CN110967597A - 一种对地电容电流检测方法 - Google Patents
一种对地电容电流检测方法 Download PDFInfo
- Publication number
- CN110967597A CN110967597A CN201911239850.6A CN201911239850A CN110967597A CN 110967597 A CN110967597 A CN 110967597A CN 201911239850 A CN201911239850 A CN 201911239850A CN 110967597 A CN110967597 A CN 110967597A
- Authority
- CN
- China
- Prior art keywords
- current
- neutral point
- arc suppression
- suppression coil
- capacitance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/086—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
- G01R19/0092—Arrangements for measuring currents or voltages or for indicating presence or sign thereof measuring current only
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
- G01R27/26—Measuring inductance or capacitance; Measuring quality factor, e.g. by using the resonance method; Measuring loss factor; Measuring dielectric constants ; Measuring impedance or related variables
- G01R27/2605—Measuring capacitance
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/088—Aspects of digital computing
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Mathematical Physics (AREA)
- Theoretical Computer Science (AREA)
- Measurement Of Resistance Or Impedance (AREA)
Abstract
一种对地电容电流检测方法,涉及中压输配电技术领域。构建中性点经消弧线圈接地电路,再从电压源到电流源的变换,以消弧线圈并联可调电导的初始电导值计算中性点通过电流,然后改变消弧线圈并联电导值再次计算中性点通过电流,最后通过计算得到系统对地电容值。本发明提出了一种通过改变中性点电阻阻值,分别测量改变阻值前、后中性点过电流的值,计算系统对地电容电流的方法。其中流过中性点电流值可以直接从中性点电流互感器,即零序电流互感器得到,数值为零序电流的3倍。该方法测量信号容易得到,方法简单,对系统影响小,实用性高、精度高。
Description
技术领域
本发明涉及中压输配电技术领域,具体是涉及一种对地电容电流检测方法。
背景技术
我国35kV及以下配电网系统多采用中性点非有效接地方式,其中中性点经消弧线圈接地方式应用广泛。对该种系统,单相接地故障最为常见,发生单相接地时,接地电容电流由中性点消弧线圈电抗器补偿,限制了接地电流的大小,减少恢复电压,使电弧容易熄灭,避免电弧重燃,减少对电路危害。我国电网系统,对中性点非有效接地方式,发生单相接地故障时允许短时允许2小时,该种接地方式有效减少故障电流危害。
目前,主要采用的对地电容电流检测方法有极大值法、注入信号法、阻抗三角形法等方法。但是,注入法需要向系统注入谐波,谐波会对系统及测量造成影响,阻抗法、极值法等需要对消弧线圈反复调节,对设备造成损害。
发明内容
为解决上述问题,本发明提出一种对地电容电流检测方法,测量信号容易得到,方法简单,对系统影响小,实用性高、精度高。
为了实现上述目的,本发明所采用的技术方案为:一种对地电容电流检测方法,构建中性点经消弧线圈接地电路,再从电压源到电流源的变换,以消弧线圈并联可调电导的初始电导值计算中性点通过电流,然后改变消弧线圈并联电导值再次计算中性点通过电流,最后通过计算得到系统对地电容值。
具体的,构建中性点经消弧线圈接地电路步骤为:
电导G与电容L即导纳支路并联在线路接地回路中,其中,分别为A相、B相、C相电源的相电压;L为消弧线圈电感,G为消弧线圈并联可调电导;CA、CB、CC分别为电网A相、B相、C相的对地电容;GA、GB、GC分别为电网A相、B相、C相的对地电导。
具体的,从电压源到电流源的变换步骤为:
具体的,以消弧线圈并联可调电导的初始电导值计算中性点通过电流步骤为:
计G1消弧线圈并联可调电导的初始电导值;
计YLC为A、B、C三相电容容纳之和中性点接消弧线圈感纳的差,即:
计GΣ=GA+GB+GC为A、B、C三相电导之和;
计KZ为系统的不对称矢量和KZ=GA+jωCA+α2(GB+jωCB)+α(GC+jωCC),式中α=ej120°;
带入(1)式得到:
具体的,改变消弧线圈并联电导值再次计算中性点通过电流步骤为:
具体的,计算步骤为:
将(5)式除以(4)式:
化简得到
化简(7)式等号右边实部为GΣ,虚部为jYLC;从而计算得到系统对地电容值:
化简(7)式得到实部为
化简(7)式得到虚部为:
本发明的对地电容电流检测方法,其有益效果表现在:
本发明提出了一种通过改变中性点电阻阻值,分别测量改变阻值前、后中性点过电流的值,计算系统对地电容电流的方法。其中流过中性点电流值可以直接从中性点电流互感器,即零序电流互感器得到,数值为零序电流的3倍。该方法测量信号容易得到,方法简单,对系统影响小,实用性高、精度高。
附图说明
以下结合实施例和附图对本发明的对地电容电流检测方法作进一步的详述。
图1是中性点经消弧线圈接地电路图。
图2是对图1接地电路进行电压源到电流源的变换图。
图3是实验仿真电路图。
具体实施方式
本发明提出的一种对地电容电流检测方法,主要步骤为:构建中性点经消弧线圈接地电路,再从电压源到电流源的变换,以消弧线圈并联可调电导的初始电导值计算中性点通过电流,然后改变消弧线圈并联电导值再次计算中性点通过电流,最后通过计算得到系统对地电容值。下面依次介绍各步骤方法:
步骤①、构建中性点经消弧线圈接地电路
如图1所示,电导G与电容L即导纳支路并联在线路接地回路中。
步骤②、从电压源到电流源的变换
如图2所示,将电压源与导纳的串联转化成为电流源与导纳的并联。
步骤③、以消弧线圈并联可调电导的初始电导值计算中性点通过电流
计G1消弧线圈并联可调电导的初始电导值。
计YLC为A、B、C三相电容容纳之和中性点接消弧线圈感纳的差(又称失协度),即:
计GΣ=GA+GB+GC为A、B、C三相电导之和。
计KZ为系统的不对称矢量和KZ=GA+jωCA+α2(GB+jωCB)+α(GC+jωCC),式中α=ej120°。
带入(1)式得到:
步骤④、改变消弧线圈并联电导值再次计算中性点通过电流
步骤⑤、计算
将(5)式除以(4)式:
化简得到
化简(7)式等号右边实部为GΣ,虚部为jYLC。从而计算得到系统对地电容值:
化简(7)式得到实部为
化简(7)式得到虚部为:
根据上述测量方法原理,通过改变中性点接地电阻大小测量两次中性点电流即3倍的零序电流就可以计算出系统电容的大小。选择中性点电抗和电阻的值对测量及单相接地后可以正确的跟踪补偿至关重要。电阻和电抗的值选择需要满足两个条件:脱谐度在±5%以内;保证中性点长时间电压偏移不超过相电压额定电压的15%。下面进行仿真计算:
在matlab中搭建实验电路如图3所示。该系统为10KV配网。出线4条。L1、L2为架空线路,L3、L4为电缆线路长度分别为10、15、20、10km。由于换位不充分,L1的A相多2Km。各个线路的参数如表1,总零序电抗为1.52×10-5F谐振电感设置为0.67H。如需跟踪补偿可以在L1上设置故障,分别设置中性点接地电阻由1000Ω到300Ω和2000Ω到500Ω,记录中性点电流的变化根据公式(8)计算结果与实际相符满足测量要求(表2所示)。
表1配电系统参数
表2计算结果
以上内容仅仅是对本发明的构思所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明的构思或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。
Claims (6)
1.一种对地电容电流检测方法,其特征在于:构建中性点经消弧线圈接地电路,再从电压源到电流源的变换,以消弧线圈并联可调电导的初始电导值计算中性点通过电流,然后改变消弧线圈并联电导值再次计算中性点通过电流,最后通过计算得到系统对地电容值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911239850.6A CN110967597B (zh) | 2019-12-06 | 2019-12-06 | 一种对地电容电流检测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911239850.6A CN110967597B (zh) | 2019-12-06 | 2019-12-06 | 一种对地电容电流检测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110967597A true CN110967597A (zh) | 2020-04-07 |
CN110967597B CN110967597B (zh) | 2022-03-11 |
Family
ID=70033300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911239850.6A Active CN110967597B (zh) | 2019-12-06 | 2019-12-06 | 一种对地电容电流检测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110967597B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112595896A (zh) * | 2020-11-28 | 2021-04-02 | 国网河南省电力公司电力科学研究院 | 一种对地电容参数检测方法 |
CN112865059A (zh) * | 2020-12-30 | 2021-05-28 | 上海宏力达信息技术股份有限公司 | 一种适用于链式柔性消弧测量控制的方法及系统 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102638033A (zh) * | 2012-04-19 | 2012-08-15 | 刘宝稳 | 一种消弧线圈综合控制方法 |
CN102761119A (zh) * | 2012-07-13 | 2012-10-31 | 刘宝稳 | 变参比压法的消弧线圈跟踪调谐控制方法 |
CN104917169A (zh) * | 2015-07-10 | 2015-09-16 | 山东大学 | 用于中性点经消弧线圈接地系统的对地电容检测方法 |
US20160233661A1 (en) * | 2013-09-16 | 2016-08-11 | State Grid Corporation Of China | Single-phase-to-earth fault processing device and method for neutral non-effectively grounded distribution network |
CN106093591A (zh) * | 2016-06-27 | 2016-11-09 | 国网河南省电力公司新乡供电公司 | 一种中性点不接地配电网电容电流测量系统及方法 |
CN106802361A (zh) * | 2017-02-21 | 2017-06-06 | 国家电网公司 | 一种配网混连接地运行的电容电流测量方法及系统 |
CN107332227A (zh) * | 2017-09-05 | 2017-11-07 | 国网湖南省电力公司 | 中性点不接地系统的单相接地故障电压消弧方法及系统 |
-
2019
- 2019-12-06 CN CN201911239850.6A patent/CN110967597B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102638033A (zh) * | 2012-04-19 | 2012-08-15 | 刘宝稳 | 一种消弧线圈综合控制方法 |
CN102761119A (zh) * | 2012-07-13 | 2012-10-31 | 刘宝稳 | 变参比压法的消弧线圈跟踪调谐控制方法 |
US20160233661A1 (en) * | 2013-09-16 | 2016-08-11 | State Grid Corporation Of China | Single-phase-to-earth fault processing device and method for neutral non-effectively grounded distribution network |
CN104917169A (zh) * | 2015-07-10 | 2015-09-16 | 山东大学 | 用于中性点经消弧线圈接地系统的对地电容检测方法 |
CN106093591A (zh) * | 2016-06-27 | 2016-11-09 | 国网河南省电力公司新乡供电公司 | 一种中性点不接地配电网电容电流测量系统及方法 |
CN106802361A (zh) * | 2017-02-21 | 2017-06-06 | 国家电网公司 | 一种配网混连接地运行的电容电流测量方法及系统 |
CN107332227A (zh) * | 2017-09-05 | 2017-11-07 | 国网湖南省电力公司 | 中性点不接地系统的单相接地故障电压消弧方法及系统 |
Non-Patent Citations (2)
Title |
---|
李晓波等: "基于偏置阻抗法的配电网电容电流测量新方法", 《电力系统保护与控制》 * |
赵军等: "基于变电阻电压扰动的配电网对地参数精确测量新方法", 《电力系统保护与控制》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112595896A (zh) * | 2020-11-28 | 2021-04-02 | 国网河南省电力公司电力科学研究院 | 一种对地电容参数检测方法 |
CN112865059A (zh) * | 2020-12-30 | 2021-05-28 | 上海宏力达信息技术股份有限公司 | 一种适用于链式柔性消弧测量控制的方法及系统 |
CN112865059B (zh) * | 2020-12-30 | 2023-03-14 | 上海宏力达信息技术股份有限公司 | 一种适用于链式柔性消弧测量控制的方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN110967597B (zh) | 2022-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106093591B (zh) | 一种中性点不接地配电网电容电流测量系统及方法 | |
CN103454555B (zh) | 基于参数识别的配电网单相接地故障区段定位方法 | |
CN104898021B (zh) | 一种基于k‑means聚类分析的配电网故障选线方法 | |
CN104181442A (zh) | 基于相关分析的配电网单相接地故障区段定位方法 | |
CN103792465A (zh) | 一种基于零序电压的配电网单相接地故障测距的方法 | |
CN108957225B (zh) | 一种计及电缆分布电容的直流配电线路单端故障测距方法 | |
CN205910263U (zh) | 一种中性点不接地配电网电容电流测量系统 | |
CN110967597B (zh) | 一种对地电容电流检测方法 | |
CN111103500B (zh) | 一种计及阻尼电阻的谐振接地配电网对地参数测量方法 | |
CN112285485A (zh) | 基于故障快速转移熄弧装置的配电网故障测距方法 | |
CN112234579B (zh) | 大型水轮发电机的注入式定子接地保护方法及系统 | |
CN107831378B (zh) | 一种检验消弧线圈补偿效果的装置及方法 | |
Yang et al. | A novel fault location method for HVDC transmission lines | |
CN107870265A (zh) | 一种基于高精度dft的电网对地电容检测方法 | |
CN109001589B (zh) | 基于非全相运行故障录波数据的线路参数时域计算方法 | |
CN202748409U (zh) | 可消除工频干扰的线路工频参数测量装置 | |
CN109635374A (zh) | 一种基于动态相量时域法的短路电流计算方法及装置 | |
CN115622015A (zh) | 基于故障后配电网对地参数测量的有源消弧方法 | |
LIANG et al. | Research on setting method of time domain distance protection | |
Nan et al. | A new method of measuring capacitance current in non-effective grounding power system | |
CN105353194A (zh) | 三相中性点不接地系统的电压采样装置 | |
CN105067952B (zh) | 小电流接地系统单相接地故障的寻址系统 | |
Fu et al. | The calculation of 750kV line parameters based on ATP-EMTP simulation | |
Kong et al. | Modeling and Simulation of Fault Location with Traveling Wave for 35kV Distribution Networks | |
Gao et al. | Fault line detection based on cross correlation coefficient for distribution network with DG |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |