CN102955025B - 一种煤矿采场上覆岩梁断裂带高度及范围确定方法 - Google Patents
一种煤矿采场上覆岩梁断裂带高度及范围确定方法 Download PDFInfo
- Publication number
- CN102955025B CN102955025B CN201210483350.9A CN201210483350A CN102955025B CN 102955025 B CN102955025 B CN 102955025B CN 201210483350 A CN201210483350 A CN 201210483350A CN 102955025 B CN102955025 B CN 102955025B
- Authority
- CN
- China
- Prior art keywords
- stope
- stress
- rock
- monitoring
- fracture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Geophysics And Detection Of Objects (AREA)
- Force Measurement Appropriate To Specific Purposes (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210483350.9A CN102955025B (zh) | 2012-11-14 | 2012-11-14 | 一种煤矿采场上覆岩梁断裂带高度及范围确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210483350.9A CN102955025B (zh) | 2012-11-14 | 2012-11-14 | 一种煤矿采场上覆岩梁断裂带高度及范围确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102955025A CN102955025A (zh) | 2013-03-06 |
CN102955025B true CN102955025B (zh) | 2014-08-20 |
Family
ID=47764103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210483350.9A Active CN102955025B (zh) | 2012-11-14 | 2012-11-14 | 一种煤矿采场上覆岩梁断裂带高度及范围确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102955025B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105783854A (zh) * | 2016-03-07 | 2016-07-20 | 辽宁工程技术大学 | 一种煤矿采空区充填后的覆岩移动变形监测系统 |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103267601B (zh) * | 2013-05-07 | 2014-10-08 | 山东科技大学 | 采空区覆岩运动稳定性监测系统及稳定性监测判别方法 |
CN105257337B (zh) * | 2015-10-20 | 2017-08-25 | 辽宁工程技术大学 | 基于板壳理论的充填开采覆岩断裂带高度确定方法 |
CN108318931B (zh) * | 2017-12-14 | 2019-12-31 | 中国矿业大学 | 高精度、本质安全煤层顶板导水裂隙带高度实时监测方法 |
CN108414729B (zh) * | 2018-03-12 | 2020-10-02 | 河南理工大学 | 顶煤破碎特性模拟研究装置及其模拟试验方法 |
CN109059833B (zh) * | 2018-08-09 | 2019-05-24 | 山东科技大学 | 温度-渗流-应力耦合作用下承压水导升带高度确定方法 |
CN110579194B (zh) * | 2019-09-26 | 2021-01-12 | 山东科技大学 | 沿空巷道侧向基本顶岩梁断裂位置的现场测试方法及应用 |
CN110967466B (zh) * | 2019-11-13 | 2022-05-17 | 鞍钢集团矿业有限公司 | 采场空区稳定性的评价方法 |
CN116822008B (zh) * | 2023-06-02 | 2023-12-26 | 山东科技大学 | 一种构建煤矿三维透视采场的方法及系统 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1131463A (en) * | 1980-08-01 | 1982-09-14 | Susan A. De Korompay | Method of fracturation detection |
JP2000337070A (ja) * | 1999-05-26 | 2000-12-05 | Shimizu Corp | 掘削または穿孔時の地質・地層変化の判定方法 |
CN102455176A (zh) * | 2010-10-20 | 2012-05-16 | 山西潞安环保能源开发股份有限公司 | 一种采场上覆岩层破坏高度的监测方法 |
CN202362466U (zh) * | 2011-12-08 | 2012-08-01 | 山西潞安环保能源开发股份有限公司 | 采煤工作面导水裂隙带高度探测装置 |
CN102590853A (zh) * | 2012-01-12 | 2012-07-18 | 山东科技大学 | 冲击地压煤层动压扰动范围微观定量观测方法 |
-
2012
- 2012-11-14 CN CN201210483350.9A patent/CN102955025B/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105783854A (zh) * | 2016-03-07 | 2016-07-20 | 辽宁工程技术大学 | 一种煤矿采空区充填后的覆岩移动变形监测系统 |
CN105783854B (zh) * | 2016-03-07 | 2019-04-09 | 辽宁工程技术大学 | 一种煤矿采空区充填后的覆岩移动变形监测系统 |
Also Published As
Publication number | Publication date |
---|---|
CN102955025A (zh) | 2013-03-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102955025B (zh) | 一种煤矿采场上覆岩梁断裂带高度及范围确定方法 | |
Zhang et al. | Ground response of a gob-side entry in a longwall panel extracting 17 m-thick coal seam: a case study | |
AU2017421071B2 (en) | Three-aspect integrated monitoring method for strata control | |
CN106779231B (zh) | 一种基于采空区压力监测的煤矿采空区飓风灾害预警方法 | |
CN104237024B (zh) | 一种矿井工作面底板采动破坏模拟试验方法 | |
CN103076119B (zh) | 一种巷道底鼓主控应力测量的方法 | |
CN110390152A (zh) | 一种模拟巷道围岩裂隙演化的离散元方法 | |
CN104266913A (zh) | 一种矿井工作面底板采动破坏模拟试验装置 | |
CN104653226A (zh) | 一种基于应力梯度的煤矿冲击地压危险区域的划分方法 | |
CN103726851B (zh) | 一种降低深埋隧道穿越断层区域岩爆风险的开挖方法 | |
CN112483068B (zh) | 一种采煤工作面超前顶板预裂爆破钻孔的倾角确定方法 | |
CN111077576A (zh) | 地面压裂的监测方法 | |
CN102944906B (zh) | 煤矿顶板裂隙形态及其演化过程的精密搜索观测方法 | |
CN102997886A (zh) | 远程测控底板岩层破坏深度监测方法 | |
Yang et al. | In situ investigations into mining-induced hard main roof fracture in longwall mining: a case study | |
CN114251103A (zh) | 一种定向切缝压裂顶板大巷防冲护巷方法及安全采矿方法 | |
CN104089595B (zh) | 回采工作面基本顶超前断裂距离的确定方法 | |
CN202914103U (zh) | 煤矿采场上覆岩梁断裂带高度及范围监测系统 | |
CN104832163A (zh) | 一种煤矿地下开采中冲击地压危险性的监测方法 | |
CN111173487B (zh) | 区域式水力压裂的监测方法 | |
CN111677514A (zh) | 顶板弱化方法 | |
CN112780276A (zh) | 一种注浆改造复合顶板的全闭合爆破卸压结构及自留巷方法 | |
CN110988502A (zh) | 一种监测矿井煤岩破裂电场强度变化的测站布置方法 | |
CN114961713A (zh) | 一种确定动压巷道水力压裂切顶卸压时机的方法及系统 | |
CN102590853A (zh) | 冲击地压煤层动压扰动范围微观定量观测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Wen Zhijie Inventor after: Liu Guiren Inventor after: Jiang Yujing Inventor after: Zhu Zhuwu Inventor after: Wang Gang Inventor after: Wu Xuezhen Inventor before: Wen Zhijie Inventor before: Jiang Yujing Inventor before: Zhu Zhuwu Inventor before: Wang Gang Inventor before: Wu Xuezhen |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WEN ZHIJIE JIANG YUJING ZHU ZHUWU WANG GANG WU XUEZHEN TO: WEN ZHIJIE LIU GUIREN JIANG YUJING ZHU ZHUWU WANG GANG WU XUEZHEN |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |