CN111021715A - Movable support platform suitable for box body type structure - Google Patents

Movable support platform suitable for box body type structure Download PDF

Info

Publication number
CN111021715A
CN111021715A CN201911311940.1A CN201911311940A CN111021715A CN 111021715 A CN111021715 A CN 111021715A CN 201911311940 A CN201911311940 A CN 201911311940A CN 111021715 A CN111021715 A CN 111021715A
Authority
CN
China
Prior art keywords
lifting
main beam
upright post
vertically fixed
support platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911311940.1A
Other languages
Chinese (zh)
Inventor
卞桂荣
李宝枝
顾晓彬
朱井佳
袁俊俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
Nanjing Branch Of Cccc Third Harbor Engineering Co ltd
Original Assignee
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
Nanjing Branch Of Cccc Third Harbor Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd, Nanjing Branch Of Cccc Third Harbor Engineering Co ltd filed Critical No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
Priority to CN201911311940.1A priority Critical patent/CN111021715A/en
Publication of CN111021715A publication Critical patent/CN111021715A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/34Horizontally-travelling moulds for making walls blockwise or section-wise
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms
    • E04G11/54Girders, beams, or the like as supporting members for forms of extensible type, with or without adjustable supporting shoes, fishplates, or the like

Abstract

The invention discloses a movable support platform suitable for a box type structure, which comprises a screw rod inclined strut, a main beam, a secondary beam, a lifting upright post, an inclined strut, a lifting main beam, a lifting secondary beam, a tripod, an upright post, a strut, a cross connection and a cross strut; the secondary beam is vertically fixed on the main beam, the screw rod inclined strut is connected to the side face of the main beam through a pin shaft, the lifting upright post is vertically fixed on the main beam, the lifting main beam is arranged above the lifting upright post, and the upright post is connected with the lower part of the cantilever end of the lifting main beam through a pin shaft; the lifting secondary beam is vertically fixed on the lifting main beam, and the triangular frame is vertically fixed at the end part of the lifting main beam. The formwork support system is reasonable in structure, fast in field assembly and high in practicability, can realize integral formwork erecting, formwork removing and moving operation of a large-span formwork support system, and improves construction efficiency; platform assembly and full framing set up one shot forming, follow-up need not to dismantle the adjustment repeatedly, reduces personnel's input by a wide margin, effectively reduces high altitude construction volume.

Description

Movable support platform suitable for box body type structure
Technical Field
The invention belongs to the technical field of steel structures, and particularly relates to a movable support platform applicable to a box type structure.
Background
Cast-in-place box formula structure (like tunnel open cut method construction, piping lane construction) roof construction often uses full hall support as template support system, and traditional support method construction needs to set up repeatedly, dismantles and transports scaffold frame, and the efficiency of construction is lower, leads to the high altitude construction volume big simultaneously, and the safe risk is high, and personnel and the input of material are great, and economic benefits is relatively poor.
The movable support system is mainly divided into a bearing system, a formwork mounting and dismounting system and a traveling system, the whole support moving process replaces the processes of dismounting, transporting and re-erecting in the traditional support method construction by the automatic demoulding and traveling functions of a hydraulic system, the construction efficiency is greatly improved, and the overhead working amount is effectively reduced.
Disclosure of Invention
In order to solve the problems, the invention discloses a movable support platform suitable for a box type structure, which is suitable for a full-scale support of a large-section long-mileage box structure top template of a finished bottom plate and a finished side wall, and has the advantages of high construction efficiency, reliable safety performance and good economic benefit.
In order to achieve the purpose, the technical scheme of the invention is as follows:
a movable support platform suitable for a box type structure comprises a main beam, a secondary beam, an upright post, an inclined strut, a lifting upright post, a lifting main beam, a lifting secondary beam, a strut, a tripod, a scissor strut, a transverse connection and a screw rod inclined strut; the secondary beam is vertically fixed on the main beam, the screw rod inclined strut is connected to the side face of the main beam through a pin shaft, the lifting upright post is vertically fixed on the main beam, the lifting main beam is arranged above the lifting upright post, and the upright post is connected with the lower part of the cantilever end of the lifting main beam through a pin shaft; the lifting secondary beam is vertically fixed on the lifting main beam, and the triangular frame is vertically fixed at the end part of the lifting main beam.
Furthermore, the end part of the screw rod inclined strut is propped against a steel bar embedded in the bottom plate to resist the lateral pressure of cast-in-place concrete.
Furthermore, the main beam and the secondary beam are connected through high-strength bolts, so that the shearing resistance is high.
Further, the secondary beam is arranged according to the longitudinal interval of the full support, the support bottom support falls on the central line of the secondary beam, and the structure adaptability and the stability are strong.
Further, raise the stand, raise the girder, raise the overhead part that the secondary beam is constituteed and through the rational distribution interval, avoid excavation supporting steel bracing.
Further, the bracing sets up in raising the stand and raising between the girder, and the part stability is raised in the reinforcing.
Furthermore, the stay bar is arranged between the upright post and the inclined strut, so that the stability of the upright post during pouring is enhanced.
Furthermore, the secondary beam is manufactured into a through long form at the foundation-pit-free support steel inclined strut section, and the lifting part is not required to be arranged.
Furthermore, the tripod is made of channel steel in a welding mode, and stability is high.
Furthermore, the cross braces are made of angle steel and arranged between the tripods, so that the stability of the frame body is enhanced.
The invention has the beneficial effects that:
the movable support platform suitable for the box type structure is reasonable in structure, rapid in field assembly and high in practicability, and the elevated part ingeniously avoids a foundation pit supporting structure, so that the problem that the traditional full-hall support is irregularly erected in the area is solved; the platform is matched with the self-locking hydraulic jack and the lifting movable trolley to work, so that the stability under the condition of large load during pouring can be met, the integral formwork erecting, formwork removing and moving operation of a large-span formwork support system can be realized, and the construction efficiency is improved; platform assembly and full framing set up one shot forming, follow-up need not to dismantle the adjustment repeatedly, reduces personnel's input by a wide margin, effectively reduces high altitude construction volume.
Drawings
FIG. 1 is a schematic view of an elevated platform.
FIG. 2 schematic diagram of elevated platform tripod reinforcement
FIG. 3 is a schematic view of a non-elevated platform.
List of reference numerals:
1: a screw rod inclined strut; 2: a main beam; 3: a secondary beam; 4: lifting the upright post; 5: bracing; 6: lifting the main beam; 7: lifting the secondary beam; 8: a tripod; 9: a column; 10: a stay bar; 11: transverse connection; 12: and (4) supporting the scissors.
Detailed Description
The present invention will be further illustrated with reference to the accompanying drawings and specific embodiments, which are to be understood as merely illustrative of the invention and not as limiting the scope of the invention. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in the figure, the movable support platform applicable to the box type structure comprises a lead screw inclined strut 1, a main beam 2, a secondary beam 3, a lifting upright column 4, an inclined strut 5, a main beam 6, a secondary beam 7, a tripod 8, a vertical column 9, a strut 10, a cross-connection 11 and a cross-connection 12; the lead screw inclined strut 1 is connected with the main beam 2 through a pin shaft; the secondary beam 3 is vertically fixed on the main beam 2, and the main beam 2 is connected with the secondary beam 3 through a high-strength bolt; the inclined strut 5 connects the lifting upright post 4 and the lifting main beam 6 into a whole; the lifting secondary beam 7 is connected with the lifting main beam 6 through a high-strength bolt; the tripod 8 is fixed on the lifting secondary beam 7; the upright post 9 is connected with the cantilever end of the lifting main beam 6 through a pin shaft; the stay bar 10 is temporarily fixed between the inclined strut 5 and the upright post 9 during pouring operation, and the stay bar 10 is removed during movement, the upright post 9 is folded and temporarily fixed on the inclined strut 5; the transverse link 11 is connected with the side surface of the tripod 8 in a whole length manner; the cross braces 12 are connected in spaced relation between the tripods 8.
During construction, paying off according to a design drawing to determine the position of the main beam 2, placing jacks according to the relative positions, adjusting the jacking positions to the same height, and hoisting the main beam 2; hoisting the secondary beam 3 according to the position of the opening on the main beam, and pre-screwing a high-strength bolt at a preset position; when the lifting part of the mounting platform is lifted, the upright post 9 is firstly put down, and the bolt between the lifting upright post 4 and the main beam 3 is pre-screwed; after the lifting secondary beam 7 is installed, the triangular supports 8 are hoisted, the cross connection 11 is connected according to the designed position, and the cross support 12 is connected between the triangular supports 8; and after all the components are installed, checking the positions, and finally screwing the bolts after no errors exist.
When concrete is poured, the frame body is jacked to the designed elevation by utilizing the movable trolley, the screw rod inclined strut 1 is screwed in place, the stay bar 10 is connected between the upright post 9 and the inclined strut 5, and the jack is locked, so that the pouring operation can be carried out. And (3) during demoulding, the movable trolley supports the secondary beam 3, the support rod 10 is removed, the screw rod inclined support 1 and the jack are retracted, the upright post 9 is retracted, the upright post 9 and the inclined support 5 are temporarily fixed, the trolley descends, and the trolley moves to the next section after being integrally demoulded.
The technical means disclosed in the invention scheme are not limited to the technical means disclosed in the above embodiments, but also include the technical scheme formed by any combination of the above technical features.

Claims (8)

1. The utility model provides a portable support platform suitable for box formula structure which characterized in that: the lifting device comprises a main beam, secondary beams, upright columns, inclined struts, lifting upright columns, lifting main beams, lifting secondary beams, support rods, triangular supports, scissor supports, transverse links and screw rod inclined struts; the secondary beam is vertically fixed on the main beam, and the main beam is connected with the secondary beam through a high-strength bolt; the lead screw inclined strut is connected to the side face of the main beam through a pin shaft, the lifting upright post is vertically fixed on the main beam, the lifting main beam is arranged above the lifting upright post, and the upright post is connected with the lower part of the cantilever end of the lifting main beam through the pin shaft; the lifting secondary beam is vertically fixed on the lifting main beam, and the triangular frame is vertically fixed at the end part of the lifting main beam.
2. The movable support platform applicable to box-type structures of claim 1, wherein the screw rod diagonal brace is connected to the side surface of the main beam through a pin shaft, and the end part of the screw rod diagonal brace is supported on a steel bar embedded in the bottom plate.
3. The movable support platform for a box structure of claim 1, wherein the secondary beams are arranged at longitudinal intervals of the full support.
4. The movable support platform applicable to box structures according to claim 1, wherein the elevated portion consisting of the elevated columns, the elevated main beams and the elevated secondary beams avoids the foundation pit support steel diagonal bracing through reasonable distribution of spacing.
5. The mobile support platform for box structures of claim 1, wherein the secondary beams are fabricated in full length form at the non-excavation supporting steel diagonal bracing sections without providing the raised portions.
6. The movable support platform for box structures as claimed in claim 1, wherein the tripod is made of welded steel channels, and cross-linking and cross-bracing are arranged between the tripod and the steel channels.
7. A mobile racking platform adapted for use in a box structure as claimed in claim 6 wherein said cross braces are made of angle steel and are spaced between the tripods.
8. A mobile racking platform adapted for use with a box structure as claimed in claim 6 wherein said cross-links are formed from channel steel with the full length being provided to the tripod sides.
CN201911311940.1A 2019-12-18 2019-12-18 Movable support platform suitable for box body type structure Pending CN111021715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911311940.1A CN111021715A (en) 2019-12-18 2019-12-18 Movable support platform suitable for box body type structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911311940.1A CN111021715A (en) 2019-12-18 2019-12-18 Movable support platform suitable for box body type structure

Publications (1)

Publication Number Publication Date
CN111021715A true CN111021715A (en) 2020-04-17

Family

ID=70210390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911311940.1A Pending CN111021715A (en) 2019-12-18 2019-12-18 Movable support platform suitable for box body type structure

Country Status (1)

Country Link
CN (1) CN111021715A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101056249B1 (en) * 2011-03-07 2011-08-11 양현기 A structure for transporting the tunnel steel lining foam
CN104564104A (en) * 2014-12-17 2015-04-29 张进军 Trolley system used for tunnel lining
CN109281689A (en) * 2018-10-19 2019-01-29 湖南五新模板有限公司 Integral construction method based on tunnel trestle full width inverted arch template
CN109653771A (en) * 2019-01-07 2019-04-19 中国葛洲坝集团第六工程有限公司 Tunnel arch two lined steel mould trolley integrated with cable duct side wall
CN208966350U (en) * 2018-10-18 2019-06-11 云南建交市政工程有限公司 A kind of tunnel reinforcement and the mobile bracket of maintenance
CN110424986A (en) * 2019-09-03 2019-11-08 韶关市鑫德利机械设备有限公司 A kind of improved tunnel lining trolley of structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101056249B1 (en) * 2011-03-07 2011-08-11 양현기 A structure for transporting the tunnel steel lining foam
CN104564104A (en) * 2014-12-17 2015-04-29 张进军 Trolley system used for tunnel lining
CN208966350U (en) * 2018-10-18 2019-06-11 云南建交市政工程有限公司 A kind of tunnel reinforcement and the mobile bracket of maintenance
CN109281689A (en) * 2018-10-19 2019-01-29 湖南五新模板有限公司 Integral construction method based on tunnel trestle full width inverted arch template
CN109653771A (en) * 2019-01-07 2019-04-19 中国葛洲坝集团第六工程有限公司 Tunnel arch two lined steel mould trolley integrated with cable duct side wall
CN110424986A (en) * 2019-09-03 2019-11-08 韶关市鑫德利机械设备有限公司 A kind of improved tunnel lining trolley of structure

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN206110656U (en) Scalable foldable integrally lift up tube formwork of elevartor shaft
CN108678423A (en) Vertical conversion bearing structure is demolishd in reverse direction of reinforced concrete structure
WO2019011319A1 (en) Hydraulic steel jacking platform capable of achieving integral and local jacking of external formwork and steel platform
CN212247900U (en) A artifical beam device that traverses that is used for bridge and tunnel zero distance to erect T roof beam
CN217175692U (en) Intelligent hydraulic lifting formwork system for super high-rise core tube construction
CN111364757A (en) Supporting structure of steel bar truss floor bearing plate
CN112921785A (en) Telescopic sliding formwork device for prefabricating steel-concrete composite beam
CN106836146B (en) Hydraulic self-lifting cantilever heavy arch dam template working platform
CN111021715A (en) Movable support platform suitable for box body type structure
CN105863261A (en) Universally-adjustable suspension formwork system
CN111519661A (en) Vertical wall construction movable formwork capable of sliding laterally and construction method thereof
CN213233105U (en) Small-span concrete cast-in-place box girder support system
CN215164712U (en) Movable platform system for construction of large-span concrete-filled steel tube arch
CN112502475B (en) Supporting bearing capacity conversion device and using method thereof
CN211074037U (en) Box girder template
CN111364741A (en) Construction process for integrally moving disc buckle type full-hall support
CN208023608U (en) A kind of post-cast strip can have enough to meet the need steel channel formwork system
CN212670637U (en) Vertical wall construction movable formwork capable of sliding laterally
CN109372242B (en) Elevator shaft construction safety lifting platform device and using method
CN108439266B (en) Jacking device for crane
CN111847272A (en) Supporting method of tower crane for reconstruction of existing building
CN217299797U (en) Synchronous lifting sliding form device applied to hollow thin-wall pier
CN212269274U (en) Tower crane supporting system for reconstruction of existing building
CN111172883B (en) Assembly type box girder assembled temporary buttress and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200417