CN110906903A - 一种快速获得综采工作面顶板下沉量的方法 - Google Patents
一种快速获得综采工作面顶板下沉量的方法 Download PDFInfo
- Publication number
- CN110906903A CN110906903A CN201911281908.3A CN201911281908A CN110906903A CN 110906903 A CN110906903 A CN 110906903A CN 201911281908 A CN201911281908 A CN 201911281908A CN 110906903 A CN110906903 A CN 110906903A
- Authority
- CN
- China
- Prior art keywords
- top plate
- fully mechanized
- angle
- mechanized mining
- mining face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
- G01B21/02—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring length, width, or thickness
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
本发明公开了一种快速获得综采工作面顶板下沉量的方法,其特征在于,在综采工作面上对观测区域内的3‑5架综采支架顶梁安装上角度仪,在继续向前回采到顶板切顶线处时,顶板会偏斜下沉作用在悬臂状态的顶梁上,使顶梁产生一个旋转角度,角度仪将即时获得的角度值传送到电脑换算成位移值,电脑取几架的位移平均数值作为顶板下沉量输出,从而及时获得矿压观测需要的数据。
Description
技术领域
本发明属于矿山开采技术领域。
背景技术
随着煤矿开采深度增加、开采强度增大,顶板控制问题始终是煤矿安全的重大技术问题,特别是工作面经常遇到构造、高应力显现区域,出现顶板破碎现象,造成局部或大面积冒顶(即顶板事故),不但影响开采进度,而且造成顶板事故隐患。尤其是大采高开采机械化的推广应用,顶板控制问题已成为关键技术。顶板事故与支架围岩关系密切相关,支架围岩关系恶劣时,会造成断面冒顶,进而引发大面积顶板事故;如支架阻力偏小,容易造成顶板下沉过大,压死支架,造成停产停面。判断支架围关系的优劣是以研究支架与顶板适应性为前提,需要进行矿压观测;矿压观测主要包括三量观测,即支架工作阻力、活柱缩量顶板下沉量。其中顶板下沉量的是在顶底板布置固定点,在固定点安装顶板下沉测量仪。这种观测手段安装仪器繁琐,安全性也难以保障,而且随着工作面的推进不断变换位置。尤其在机械化程度高、工作面推进速度快的条件下,在现场很难做到快速的实时的进行顶板下沉量的定量观测。因此,需要一种根据目前机械化程度高、工作面推进速度快的特点,进行简单、快速易行的顶板下沉量的定量观测方法。
发明内容
本发明的目的是针对综采工作面顶板下沉量难以快速、量化观测的问题,提出一种新的、具有及时、快速的对顶板下沉进行观测的方法。
本发明的技术方案是,一种快速获得综采工作面顶板下沉量的方法,其特征在于,在综采工作面上,选取顶板整体上平整的一个区域作为观测区,对观测区域内的3-5架综采支架顶梁安装上角度仪,要求在综采支架上间隔安装,且安装在顶梁位置,角度仪用于自动观测顶梁与水平面的角度;在综采工作面回采到观测区时,对于割煤暴露出的凹凸不平顶板用采煤机切割修整,能使综采支架移架后使顶梁处于基本平整的顶板上;在继续向前回采到顶板切顶线处时,顶板会偏斜下沉作用在悬臂状态的顶梁上,使顶梁产生一个旋转角度,角度仪将即时获得的角度值传送到电脑换算成位移值,电脑取几架的位移平均数值作为顶板下沉量输出,从而及时获得矿压观测需要的数据。
本发明的积极效果是:
1、在综采支架上紧跟工作面获得矿压观测需要的数据,快速及时,满足矿压观测的要求,代替了过去在顶底板布置固定点的繁琐和难以长期保留观测的问题。
2、通过观测支架顶梁角度,间接观测了切顶线处的下沉量,通过电脑可以以图表形式显示,供观测人员采用。
附图说明
图1是实施例的原理图。
具体实施方式
根据发明内容所述的技术方案和图1所示的原理图,本领域技术人员即可实施,在此不再详述。需要说明的是,计算下沉量c时,根据角度仪获得的角度值a和综采支架顶梁长度b按照三角函数公式即可计算。
Claims (1)
1.一种快速获得综采工作面顶板下沉量的方法,其特征在于,在综采工作面上,选取顶板整体上平整的一个区域作为观测区,对观测区域内的3-5架综采支架顶梁安装上间隔安装上角度仪,角度仪角度仪用于自动观测顶梁与水平面的角度;在综采工作面回采到观测区时,对于割煤暴露出的凹凸不平顶板用采煤机切割修整,能使综采支架移架后使顶梁处于基本平整的顶板上;在继续向前回采到顶板切顶线处时,顶板会偏斜下沉作用在悬臂状态的顶梁上,使顶梁产生一个旋转角度,角度仪将即时获得的角度值传送到电脑换算成位移值,电脑取几架的位移平均数值作为顶板下沉量输出,从而及时获得矿压观测需要的数据。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911281908.3A CN110906903A (zh) | 2019-12-13 | 2019-12-13 | 一种快速获得综采工作面顶板下沉量的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911281908.3A CN110906903A (zh) | 2019-12-13 | 2019-12-13 | 一种快速获得综采工作面顶板下沉量的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110906903A true CN110906903A (zh) | 2020-03-24 |
Family
ID=69825435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911281908.3A Pending CN110906903A (zh) | 2019-12-13 | 2019-12-13 | 一种快速获得综采工作面顶板下沉量的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110906903A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100793945B1 (ko) * | 2007-04-13 | 2008-01-16 | 주식회사 이제이텍 | 선행침하량을 이용한 효율적인 터널굴착방법 |
CN101952547A (zh) * | 2008-02-19 | 2011-01-19 | 拉格股份公司 | 在地下煤矿开采的长壁式开采作业中自动建立确定的工作面开口的方法 |
CN101970795A (zh) * | 2008-02-19 | 2011-02-09 | 拉格股份公司 | 控制长壁开采作业的方法 |
-
2019
- 2019-12-13 CN CN201911281908.3A patent/CN110906903A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100793945B1 (ko) * | 2007-04-13 | 2008-01-16 | 주식회사 이제이텍 | 선행침하량을 이용한 효율적인 터널굴착방법 |
CN101952547A (zh) * | 2008-02-19 | 2011-01-19 | 拉格股份公司 | 在地下煤矿开采的长壁式开采作业中自动建立确定的工作面开口的方法 |
CN101970795A (zh) * | 2008-02-19 | 2011-02-09 | 拉格股份公司 | 控制长壁开采作业的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102841030B (zh) | 用于隧道掘进机刀具破岩机理模态研究的试验平台 | |
CN101446537B (zh) | 一种可调式多滚刀切削破岩试验装置 | |
Gong et al. | Development of a mechanical rock breakage experimental platform | |
AU2008351278B2 (en) | Method for automatically creating a defined face opening in plow operations in coal mining | |
CN204804853U (zh) | 滚筒式矩形盾构机 | |
CN103969141A (zh) | 一种硬岩滚刀破岩特性测试装置 | |
ATE533918T1 (de) | Verfahren und einrichtung zur überwachung einer schneidenden gewinnungsmaschine | |
CN104020055A (zh) | 多功能粗颗粒土直剪、固结装置 | |
CN108733964A (zh) | 短壁块段式采煤覆岩导水裂隙带发育高度预测方法 | |
CN109505654B (zh) | 一种重复采动影响下巷道防冒顶支护方法 | |
CN102955025A (zh) | 一种煤矿采场上覆岩梁断裂带高度及范围确定方法 | |
CN115758671A (zh) | 围岩巷道加强锚注支护全生命周期管理方法、系统及应用 | |
CN104949851A (zh) | 类矩形盾构切削推进模拟试验系统 | |
CN108426663B (zh) | 一种矩形钻孔应力监测装置及监测方法 | |
CN110906903A (zh) | 一种快速获得综采工作面顶板下沉量的方法 | |
Kong et al. | Development and application of a physical model for longwall coal face failure simulation | |
CA2986142C (en) | Method for monitoring early subsidence of roof during fully-mechanized solid filling mining | |
CN110579194B (zh) | 沿空巷道侧向基本顶岩梁断裂位置的现场测试方法及应用 | |
CN110119527A (zh) | 一种注浆锚索超前支护回采工作面巷道稳定性评价方法 | |
CN104763424A (zh) | 沿空掘巷合理位置的确定方法 | |
CN204903189U (zh) | 类矩形盾构切削推进模拟试验系统 | |
CN109522612B (zh) | 一种基于综采液压支架受力反演直接顶厚度的方法 | |
Andrews et al. | Advanced techniques for the monitoring of pillar and excavation behaviour at a deep level massive mine | |
Clarkson | Effect of punch longwall retreat on highwall stability | |
CN205654344U (zh) | 一种用于开采模拟煤层的多功能采煤铲 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 266590 No. 579, Bay Road, Huangdao District, Shandong, Qingdao Applicant after: Shandong University of Science and Technology Address before: 271000 Shandong Province, Tai'an city Taishan District mountain Street No. 223 Tai'an campus of Shandong University of Science and Technology Applicant before: Shandong University of Science and Technology |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200324 |
|
RJ01 | Rejection of invention patent application after publication |