CN111080051A - 一种配电网设备运行自动比较方法 - Google Patents
一种配电网设备运行自动比较方法 Download PDFInfo
- Publication number
- CN111080051A CN111080051A CN201911012677.6A CN201911012677A CN111080051A CN 111080051 A CN111080051 A CN 111080051A CN 201911012677 A CN201911012677 A CN 201911012677A CN 111080051 A CN111080051 A CN 111080051A
- Authority
- CN
- China
- Prior art keywords
- index
- indicators
- equipment
- calculating
- matrix
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 239000011159 matrix material Substances 0.000 claims abstract description 21
- 238000011156 evaluation Methods 0.000 claims abstract description 20
- 239000003245 coal Substances 0.000 claims description 9
- 230000007613 environmental effect Effects 0.000 claims description 3
- 230000004048 modification Effects 0.000 claims description 3
- 238000012986 modification Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 9
- 230000005611 electricity Effects 0.000 description 9
- 230000009466 transformation Effects 0.000 description 6
- 238000010248 power generation Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000002407 reforming Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911012677.6A CN111080051A (zh) | 2019-10-23 | 2019-10-23 | 一种配电网设备运行自动比较方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911012677.6A CN111080051A (zh) | 2019-10-23 | 2019-10-23 | 一种配电网设备运行自动比较方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111080051A true CN111080051A (zh) | 2020-04-28 |
Family
ID=70310560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911012677.6A Pending CN111080051A (zh) | 2019-10-23 | 2019-10-23 | 一种配电网设备运行自动比较方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111080051A (zh) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101968864A (zh) * | 2010-11-17 | 2011-02-09 | 山东电力研究院 | 以电力系统运行可靠性为中心的设备重要性评价方法 |
CN109214702A (zh) * | 2018-09-21 | 2019-01-15 | 东北电力大学 | 基于ahp-熵权法的城市配电网运行水平和供电能力模糊综合评价方法 |
-
2019
- 2019-10-23 CN CN201911012677.6A patent/CN111080051A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101968864A (zh) * | 2010-11-17 | 2011-02-09 | 山东电力研究院 | 以电力系统运行可靠性为中心的设备重要性评价方法 |
CN109214702A (zh) * | 2018-09-21 | 2019-01-15 | 东北电力大学 | 基于ahp-熵权法的城市配电网运行水平和供电能力模糊综合评价方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Georgilakis et al. | Reliability and economic evaluation of small autonomous power systems containing only renewable energy sources | |
CN103034961B (zh) | 一种电网节能水平的判定方法 | |
CN103426122A (zh) | 一种微电网综合评价方法 | |
CN104966147A (zh) | 一种考虑基态和事故态的电网运行风险分析方法 | |
CN102708426B (zh) | 含电动汽车充电设施的智能小区供电容量规划系统及方法 | |
CN102800032A (zh) | 一种可再生能源分布式发电运营模式的成本效益分析方法 | |
CN106961116A (zh) | 需求侧光储一体化微电网系统 | |
CN109038678A (zh) | 基于大数据的园区分布式能源智能管控系统 | |
Xu et al. | Implementation of repowering optimization for an existing photovoltaic‐pumped hydro storage hybrid system: A case study in Sichuan, China | |
CN105760993A (zh) | 一种多源接入主动配电网评估方法 | |
CN106786549A (zh) | 一种基于智能配电网成本效益模型的综合效益分析法 | |
CN105608635A (zh) | 一种基于峰谷电价的区域电网经济调度系统及方法 | |
Nunna et al. | Optimal management of microgrids | |
Pinceti et al. | Technical KPIs for microgrids | |
CN109377088A (zh) | 智能电网规划的新型评价方法 | |
CN111080051A (zh) | 一种配电网设备运行自动比较方法 | |
Yang et al. | Comprehensive evaluation of distribution network reliability for power consumer based on AHP and entropy combination method | |
Crosara et al. | Generation adequacy in the Nordic and Baltic area: The potential of flexible residential electric heating | |
CN110429593A (zh) | 一种考虑电动汽车充电需求的配电最优容载比确定方法 | |
Chen et al. | Evaluation indices set and decision-making method for regional “coal to electricity” optimal development mode | |
CN110718913B (zh) | 一种居民低电压溯源方法及系统 | |
Yu et al. | Comprehensive Benefit Evaluation of Distributed Photovoltaic Power Generation System with DC Interconnection Based on Benefit-Cost Ratio | |
Li et al. | Power optimization and peak shaving strategies for offshore wind power and hydrogen production systems | |
Sam | Post-implementation review of the net metering policy in Namibia and design of distributed generation hosting capacity algorithm | |
CN201126592Y (zh) | 用于电力系统设备的lcc控制装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200723 Address after: 102200 Beijing Changping District Future Science and Technology City Riverside Avenue 18 A Building 5 and 6 floors Applicant after: STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE Co.,Ltd. Applicant after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co. Applicant after: NORTH CHINA ELECTRIC POWER University Applicant after: ECONOMIC RESEARCH INSTITUTE OF STATE GRID SHANXI ELECTRIC POWER Co. Address before: 102200 Beijing Changping District Future Science and Technology City Riverside Avenue 18 A Building 5 and 6 floors Applicant before: STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE Co.,Ltd. Applicant before: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co. Applicant before: NORTH CHINA ELECTRIC POWER University |
|
TA01 | Transfer of patent application right | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20200428 |
|
WD01 | Invention patent application deemed withdrawn after publication |