CN111030186A - Prevent to mistake and close return circuit of generator outlet switch - Google Patents

Prevent to mistake and close return circuit of generator outlet switch Download PDF

Info

Publication number
CN111030186A
CN111030186A CN201911324412.XA CN201911324412A CN111030186A CN 111030186 A CN111030186 A CN 111030186A CN 201911324412 A CN201911324412 A CN 201911324412A CN 111030186 A CN111030186 A CN 111030186A
Authority
CN
China
Prior art keywords
generator
outlet switch
switching
test
loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911324412.XA
Other languages
Chinese (zh)
Inventor
邹科
李平
胡镇良
俸梅
邓晓春
敖富荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longtan Hydropower Development Co Ltd Longtan Hydroelectric Power Plant
Guangxi Guiguan Electric Power Co ltd
Original Assignee
Longtan Hydropower Development Co Ltd Longtan Hydroelectric Power Plant
Guangxi Guiguan Electric Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longtan Hydropower Development Co Ltd Longtan Hydroelectric Power Plant, Guangxi Guiguan Electric Power Co ltd filed Critical Longtan Hydropower Development Co Ltd Longtan Hydroelectric Power Plant
Priority to CN201911324412.XA priority Critical patent/CN111030186A/en
Publication of CN111030186A publication Critical patent/CN111030186A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/40Synchronising a generator for connection to a network or to another generator

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The invention discloses a loop for preventing a generator outlet switch from being switched on by mistake, which is an improvement on a traditional generator outlet switch switching-on loop and comprises the following steps: (1) a switching-on loop of a generator outlet switch is connected at the joint of a relay 1 and a relay 2 of a unit test switching-on J7, a pressing plate LB1 is added, LB1 is in a quitting state at ordinary times, when the unit switching-on test is to be carried out, LB1 is put into the unit switching-on test by an operator, and LB1 quits after the test is finished; (2) and opening a relay J0 when the rotating speed of the generator is increased by 95% at the LCU, and connecting 1 and 2 nodes of J0 in series into 1 and 2 nodes of XJ5 to form a synchronous closing loop of the generator. The loop of the invention has safe and reliable design, is scientific and reasonable, has low modification cost, can effectively avoid the impact problem of the generator caused by the false switching-on of the outlet switch when the generator is in a shutdown hot standby state, protects the generator set and prolongs the service life of the generator set.

Description

Prevent to mistake and close return circuit of generator outlet switch
Technical Field
The invention belongs to the technical field of hydroelectric power generation control loops, and particularly relates to a loop for preventing a generator outlet switch from being mistakenly closed.
Background
The generator is switched on by mistake in the shutdown hot standby state, the impact on the generator is huge, the performance of a light generator is reduced, the service life of the generator is shortened, and the heavy generator is damaged, thereby causing great economic loss to the country. The traditional design of a closing loop of an outlet switch of a generator is composed of two branches, one branch is controlled by a generator synchronization device, when the generator meets synchronization conditions, an XJ5 relay acts, and the junction of an XJ5 relay 1 and a junction of the XJ5 relay 2 is connected with the closing loop of the outlet switch of the generator; the other is that the generator computer monitors a set test closing instruction controlled by the local LCU, the J7 relay acts, and the joint of the J7 relay 1 and the J7 relay 2 is connected with a closing loop of an outlet switch of the generator; when some hydroelectric station generators are in a shutdown hot standby state, because the junction of XJ5 relays 1 and 2 is opened by mistake, the junction of J7 relays 1 and 2 is opened by mistake, or the J7 is operated by mistake during the switching-on period of the unit test, the switch of the generator is switched on by mistake, and the problem of impact on the generator is occasionally caused, so that the technical solution is necessary.
Disclosure of Invention
The invention aims to provide a loop which is safe and reliable, scientific and reasonable in design, low in modification cost and capable of preventing the generator outlet switch from being mistakenly closed, aiming at the defects in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme:
a prevent that mistake from closing return circuit of generator exit switch is to improve on traditional generator exit switch closes the return circuit, includes:
(1) a switching-on loop of a generator outlet switch is connected at the joint of a relay 1 and a relay 2 of a unit test switching-on J7, a pressing plate LB1 is added, LB1 is in a quitting state at ordinary times, when the unit switching-on test is to be carried out, LB1 is put into the unit switching-on test by an operator, and LB1 quits after the test is finished;
(2) and opening a relay J0 when the rotating speed of the generator is increased by 95% at the LCU, and connecting 1 and 2 nodes of J0 in series into 1 and 2 nodes of XJ5 to form a synchronous closing loop of the generator.
The 95% of the rotating speed of the generator is also an excitation signal for starting the generator at the same time, and the time from the excitation signal for starting the generator at the 95% of the rotating speed of the generator at the same time to the synchronization success of the generator is generally about 100 seconds.
The invention has the advantages that:
the control loop redesigned by the invention is safe, reliable, scientific and reasonable, has low modification cost, can effectively avoid the impact problem of the generator caused by the mistaken closing of the outlet switch when the generator is in the shutdown hot standby state, protects the generator set and prolongs the service life of the generator set.
Drawings
FIG. 1 is a schematic diagram of a circuit for designing a closing circuit of an outlet switch of a conventional generator;
FIG. 2 is a schematic diagram of a circuit for loop design according to an embodiment of the present invention.
Detailed Description
The invention is further described below with reference to the accompanying drawings.
Example (b):
as shown in fig. 2, a circuit for preventing the generator outlet switch from being erroneously turned on is an improvement on a conventional generator outlet switch closing circuit, and includes:
(1) a switching-on loop of a generator outlet switch is connected at the joint of a relay 1 and a relay 2 of a unit test switching-on J7, a pressing plate LB1 is added, LB1 is in a quitting state at ordinary times, when the unit switching-on test is to be carried out, LB1 is put into the unit switching-on test by an operator, and LB1 quits after the test is finished;
(2) and opening a relay J0 when the rotating speed of the generator is increased by 95% at the LCU, and connecting 1 and 2 nodes of J0 in series into 1 and 2 nodes of XJ5 to form a synchronous closing loop of the generator.
The 95% of the rotating speed of the generator is also an excitation signal for starting the generator at the same time, and the time from the excitation signal for starting the generator at the 95% of the rotating speed of the generator at the same time to the synchronization success of the generator is generally about 100 seconds.
A certain hydraulic power plant is used for performing peak frequency modulation on a power grid, 7 700MW hydraulic generators are used, the average standby time of each unit in 2018 is 3894.56h, namely, the hydraulic power plant is shut down for standby about 10.67h each day. The synchronous successful grid connection of the generator from 95% of the rotation speed to the generator is generally about 100 seconds, so that the fault occurrence rate of mistakenly closing the outlet switch of the generator can be reduced by 99.74%.
It should be noted that the above-mentioned embodiments are only for illustrating the technical concept and features of the present invention, and the purpose of the present invention is to enable those skilled in the art to understand the content of the present invention and implement the present invention, and not to limit the protection scope of the present invention. All equivalent changes and modifications made according to the spirit of the present invention should be covered within the protection scope of the present invention.

Claims (2)

1. The utility model provides a prevent to miss return circuit that closes generator outlet switch improves on traditional generator outlet switch closes the return circuit, its characterized in that includes:
(1) a switching-on loop of a generator outlet switch is connected at the joint of a relay 1 and a relay 2 of a unit test switching-on J7, a pressing plate LB1 is added, LB1 is in a quitting state at ordinary times, when the unit switching-on test is to be carried out, LB1 is put into the unit switching-on test by an operator, and LB1 quits after the test is finished;
(2) and opening a relay J0 when the rotating speed of the generator is increased by 95% at the LCU, and connecting 1 and 2 nodes of J0 in series into 1 and 2 nodes of XJ5 to form a synchronous closing loop of the generator.
2. The circuit for preventing false-closing of a generator outlet switch according to claim 1, wherein: the 95% of the rotating speed of the generator is also an excitation signal for starting the generator at the same time, and the time from the excitation signal for starting the generator at the 95% of the rotating speed of the generator at the same time to the synchronization success of the generator is generally 100 seconds.
CN201911324412.XA 2019-12-20 2019-12-20 Prevent to mistake and close return circuit of generator outlet switch Pending CN111030186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911324412.XA CN111030186A (en) 2019-12-20 2019-12-20 Prevent to mistake and close return circuit of generator outlet switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911324412.XA CN111030186A (en) 2019-12-20 2019-12-20 Prevent to mistake and close return circuit of generator outlet switch

Publications (1)

Publication Number Publication Date
CN111030186A true CN111030186A (en) 2020-04-17

Family

ID=70211173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911324412.XA Pending CN111030186A (en) 2019-12-20 2019-12-20 Prevent to mistake and close return circuit of generator outlet switch

Country Status (1)

Country Link
CN (1) CN111030186A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431229A (en) * 2008-12-05 2009-05-13 浙江省电力公司 Asynchronous switch-on protection method for generator set
CN103647306A (en) * 2013-12-10 2014-03-19 龙滩水电开发有限公司 Automatic quasi-synchronization closing loop for preventing generator nonsynchronous closing
CN107086667A (en) * 2017-06-08 2017-08-22 国电大渡河流域水电开发有限公司 A kind of outlet breaker closing circuit structure and its method of work

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431229A (en) * 2008-12-05 2009-05-13 浙江省电力公司 Asynchronous switch-on protection method for generator set
CN103647306A (en) * 2013-12-10 2014-03-19 龙滩水电开发有限公司 Automatic quasi-synchronization closing loop for preventing generator nonsynchronous closing
CN107086667A (en) * 2017-06-08 2017-08-22 国电大渡河流域水电开发有限公司 A kind of outlet breaker closing circuit structure and its method of work

Similar Documents

Publication Publication Date Title
CN107465255B (en) A kind of Turbo-generator Set accident starting auxiliary Power switching method and system
CN203747436U (en) Distributed photovoltaic power generation access system
CN111835031A (en) Wind generating set converter network side circuit breaker and machine side switch control strategy
CN110474595A (en) A kind of air blower main oil pump control switching circuit and booting, method for handover control
CN104377729A (en) Reverse power protection method applicable to self-generation self-use grid-connection mode distributed photovoltaic power station
CN203301225U (en) Control device based on security-section interlocking self-switchover of gas-steam combined unit
CN113113937B (en) Excitation system of hydropower station black start unit and grid-connected signal input and removal method
CN204312302U (en) A kind of control cabinet for generator cooling-water pump
CN111030186A (en) Prevent to mistake and close return circuit of generator outlet switch
CN116608083A (en) Automatic operation flow of hydroelectric generating set from cold standby to overhauling and draining to volute and tail horizontal pressure monitoring system
CN110854901A (en) Black start method of wind generating set
CN105244906A (en) Standby state control method, device and system for wind driven generator converter
CN214626500U (en) Black start system
CN107086662B (en) A kind of control method of wind power plant distribution yaw backup power system
CN208142816U (en) Protect pressing plate automatic switching device
CN209104790U (en) Low-voltage variable-frequency motor cooling blower electric control circuit
CN202326142U (en) Secondary net water pump electronic-control device for intelligent heat exchange unit
CN112803580A (en) Security power supply system with outlet circuit breaker and double-gas-turbine configuration and working method thereof
CN111384707B (en) Nuclear power plant ultrahigh voltage combined switch station supplementary tripping device and method
CN208489690U (en) A kind of become based on high factory has the voltage-regulating system for carrying transformer
CN202084985U (en) Self-startup power supply apparatus
CN112327160A (en) Hydropower station black start simulation test system and method of plant hydraulic generator
CN207753453U (en) A kind of ship connects electric phase sequence automatic conversion and open phase protection
CN206226107U (en) A kind of industrial undisturbed safety control
CN216312743U (en) Security power supply system with outlet circuit breaker and double-gas turbine configuration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200417

RJ01 Rejection of invention patent application after publication