Method for testing cold control power-off time fixed value of transformer cooler Download PDF

Info

Publication number
CN111025069A
CN111025069A CN201911388549.1A CN201911388549A CN111025069A CN 111025069 A CN111025069 A CN 111025069A CN 201911388549 A CN201911388549 A CN 201911388549A CN 111025069 A CN111025069 A CN 111025069A
Authority
CN
China
Prior art keywords
control power
cold control
time
fixed value
cold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911388549.1A
Other languages
Chinese (zh)
Other versions
CN111025069B (en
Inventor
王世祥
袁志军
谷斌
吴海涛
陈宇晖
修荣堃
康鑫
肖硕霜
苏桂香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201911388549.1A priority Critical patent/CN111025069B/en
Publication of CN111025069A publication Critical patent/CN111025069A/en
Application granted granted Critical
Publication of CN111025069B publication Critical patent/CN111025069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/003Environmental or reliability tests

Abstract

The invention provides a method for testing the fixed value of the cold control power-off time of a transformer cooler, which comprises the steps of triggering a first preset circuit connection condition after a testing environment is ready, enabling a cold control power-off power supply loop, a cold control power-off control loop and a cold control power-off time fixed value setting logic circuit to be connected, and obtaining the time length from the triggering to the tripping of a cold control power-off fixed delay device to calculate the delay fixed value of a time relay on the cold control power-off control loop; if the delay fixed value of the time relay is not 0, the delay fixed value is adjusted to be 0, then a second preset circuit connection condition is continuously triggered, and the time from the triggering to the tripping of the cold control power-off delay relay is obtained to calculate the delay fixed value of the cold control power-off delay relay; if the delay fixed value of the cold control power-off delay relay is less than or equal to the setting time, the standard is reached; otherwise, the regulation is needed when the standard is not reached. By implementing the method, the cold control power-off time fixed value of the transformer cooler is effectively monitored and ensured to be less than or equal to the setting time of the full stop of the transformer cooler.

Description

Method for testing cold control power-off time fixed value of transformer cooler
Technical Field
The invention relates to the technical field of transformer testing, in particular to a method for testing the fixed value of cold control power-off time of a transformer cooler.
Background
Fig. 1 is a schematic diagram of the external primary side wiring of the transformer. This transformer links to each other through three side circuit breaker 1DL, 2DL, 3DL combined floodgates and corresponding isolator 1G, 2G, 3G and different generating lines respectively and realizes the vary voltage power supply, however in case the oil temperature can rise fast after the transformer is inside to break down, if the fault phenomenon and the time maintenance of cutting off all coolers also appear in cooling system this moment for a long time, then can lead to the transformer to seriously damage.
According to DL/T572-95 Power Transformer operating regulations: and when all coolers are cut off due to faults of a cooling system, the transformer is allowed to operate for 20min with rated load. If the top oil temperature has not reached 75 ℃ after 20min, the temperature is allowed to rise to 75 ℃, but the maximum time for operating in this state must not exceed 60 min. Therefore, it is necessary to study the principle of cold-controlled power loss of the transformer cooler.
In the prior art, as shown in fig. 2 to 4, the working principle diagrams of a transformer cooler cold control power-off power supply loop, a control loop and a time constant setting logic circuit are respectively shown, in fig. 2, a cooler I, II group power supply conversion handle SS is arranged in a first group power supply to work (① - ② contacts are on and ⑤ - ⑥ contacts are off when the first group power supply works), at this time, a 380V power supply can be switched on through a normally closed contact KMJ2 of an alternating current contactor KMS2 (at this time, an excitation coil of an alternating current contactor KMS2 is demagnetized) and an excitation coil of an alternating current contactor KMS1 (at this time, the normally closed contact KMS1 is started and the normally closed contact KMJ1 thereof is opened), then a manual switch in the fig. 3 is switched on (at the working time, 1-1 is switched on), and the normally closed contacts QF 72, QF, the normally closed contacts of three-side circuit breakers 1DL, 2DL and 3DL are respectively connected in series to make the normally closed contacts QF1, the normally closed contacts of the normally closed contacts QF, the normally closed contacts of the three-side circuit breakers 1, the three-side circuit breakers 1-DL, the normally closed contacts QF-open contacts are respectively connected to make the normally closed contacts of the intermediate KMS, so that the intermediate KMS cold control contactor KMS cold control contactor KMS cold power breaker KMS cold contactor KMS, the cold contactor KMS, the cold contactor KMS 72, the cold contactor KMS cold.
However, field workers are often unfamiliar with the fixed value of the cold control power-off time (for example, the cold control power-off delay relay TLKSD can be set to 60min delay and the time relay KT11 can be set to 20min delay), so that the setting time (60min) of the transformer cooler full stop is often exceeded during switching operation of the control words SW 7-SW 9, and the three-side circuit breakers 1DL, 2DL and 3DL are not tripped or delayed to trip during operation under the high temperature of the transformer for a long time, so that potential safety hazards of transformer temperature rise, ignition, explosion and the like are caused. For example, when a worker is put into operation, the control word SW9 is put in (for example, the control word "1") and the control word SW8 and the control word SW7 are both put out (for example, the control word "0"), even if the delay time of the cold control power-off delay relay TLKSD is set to "0 min", the delay time of the transformer cooler cold control power-off outlet tripping is also caused to be overlong, namely, under the condition that the oil temperature is high, 80min of 20min of the time relay KT11 plus 60min of the cold control power-off fixed delay device LKD60 is required, and the setting time is 60min after the transformer cooler is completely stopped; for another example, when the worker is put into operation, the control word SW9 is withdrawn, the control word SW7 and the control word SW8 are put into operation, and meanwhile, the delay time of the cold control power-off delay relay TLKSD is set to be 60min, so that the delay time of tripping the cold control power-off outlet of the transformer cooler is excessively long, under the condition that the oil temperature is high, the time of at least 20min of the time relay KT11 plus 60min of the cold control power-off delay relay TLKSD is 80min, and the time exceeds the setting time of the transformer cooler when the cold control power-off is completely stopped for 60 min; for another example, when the operator is in operation, the control word SW9 and the control word SW8 are exited, the control word SW7 is entered, and the cold-controlled power-off delay relay TLKSD is set to "60 min", at this time, the transformer cooler is too long in cold-controlled power-off and the cold-controlled power-off trip relay LKSDTZ does not exit the trip because the control word SW8 is not entered, which causes the and circuit (the symbol &shownin fig. 4) to be locked.
Therefore, a method for testing the cold control power-off time fixed value of the transformer cooler is urgently needed, the cold control power-off time fixed value of the transformer cooler is effectively monitored, and the setting time which is less than or equal to the full stop of the transformer cooler is ensured, so that the problem that three side circuit breakers of the transformer do not trip or trip in a delayed mode when the transformer runs at a high temperature for a long time is solved, and the running safety of a power grid is improved.
Disclosure of Invention
The technical problem to be solved by the embodiment of the invention is to provide a method for testing the fixed value of the cold control power-off time of the transformer cooler, which can effectively monitor the fixed value of the cold control power-off time of the transformer cooler and ensure the fixed time less than or equal to the full stop of the transformer cooler, thereby avoiding the problem that a three-side circuit breaker of the transformer does not trip or trips in a delayed manner when the transformer runs at a high temperature for a long time and improving the running safety of a power grid.
In order to solve the above technical problem, an embodiment of the present invention provides a method for testing a cold control power-off time fixed value of a transformer cooler, which is used for a transformer that supplies power to three buses through a three-sided circuit breaker and a corresponding disconnecting switch, and the transformer has a cold control power-off power supply loop, a cold control power-off control loop and a cold control power-off time fixed value setting logic circuit, wherein the method tests a delay fixed value of a time relay on the cold control power-off control loop and a delay fixed value of a cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit, and includes the following steps:
after the test environment is detected to be ready, triggering a first preset circuit connection condition to enable the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit to be connected, and acquiring a fixed delay fixed value of a cold control power-off fixed delay device on the cold control power-off time fixed value setting logic circuit to enable the whole time length at the moment of cold control power-off tripping to serve as a first test time length when the first preset circuit connection condition is triggered to pass through the delay fixed value of a time relay on the cold control power-off control loop to finally pass through the fixed delay fixed value of the cold control power-off fixed delay device on the cold control power-off time fixed value setting logic circuit;
taking the difference obtained by calculating the obtained first test duration and the fixed delay fixed value on the cold control power-off fixed delay device as the delay fixed value of the time relay on the cold control power-off control loop;
if the delay fixed value of the time relay on the cold control power-off control loop is judged not to be 0, the cold control power-off time of the transformer cooler is judged not to reach the standard, after the delay fixed value of the time relay on the cold control power-off control loop is required to be adjusted to be 0, a second preset circuit connection condition is continuously triggered, the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit are all connected again, the second preset circuit connection condition is obtained, the whole time length at the moment of cold control power-off tripping is finally realized through the delay fixed value of the time relay on the cold control power-off control loop to the delay fixed value of the cold control power-off time delay relay on the cold control power-off time setting logic circuit, and the whole time length at the moment of cold control power-off tripping is used as a second test time length;
if the obtained second test time length is judged to be less than or equal to the preset setting time of the full stop of the transformer cooler, the delay fixed value of the time relay on the cold control power-off control loop and the delay fixed value of the cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit are judged to reach the standard; and otherwise, determining that only the delay fixed value of the cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit does not reach the standard, and further adjusting the delay fixed value to be less than or equal to the preset setting time of the full stop of the transformer cooler.
Wherein the test environment ready specifically includes the following conditions:
the three-side circuit breaker and the disconnecting switches correspondingly connected with the three buses are all in a disconnected state;
the three side breakers are all in a closing state; and
and the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit all complete correct wiring, and all the parts are normal.
The first preset circuit connection condition is specifically as follows:
the following actions can be completed at the same trigger time: all alternating current contactors on the cold control power-loss power supply loop lose magnetism, and a power supply conversion handle on the cold control power-loss power supply loop can be connected with a group of power supplies to work; a manual switch on the cold control power loss control loop is intelligently closed; and a temperature sensing contact on the cold control power-off time fixed value setting logic circuit is closed, a cold control power-off delay 60-minute trip control word is set to be 1, cold control power-off is set to be 0 through an oil temperature high locking control word, and a cold control power-off protection input control word is set to be 0, so that the cold control power-off time fixed value setting logic circuit realizes the trip of the cold control power-off trip relay only through the fixed delay fixed value of the cold control power-off fixed delay device.
The second preset circuit connection condition is specifically as follows:
the following actions can be completed at the same trigger time: all alternating current contactors on the cold control power-loss power supply loop lose magnetism, and a power supply conversion handle on the cold control power-loss power supply loop can be connected with a group of power supplies to work; a manual switch on the cold control power loss control loop is intelligently closed; and a temperature sensing contact on the cold control power-off time fixed value setting logic circuit is closed, a 60-minute cold control power-off delay tripping control word is set to be 0, cold control power-off is set to be 1 through an oil temperature high locking control word, and a cold control power-off protection input control word is set to be 1, so that the cold control power-off time fixed value setting logic circuit realizes the tripping of the cold control power-off tripping relay only through the delay fixed value of the cold control power-off delay relay.
And the fixed delay fixed value on the cold control power-off fixed delay device is the same as the preset setting time of the transformer cooler full stop.
And the preset setting time of the full stop of the transformer cooler is 60 min.
The embodiment of the invention has the following beneficial effects:
according to the invention, the delay fixed value of the time relay on the cold control power-off control loop and the delay fixed value of the cold control power-off delay relay on the cold control power-off fixed value setting logic circuit are monitored to realize effective monitoring of the cold control power-off fixed value of the transformer cooler and ensure the setting time less than or equal to the full stop of the transformer cooler, so that the problem that the three-side circuit breaker of the transformer does not trip or trips in a delay manner when the transformer runs at a high temperature for a long time is avoided, and the running safety of a power grid is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is within the scope of the present invention for those skilled in the art to obtain other drawings based on the drawings without creative efforts.
FIG. 1 is a schematic diagram of a primary external connection of a transformer in the prior art;
FIG. 2 is a schematic diagram of a prior art cold-control power-loss power supply circuit of a transformer cooler;
FIG. 3 is a schematic diagram of a prior art transformer cooler cold control power loss control loop;
FIG. 4 is a schematic diagram of a logic circuit for setting a cold control power-off time setting value of a transformer cooler in the prior art;
fig. 5 is a flowchart of a method for testing a cold control power-off time fixed value of a transformer cooler according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 5, the method for testing the cold control power-off time fixed value of the transformer cooler provided in the embodiment of the present invention is applied to an existing transformer (as shown in fig. 1) that supplies power to three buses through a three-sided circuit breaker and a corresponding disconnecting switch, and the transformer has a cold control power-off power supply loop, a cold control power-off control loop, and a cold control power-off time fixed value setting logic circuit; wherein the content of the first and second substances,
the cold control power-loss power circuit (as shown in fig. 2) comprises two sets of 380V alternating current power supplies (N is a public end), resistors F1 and F2 are arranged in the alternating current circuit, a power supply conversion handle SS, two alternating current contactors KMS1 and KMS2, wherein when the first set of power supplies work, contacts of the power supply conversion handles SS ① - ② are on and contacts of ⑤ - ⑥ are off, when the second set of power supplies work, contacts of the power supply conversion handles SS ① - ② are off and contacts of ⑤ - ⑥ are on, a normally closed contact KMJ1 of an alternating current contactor KMS1 is connected with an excitation coil of the alternating current contactor KMS2 in series, and a normally closed contact KMJ2 of the alternating current contactor KMS2 is connected with an excitation coil of the alternating current contactor KMS1 in series;
the cold control power-loss control loop (shown in figure 3) comprises a manual switch ST (switched on when in work ① - ②), an alternating current power supply fuse QF, three-side transformer breakers DL1, DL2 and DL3 (shown in figure 1), normally-open contacts QF1, QF2, QF3, a middle relay K for automatic cooler control, a time relay KT11 and a middle relay K11 for cold control power-loss full stop of a transformer cooler, wherein when the three-side breakers 1DL, 2DL and 3DL are switched on, the normally-open contacts QF1, QF2 and QF3 are switched on in a closed mode, the delay setting value of the time relay 63KT 23 is 0-20 min, the normally-open contact KJ of the middle relay K for automatic cooler control is connected with the normally-closed contact KMJ 7378 of a power supply alternating current contactor KMS1, the normally-closed contact KMKTJ 2 of the alternating current contactor KMKTS 6866, the normally-closed time relay 11 and the cold control power-loss full stop of the transformer cooler are connected in series with the intelligent test equipment under the preset intelligent open and preset time test environment;
the cold control power-off time fixed value setting logic circuit (shown in fig. 4) comprises an oil temperature sensing contact POP, a normally open contact KJ11 of a transformer cooler cold control power-off full stop intermediate relay K11, a cold control power-off fixed time delay device LKD60, a cold control power-off time delay relay TLKSD, a control word SW9 (a cold control power-off 60-minute trip control word is delayed), a control word SW8 (a cold control power-off control word is locked by oil temperature high locking), a control word SW7 (a cold control power-off protection input control word), a cold control power-off trip relay LKSTZ, a divider resistor R, an AND gate circuit and/or a gate circuit; wherein, the POP induction temperature of the oil temperature induction contact exceeds 75 ℃ and is closed; the cold control power-off fixed delay device LKD60 has a fixed delay fixed value (such as 60min, which is equal to the setting time of the transformer cooler full stop); the delay setting value of the cold control power loss delay relay TLKSD is 0-60 min; if the control words SW 7-SW 9 are '1', the input is performed, and if the control words SW 7-SW 9 are '0', the exit is performed; it should be noted that, in the test environment, the oil temperature sensing contact POP can be closed intelligently, and the control words SW 7-SW 9 can be preset in advance;
at the moment, the method for testing the cold control power-off time fixed value of the transformer cooler tests the delay fixed value of the time relay on the cold control power-off control loop and the delay fixed value of the cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit, and comprises the following steps of:
step S1, after the testing environment is detected to be ready, triggering a first preset circuit connection condition to enable the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit to be connected, and acquiring the first preset circuit connection condition to trigger the whole time length at the moment of cold control power-off tripping to serve as a first testing time length from the time delay fixed value of a time relay on the cold control power-off control loop to the fixed time delay fixed value of a cold control power-off fixed time delay device on the cold control power-off time fixed value setting logic circuit;
firstly, avoiding live operation, and detecting whether a test environment is ready to meet the subsequent circuit connection requirement; the condition of the test environment readiness is specifically that the three-side circuit breakers DL1, DL2 and DL3 and the disconnecting switches 1G, 2G and 3G correspondingly connected with the three buses 1M, 2M and 3M are all in an off state; the three-side circuit breakers DL1, DL2 and DL3 are all in a closing state (namely corresponding normally open contacts QF1, QF2 and QF3 are all closed); and the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit all complete correct wiring, and all parts are normal.
Secondly, a first preset circuit connection condition is set to meet the circuit connection requirement when the delay timing value of a time relay KT11 on the cold control power loss control loop is detected; the first preset circuit connection condition is specifically that the following actions can be completed at the same trigger time: all alternating-current contactors on the cold-control power-loss power supply circuit are in power loss (namely normally closed contacts KMJ1 and KMJ2 of two alternating-current contactors KMS1 and KMS2 are kept in a closed state), and a power supply conversion handle SS on the cold-control power-loss power supply circuit can conduct one group of power supplies to work (such as a first group of power supplies or a second group of power supplies to work); a manual switch ST on the cold control power loss control loop is intelligently closed; and a temperature sensing contact POP on the cold control power-off time fixed value setting logic circuit is closed, a cold control power-off delay 60-minute trip control word SW9 is set to be 1, the cold control power-off is set to be 0 through an oil temperature high locking control word SW8, and a cold control power-off protection input control word SW7 is set to be 0, so that the cold control power-off time fixed value setting logic circuit realizes the cold control power-off trip of the trip relay LKSDTTZ only through the fixed delay fixed value (such as 60min) of the cold control power-off fixed delay device LKD 60. It should be noted that there may be other configurations that are sequentially arranged, and the power-on operation is completed at different times, for example, the power conversion handle SS can first turn on one set of power supplies (for example, the first set of power supplies or the second set of power supplies); a manual switch ST on the cold control power loss control loop is intelligently closed; a temperature sensing contact POP on the cold control power-off time fixed value setting logic circuit is closed, a cold control power-off delay 60-minute trip control word SW9 is set to be 1, cold control power-off is set to be 0 through an oil temperature high locking control word SW8, and a cold control power-off protection input control word SW7 is set to be 0; and finally triggering all alternating current contactors on the cold control power loss power supply loop to lose magnetism at the triggering moment.
Then, the cold control power-off power supply circuit, the cold control power-off control circuit and the cold control power-off time fixed value setting logic circuit are all in a connected state, and only the cold control power-off control circuit has a fixed delay fixed value (such as 60min) of a cold control power-off fixed delay device LKD60 for the delay fixed value of the time relay KT11 and the cold control power-off time fixed value setting logic circuit, so that the connection is realized after the respective delay time is finished. At this time, the cold control power-off time fixed value setting logic circuit finally realizes cold control power-off tripping (namely cold control power-off delay relay TKSDTZ tripping) by the cold control power-off fixed delay device LKD60, the triggering time when the first preset circuit connection condition is triggered and the instant time of cold control power-off delay relay TLKSD tripping need to be recorded, and the total time length calculated by the two is used as the first testing time length.
It can be understood that the triggering time when the above first preset circuit on condition is triggered should be counted at the time when the manual switch ST on the cold power loss control loop is intelligently closed, and the tripping moment of the cold power loss delay relay TLKSD is the ending time of the counting.
Step S2, calculating the difference between the obtained first test duration and a fixed delay fixed value on the cold control power-off fixed delay device to obtain a delay fixed value of a time relay on the cold control power-off control loop;
the specific process is that the fixed delay fixed value on the cold control power-off fixed delay device LKD60 is subtracted from the first test duration for 60min, and the delay fixed value of the time relay KT11 is obtained.
Step S3, if the delay fixed value of the time relay on the cold control power-off control loop is judged not to be 0, the cold control power-off time of the transformer cooler is judged not to reach the standard, a second preset circuit connection condition is continuously triggered after the delay fixed value of the time relay on the cold control power-off control loop is regulated to be 0, the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit are all connected, and the second preset circuit connection condition trigger is obtained to finally realize the whole time length at the moment of cold control power-off tripping as a second test time length from the delay fixed value of the time relay on the cold control power-off control loop to the delay fixed value of the cold control power-off time delay relay on the cold control power-off time fixed value setting logic circuit;
the specific process is that firstly, as the fixed delay fixed value 60min on the cold control power-off fixed delay device LKD60 is the same as the setting time of the transformer cooler full stop, as long as the delay fixed value of the time relay KT11 is not 0, the delay of the tripping of the cold control power-off outlet of the transformer cooler is overlong, the cold control power-off time of the transformer cooler is determined not to reach the standard, and the delay fixed value of the time relay KT11 on the cold control power-off control loop is required to be adjusted to be 0.
Secondly, after the delay fixed value of a time relay KT11 on the cold control power-off control loop is adjusted to be 0, a second preset circuit connection condition is set to meet the circuit connection requirement when the delay fixed value of the cold control power-off delay relay TLKSD on the cold control power-off time fixed setting logic circuit is detected; the second preset circuit connection condition is specifically that the following actions can be completed at the same trigger time: all alternating-current contactors on the cold-control power-loss power supply circuit are in power loss (namely normally closed contacts KMJ1 and KMJ2 of two alternating-current contactors KMS1 and KMS2 are kept in a closed state), and a power supply conversion handle SS on the cold-control power-loss power supply circuit can conduct one group of power supplies to work (such as a first group of power supplies or a second group of power supplies to work); a manual switch ST on the cold control power loss control loop is intelligently closed; and a temperature sensing contact POP on the cold control power-off time fixed value setting logic circuit is closed, a cold control power-off delay 60-minute trip control word SW9 is set to be 0, the cold control power-off is set to be 1 through an oil temperature high locking control word SW8, and a cold control power-off protection input control word SW7 is set to be 1, so that the cold control power-off time fixed value setting logic circuit realizes the LKSDTTZ trip of the cold control power-off trip relay only through the delay fixed value of the cold control power-off delay relay TLKSD. It should be noted that there may be other configurations that are sequentially arranged, and the power-on operation is completed at different times, for example, the power conversion handle SS can first turn on one set of power supplies (for example, the first set of power supplies or the second set of power supplies); a manual switch ST on the cold control power loss control loop is intelligently closed; a temperature sensing contact POP on the cold control power-off time fixed value setting logic circuit is closed, a cold control power-off delay 60-minute trip control word SW9 is set to be 0, cold control power-off is set to be 1 through an oil temperature high locking control word SW8, and a cold control power-off protection input control word SW7 is set to be 1; and finally triggering all alternating current contactors on the cold control power loss power supply loop to lose magnetism at the triggering moment.
Then, a cold control power-off power supply loop, a cold control power-off control loop (at the moment, the time delay fixed value of the cold control power-off control loop with a time relay KT11 is 0) and a cold control power-off time fixed value setting logic circuit are all in a connected state, and the connection is realized only after the cold control power-off time fixed value setting logic circuit has the time delay fixed value (such as 0-60 min) of a cold control power-off delay relay TLKSD. At this time, the cold control power-off time fixed value setting logic circuit finally realizes cold control power-off tripping (namely cold control power-off delay relay TKSDTZ tripping) by the cold control power-off delay relay TLKSD, the triggering time when the second preset circuit connection condition is triggered and the instant time of tripping of the cold control power-off delay relay TLKSD need to be recorded, and the total time length calculated by the two is used as the second testing time length.
It can be understood that the triggering time when the second preset circuit on condition is triggered should be counted at the time when the manual switch ST on the cold power loss control loop is intelligently closed, and the tripping moment of the cold power loss delay relay TLKSD is the ending time of the counting.
Step S4, if the obtained second test duration is judged to be less than or equal to the preset setting time of the transformer cooler full stop, the delay fixed value of the time relay on the cold control power-off control loop and the delay fixed value of the cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit are both judged to reach the standard; and otherwise, determining that only the delay fixed value of the cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit does not reach the standard, and further adjusting the delay fixed value to be less than or equal to the preset setting time of the full stop of the transformer cooler.
The specific process is that if the second test time (for example, 40min) <thepreset setting time of the transformer cooler full stop of 60min, the delay fixed value 0 of the time relay KT11 and the delay fixed value 40min of the cold control power-off delay relay TLKSD are both determined to reach the standard;
on the contrary, if the second test duration (for example, 80min) > is the preset setting time for the full stop of the transformer cooler of 60min, it is determined that only the delay timing value of the cold-control power-off delay relay TLKSD does not reach the standard 80min, and the further adjustment is required to be less than the preset setting time for the full stop of the transformer cooler of 60 min.
An application scenario of the method for testing the constant value of the cold control power-off time of the transformer cooler in the embodiment of the present invention is further described with reference to fig. 1 to 4:
step 1: before the constant value test of the cold control power-off time of the transformer cooler, disconnecting the three-side circuit breakers 1DL, 2DL and 3DL of the transformer, and disconnecting the three- side disconnecting switches 1G, 2G and 3G of the transformer to ensure the safety;
step 2: after ensuring that the three-side isolating switches 1G, 2G and 3G of the transformer are disconnected, switching on the three-side circuit breakers 1DL, 2DL and 3DL of the transformer, firstly checking the excitation of a power supply conversion handle SS and two alternating current contactors KMS1 and KMS2 in a cold loss control power supply loop, and the serial connection condition of a normally closed contact KMJ1 of an alternating current contactor KMS1 and an excitation coil of an alternating current contactor KMS2, and the serial connection condition of a normally closed contact KMJ2 of an alternating current contactor KMS2 and an excitation coil of an alternating current contactor KMS 1; secondly, checking the closing condition of normally open contacts QF1, QF2 and QF3 when three-side circuit breakers 1DL, 2DL and 3DL are switched on in a cold control power loss control loop, automatically controlling the excitation of an intermediate relay K relay for a cooler and the switching-on state of a normally open contact KJ1 of the intermediate relay K, exciting a time relay KT11, and connecting the normally open contact KJ of the intermediate relay K for automatically controlling the cooler with a normally closed contact KMJ1 of a power supply alternating current contactor KMS1, a normally closed contact KMJ2 of an alternating current contactor KMS2, a time relay KT11 and a transformer cooler cold control power loss full stop outlet intermediate relay K11 in series; finally, checking the closing condition of an oil temperature sensing contact POP in a cold control power-off time fixed value setting logic circuit, the excitation of a transformer cooler cold control power-off full stop outlet intermediate relay K11 and the opening and closing state of a normally open contact KJ11 thereof, the excitation of a cold control power-off fixed delay device LKD60 and a fixed delay fixed value thereof, the excitation of a cold control power-off delay relay TLKSD, the corresponding setting conditions of control words SW 7-SW 9 and the excitation of a cold control power-off trip relay LKSTZ;
and 3, step 3: after the steps 1 to 2 are completed, the testing environment is ready, a first preset circuit connection condition is started, at the moment, SW7 is set to be 0, SW8 is set to be 0, SW9 is set to be 1, the delay fixed value of a time relay KT11 is set to be 0min, and excitation tripping is carried out after a cold control power loss tripping relay LKSDTTZ (60min) is tested; furthermore, the delay fixed value of the time relay KT11 is set to be 20min, and excitation tripping is carried out after a cold control power loss tripping relay LKSDTZ (60min +20min is 80min) is tested. Certainly, at least one of SW 7-SW 8 is set to be 0, SW9 is set to be 1, the testing requirements can also be met, the delay fixed value of the time relay KT11 is set to be 0min or 20min, and the cold control power-off tripping relay delays the excitation tripping time;
and 4, step 4: after a testing environment is ready and the delay constant value of the relay KT11 is set to be 0min, starting a second preset circuit connection condition, setting SW7 to be '1', SW8 to be '1', and SW9 to be '0', setting the delay constant value of the cold control power-off delay relay TLKSD to be 60min, and testing a cold control power-off tripping relay LKSDTTZ (60min) and then performing excitation tripping; further, the delay fixed value of the cold control power-off delay relay TLKSD is set to be 20min, and excitation tripping is carried out after the cold control power-off tripping relay LKSDTTZ (20min) is tested. Of course, placing SW8 to "0" an AND gate & latch can be tested.
The embodiment of the invention has the following beneficial effects:
according to the invention, the delay fixed value of the time relay on the cold control power-off control loop and the delay fixed value of the cold control power-off delay relay on the cold control power-off fixed value setting logic circuit are monitored to realize effective monitoring of the cold control power-off fixed value of the transformer cooler and ensure the setting time less than or equal to the full stop of the transformer cooler, so that the problem that the three-side circuit breaker of the transformer does not trip or trips in a delay manner when the transformer runs at a high temperature for a long time is avoided, and the running safety of a power grid is improved.
It will be understood by those skilled in the art that all or part of the steps in the method for implementing the above embodiments may be implemented by relevant hardware instructed by a program, and the program may be stored in a computer-readable storage medium, such as ROM/RAM, magnetic disk, optical disk, etc.
The above disclosure is only for the purpose of illustrating the preferred embodiments of the present invention, and it is therefore to be understood that the invention is not limited by the scope of the appended claims.

Claims (6)

1. A method for testing the fixed value of the cold control power-off time of a transformer cooler is used for a transformer which supplies power to three buses through a three-side circuit breaker and a corresponding isolating switch, the transformer is provided with a cold control power-off power supply loop, a cold control power-off control loop and a cold control power-off time fixed value setting logic circuit, and is characterized in that the method tests the delay fixed value of a time relay on the cold control power-off control loop and the delay fixed value of the cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit, and comprises the following steps:
after the test environment is detected to be ready, triggering a first preset circuit connection condition to enable the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit to be connected, and acquiring a fixed delay fixed value of a cold control power-off fixed delay device on the cold control power-off time fixed value setting logic circuit to enable the whole time length at the moment of cold control power-off tripping to serve as a first test time length when the first preset circuit connection condition is triggered to pass through the delay fixed value of a time relay on the cold control power-off control loop to finally pass through the fixed delay fixed value of the cold control power-off fixed delay device on the cold control power-off time fixed value setting logic circuit;
taking the difference obtained by calculating the obtained first test duration and the fixed delay fixed value on the cold control power-off fixed delay device as the delay fixed value of the time relay on the cold control power-off control loop;
if the delay fixed value of the time relay on the cold control power-off control loop is judged not to be 0, the cold control power-off time of the transformer cooler is judged not to reach the standard, after the delay fixed value of the time relay on the cold control power-off control loop is required to be adjusted to be 0, a second preset circuit connection condition is continuously triggered, the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit are all connected again, the second preset circuit connection condition is obtained, the whole time length at the moment of cold control power-off tripping is finally realized through the delay fixed value of the time relay on the cold control power-off control loop to the delay fixed value of the cold control power-off time delay relay on the cold control power-off time setting logic circuit, and the whole time length at the moment of cold control power-off tripping is used as a second test time length;
if the obtained second test time length is judged to be less than or equal to the preset setting time of the full stop of the transformer cooler, the delay fixed value of the time relay on the cold control power-off control loop and the delay fixed value of the cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit are judged to reach the standard; and otherwise, determining that only the delay fixed value of the cold control power-off delay relay on the cold control power-off time fixed value setting logic circuit does not reach the standard, and further adjusting the delay fixed value to be less than or equal to the preset setting time of the full stop of the transformer cooler.
2. The method for testing the constant value of the cold control power-off time of the transformer cooler according to claim 1, wherein the ready test environment specifically comprises the following conditions:
the three-side circuit breaker and the disconnecting switches correspondingly connected with the three buses are all in a disconnected state;
the three side breakers are all in a closing state; and
and the cold control power-off power supply loop, the cold control power-off control loop and the cold control power-off time fixed value setting logic circuit all complete correct wiring, and all the parts are normal.
3. The method for testing the constant value of the cold control power-off time of the transformer cooler according to claim 1, wherein the first preset circuit connection condition is specifically as follows:
the following actions can be completed at the same trigger time: all alternating current contactors on the cold control power-loss power supply loop lose magnetism, and a power supply conversion handle on the cold control power-loss power supply loop can be connected with a group of power supplies to work; a manual switch on the cold control power loss control loop is intelligently closed; and a temperature sensing contact on the cold control power-off time fixed value setting logic circuit is closed, a cold control power-off delay 60-minute trip control word is set to be 1, cold control power-off is set to be 0 through an oil temperature high locking control word, and a cold control power-off protection input control word is set to be 0, so that the cold control power-off time fixed value setting logic circuit realizes the trip of the cold control power-off trip relay only through the fixed delay fixed value of the cold control power-off fixed delay device.
4. The method for testing the cold control power-off time fixed value of the transformer cooler according to claim 1, wherein the second preset circuit connection condition is specifically as follows:
the following actions can be completed at the same trigger time: all alternating current contactors on the cold control power-loss power supply loop lose magnetism, and a power supply conversion handle on the cold control power-loss power supply loop can be connected with a group of power supplies to work; a manual switch on the cold control power loss control loop is intelligently closed; and a temperature sensing contact on the cold control power-off time fixed value setting logic circuit is closed, a 60-minute cold control power-off delay tripping control word is set to be 0, cold control power-off is set to be 1 through an oil temperature high locking control word, and a cold control power-off protection input control word is set to be 1, so that the cold control power-off time fixed value setting logic circuit realizes the tripping of the cold control power-off tripping relay only through the delay fixed value of the cold control power-off delay relay.
5. The method for testing the constant value of the cold control power-off time of the transformer cooler according to claim 1, wherein the constant value of the fixed delay time on the cold control power-off delay device is the same as the preset setting time of the transformer cooler in full stop.
6. The method for testing the constant value of the cold control power-off time of the transformer cooler as claimed in claim 5, wherein the preset setting time of the full stop of the transformer cooler is 60 min.
CN201911388549.1A 2019-12-30 2019-12-30 Method for testing constant value of cold control power-off time of transformer cooler Active CN111025069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911388549.1A CN111025069B (en) 2019-12-30 2019-12-30 Method for testing constant value of cold control power-off time of transformer cooler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911388549.1A CN111025069B (en) 2019-12-30 2019-12-30 Method for testing constant value of cold control power-off time of transformer cooler

Publications (2)

Publication Number Publication Date
CN111025069A true CN111025069A (en) 2020-04-17
CN111025069B CN111025069B (en) 2022-08-16

Family

ID=70199052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911388549.1A Active CN111025069B (en) 2019-12-30 2019-12-30 Method for testing constant value of cold control power-off time of transformer cooler

Country Status (1)

Country Link
CN (1) CN111025069B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111986901A (en) * 2020-07-23 2020-11-24 深圳供电局有限公司 Method and system for testing starting time constant value of oil pump in transformer
CN115032491A (en) * 2022-08-12 2022-09-09 国网山东省电力公司电力科学研究院 Non-electric quantity protection test method for transformer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100315188A1 (en) * 2009-06-15 2010-12-16 Advanced Power Technologies, Llc Apparatus and method for cooling power transformers
CN202260395U (en) * 2011-09-28 2012-05-30 宁夏电力公司超高压分公司 Full-stop tripping protection circuit of transformer cooler
CN202384744U (en) * 2012-01-03 2012-08-15 聂云瑞 Full-stop protection device for cooler of forced oil-air cooling power transformer
CN202500796U (en) * 2011-12-29 2012-10-24 卧龙电气集团股份有限公司 Automatic control circuit of high voltage frequency conversion cooling blower
CN203786524U (en) * 2013-12-14 2014-08-20 广东惠州天然气发电有限公司 Novel main transformer cooler control circuit
CN109786090A (en) * 2019-02-26 2019-05-21 山东钢铁股份有限公司 Transformer cooling fan control circuit and method
CN110411774A (en) * 2019-08-21 2019-11-05 四川金康电力发展有限公司 Power transformer water cooler control loop

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100315188A1 (en) * 2009-06-15 2010-12-16 Advanced Power Technologies, Llc Apparatus and method for cooling power transformers
CN202260395U (en) * 2011-09-28 2012-05-30 宁夏电力公司超高压分公司 Full-stop tripping protection circuit of transformer cooler
CN202500796U (en) * 2011-12-29 2012-10-24 卧龙电气集团股份有限公司 Automatic control circuit of high voltage frequency conversion cooling blower
CN202384744U (en) * 2012-01-03 2012-08-15 聂云瑞 Full-stop protection device for cooler of forced oil-air cooling power transformer
CN203786524U (en) * 2013-12-14 2014-08-20 广东惠州天然气发电有限公司 Novel main transformer cooler control circuit
CN109786090A (en) * 2019-02-26 2019-05-21 山东钢铁股份有限公司 Transformer cooling fan control circuit and method
CN110411774A (en) * 2019-08-21 2019-11-05 四川金康电力发展有限公司 Power transformer water cooler control loop

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丘演峰、曾招辉: "220kV主变强油循环风冷全停延时起动跳闸回路的探讨", 《电气技术》 *
汪为民: "变压器冷却器控制回路的改进", 《中国电力教育》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111986901A (en) * 2020-07-23 2020-11-24 深圳供电局有限公司 Method and system for testing starting time constant value of oil pump in transformer
CN111986901B (en) * 2020-07-23 2023-07-07 深圳供电局有限公司 Method and system for testing fixed value of starting time of oil pump in transformer
CN115032491A (en) * 2022-08-12 2022-09-09 国网山东省电力公司电力科学研究院 Non-electric quantity protection test method for transformer
CN115032491B (en) * 2022-08-12 2022-11-01 国网山东省电力公司电力科学研究院 Non-electric quantity protection test method for transformer

Also Published As

Publication number Publication date
CN111025069B (en) 2022-08-16

Similar Documents

Publication Publication Date Title
CN111025069B (en) Method for testing constant value of cold control power-off time of transformer cooler
CN106684824A (en) Transformer differential protection method and device based on current transformer disconnection
CN102005720B (en) Neutral line breakage detection protection method and device
CN109286171B (en) Repeated tripping and closing method of locking circuit breaker for direct-current traction feeder protection device
CN111880084A (en) Residual current protection uninterruptible power test method and device and residual current protection device
US3158785A (en) Devices for detecting earth faults in electric distribution networks
CN111880083A (en) Uninterrupted residual current test method and device and residual current protection device
CN106291141B (en) Automatic phase sequence identification device for three-phase power supply on construction site
CN103166180A (en) Method and device for judging overload shedding for power system transformer
CN202712819U (en) Protection system capable of realizing breaker failure triggering relevant trips of interconnecting transformer
Proctor Application of undervoltage protection to critical motors
CN110988669B (en) Fault detection method and device for high-voltage circuit breaker
CN110970868A (en) Method and system for realizing three-phase inconsistent protection action logic of electrical quantity of circuit breaker
CN106712307B (en) Dynamic time delay sequential closing system and method for avoiding damage to circuit breaker by bias current
JP2011076986A (en) Circuit breaker operation monitoring device, monitoring system, program, and judgement method of input operation method of circuit breaker
Pickett et al. Reducing outages through improved protection, monitoring, diagnostics, and autorestoration in transmission substations—(69 kV and above)
CN113237678A (en) Method and equipment for testing mechanical function of circuit breaker
CN204947582U (en) Loop is distributed in the jumping of 220kV failure protection connection rationally
CN111929614A (en) Device and method for realizing leakage protection full self-checking function
Ahmed et al. Customized fault management system for low voltage (LV) distribution automation system
CN205429702U (en) Can distinguish device of high -voltage motor overcurrent and overload protection actuating signal
CN220604557U (en) High-voltage circuit breaker and anti-tripping control circuit thereof
CN1246745A (en) Automatic demagnetizing and slip over-voltage protecting unit for large electric generator
CN204886155U (en) Malfunctioning protection of 220kV allies oneself with jumps optimal configuration return circuit
CN115561629B (en) Portable motor no-load test device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant