CN111090635A - Configuration method and device of early warning scheme and computer readable storage medium - Google Patents
Configuration method and device of early warning scheme and computer readable storage medium Download PDFInfo
- Publication number
- CN111090635A CN111090635A CN201911199283.6A CN201911199283A CN111090635A CN 111090635 A CN111090635 A CN 111090635A CN 201911199283 A CN201911199283 A CN 201911199283A CN 111090635 A CN111090635 A CN 111090635A
- Authority
- CN
- China
- Prior art keywords
- early warning
- warning scheme
- data source
- scheme
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 44
- 230000008859 change Effects 0.000 claims description 11
- 238000010586 diagram Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000004590 computer program Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000010365 information processing Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000007723 transport mechanism Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/252—Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
Abstract
A configuration method, a device and a computer readable storage medium of an early warning scheme comprise the following steps: acquiring an early warning scheme of a pre-configured database as a first early warning scheme; and configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme. The early warning scheme of the data source under the database and the data table under the data source is configured according to the first early warning scheme of the pre-configured database, so that the automatic configuration of the early warning scheme is realized, the labor cost is saved, and the configuration efficiency is improved.
Description
Technical Field
The present disclosure relates to information processing technologies, and in particular, to a method and an apparatus for configuring an early warning scheme, and a computer readable storage medium.
Background
With the advent of the big data era, data becomes a precious resource, and the data needs to play a practical role and ensure the quality (effectiveness, accuracy, consistency and the like) of the data.
In the related art, the architecture of data includes: the configuration of the early warning scheme is usually performed in a manual mode.
However, this method is completely dependent on manual operation, which is very labor-consuming and inefficient.
Disclosure of Invention
The application provides a configuration method and device of an early warning scheme and a computer readable storage medium, which can save labor cost and improve configuration efficiency.
The application provides a configuration method of an early warning scheme, which comprises the following steps:
acquiring an early warning scheme of a pre-configured database as a first early warning scheme;
and configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme.
The early warning scheme for configuring the data source under the database and the data table under the data source according to the first early warning scheme comprises the following steps:
and configuring the early warning scheme of the data source under the database as the first early warning scheme, and configuring the early warning scheme of the data table under the data source as the first early warning scheme.
When a second early warning scheme different from the first early warning scheme of the database exists in the first target data source under the database, configuring the early warning scheme of the data source under the database as the first early warning scheme, and configuring the early warning scheme of the data table under the data source as the first early warning scheme, the method further includes:
and changing and configuring the early warning scheme of the first target data source into the second early warning scheme, and changing and configuring the early warning scheme of the data table under the first target data source into the second early warning scheme.
When a third early warning scheme different from the second early warning scheme of the first target data source exists in the first target data table under the first target data source, the changing and configuring the early warning scheme of the first target data source into the second early warning scheme, and the changing and configuring the early warning scheme of the data table under the first target data source into the second early warning scheme further include:
and changing and configuring the early warning scheme of the first target data table into the third early warning scheme.
When a fourth early warning scheme different from the early warning scheme of the second target data source exists in the second target data table of the second target data source in the database, the configuring the early warning scheme of the data source in the database as the first early warning scheme, and configuring the early warning scheme of the data table of the data source as the first early warning scheme, the method further includes:
and changing and configuring the early warning scheme of the second target data table into the fourth early warning scheme.
The present application further provides a server, including:
the acquisition module is used for acquiring a pre-warning scheme of a pre-configured database as a first pre-warning scheme;
and the processing module is used for configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme.
The processing module is specifically configured to configure the early warning scheme of the data source in the database as the first early warning scheme, and configure the early warning scheme of the data table in the data source as the first early warning scheme.
When a second early warning scheme different from the first early warning scheme of the database exists in the first target data source under the database, the processing module is further configured to change the early warning scheme of the first target data source to be configured as the second early warning scheme, and change the early warning scheme of the data table under the first target data source to be configured as the second early warning scheme.
The application also provides a configuration device of the early warning scheme, which comprises: a processor and a memory, wherein the memory has stored therein the following commands executable by the processor:
acquiring an early warning scheme of a pre-configured database as a first early warning scheme;
and configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme.
The present application further provides a computer-readable storage medium having stored thereon computer-executable instructions for performing the steps of:
acquiring an early warning scheme of a pre-configured database as a first early warning scheme;
and configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme.
Compared with the related art, the method comprises the following steps: acquiring an early warning scheme of a pre-configured database as a first early warning scheme; and configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme. The early warning scheme of the data source under the database and the data table under the data source is configured according to the first early warning scheme of the pre-configured database, so that the automatic configuration of the early warning scheme is realized, the labor cost is saved, and the configuration efficiency is improved.
Additional features and advantages of the application will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the application. The objectives and other advantages of the application may be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
Drawings
The accompanying drawings are included to provide an understanding of the present disclosure and are incorporated in and constitute a part of this specification, illustrate embodiments of the disclosure and together with the examples serve to explain the principles of the disclosure and not to limit the disclosure.
Fig. 1 is a schematic flowchart of a configuration method of an early warning scheme according to an embodiment of the present disclosure;
fig. 2 is a schematic flowchart of a configuration method of another early warning scheme according to an embodiment of the present disclosure;
fig. 3 is a schematic configuration diagram of an early warning scheme provided in an embodiment of the present application;
fig. 4 is a schematic flowchart of a configuration method of another early warning scheme according to an embodiment of the present application;
fig. 5 is a schematic configuration diagram of another warning scheme provided in the embodiment of the present application;
fig. 6 is a schematic configuration diagram of another warning scheme provided in the embodiment of the present application;
fig. 7 is a schematic flowchart of a configuration method of another early warning scheme according to an embodiment of the present application;
fig. 8 is a schematic structural diagram of a server according to an embodiment of the present application.
Detailed Description
The present application describes embodiments, but the description is illustrative rather than limiting and it will be apparent to those of ordinary skill in the art that many more embodiments and implementations are possible within the scope of the embodiments described herein. Although many possible combinations of features are shown in the drawings and discussed in the detailed description, many other combinations of the disclosed features are possible. Any feature or element of any embodiment may be used in combination with or instead of any other feature or element in any other embodiment, unless expressly limited otherwise.
The present application includes and contemplates combinations of features and elements known to those of ordinary skill in the art. The embodiments, features and elements disclosed in this application may also be combined with any conventional features or elements to form a unique inventive concept as defined by the claims. Any feature or element of any embodiment may also be combined with features or elements from other inventive aspects to form yet another unique inventive aspect, as defined by the claims. Thus, it should be understood that any of the features shown and/or discussed in this application may be implemented alone or in any suitable combination. Accordingly, the embodiments are not limited except as by the appended claims and their equivalents. Furthermore, various modifications and changes may be made within the scope of the appended claims.
Further, in describing representative embodiments, the specification may have presented the method and/or process as a particular sequence of steps. However, to the extent that the method or process does not rely on the particular order of steps set forth herein, the method or process should not be limited to the particular sequence of steps described. Other orders of steps are possible as will be understood by those of ordinary skill in the art. Therefore, the particular order of the steps set forth in the specification should not be construed as limitations on the claims. Further, the claims directed to the method and/or process should not be limited to the performance of their steps in the order written, and one skilled in the art can readily appreciate that the sequences may be varied and still remain within the spirit and scope of the embodiments of the present application.
The embodiment of the present application provides a configuration method of an alarm scheme, as shown in fig. 1, including:
In an exemplary embodiment, the database may be one or more pre-warning schemes, which is not limited in this application.
And 102, configuring an early warning scheme of a data source under a database and a data table under the data source according to the first early warning scheme.
In one illustrative example, configuring an early warning scheme for data sources and data tables under the data sources according to a first early warning scheme comprises:
and configuring the early warning scheme of the data source under the database as a first early warning scheme, and configuring the early warning scheme of the data table under the data source as the first early warning scheme.
In an exemplary example, after a second early warning scheme different from the first early warning scheme of the database exists in the first target data source under the database, the early warning scheme of the data source under the database is configured as the first early warning scheme, and the early warning scheme of the data table under the data source is configured as the first early warning scheme, the method further includes:
and changing and configuring the early warning scheme of the first target data source into a second early warning scheme, and changing and configuring the early warning scheme of the data table under the first target data source into the second early warning scheme.
In an exemplary example, after the first target data table under the first target data source has a third warning scenario different from the second warning scenario of the first target data source, the modifying the warning scenario of the first target data source to the second warning scenario, and the modifying the warning scenario of the first target data table under the first target data source to the second warning scenario, the method further includes:
and changing and configuring the early warning scheme of the first target data table into a third early warning scheme.
In an exemplary example, when a fourth warning scheme different from the warning scheme of the second target data source exists in the second target data table of the second target data source in the database, the configuring the warning scheme of the data source in the database as the first warning scheme, and the configuring the warning scheme of the data table of the data source as the first warning scheme, the method further includes:
and changing and configuring the early warning scheme of the second target data table into a fourth early warning scheme.
According to the configuration method of the early warning scheme, the early warning scheme of the data source under the database and the early warning scheme of the data table under the data source are configured according to the first early warning scheme of the pre-configured database, so that the automatic configuration of the early warning scheme is realized, the labor cost is saved, and the configuration efficiency is improved.
The embodiment of the application provides a configuration method of an early warning scheme, wherein M is assumed to represent a data type library, L represents a data source under the database M, N represents a data table under the data source L, and O represents the early warning scheme, and the method comprises the following steps:
early warning method for first process and configuration database
The process flow diagram can be shown in fig. 2, and includes:
A schematic of this step may be that shown in fig. 3.
Secondly, configuring the early warning scheme of the data source and the data table according to the early warning scheme of the database
The process flow diagram can be shown in fig. 4, and includes:
In this step, the early warning schemes of the data sources L1 and L2 under the database M are configured as the early warning scheme of the database M, and a schematic diagram of this step may be as shown in fig. 5.
In this step, the early warning schemes of the data tables N1, N2, N3, N4 are configured as early warning schemes of the data sources L1, L2.
A schematic of this step may be that shown in fig. 6.
Third, changing the specific pre-warning scheme of configuration
The process flow diagram can be shown in fig. 7, and includes:
And step 403, changing an early warning scheme for configuring a specific data table.
The configuration method of the early warning scheme provided by the embodiment of the application comprises the steps of firstly configuring the early warning scheme of the database M, configuring the early warning scheme of the data source L under the database M as the early warning scheme of the database M, configuring the early warning scheme of the data table N under the data source L as the early warning scheme of the data source L, changing the early warning scheme of the configured data source L, changing the early warning scheme of the data table N under the data source L into the early warning scheme of the data source L instead of the early warning scheme of the database M, namely changing the configuration of the early warning scheme only enables the early warning scheme of the next stage and the early warning scheme of the current stage of the cascade connection to be the same, so that the specific early warning scheme can be configured for the specific data table, and meanwhile, the rapid configuration can be realized when the number of the data tables is.
An embodiment of the present application further provides a server, as shown in fig. 8, where the server 8 includes:
the obtaining module 81 is configured to obtain an early warning scheme of a preconfigured database as a first early warning scheme.
And the processing module 82 is used for configuring the early warning schemes of the data source and the data table under the data source according to the first early warning scheme.
In an exemplary example, the processing module 82 is specifically configured to configure the early warning scheme of the data source under the database as a first early warning scheme, and configure the early warning scheme of the data table under the data source as a first early warning scheme.
In an exemplary example, when a second warning scheme different from the first warning scheme of the database exists in the first target data source under the database, the processing module 82 is further configured to configure the warning scheme change of the first target data source as the second warning scheme, and configure the warning scheme change of the data table under the first target data source as the second warning scheme.
In an exemplary example, when a third warning scenario exists in the first target data table under the first target data source, the processing module 82 is further configured to change the warning scenario of the first target data table to a third warning scenario.
In an exemplary example, when a fourth warning scheme different from the warning scheme of the second target data source exists in the second target data table of the second target data source in the database, the processing module 82 is further configured to change the warning scheme of the second target data table to be configured as the fourth warning scheme.
According to the server provided by the embodiment of the application, the early warning schemes of the data source under the database and the data table under the data source are configured according to the first early warning scheme of the pre-configured database, so that the automatic configuration of the early warning schemes is realized, the labor cost is saved, and the configuration efficiency is improved.
In practical applications, the obtaining module 81 and the Processing module 82 are implemented by a Central Processing Unit (CPU), a microprocessor Unit (MPU), a Digital Signal Processor (DSP), a Field Programmable Gate Array (FPGA), or the like, which are located in a server.
The embodiment of the present application further provides a configuration device of an early warning scheme, including: a processor and a memory, wherein the memory has stored therein a computer program which, when executed by the processor, implements the processing of the method as set forth in any one of the above.
An embodiment of the present application further provides a storage medium, where the storage medium stores computer-executable commands, and the computer-executable commands are used for executing the processing of any one of the methods described above.
It will be understood by those of ordinary skill in the art that all or some of the steps of the methods, systems, functional modules/units in the devices disclosed above may be implemented as software, firmware, hardware, and suitable combinations thereof. In a hardware implementation, the division between functional modules/units mentioned in the above description does not necessarily correspond to the division of physical components; for example, one physical component may have multiple functions, or one function or step may be performed by several physical components in cooperation. Some or all of the components may be implemented as software executed by a processor, such as a digital signal processor or microprocessor, or as hardware, or as an integrated circuit, such as an application specific integrated circuit. Such software may be distributed on computer readable media, which may include computer storage media (or non-transitory media) and communication media (or transitory media). The term computer storage media includes volatile and nonvolatile, removable and non-removable media implemented in any method or technology for storage of information such as computer readable instructions, data structures, program modules or other data, as is well known to those of ordinary skill in the art. Computer storage media includes, but is not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, Digital Versatile Disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to store the desired information and which can accessed by a computer. In addition, communication media typically embodies computer readable instructions, data structures, program modules or other data in a modulated data signal such as a carrier wave or other transport mechanism and includes any information delivery media as known to those skilled in the art.
Claims (10)
1. A configuration method of an early warning scheme is characterized by comprising the following steps:
acquiring an early warning scheme of a pre-configured database as a first early warning scheme;
and configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme.
2. The configuration method of claim 1, wherein the configuring the pre-warning scheme of the data source and the data table under the data source according to the first pre-warning scheme comprises:
and configuring the early warning scheme of the data source under the database as the first early warning scheme, and configuring the early warning scheme of the data table under the data source as the first early warning scheme.
3. The configuration method according to claim 2, wherein when a second warning scheme different from the first warning scheme of the database exists in the first target data source under the database, the configuring the warning scheme of the data source under the database as the first warning scheme and the configuring the warning scheme of the data table under the data source as the first warning scheme further comprises:
and changing and configuring the early warning scheme of the first target data source into the second early warning scheme, and changing and configuring the early warning scheme of the data table under the first target data source into the second early warning scheme.
4. The configuration method according to claim 3, wherein when a third warning scenario exists in the first target data table under the first target data source, the third warning scenario being different from the second warning scenario of the first target data source, the changing the warning scenario of the first target data source to the second warning scenario and the changing the warning scenario of the first target data table to the second warning scenario further comprise:
and changing and configuring the early warning scheme of the first target data table into the third early warning scheme.
5. The configuration method according to claim 2, wherein when a fourth warning scheme different from the warning scheme of the second target data source exists in the second target data table of the second target data source in the database, the configuring the warning scheme of the data source in the database as the first warning scheme and the configuring the warning scheme of the data table of the data source as the first warning scheme further comprises:
and changing and configuring the early warning scheme of the second target data table into the fourth early warning scheme.
6. A server, comprising:
the acquisition module is used for acquiring a pre-warning scheme of a pre-configured database as a first pre-warning scheme;
and the processing module is used for configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme.
7. The server according to claim 6, wherein the processing module is specifically configured to configure an early warning scheme of a data source in the database as the first early warning scheme, and configure an early warning scheme of a data table in the data source as the first early warning scheme.
8. The server according to claim 7, wherein when a second warning scheme different from the first warning scheme of the database exists in the first target data source under the database, the processing module is further configured to change the warning scheme of the first target data source to the second warning scheme, and change the warning scheme of the data table under the first target data source to the second warning scheme.
9. An arrangement for configuring an early warning scheme, comprising: a processor and a memory, wherein the memory has stored therein the following commands executable by the processor:
acquiring an early warning scheme of a pre-configured database as a first early warning scheme;
and configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme.
10. A computer-readable storage medium having computer-executable instructions stored thereon for performing the steps of:
acquiring an early warning scheme of a pre-configured database as a first early warning scheme;
and configuring the early warning schemes of the data source under the database and the data table under the data source according to the first early warning scheme.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911199283.6A CN111090635B (en) | 2019-11-29 | 2019-11-29 | Configuration method and device of early warning scheme and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911199283.6A CN111090635B (en) | 2019-11-29 | 2019-11-29 | Configuration method and device of early warning scheme and computer readable storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111090635A true CN111090635A (en) | 2020-05-01 |
CN111090635B CN111090635B (en) | 2023-11-07 |
Family
ID=70393789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911199283.6A Active CN111090635B (en) | 2019-11-29 | 2019-11-29 | Configuration method and device of early warning scheme and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111090635B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101541021A (en) * | 2008-03-18 | 2009-09-23 | 中国移动通信集团天津有限公司 | Method for automatically generating capacity-warning reports |
CN104063468A (en) * | 2014-06-27 | 2014-09-24 | 北京思特奇信息技术股份有限公司 | Data report automatic generating and extracting method and device |
CN104281704A (en) * | 2014-10-22 | 2015-01-14 | 新华瑞德(北京)网络科技有限公司 | Database data copying method and device |
US20150199395A1 (en) * | 2014-01-15 | 2015-07-16 | International Business Machines Corporation | Enabling collaborative development of a database application across multiple database management systems |
CN106649226A (en) * | 2015-10-29 | 2017-05-10 | 北京国双科技有限公司 | Report generation method and device |
CN107678907A (en) * | 2017-05-22 | 2018-02-09 | 平安科技(深圳)有限公司 | Database business logic monitoring method, system and storage medium |
CN109542907A (en) * | 2018-11-21 | 2019-03-29 | 万兴科技股份有限公司 | Database caches construction method, device, computer equipment and storage medium |
CN109656927A (en) * | 2018-12-24 | 2019-04-19 | 成都四方伟业软件股份有限公司 | Tables of data method for early warning and device |
CN109814895A (en) * | 2018-11-29 | 2019-05-28 | 广州因特信息科技有限公司 | A kind of database update method and system of automation |
-
2019
- 2019-11-29 CN CN201911199283.6A patent/CN111090635B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101541021A (en) * | 2008-03-18 | 2009-09-23 | 中国移动通信集团天津有限公司 | Method for automatically generating capacity-warning reports |
US20150199395A1 (en) * | 2014-01-15 | 2015-07-16 | International Business Machines Corporation | Enabling collaborative development of a database application across multiple database management systems |
CN104063468A (en) * | 2014-06-27 | 2014-09-24 | 北京思特奇信息技术股份有限公司 | Data report automatic generating and extracting method and device |
CN104281704A (en) * | 2014-10-22 | 2015-01-14 | 新华瑞德(北京)网络科技有限公司 | Database data copying method and device |
CN106649226A (en) * | 2015-10-29 | 2017-05-10 | 北京国双科技有限公司 | Report generation method and device |
CN107678907A (en) * | 2017-05-22 | 2018-02-09 | 平安科技(深圳)有限公司 | Database business logic monitoring method, system and storage medium |
CN109542907A (en) * | 2018-11-21 | 2019-03-29 | 万兴科技股份有限公司 | Database caches construction method, device, computer equipment and storage medium |
CN109814895A (en) * | 2018-11-29 | 2019-05-28 | 广州因特信息科技有限公司 | A kind of database update method and system of automation |
CN109656927A (en) * | 2018-12-24 | 2019-04-19 | 成都四方伟业软件股份有限公司 | Tables of data method for early warning and device |
Also Published As
Publication number | Publication date |
---|---|
CN111090635B (en) | 2023-11-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102125177B1 (en) | Blockchain-based data processing method and device | |
US20170161297A1 (en) | Data synchronization in a storage network | |
CN109714188B (en) | Configuration data management method, device and storage medium based on Zookeeper | |
US20170201566A1 (en) | File downloading method, apparatus, and terminal device | |
US20200019559A1 (en) | Synchronizing object in local object storage node | |
CN104267980A (en) | Software score display method, terminal, data server and system | |
CN109391512A (en) | A kind of service issuing method, device and electronic equipment | |
CN110569224A (en) | Data deduplication method and device | |
CN111143331A (en) | Data migration method and device and computer storage medium | |
CN103150253A (en) | Method and system for duration performance testing | |
CN110717050B (en) | Knowledge graph database access method and device | |
CN110765151A (en) | Calculation formula processing method and device | |
CN116521956A (en) | Graph database query method and device, electronic equipment and storage medium | |
CN110895544B (en) | Interface data processing method, device, system and storage medium | |
CN109388644B (en) | Data updating method and device | |
CN111090635B (en) | Configuration method and device of early warning scheme and computer readable storage medium | |
CN110674171A (en) | Script generation method and device and data processing method and device | |
CN111737369A (en) | Relationship map updating method and device and storage medium | |
US10901972B2 (en) | Table partition configuration method, apparatus and system for database system | |
CN108881367B (en) | Service request processing method, device and equipment | |
CN111782641B (en) | Data error repairing method and system | |
CN111246214A (en) | Video decoding method and device | |
CN114691175A (en) | Application updating method, device and system | |
CN108763498B (en) | User identity identification method and device, electronic equipment and readable storage medium | |
CN111274410A (en) | Data storage method and device and data query method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |