CN111021270A - Construction method for permanently protecting existing pipeline during road reconstruction - Google Patents

Construction method for permanently protecting existing pipeline during road reconstruction Download PDF

Info

Publication number
CN111021270A
CN111021270A CN201911372739.4A CN201911372739A CN111021270A CN 111021270 A CN111021270 A CN 111021270A CN 201911372739 A CN201911372739 A CN 201911372739A CN 111021270 A CN111021270 A CN 111021270A
Authority
CN
China
Prior art keywords
sides
steel sheet
pipeline
sheet piles
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911372739.4A
Other languages
Chinese (zh)
Inventor
张平
王敦红
杨家发
浦玉炳
王兆
蒋鹏
吴伟
李运虎
章凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Municipal Design And Research Institute Co ltd
Original Assignee
Hefei Municipal Design And Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Municipal Design And Research Institute Co ltd filed Critical Hefei Municipal Design And Research Institute Co ltd
Priority to CN201911372739.4A priority Critical patent/CN111021270A/en
Publication of CN111021270A publication Critical patent/CN111021270A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes

Abstract

The invention discloses a construction method for permanently protecting an existing pipeline during road reconstruction, which comprises the following specific steps: firstly, lofting on the spot according to the pipeline position of the water supply steel pipe, breaking a hard layer of a pavement structure, and inserting and driving steel sheet piles on two sides of the water supply steel pipe along the safe distance range of the pipeline; secondly, erecting a plurality of top anchoring supports on the upper parts of the steel sheet piles on the two sides along the length direction, then excavating foundation pits on the outer sides of the steel sheet piles on the two sides, and pouring side walls and cover plates on the outer sides of the steel sheet piles on the two sides in an inserting and driving mode; then backfilling the foundation pit, pulling out the steel sheet pile, and filling gaps of the steel sheet pile by adopting tracking grouting; and finally, covering prefabricated cover plates on the side walls on the two sides to finish the pipeline protection culvert construction of the water supply steel pipes. The application of the invention can not only avoid disturbance to the soil around the pipeline and meet the requirement of water and soil conservation of the special pipeline, but also reduce the span of the slab culvert and backfill materials in the culvert to the maximum extent and greatly save the construction cost.

Description

Construction method for permanently protecting existing pipeline during road reconstruction
Technical Field
The invention relates to the technical field of road reconstruction, in particular to a construction method for permanently protecting an existing pipeline during road reconstruction.
Background
In the process of reconstructing a newly-built road or an old road of a current city, the protection of the existing pipeline below the road is realized by the conventional method of slope-releasing, digging the peripheral soil body of the pipeline, exposing a pipe body, building a side wall outside the safe distance of the pipe body, covering a cover plate, and bearing the road structure load, the vehicle load and the peripheral soil side pressure in the structural form of a cover plate culvert, as shown in figure 1.
However, when the protected pipe has special requirements (such as a high-pressure main water supply pipe), and soil around the pipeline within a certain safe distance range cannot be disturbed, the method has many adverse factors such as increased span of the cover plate culvert, increased stress on the cover plate, larger structural size and the like, thereby having great influence on structural safety and construction cost.
Therefore, how to ensure the permanent protection of the existing pipeline in road reconstruction becomes a technical problem which needs to be solved urgently by the technical personnel in the field.
Disclosure of Invention
In view of the above defects of the prior art, the invention provides a construction method for permanently protecting the existing pipeline during road reconstruction, which can not only avoid disturbance to the soil around the pipeline and meet the requirement of water and soil conservation of the special pipeline, but also reduce the span of the slab culvert and backfill materials in the culvert to the greatest extent and greatly save the construction cost.
In order to achieve the purpose, the invention discloses a construction method for permanently protecting the existing pipeline during road reconstruction, which comprises the following specific steps:
step one, lofting on the spot according to the pipeline position of the water supply steel pipe, breaking a hard layer of a pavement structure, and inserting and driving steel sheet piles at two sides of the water supply steel pipe along the safe distance range of a pipeline;
secondly, erecting a plurality of top anchoring supports on the upper parts of the steel sheet piles on the two sides along the length direction, then excavating foundation pits on the outer sides of the steel sheet piles on the two sides, and pouring side walls and cover plates on the outer sides of the steel sheet piles on the two sides in an inserting and driving mode;
step three, backfilling the foundation pit after the strength of the cover plate and the side walls on the two sides reaches 100%, pulling out the steel sheet pile after backfilling the foundation pit, and filling gaps of the steel sheet pile by adopting tracking grouting when the steel sheet pile is pulled out;
and step four, covering prefabricated cover plates on the side walls on two sides to finish the pipeline protection culvert construction of the water supply steel pipes.
Preferably, in the second step, the size of the construction covering plate includes side walls on two sides; and the other side of the foundation pit on each side is excavated by slope excavation.
The invention has the beneficial effects that:
the application of the invention can not only avoid disturbance to the soil around the pipeline and meet the requirement of water and soil conservation of the special pipeline, but also reduce the span of the slab culvert and backfill materials in the culvert to the maximum extent and greatly save the construction cost.
The conception, the specific structure and the technical effects of the present invention will be further described with reference to the accompanying drawings to fully understand the objects, the features and the effects of the present invention.
Drawings
Fig. 1 shows a schematic structure of the prior art.
Fig. 2 is a schematic view illustrating a state in which a steel sheet pile is restrained by anchor bars and an anchor head according to an embodiment of the present invention.
Fig. 3 is a diagram illustrating a state of executing step one according to an embodiment of the present invention.
Fig. 4 is a diagram illustrating a state of executing step two according to an embodiment of the present invention.
Fig. 5 is a diagram illustrating a state of performing step three according to an embodiment of the present invention.
Fig. 6 is a diagram illustrating a state of executing step four according to an embodiment of the present invention.
Detailed Description
Examples
As shown in fig. 2 to 4, the construction method for permanently protecting the existing pipeline during road reconstruction specifically comprises the following steps:
step one, lofting on the spot according to the pipeline position of the water supply steel pipe, breaking a hard layer of a pavement structure, and inserting and driving steel sheet piles at two sides of the water supply steel pipe along the safe distance range of a pipeline;
secondly, erecting a plurality of top anchoring supports on the upper parts of the steel sheet piles on the two sides along the length direction, then excavating foundation pits on the outer sides of the steel sheet piles on the two sides, and pouring side walls and cover plates on the outer sides of the steel sheet piles on the two sides in an inserting and driving mode;
step three, backfilling the foundation pit after the strength of the cover plate and the side walls on the two sides reaches 100%, pulling out the steel sheet pile after backfilling the foundation pit, and filling gaps of the steel sheet pile by adopting tracking grouting when the steel sheet pile is pulled out;
and step four, covering prefabricated cover plates on the side walls on two sides to finish the pipeline protection culvert construction of the water supply steel pipes.
The principle of the invention lies in that when a steel sheet pile supporting and anchor pulling system is applied to the construction of a pipeline protection cover plate culvert, the upper part of the steel sheet pile is restrained by anchor pulling steel bars and an anchor head, so that the disturbance of the soil body around the pipeline is avoided, and the excavation of foundation pits at two sides of the steel sheet pile and the pouring of side walls are realized.
In some embodiments, in the second step, the size of the construction covering plate includes side walls on two sides; and the other side of the foundation pit on each side is excavated by slope excavation.
The foregoing detailed description of the preferred embodiments of the invention has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.

Claims (2)

1. The construction method for permanently protecting the existing pipeline during road reconstruction comprises the following specific steps:
step one, lofting on the spot according to the pipeline position of the water supply steel pipe, breaking a hard layer of a pavement structure, and inserting and driving steel sheet piles at two sides of the water supply steel pipe along the safe distance range of a pipeline;
secondly, erecting a plurality of top anchoring supports on the upper parts of the steel sheet piles on the two sides along the length direction, then excavating foundation pits on the outer sides of the steel sheet piles on the two sides, and pouring side walls and cover plates on the outer sides of the steel sheet piles on the two sides in an inserting and driving mode;
step three, backfilling the foundation pit after the strength of the cover plate and the side walls on the two sides reaches 100%, pulling out the steel sheet pile after backfilling the foundation pit, and filling gaps of the steel sheet pile by adopting tracking grouting when the steel sheet pile is pulled out;
and step four, covering prefabricated cover plates on the side walls on two sides to finish the pipeline protection culvert construction of the water supply steel pipes.
2. The construction method for permanently protecting the existing pipeline in the process of road reconstruction as claimed in claim 1, wherein in the second step, the size of the construction covering plate is equal to the size of the side walls on the two sides of the construction covering plate; and the other side of the foundation pit on each side is excavated by slope excavation.
CN201911372739.4A 2019-12-27 2019-12-27 Construction method for permanently protecting existing pipeline during road reconstruction Pending CN111021270A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911372739.4A CN111021270A (en) 2019-12-27 2019-12-27 Construction method for permanently protecting existing pipeline during road reconstruction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911372739.4A CN111021270A (en) 2019-12-27 2019-12-27 Construction method for permanently protecting existing pipeline during road reconstruction

Publications (1)

Publication Number Publication Date
CN111021270A true CN111021270A (en) 2020-04-17

Family

ID=70214905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911372739.4A Pending CN111021270A (en) 2019-12-27 2019-12-27 Construction method for permanently protecting existing pipeline during road reconstruction

Country Status (1)

Country Link
CN (1) CN111021270A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202402795U (en) * 2011-12-28 2012-08-29 中铁十九局集团有限公司 Support device for pipelines met during tunneling in water-rich quicksand formation
CN204059403U (en) * 2014-09-02 2014-12-31 德州市公路工程总公司 A kind of low embankment existing gas pipeline insulation blocking structure
CN105953078A (en) * 2016-04-29 2016-09-21 中国冶集团有限公司 Protection device and protection method of high-pressure gas pipeline
CN205839768U (en) * 2016-07-28 2016-12-28 上海市城市建设设计研究总院 Cantilever Steel Sheet Pile foundation pit supporting construction
CN107299630A (en) * 2017-08-17 2017-10-27 浙江交工集团股份有限公司 A kind of deep & thick silt matter riverbed piping lane crosses the river double steel plate pile cofferdam structure and construction method
CN208039285U (en) * 2018-02-06 2018-11-02 广东省基础工程集团有限公司 One kind is to drawing the double-deck back-up sand steel sheet-pile cofferdam
CN208650073U (en) * 2018-08-06 2019-03-26 合肥市市政设计研究总院有限公司 Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202402795U (en) * 2011-12-28 2012-08-29 中铁十九局集团有限公司 Support device for pipelines met during tunneling in water-rich quicksand formation
CN204059403U (en) * 2014-09-02 2014-12-31 德州市公路工程总公司 A kind of low embankment existing gas pipeline insulation blocking structure
CN105953078A (en) * 2016-04-29 2016-09-21 中国冶集团有限公司 Protection device and protection method of high-pressure gas pipeline
CN205839768U (en) * 2016-07-28 2016-12-28 上海市城市建设设计研究总院 Cantilever Steel Sheet Pile foundation pit supporting construction
CN107299630A (en) * 2017-08-17 2017-10-27 浙江交工集团股份有限公司 A kind of deep & thick silt matter riverbed piping lane crosses the river double steel plate pile cofferdam structure and construction method
CN208039285U (en) * 2018-02-06 2018-11-02 广东省基础工程集团有限公司 One kind is to drawing the double-deck back-up sand steel sheet-pile cofferdam
CN208650073U (en) * 2018-08-06 2019-03-26 合肥市市政设计研究总院有限公司 Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction

Similar Documents

Publication Publication Date Title
WO2020173100A1 (en) Reinforcement apparatus and construction method for local freezing reinforcement of deep foundation pit in water-rich sand gravel stratum
CN104234080B (en) For preventing the underground pipe gallery structure deformed in high water level liquefaction site
CN110374112B (en) Deep foundation pit supporting system for weak soil field and construction method thereof
CN102434717A (en) Construction method of joist steel pipe-jacking work pit
CN109578014B (en) Anti-surging bottom sealing structure and construction method
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
JP2012026211A (en) Ground deformation preventing method and underground structure construction method using the same
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN102410031B (en) Underground space structure constructed by pile wall construction method
CN106812131B (en) A kind of permanent sheet pile underground structure and its construction method
CN108149692B (en) Supporting construction suitable for non-closed foundation ditch
CN213145577U (en) Temporary overhead supporting structure for pipeline
JP2008208533A (en) Caisson and its construction method
JP5846150B2 (en) Construction method of river revetment structure
CN110117959B (en) Construction method for foundation pit support near river
CN209066508U (en) Cross the existing electric power piping lane protection structure of tunnel foundation pit
CN210163910U (en) Pipeline pipe jacking receiving well foundation pit supporting structure
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN216839456U (en) Post grouting device for pile end of steel pipe pile
JP4226954B2 (en) Underpinning method and viaduct
CN111021270A (en) Construction method for permanently protecting existing pipeline during road reconstruction
CN112681333B (en) Foundation pit supporting structure of waterside bridge abutment foundation and construction method thereof
CN215715515U (en) Municipal pipe network construction supporting integrated structure under unfavorable geological conditions
CN201459770U (en) Joint structure between two different fender bodies in deep foundation pit
CN114908766A (en) Seepage-proofing reinforcing structure at joint of adjacent diaphragm walls and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 230041 floors 14, 15, 16, 17 and 18 floors, Yingshang Road West and Yijing Road South, Hefei, Anhui Province

Applicant after: HEFEI MUNICIPAL DESIGN AND RESEARCH INSTITUTE Co.,Ltd.

Address before: 230041 floor 14, 15, 16, 17, 18, South riotous Nanguo office building, Yingshang Road West, Yijing Road South, Hefei City, Anhui Province

Applicant before: HEFEI MUNICIPAL DESIGN AND RESEARCH INSTITUTE Co.,Ltd.