CN110929320A - 基于Skyline软件计算航道疏浚工程施工量的方法 - Google Patents

基于Skyline软件计算航道疏浚工程施工量的方法 Download PDF

Info

Publication number
CN110929320A
CN110929320A CN201911065252.1A CN201911065252A CN110929320A CN 110929320 A CN110929320 A CN 110929320A CN 201911065252 A CN201911065252 A CN 201911065252A CN 110929320 A CN110929320 A CN 110929320A
Authority
CN
China
Prior art keywords
dredging
skyline
software
channel
skyline software
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911065252.1A
Other languages
English (en)
Other versions
CN110929320B (zh
Inventor
郭涛
宋成果
余青容
杨建东
王鹏
顾粲
刘俊伟
黄栋
须琼辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Terry Digital Technology (beijing) Co Ltd
Changjiang Waterway Planning Design and Research Institute
Original Assignee
Terry Digital Technology (beijing) Co Ltd
Changjiang Waterway Planning Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Terry Digital Technology (beijing) Co Ltd, Changjiang Waterway Planning Design and Research Institute filed Critical Terry Digital Technology (beijing) Co Ltd
Priority to CN201911065252.1A priority Critical patent/CN110929320B/zh
Publication of CN110929320A publication Critical patent/CN110929320A/zh
Application granted granted Critical
Publication of CN110929320B publication Critical patent/CN110929320B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • Remote Sensing (AREA)
  • Computer Graphics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开一种基于Skyline软件计算航道疏浚工程施工量的方法。通过将河道地形的三维数据利用Skyline软件可视化后;在Skyline软件中完成疏浚工程量计算;然后疏浚边坡模型生成。通过三维地理信息系统软件,将疏浚工程主要涉及对象三维可视化。同时将原来复杂的疏浚工程土方量计算精细化、准确化。

Description

基于Skyline软件计算航道疏浚工程施工量的方法
技术领域
本发明属于工程设计技术,具体涉及一种利用基于Skyline软件确定航道疏浚工程施工量的技术。
背景技术
疏浚工程设计中,为了维持挖槽两侧的稳定,需根据沉积物的土力学性质和水动力条件确定一定的边坡坡度,即挖槽坡度。根据挖泥船的类型确定计算超宽和计算超深。挖槽断面一般都设计成倒梯形,倒梯形的底边即为设计挖宽,现有水深与设计水深的差值即为设计挖深。在以往的疏浚工程设计中,挖槽中线确定、尺寸设计和工程量计算等主要采用经验法或估算法,很大程度上依赖于设计者的经验及其专业知识,对设计者的要求较高,且计算结果的可重复性差,精度较低,工程量估算不准确,导致疏浚工程返工,造成经济损失。近来,随计算机科学的发展,利用计算机开发设计专业软件,推动了对疏浚工程设计中的疏浚基面拟合、疏浚区测量点边界搜索、挖槽定线、尺寸设计和疏浚量计算等方面的相关研究。航道疏浚工程量大,花费高,耗时长,疏浚基面和航道边界线是确定航道疏浚范围的基础,对计算航道疏浚量尤为重要。已有方法中,利用测量数据通过多层面叠加法拟合成航道疏浚基面,操作复杂、费时费力,直接简单连成连续的折线构成航道疏浚基面,则影响了计算精度,均有待进一步优化。同时,疏浚量和疏浚效果,没有一种可视化的直观的手段让用户看到疏浚的施工效果。
发明内容
本发明的目的在于提供一种利用Skyline软件,实现河道疏浚量的可视化。
本发明的技术方案为:基于Skyline软件计算航道疏浚工程施工量的方法,其特征在于:
S101,将河道地形的三维数据利用Skyline软件可视化;
S102,在Skyline软件中完成疏浚工程量计算;
S103,根据设定的疏浚边坡参数,利用skyline对象自动创建疏浚边坡模型,实现疏浚边坡模型可视化构建。
进一步的技术方案为:所述在Skyline软件中完成疏浚工程量计算包括:通过输入设计参数和skyline软件中拾取疏浚范围,由skyline软件创建疏浚设计对象;所述设计对象和原有河道对象进行比对,进行差值计算,即可得到疏浚施工对象。
进一步的技术方案为:所述将河道地形的三维数据利用Skyline软件可视化及入库为:将河道的数字高程模型数据中的XYZ及坐标参考信息存入空间数据库;同时也将DEM直接以高程图层对象导入Skyline桌面端软件,实现河道地形的可视化。
进一步的技术方案为:所述空间数据库是PostgreSQL。
本发明设计了一种基于Skyline软件进行疏浚工程土石方量计算以及将疏浚边坡建模可视化的方法。一方面该方法首次通过三维地理信息系统软件,将疏浚工程主要涉及对象三维可视化。一方面通过该方法,可以将原来复杂的疏浚工程土方量计算精细化、准确化。利用Skyline软件的空间分析和计算功能,不仅提高了计算精度,且工作量小,自动化程度高,简便易行。
附图说明
图1本发明方法流程图。
具体实施方式
以下结合图1本发明权利要求书技术方案予以解释。
S101,将河道地形的三维数据利用Skyline软件可视化并入库;
将现有河道的数字高程模型数据(简称DEM)中的XYZ及坐标参考信息存入空间数据库(PostgreSQL);同时也将DEM直接以高程图层对象导入Skyline桌面端软件,Skyline软件可以自动将其解析为X,Y,Z,并表现为河道地形起伏,配合河道卫星影像,实现河道三维可视化,此步骤为疏浚工程计算的基础;此步骤得到河道的初始地形M2可视化三维数据(图形);
S102,在Skyline软件中完成疏浚工程量计算;
S1021输入设计参数:基于Visual Studio开发工具,基于Skyline桌面端软件二次开发接口,设计“参数输入”界面,在该界面上可以输入疏浚工程设计水深和边坡坡比。键盘输入后,该参数会传入Skyline桌面端软件;
S1022拾取疏浚范围:基于Skyline桌面端软件提供的河道三维可视化窗口,通过鼠标拾取河道疏浚范围,
S1023创建设计疏浚对象:根据S1021输入的设计高度、边坡坡比,以及S1022绘制的疏浚范围,通过Skline的修改地形工具,可以得到一个设计数据的体对象,该对象是Skyline软件中的修改地形对象M1;
S1024创建疏浚施工对象:将S1023创建的疏浚对象M1和S1021范围内包含的河道初始地形M2(参见第一步)进行对比,通过分析设计参数与已有河道地形的差异,可以计算超深与超宽工程量,采用断面面积法、平均水深法或网格法进行计算边坡较陡的区域;拓宽不多的挖槽应采用断面面积计算,计算断面的间距宜按测深线间距选取,挖槽的起点转折点、终点和不同类别土质的界面处均应布设计断面,最终得到一个新的Skyline桌面端软件中的修改地形对象M3,该对象即为此次疏浚工程的数据对象;
S1025计算土方量:根据M3对象,利用Skyline空间分析功能,将其进行断面法计算(将该M3对象分为若干断面,计算出每个断面的面积,将相邻两个断面面积平均乘以断面间距,即为该段挖槽计算工程量,各段相加即为整个挖槽工程量),从而得到疏浚施工土方量结果;
S103,疏浚边坡模型生成
对于疏浚对象M3,涉及到河道的部分因为在水里,可以不予展现。对于边坡,由于其在河岸上,因此可以通过输入边坡设计参数(坡比、厚度、宽度、纹理、方向),利用Skyline桌面端软件的polygon对象,根据边坡角度、框选范围内的河道边界、疏浚后地面高度,从河道边界向指定角度延伸,并于地面高度线相交,自动生成一个边坡模型体,并在Skyline软件内进行自动进行贴图,可以自动构建出边坡模型,并绘制在河岸上,实现疏浚边坡模型可视化构建。
本发明在一定的水深测量DEM基础上,利用Skyline软件自身的修改地形工具和空间插值计算功能,生成的航道疏浚基面能够准确地反映真实的水下地形,提高了航道内主槽疏浚量的计算精度。只要水深测量精度高,此方法能够保证生成最大限度地接近真实水下地形的航道疏浚基面。用断面法计算航道边坡疏浚量时,当边坡疏浚最大宽度小于沿航道横断面的测量间距时,将两侧边坡航道疏浚基面的断面曲线做直线处理,不会带来进一步的误差。利用Skyline软件的空间分析和计算功能,不仅提高了计算精度,且工作量小,自动化程度高,简便易行,对专业性的要求不是很高,一般人员经过学习都能掌握与操作。
该方法可用于可辅助航道设计和疏浚施工,并且具有很大的灵活性,能针对不同的设计水深等情况快捷计算,更好地为合理的疏浚方案设计与优选服务。

Claims (4)

1.一种基于Skyline软件计算航道疏浚工程施工量的方法,其特征在于:
S101,将河道地形的三维数据利用Skyline软件可视化;
S102,在Skyline软件中完成疏浚工程量计算;
S103,根据设定的疏浚边坡参数,利用skyline对象自动创建疏浚边坡模型,实现疏浚边坡模型可视化构建。
2.如权利要求1所述基于Skyline软件计算航道疏浚工程施工量的方法,其特征在于:所述在Skyline软件中完成疏浚工程量计算包括:通过输入设计参数和skyline软件中拾取疏浚范围,由skyline软件创建疏浚设计对象;所述设计对象和原有河道对象进行比对,进行差值计算,即可得到疏浚施工对象。
3.如权利要求1所述基于Skyline软件计算航道疏浚工程施工量的方法,其特征在于:所述将河道地形的三维数据利用Skyline软件可视化及入库为:将河道的数字高程模型数据中的XYZ及坐标参考信息存入空间数据库;同时也将DEM直接以高程图层对象导入Skyline桌面端软件,实现河道地形的可视化。
4.如权利要求3所述基于Skyline软件计算航道疏浚工程施工量的方法,其特征在于:所述空间数据库是PostgreSQL。
CN201911065252.1A 2019-11-04 2019-11-04 基于Skyline软件计算航道疏浚工程施工量的方法 Active CN110929320B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911065252.1A CN110929320B (zh) 2019-11-04 2019-11-04 基于Skyline软件计算航道疏浚工程施工量的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911065252.1A CN110929320B (zh) 2019-11-04 2019-11-04 基于Skyline软件计算航道疏浚工程施工量的方法

Publications (2)

Publication Number Publication Date
CN110929320A true CN110929320A (zh) 2020-03-27
CN110929320B CN110929320B (zh) 2022-11-29

Family

ID=69850229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911065252.1A Active CN110929320B (zh) 2019-11-04 2019-11-04 基于Skyline软件计算航道疏浚工程施工量的方法

Country Status (1)

Country Link
CN (1) CN110929320B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112765717A (zh) * 2021-01-28 2021-05-07 广东长信建设有限公司 一种低能耗环保疏浚施工系统及方法
CN113325424A (zh) * 2021-06-02 2021-08-31 上海海洋大学 根据多波束水深数据估算人工鱼礁空方量的方法
CN114741770A (zh) * 2022-04-28 2022-07-12 中铁长江交通设计集团有限公司 一种基于Civil3D的疏浚断面结构及模板创建方法
CN114936396A (zh) * 2022-04-28 2022-08-23 中铁长江交通设计集团有限公司 一种基于Civil 3D的疏浚工程量自动生成方法
CN114996798A (zh) * 2022-04-28 2022-09-02 中铁长江交通设计集团有限公司 基于Civil3D的疏浚施工图自动创建方法及系统

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906771A (zh) * 2010-08-03 2010-12-08 中交天津航道局有限公司 辅助疏浚工程勘测、设计与施工的三维土质分析方法
KR101546708B1 (ko) * 2015-03-02 2015-08-24 한국건설기술연구원 3d 스캐너를 이용한 토공량 산정 시스템 및 방법
KR20160024232A (ko) * 2014-08-25 2016-03-04 서울대학교산학협력단 지반정보에 기초한 3차원 공간 모델링 방법
CN105868341A (zh) * 2016-03-29 2016-08-17 黄河勘测规划设计有限公司 适于水利工程应用的三维数字地球平台构建方法
CN107423455A (zh) * 2016-12-13 2017-12-01 广东科诺勘测工程有限公司 一种公路自动建模方法及系统
CN108375367A (zh) * 2018-01-25 2018-08-07 中铁第四勘察设计院集团有限公司 结合地面激光雷达和倾斜摄影的工点勘察方法及系统
CN110222445A (zh) * 2019-06-13 2019-09-10 四川省交通勘察设计研究院有限公司 基于bim与设计信息的集成、协同设计和交付方法及系统

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906771A (zh) * 2010-08-03 2010-12-08 中交天津航道局有限公司 辅助疏浚工程勘测、设计与施工的三维土质分析方法
KR20160024232A (ko) * 2014-08-25 2016-03-04 서울대학교산학협력단 지반정보에 기초한 3차원 공간 모델링 방법
KR101546708B1 (ko) * 2015-03-02 2015-08-24 한국건설기술연구원 3d 스캐너를 이용한 토공량 산정 시스템 및 방법
CN105868341A (zh) * 2016-03-29 2016-08-17 黄河勘测规划设计有限公司 适于水利工程应用的三维数字地球平台构建方法
CN107423455A (zh) * 2016-12-13 2017-12-01 广东科诺勘测工程有限公司 一种公路自动建模方法及系统
CN108375367A (zh) * 2018-01-25 2018-08-07 中铁第四勘察设计院集团有限公司 结合地面激光雷达和倾斜摄影的工点勘察方法及系统
CN110222445A (zh) * 2019-06-13 2019-09-10 四川省交通勘察设计研究院有限公司 基于bim与设计信息的集成、协同设计和交付方法及系统

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
DENGQINLAO6873: "SkylineGlobe 7.0.1 & 7.0.2版本Web开发如何实现土方量计算", 《HTTPS://BLOG.CSDN.NET/DENGQINLAO6873/ARTICLE/DETAILS/102435292》 *
宋贺好: "港口航道疏浚工程中的断面法挖槽土方量的计算分析", 《港口科技》 *
杨启贵: "水利工程虚拟仿真技术应用研究", 《人民长江》 *
林思等: "基于Skyline的三维水电站地理信息系统构建", 《价值工程》 *
林方炎: "东莞水道样板航道整治工程交工验收抽检方案的设计和实施", 《珠江水运》 *
陈志熔: "海洋河口疏浚工程中的三维海底地形系统设计研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
陈志熔等: "海洋河口疏浚工程中的三维海底地形系统设计研究", 《科技风》 *
陈芝等: "疏浚工程中土方量常用计算方法及其对比分析", 《中国水运(下半月)》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112765717A (zh) * 2021-01-28 2021-05-07 广东长信建设有限公司 一种低能耗环保疏浚施工系统及方法
CN113325424A (zh) * 2021-06-02 2021-08-31 上海海洋大学 根据多波束水深数据估算人工鱼礁空方量的方法
CN113325424B (zh) * 2021-06-02 2023-07-25 上海海洋大学 根据多波束水深数据估算人工鱼礁空方量的方法
CN114741770A (zh) * 2022-04-28 2022-07-12 中铁长江交通设计集团有限公司 一种基于Civil3D的疏浚断面结构及模板创建方法
CN114936396A (zh) * 2022-04-28 2022-08-23 中铁长江交通设计集团有限公司 一种基于Civil 3D的疏浚工程量自动生成方法
CN114996798A (zh) * 2022-04-28 2022-09-02 中铁长江交通设计集团有限公司 基于Civil3D的疏浚施工图自动创建方法及系统
CN114996798B (zh) * 2022-04-28 2023-04-11 中铁长江交通设计集团有限公司 基于Civil 3D的疏浚施工图自动创建方法及系统

Also Published As

Publication number Publication date
CN110929320B (zh) 2022-11-29

Similar Documents

Publication Publication Date Title
CN110929320B (zh) 基于Skyline软件计算航道疏浚工程施工量的方法
Zhang et al. Extension of a GIS procedure for calculating the RUSLE equation LS factor
CN106446349B (zh) 一种基于revit软件的土方原地摊销的计算方法
CN101906771B (zh) 辅助疏浚工程勘测、设计与施工的三维土质分析方法
CN111681316B (zh) 一种高精度河道地形插值方法
CN108978573A (zh) 一种地形数据快速可视化辅助河床演变研究的方法
Long et al. Accuracy assessment of mine walls’ surface models derived from terrestrial laser scanning
CN105118091B (zh) 一种构建多精度非均匀地质网格曲面模型的方法和系统
CN113256809A (zh) 一种基于bim的海底沉管隧道基槽的工程土方量计算方法
CN113235655B (zh) 海底沉管隧道基槽分土质工程土方量计算方法
CN111553008B (zh) 一种将边坡三维地质模型转换为二维计算剖面的方法
US7518606B2 (en) System and method for generating curved pipe objects for computer aided design models
Lee et al. BasinVis 1.0: A MATLAB®-based program for sedimentary basin subsidence analysis and visualization
CN105261067A (zh) 一种基于真三维地上地下一体化的建模方法及系统
CN106023311A (zh) 提高三维地形生成精度的方法
CN103871101A (zh) 一种基于三维布尔运算的基坑与地质体模型无缝集成方法
CN106875484A (zh) 一种基于三维地形的地质堆积体快速拟合建模方法
US7788069B2 (en) System and method for generating grading transitions
CN107507179B (zh) 基于gocad的岩土体量化分析方法
CN107886573B (zh) 一种复杂地质条件下边坡三维有限元网格生成方法
CN104005385A (zh) 拱坝坝肩稳定滑动块体体积面积的确定方法
Rulli A physically based watershed partitioning method
JP4206980B2 (ja) 沈下量予測方法及び沈下量予測プログラム
CN112967354B (zh) 一种基于有限固定断面地形与遥感影像资料生成二维地形的方法
Santillan et al. Influence of river bed elevation survey configurations and interpolation methods on the accuracy of lidar dtm-based river flow simulations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant