CN111008369A - Engineering cost information management system based on big data - Google Patents
Engineering cost information management system based on big data Download PDFInfo
- Publication number
- CN111008369A CN111008369A CN201911269200.6A CN201911269200A CN111008369A CN 111008369 A CN111008369 A CN 111008369A CN 201911269200 A CN201911269200 A CN 201911269200A CN 111008369 A CN111008369 A CN 111008369A
- Authority
- CN
- China
- Prior art keywords
- information
- unit
- module
- managing
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
- G06F21/31—User authentication
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Responding to the occurrence of a fault, e.g. fault tolerance
- G06F11/14—Error detection or correction of the data by redundancy in operation
- G06F11/1402—Saving, restoring, recovering or retrying
- G06F11/1446—Point-in-time backing up or restoration of persistent data
- G06F11/1458—Management of the backup or restore process
- G06F11/1464—Management of the backup or restore process for networked environments
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/604—Tools and structures for managing or administering access control systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/62—Protecting access to data via a platform, e.g. using keys or access control rules
- G06F21/6218—Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Computer Security & Cryptography (AREA)
- General Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- General Health & Medical Sciences (AREA)
- Bioethics (AREA)
- Automation & Control Theory (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a big data-based engineering cost information management system, which comprises: the user login module is used for verifying the personal client information and the user identity when the user login is performed; the information acquisition module is used for managing the acquired information content and editing, deleting and configuring the acquired information when the information is input; the business management module is used for managing projects related to the user, managing information of the projects and tracking the progress of the processes related to the projects; the supplier module is used for managing suppliers and product information provided by the suppliers. The method and the device ensure the safety of the information management platform, ensure the accuracy of the information, avoid data loss and improve the safety of the information management platform.
Description
Technical Field
The invention belongs to the field of management systems, and relates to a project cost information management system based on big data.
Background
At present, new technologies represented by mobile internet, internet of things, cloud computing and the like are widely applied to various industries in the society, and the production and living modes of people are continuously changed, so that great progress of the society is promoted. However, the application of information technology is not open to large data, no matter what information is finally converted into digital codes and stored, the data becomes a carrier for recording information, with the wide application of the information technology in the engineering cost industry, huge data are already accumulated in the engineering cost information data, and in order to better utilize the data, the data are classified and stored, and data statistical analysis is also needed.
The existing engineering cost information management system based on big data cannot guarantee the use safety of the system when in use, and other people are easy to enter the information management system, so that the situations of data loss, leakage and the like in the information system are caused.
Disclosure of Invention
The technical problem to be solved by the embodiment of the invention is to provide a big data-based engineering cost information management system, and solve the problem that the use safety of the system cannot be ensured during use.
The invention provides a project cost information management system based on big data, which specifically comprises:
the user login module is used for verifying the personal client information and the user identity when the user login is performed;
the information acquisition module is used for managing the acquired information content and editing, deleting and configuring the acquired information when the information is input;
the business management module is used for managing projects related to the user, managing information of the projects and tracking the progress of the processes related to the projects;
the supplier module is used for managing suppliers and product information provided by the suppliers.
Furthermore, the management system also comprises an information storage module which is used for storing and backing up data in all project units under the enterprise name and reviewing all data under the enterprise name.
Further, the user login module comprises:
the identity card identification is used for verifying the validity and the authenticity of the identity card used by the user;
fingerprint identification, which is used for verifying the fingerprint corresponding to the user-associated ID card;
and identifying the verification code, and verifying the properties of the user in the processes of registration, login and tariff through the verification code.
Further, the information acquisition module comprises:
the information input unit is used for writing, sequencing and transferring information and rapidly managing the acquired information content;
and the information auditing unit is used for auditing the information completed by the information input unit.
Further, the information entry unit includes:
the information writing module is used for collecting writing and changing of information, changing information content and correcting information error content;
the information sorting module is used for automatically sorting the acquired information and sorting the acquired information by a preset rule or a keyword;
and the information transfer module is used for adjusting the acquired information and changing the content and the classification deviation of the information.
Further, the service management module includes:
the investment decision unit is used for comparing the investment estimation with the bidding scheme;
the purchase bidding unit is used for bidding, auditing and inquiring the purchase of engineering materials;
the construction management unit is used for recognizing the price of engineering materials, recognizing material purchase and auditing the construction amount of the engineering;
and the completion settlement unit is used for auditing the engineering settlement and approving and evaluating after the project is completed.
Further, the supplier module includes:
the supplier information unit is used for managing the relevant information of the supplier, including name, registered money information, address information and contact information;
the material price unit is used for managing information related to the material equipment, and comprises codes, names, specifications, units, brands, prices and quotation time;
and a supplier evaluation unit for managing information related to evaluation and quality of the supplier.
Further, the information storage module includes:
the cloud storage unit is used for storing data in the engineering cost information management system;
and the backup unit is used for backing up the data in the cloud storage unit.
The embodiment of the invention has the following beneficial effects:
according to the engineering cost information management system based on big data, provided by the embodiment of the invention, the identity of the personnel using the information management platform is verified through triple information identification, so that the safety of the information management platform is ensured, other people are prevented from entering the information management platform, the accuracy of the information can be ensured through the use of the information auditing unit, the data loss can be avoided through the use of the backup unit, and the safety of the information management platform is further improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is within the scope of the present invention for those skilled in the art to obtain other drawings based on the drawings without inventive exercise.
Fig. 1 is a schematic structural diagram of a big data-based project cost information management system provided by the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, a schematic diagram of an embodiment of a big data-based project cost information management system provided by the present invention is shown, and in this embodiment, the system specifically includes:
the user login module is used for verifying the personal client information and the user identity when the user login is performed;
in a specific embodiment, the user login module includes: the identity card identification is used for verifying the validity and the authenticity of the identity card used by the user; fingerprint identification, which is used for verifying the fingerprint corresponding to the user-associated ID card; and identifying the verification code, and verifying the properties of the user in the processes of registration, login and tariff through the verification code.
Specifically, when checking personal client information, an identity card is often the most important certificate, but since many criminals often deal with the business by falsely using the identity card, the identity card cannot be used as a single identity card, so that fingerprint identification and verification code identification are introduced, the fingerprint identification is used as the most mature biological identification technology at present, and the identity card can be prevented from being stolen; in addition, the website adopts the verification code technology in order to prevent the user from automatically registering, logging in and irrigating by utilizing the robot, the user who needs to contact the verification code is helped to limit the manpower and financial resources, the verification code identification can help the platform personnel to better and more conveniently operate the work, and the work efficiency of the user is improved.
The information acquisition module is used for managing the acquired information content and editing, deleting and configuring the acquired information when the information is input;
in a specific embodiment, the information collecting module includes:
the information input unit is used for writing, sequencing and transferring information and rapidly managing the acquired information content;
specifically, the information entry unit includes: the information writing module is used for collecting writing and changing of information, changing information content and correcting information error content; the information sorting module is used for automatically sorting the acquired information and sorting the acquired information by a preset rule or a keyword; the information transfer module is used for adjusting the collected information and changing the content and the classification deviation of the information;
and the information auditing unit is used for auditing the information completed by the information input unit so as to avoid the leakage of important information, and comprises manual auditing and network data comparison, wherein the manual auditing is implemented by auditing the data input by the information input unit by a worker according to the network data, so as to determine the accuracy of the data.
The business management module is used for managing projects related to the user, managing information of the projects and tracking the progress of the processes related to the projects;
in a specific embodiment, the service management module includes: the investment decision unit is used for comparing the investment estimation with the bidding scheme; the purchase bidding unit is used for bidding, auditing and inquiring the purchase of engineering materials; the construction management unit is used for recognizing the price of engineering materials, recognizing material purchase and auditing the construction amount of the engineering; a completion settlement unit for project settlement examination and approval evaluation after project completion; the project can be created by taking a user as a unit, the information of the project can be managed, and the progress of the process related to the project can be tracked; all unit projects on the overall platform are managed and the project progress is inquired, and the function meets the requirement that a user checks the relevant data of the business indexes in the business summary.
The supplier module is used for managing suppliers and product information provided by the suppliers;
specifically, the system has the effects that in a healthy supplier management module, a supplier directly influences the operation cost, quality control, production capacity, inventory quantity and core competitiveness of an enterprise, and whether SAP finance and material management and control are stable or not is related; and analyzing the integral structure of the supplier management module, and performing investigation, assessment and control excitation assessment on the supplier so as to obtain win-win results of the enterprise and the supplier.
In a specific embodiment, the management system further includes an information storage module, configured to provide storage and backup of data in all project units under the enterprise name, and to review all data under the enterprise name; the storage module is a database or a hard disk.
Specifically, the information storage module includes:
the cloud storage unit is used for storing data in the engineering cost information management system, such as a database and a cloud space; the backup unit is used for backing up data in the cloud storage unit, such as a data storage server and a database.
For further details, reference may be made to the preceding description of the drawings, which are not described in detail herein.
The embodiment of the invention has the following beneficial effects:
according to the engineering cost information management system based on big data, provided by the embodiment of the invention, the identity of the personnel using the information management system is verified through triple information identification, so that the safety of the information management system is ensured, other people are prevented from entering the information management system, the accuracy of the information can be ensured through the use of the information auditing unit, the data loss can be avoided through the use of the backup unit, and the safety of the information management system is further improved.
While the invention has been described in connection with what is presently considered to be the most practical and preferred embodiment, it is to be understood that the invention is not to be limited to the disclosed embodiment, but on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims.
Claims (8)
1. A big data-based project cost information management system is characterized by comprising:
the user login module is used for verifying the personal client information and the user identity when the user login is performed;
the information acquisition module is used for managing the acquired information content and editing, deleting and configuring the acquired information when the information is input;
the business management module is used for managing projects related to the user, managing information of the projects and tracking the progress of the processes related to the projects;
the supplier module is used for managing suppliers and product information provided by the suppliers.
2. The system of claim 1, wherein the management system further comprises an information storage module for providing storage and backup of data in all project units under the enterprise name, and for reviewing all data under the enterprise name.
3. The system of claim 2, wherein the user login module comprises:
the identity card identification is used for verifying the validity and the authenticity of the identity card used by the user;
fingerprint identification, which is used for verifying the fingerprint corresponding to the user-associated ID card;
and identifying the verification code, and verifying the properties of the user in the processes of registration, login and tariff through the verification code.
4. The system of claim 3, wherein the information collection module comprises:
the information input unit is used for writing, sequencing and transferring information and rapidly managing the acquired information content;
and the information auditing unit is used for auditing the information completed by the information input unit.
5. The system of claim 4, wherein the information entry unit comprises:
the information writing module is used for collecting writing and changing of information, changing information content and correcting information error content;
the information sorting module is used for automatically sorting the acquired information and sorting the acquired information by a preset rule or a keyword;
and the information transfer module is used for adjusting the acquired information and changing the content and the classification deviation of the information.
6. The system of claim 5, wherein the traffic management module comprises:
the investment decision unit is used for comparing the investment estimation with the bidding scheme;
the purchase bidding unit is used for bidding, auditing and inquiring the purchase of engineering materials;
the construction management unit is used for recognizing the price of engineering materials, recognizing material purchase and auditing the construction amount of the engineering;
and the completion settlement unit is used for auditing the engineering settlement and approving and evaluating after the project is completed.
7. The system of claim 6, wherein the vendor module comprises:
the supplier information unit is used for managing the relevant information of the supplier, including name, registered money information, address information and contact information;
the material price unit is used for managing information related to the material equipment, and comprises codes, names, specifications, units, brands, prices and quotation time;
and a supplier evaluation unit for managing information related to evaluation and quality of the supplier.
8. The system of claim 7, wherein the information storage module comprises:
the cloud storage unit is used for storing data in the engineering cost information management system;
and the backup unit is used for backing up the data in the cloud storage unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911269200.6A CN111008369A (en) | 2019-12-11 | 2019-12-11 | Engineering cost information management system based on big data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911269200.6A CN111008369A (en) | 2019-12-11 | 2019-12-11 | Engineering cost information management system based on big data |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111008369A true CN111008369A (en) | 2020-04-14 |
Family
ID=70114533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911269200.6A Pending CN111008369A (en) | 2019-12-11 | 2019-12-11 | Engineering cost information management system based on big data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111008369A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106251082A (en) * | 2016-08-08 | 2016-12-21 | 青岛金智高新技术有限公司 | System for managing stock service of business |
CN108388625A (en) * | 2018-02-12 | 2018-08-10 | 安徽千云度信息技术有限公司 | A kind of software in project cost management platform based on big data |
CN108932586A (en) * | 2018-06-28 | 2018-12-04 | 南京绿新能源研究院有限公司 | EPC Project cooperation operation management system |
-
2019
- 2019-12-11 CN CN201911269200.6A patent/CN111008369A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106251082A (en) * | 2016-08-08 | 2016-12-21 | 青岛金智高新技术有限公司 | System for managing stock service of business |
CN108388625A (en) * | 2018-02-12 | 2018-08-10 | 安徽千云度信息技术有限公司 | A kind of software in project cost management platform based on big data |
CN108932586A (en) * | 2018-06-28 | 2018-12-04 | 南京绿新能源研究院有限公司 | EPC Project cooperation operation management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wang et al. | Data quality requirements analysis and modeling | |
US7904366B2 (en) | Method and system to determine resident qualifications | |
CN111383101B (en) | Post-credit risk monitoring method, post-credit risk monitoring device, post-credit risk monitoring equipment and computer readable storage medium | |
CN102663650A (en) | System for analyzing enterprise credit risk and application method thereof | |
US20190236347A1 (en) | System and method for identification of missing data elements in electronic documents | |
US11138372B2 (en) | System and method for reporting based on electronic documents | |
CN111985937A (en) | Method, system, storage medium and computer equipment for evaluating value information of transaction traders | |
CN111144697A (en) | Data processing method, data processing device, storage medium and electronic equipment | |
US20170169292A1 (en) | System and method for automatically verifying requests based on electronic documents | |
US20180011846A1 (en) | System and method for matching transaction electronic documents to evidencing electronic documents | |
CN111028072A (en) | Supply chain financial pre-loan tone data processing method and system | |
CN111709830A (en) | Credit limit determination method, device, equipment and medium | |
CN115526605A (en) | Enterprise internal control management-based approval method and system | |
CN112214508A (en) | Data processing method and device | |
CN115170090A (en) | Project management method and device, electronic equipment and readable storage medium | |
CN111489255A (en) | Data credit granting method, device, equipment and computer readable storage medium | |
CN110969411A (en) | Civil engineering construction project cost management system | |
CN106487799A (en) | Facility information storage system based on cloud platform | |
CN111242779A (en) | Financial data characteristic selection and prediction method, device, equipment and storage medium | |
CN111008369A (en) | Engineering cost information management system based on big data | |
KR100478691B1 (en) | Method and system for accessing risk of chain default by analyzing transaction risk between companies | |
KR101801155B1 (en) | Method and apparatus for analyzing subscription valuation | |
CN112000697B (en) | Enterprise performance identification method for bid evaluation | |
KR102416998B1 (en) | Appatus for automatically collecting and classification tax related documents and method thereof | |
KR20230103025A (en) | Method, Apparatus, and System for provision of corporate credit analysis and rating information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |