixture block and damping locating piece can provide the displacement restraint of three-dimensional for the brick body, can effectually prevent that the brick body from taking place displacement between the level.
The utility model discloses the damping bed course can weaken the brick body and transmit the impact force on the fixture block, reduces the destruction that shock load or vibration cause, plays the cushioning effect.
The utility model discloses it realizes the drainage not to utilize the space of gathering materials, so can adopt solid waste as gathering materials, accords with green, sustainable development's theory.
Drawings
Fig. 1 is a schematic overall structure diagram of a concrete overhead brick with a drainage buffer function.
Fig. 2 is a schematic view of a concrete overhead brick with a drainage buffer function.
Fig. 3 is a schematic view of a support of a concrete overhead brick with a drainage buffer function.
Fig. 4 is an overall plan view of a concrete overhead brick having a drainage buffer function.
Numbering shown in the figures: the brick comprises a brick body 1, a support 2, a water drainage hole 3, a clamping groove 4, a positioning rib 5, a water drainage hole 6, a clamping block 7, a vibration reduction cushion layer 8, a diversion trench 9, an overhead positioning block 10, a water drainage channel 11, a bottom plate 12, a vibration reduction positioning rib 13 and a water drainage channel 14.
Detailed Description
The present invention will be described in more detail with reference to the following embodiments and drawings.
The utility model relates to a built on stilts brick of concrete with drainage buffer function, its characterized in that: comprises a brick body 1 and a support 2. The brick body 1 is provided with a water drainage hole 3, a clamping groove 4 and a positioning rib 5; the support 2 is provided with a drain hole 6, a clamping block 7, a damping cushion layer 8, a diversion trench 9, an overhead positioning block 10, a drain channel 11 and a bottom plate 12; the damping cushion layer 8 is arranged on the side surface of the fixture block 7 and is provided with a damping positioning rib 13; the drainage channel 11 is arranged at the bottom of the overhead positioning block 10, and the section of the drainage channel 11 is in a pointed arch shape. The overhead part of the brick body 1 forms a drainage channel 14, and the drainage channel 11 and the drainage channel 14 form a drainage channel network. The fixture block 7 is provided with a drain hole 6 with the diameter of 10mm and is vertically communicated with the drain channel 11 downwards. The brick body 1 is provided with a drainage hole 3 with the diameter of 10mm, vertically and downwards penetrates through the brick body 1 and is communicated with a drainage channel 14. The brick body 1 and the support 2 are both poured by concrete. The damping cushion 8 is made of rubber.
The utility model discloses when laying by a large scale, earlier overlap damping bed course in fixture block 7 sides, lay support 2 and brick body 1 in proper order again. The brick body 1 and the support 2 are connected in a splicing mode with the clamping block 7 through the clamping groove 5.
The utility model discloses brick body 1 is equipped with outlet 3, can make the ponding of 1 upper surface of brick body directly flow in sluicing passageway 14 through outlet 3. When the drainage channel 11 and the drainage channel 14 are blocked or the support 2 of the brick body 1 is damaged and needs to be maintained or replaced, the whole body can be lifted out, and sundries can be conveniently cleaned.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. The utility model discloses a protection scope not only limits in the aforesaid, and the all belongings the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a protection scope. It should be noted that, for those skilled in the art, the technical solutions obtained by adopting equivalent replacement or equivalent transformation without departing from the principle of the present invention all fall within the protection scope of the present invention.

Claims (10)

1. The utility model provides a built on stilts brick of concrete with drainage buffer function which characterized in that: comprises a brick body (1), a support (2) and a water drainage channel (14); the brick body (1) is provided with a water drainage hole (3), a clamping groove (4) and a positioning rib (5); the support (2) is provided with a drain hole (6), a clamping block (7), a damping cushion layer (8), a diversion trench (9), an overhead positioning block (10), a drainage channel (11) and a bottom plate (12); the damping cushion layer (8) is arranged on the side surface of the fixture block (7) and is provided with damping positioning ribs (13); the drainage channel (11) is arranged at the bottom of the overhead positioning block (10), and the section of the drainage channel (11) is in a pointed arch shape; the brick body (1) and the support (2) are both cast by concrete, and the brick body (1) is erected on the support (2); the damping cushion (8) is made of rubber.
2. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the drainage holes (3) vertically penetrate through the brick body (1) and are communicated with the drainage channel (14).
3. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the clamping groove (4) is formed in the center of each side of the brick body (1).
4. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the positioning ribs (5) are arranged on the side surface of the brick body (1).
5. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the fixture block (7) through which the drainage hole (6) vertically penetrates is communicated with a drainage channel (11) at the bottom of the overhead positioning block (10).
6. The concrete overhead brick with the water drainage and buffering functions as claimed in claim 1, wherein the vibration-damping positioning ribs (13) are arranged in the centers of the sides of the vibration-damping cushion layer (8) and are spliced with the clamping grooves (4) on the sides of the brick body (1).
7. The concrete overhead brick with the water drainage and buffering functions as claimed in claim 1, wherein the diversion trench (9) is formed at the joint of the fixture block (7) and the overhead positioning block (10).
8. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the overhead positioning block (10) is a frustum of a pyramid with a rigidity angle of 34 °.
9. The concrete overhead brick with the drainage and buffering functions as claimed in claim 1, wherein the drainage channels (14) are arranged at the overhead part of the brick body (1), and the drainage channels (11) and the drainage channels (14) form a dense drainage channel network.
10. The concrete overhead brick with the water drainage and buffering functions as claimed in claim 1, wherein the bottom plate (12) can be fully paved.
CN202020205929.9U 2020-02-25 2020-02-25 Concrete overhead brick with drainage buffering function Expired - Fee Related CN212128702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020205929.9U CN212128702U (en) 2020-02-25 2020-02-25 Concrete overhead brick with drainage buffering function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020205929.9U CN212128702U (en) 2020-02-25 2020-02-25 Concrete overhead brick with drainage buffering function

Publications (1)

Publication Number Publication Date
CN212128702U true CN212128702U (en) 2020-12-11

Family

ID=73678709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020205929.9U Expired - Fee Related CN212128702U (en) 2020-02-25 2020-02-25 Concrete overhead brick with drainage buffering function

Country Status (1)

Country Link
CN (1) CN212128702U (en)

Similar Documents

Publication Publication Date Title
CN209779396U (en) Road of seepage and drainage combination structure of mating formation that permeates water
CN109098064A (en) The sponge urban road structure for avoiding rainwater on road surface from depositing
CN206680830U (en) A kind of highway center isolated area drainage system
CN108757027B (en) Multifunctional drainage system in tunnel
CN213448080U (en) Novel waterproof layer structure of highway bridge
CN212128702U (en) Concrete overhead brick with drainage buffering function
CN211815297U (en) Permeable asphalt pavement
CN111101414A (en) Concrete overhead brick with drainage buffering function
CN201553962U (en) U-shaped filter tank type curb stone made of reinforced concrete or natural stones
CN209584768U (en) A kind of permeable integral type water drainage curb
CN110820476A (en) Concrete pavement brick with drainage and vibration reduction composite functions
CN113832782B (en) Foundation bed structure of high-speed railway and construction method
CN107237255A (en) A kind of bridge pier type road construction concentrates discharge structure with rainwater
CN212834837U (en) Town road with drainage function
CN204919249U (en) Waterproof cement concrete pavement
CN203411895U (en) Drainage facility for highway bridge floor
CN209066280U (en) A kind of bridge road structure
CN215518195U (en) Bay type stop station with sponge city function
CN219862367U (en) Built-in drainage structure for municipal bridge
CN111181120A (en) Integrated railway cable trough structure and construction method
CN220246595U (en) Permeable asphalt pavement structure
CN211972961U (en) Concrete pavement brick with drainage and vibration reduction composite functions
CN220746626U (en) Mountain area box culvert backfill integrated configuration
CN219137282U (en) Water-permeable heat-insulating pavement structure for urban road in season frozen area
CN219430520U (en) Road surface capable of rapidly draining rainwater on road surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201211