CN110905494A CN201911153958.3A CN201911153958A CN110905494A CN 110905494 A CN110905494 A CN 110905494A CN 201911153958 A CN201911153958 A CN 201911153958A CN 110905494 A CN110905494 A CN 110905494A
Authority
CN
China
Prior art keywords
storage type
pipe
pressure gauge
type pressure
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911153958.3A
Other languages
Chinese (zh)
Inventor
朱洪征
周志平
常莉静
吕亿明
甘庆明
李大建
苏祖波
周杨帆
王百
崔文昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201911153958.3A priority Critical patent/CN110905494A/en
Publication of CN110905494A publication Critical patent/CN110905494A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/122Multiple string packers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Abstract

The invention discloses a pipe column and a method for judging the heterogeneous degree of a horizontal well shaft reservoir stratum, wherein the pipe column comprises a guide screw plug, a tail pipe, a multi-stage connection unit, a connection oil pipe and a top oil pipe, the guide screw plug is connected with one end of the tail pipe, the other end of the tail pipe is connected with the multi-stage connection unit, the multi-stage connection unit is communicated with an oil well pump through the connection oil pipe, the upper end of the oil well pump is connected with one end of a sucker rod arranged in the top oil pipe, the other end of the sucker rod is connected with a ground. The invention utilizes the packer to clamp and open the testing interval, each interval is provided with a corresponding storage type pressure gauge, the storage type pressure gauge measures the pressure recovery of different testing intervals, the pressure recovery is produced through ground swabbing, then the storage type pressure gauge is taken out to play back pressure data, and the stratum permeability of each testing interval is inversely worked out according to the actually measured pressure recovery curve, so that the permeability of each testing interval can be effectively obtained, and the heterogeneous degree of a shaft well bore of a horizontal well is obtained.

Description

Horizontal well shaft reservoir heterogeneous degree judging pipe column and judging method
Technical Field
The invention belongs to the technical field of petroleum industry, and particularly relates to a tubular column and a method for judging the heterogeneous degree of a horizontal well shaft reservoir stratum.
Background
At present, because the difference between horizontal well sections is large, partial sections can meet water in advance to cause water meeting of the whole well and influence the yield, and in order to effectively treat the water meeting problem, a water outlet section must be found out. The existing water finding process mainly uses mechanical water finding and test water finding, but has the problems of long construction period and high cost. The conventional horizontal well stopping pressure measurement, bottom closing pressure measurement modes and flow test data are mainly applied to vertical well testing at present, but for multi-section fractured horizontal wells, the evaluation of the productivity in sections cannot be realized through testing, and the cross flow between seams and the heterogeneous degree of a shaft reservoir can be identified.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides a tubular column and a method for judging the heterogeneous degree of a horizontal well shaft reservoir, and overcomes the defects that in the prior art, the non-homogeneous degree of the horizontal well shaft reservoir is 1: the problems of long construction period and high cost exist in mechanical water detection and water detection test; 2: the modes of stopping and measuring pressure of the horizontal well and closing the well at the bottom of the horizontal well are not suitable for a multi-section fractured horizontal well; 3: the prior art can not realize the evaluation of the segmented productivity through testing, and can identify the channeling among seams, the heterogeneous degree of a shaft reservoir and the like.
In order to solve the technical problem, the technical scheme of the invention is as follows: the utility model provides a tubular column is differentiateed to heterogeneous degree of horizontal well pit shaft reservoir, includes guide plug, tail pipe, multi-stage connection unit, connecting oil pipe and top oil pipe, wherein guide plug connects tail pipe one end, multi-stage connection unit is connected to the tail pipe other end, and wherein multi-stage connection unit is through connecting oil pipe and oil-well pump intercommunication, the sucker rod one end of establishing in the top oil pipe is connected to the oil-well pump upper end, and wherein ground beam-pumping unit is connected to the sucker rod other end, and wherein top oil pipe is connected to the well.
Preferably, the multi-stage connection unit comprises a plurality of storage pressure gauges and a plurality of packers, the plurality of packers are used for blocking off a plurality of test intervals of the test well, and the plurality of storage pressure gauges are used for performing segmented pressure test, wherein one storage pressure gauge corresponds to one test interval.
Preferably, the multistage connection unit comprises a first storage type pressure gauge, a first packer, a second storage type pressure gauge, a second packer, a third storage type pressure gauge … … n-1 packer and an n storage type pressure gauge which are sequentially connected through a connecting oil pipe, wherein the first storage type pressure gauge is connected with a tail pipe, the n storage type pressure gauge is communicated with an oil well pump through the connecting oil pipe, the first packer, the second packer … … and the n-1 packer are respectively arranged between two adjacent test intervals, and the first storage type pressure gauge, the second storage type pressure gauge, the third storage type pressure gauge … … and the n storage type pressure gauge are respectively arranged at each test interval.
Preferably, each storage type pressure gauge is a CY-2 type storage type pressure gauge, the pressure measuring range of the pressure gauge is 0-70 Mpa, and each packer is a compression packer.
Preferably, a screen pipe is arranged on a connecting oil pipe between the multistage connecting unit and the oil well pump.
Preferably, the method for judging the heterogeneous degree of the horizontal well shaft reservoir stratum comprises the following steps:
step 1) connecting and judging tubular columns: preparing corresponding guide plug, tail pipe, a plurality of storage type pressure gauges, a plurality of packers, connecting oil pipe and top oil pipe according to the number of test intervals of the test well, connecting the guide plug, the tail pipe, the storage type pressure gauges, the packers, the connecting oil pipe and the top oil pipe in sequence, and setting the acquisition time of each storage type pressure gauge on the ground by taking minutes as a time unit;
step 2), a judging pipe column is put in: combining the pipe columns according to the number of test intervals of the test well, then putting the pipe columns into the well, putting each packer to a preset position, ensuring that each test interval corresponds to a storage type pressure gauge, connecting an oil well pump with a sucker rod, putting the sucker rod into a top oil pipe, and connecting the sucker rod with a ground pumping unit;
step 3), swabbing production: continuous production for a period of time t by using ground pumping unitpThen, measuring the total liquid amount of the well head to be q through the ground;
step 4) pressure recovery test: setting each packer to open each testing layer section, wherein each testing layer section is correspondingly provided with a storage type pressure gauge, closing the well to measure pressure recovery, and the closing time is
Figure 808529DEST_PATH_IMAGE002
Carrying out a segmented pressure recovery test by using a storage type pressure gauge;
step 5), pulling out a distinguishing pipe column: lifting the distinguishing pipe column, unsealing each packer and pulling out the distinguishing pipe column;
step 6) playback data: taking down each storage type pressure gauge, playing back data, drawing a pressure curve of each test interval, obtaining the ratio of the initial pressure of each test interval to the tail end recovery pressure, and dividing the total liquid amount of the well mouth into absolute liquid production of each test interval according to the speed of pressure recovery of each test interval;
step 7) data analysis: and fitting a curve slope according to the pressure curve of each test interval, obtaining the slope of a straight line segment of the curve by using a formula of a Horner curve analysis method, enabling the slope of the straight line segment to be the same as the slope of the fitted curve, and reversely calculating the permeability k of each test interval of the stratum.
Preferably, the formula of the Horner curve analysis method in the step 7) and the slope formula of the straight line segment are as follows:
Figure 454231DEST_PATH_IMAGE004
Figure 94610DEST_PATH_IMAGE006
in the formula:
Pwsrecovering pressure, MPa, for the tail end;
Piinitial pressure, MPa;
b is the volume coefficient of the crude oil;
u is the fluid viscosity, mPa · s;
k is the formation permeability, um2
h is the formation thickness, m;
q is the total liquid amount of the well head measured on the ground, m3/d;
tpProduction time, h;
Figure 759991DEST_PATH_IMAGE002
closing the well for time h;
Figure 93803DEST_PATH_IMAGE008
the slope of the straight line segment.
Compared with the prior art, the invention has the advantages that:
(1) the judging pipe column comprises a guide plug, a tail pipe, a multi-stage connecting unit, a connecting oil pipe and a top oil pipe which are sequentially connected, an oil well pump is connected with a sucker rod and is put into the top oil pipe, the sucker rod is connected with a ground pumping unit, the multi-stage connecting unit comprises a plurality of storage type pressure gauges and a plurality of packers, the corresponding storage type pressure gauges and the corresponding packers can be arranged according to the number of testing intervals, the plurality of packers are utilized to block off a plurality of testing intervals of a testing well, a plurality of storage type pressure gauges are utilized to carry out segmented pressure testing, the pressure data are played back through ground swabbing production, the storage type pressure gauges are used for playing back pressure data, the stratum permeability of each testing interval is reversely worked out according to an actually measured pressure recovery curve, the permeability of each testing interval can be effectively obtained;
(2) the discrimination method of the invention realizes the explanation of stratum permeability of each test interval by a horizontal well production and simultaneous subsection pressure measurement method, discriminates the heterogeneous degree of a reservoir in the direction of a shaft of the horizontal well, can determine the position of high liquid production and the direction of water coming at the same time, and provides parameters such as pressure, liquid amount, half-length of cracks and the like of the relevant test interval, the discrimination method of the invention has simple process, high test accuracy, low cost and short period, and solves the problems of inaccurate well measurement of low liquid amount, high cost and long subsection production test method period of the conventional electric measurement method;
(3) the tubular column for distinguishing the heterogeneous degree of the horizontal well shaft reservoir is simple in structure, convenient to use and high in practicability, and can be widely applied to distinguishing the heterogeneous degree of various horizontal well shaft reservoirs.
Drawings
FIG. 1 is a schematic structural diagram of a horizontal well shaft reservoir heterogeneous degree judging pipe column;
FIG. 2 is a flow chart of a method for judging the heterogeneous degree of a horizontal well shaft reservoir.
Description of reference numerals:
1-guide plug, 2-tail pipe, 3-first storage type pressure gauge, 4-first packer, 5-second storage type pressure gauge, 6-second packer, 7-third storage type pressure gauge, 8-sieve tube, 9-connecting oil pipe, 10-oil pump, 11-sucker rod, 12-ground oil pumping machine and 13-top oil pipe.
Detailed Description
The following describes embodiments of the present invention with reference to examples:
it should be noted that the structures, proportions, sizes, and other elements shown in the specification are included for the purpose of understanding and reading only, and are not intended to limit the scope of the invention, which is defined by the claims, and any modifications of the structures, changes in the proportions and adjustments of the sizes, without affecting the efficacy and attainment of the same.
In addition, the terms "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for clarity of description, and are not intended to limit the scope of the present invention, and the relative relationship between the terms and the terms is not to be construed as a scope of the present invention.
Example 1
As shown in figure 1, the invention discloses a horizontal well shaft reservoir heterogeneous degree judging pipe column which comprises a guide plug 1, a tail pipe 2, a multi-stage connecting unit, a connecting oil pipe 9 and a top oil pipe 13, wherein the guide plug 1 is connected with one end of the tail pipe 2, the other end of the tail pipe 2 is connected with the multi-stage connecting unit, the multi-stage connecting unit is communicated with an oil well pump 10 through the connecting oil pipe 9, the upper end of the oil well pump 10 is connected with one end of a sucker rod 11 arranged in the top oil pipe 13, the other end of the sucker rod 11 is connected with a ground oil pumping unit 12, and the top oil pipe 13.
Example 2
As shown in figure 1, the invention discloses a horizontal well shaft reservoir heterogeneous degree judging pipe column which comprises a guide plug 1, a tail pipe 2, a multi-stage connecting unit, a connecting oil pipe 9 and a top oil pipe 13, wherein the guide plug 1 is connected with one end of the tail pipe 2, the other end of the tail pipe 2 is connected with the multi-stage connecting unit, the multi-stage connecting unit is communicated with an oil well pump 10 through the connecting oil pipe 9, the upper end of the oil well pump 10 is connected with one end of a sucker rod 11 arranged in the top oil pipe 13, the other end of the sucker rod 11 is connected with a ground oil pumping unit 12, and the top oil pipe 13.
Preferably, as shown in fig. 1, the multi-stage connection unit includes a plurality of storage pressure gauges and a plurality of packers, the plurality of packers are used for blocking off a plurality of test intervals of the test well, and the plurality of storage pressure gauges are used for performing a step pressure test, wherein one storage pressure gauge corresponds to one test interval.
Example 3
As shown in figure 1, the invention discloses a horizontal well shaft reservoir heterogeneous degree judging pipe column which comprises a guide plug 1, a tail pipe 2, a multi-stage connecting unit, a connecting oil pipe 9 and a top oil pipe 13, wherein the guide plug 1 is connected with one end of the tail pipe 2, the other end of the tail pipe 2 is connected with the multi-stage connecting unit, the multi-stage connecting unit is communicated with an oil well pump 10 through the connecting oil pipe 9, the upper end of the oil well pump 10 is connected with one end of a sucker rod 11 arranged in the top oil pipe 13, the other end of the sucker rod 11 is connected with a ground oil pumping unit 12, and the top oil pipe 13.
Preferably, as shown in fig. 1, the multi-stage connection unit includes a plurality of storage pressure gauges and a plurality of packers, the plurality of packers are used for blocking off a plurality of test intervals of the test well, and the plurality of storage pressure gauges are used for performing a step pressure test, wherein one storage pressure gauge corresponds to one test interval.
Preferably, as shown in fig. 1, the multistage connection unit includes a first storage type pressure gauge 3, a first packer 4, a second storage type pressure gauge 5, a second packer 6, a third storage type pressure gauge 7 … …, an n-1 th packer and an n-1 th storage type pressure gauge which are sequentially connected through a connecting oil pipe 9, wherein the first storage type pressure gauge 3 is connected with a tail pipe 2, the n-th storage type pressure gauge is communicated with an oil well pump 10 through the connecting oil pipe 9, the first packer 4, the second packer 6 … … and the n-1 th packer are respectively arranged between two adjacent test intervals, and the first storage type pressure gauge 3, the second storage type pressure gauge 5 … … and the n-th storage type pressure gauge are respectively arranged at each test interval.
Example 4
As shown in figure 1, the invention discloses a horizontal well shaft reservoir heterogeneous degree judging pipe column which comprises a guide plug 1, a tail pipe 2, a multi-stage connecting unit, a connecting oil pipe 9 and a top oil pipe 13, wherein the guide plug 1 is connected with one end of the tail pipe 2, the other end of the tail pipe 2 is connected with the multi-stage connecting unit, the multi-stage connecting unit is communicated with an oil well pump 10 through the connecting oil pipe 9, the upper end of the oil well pump 10 is connected with one end of a sucker rod 11 arranged in the top oil pipe 13, the other end of the sucker rod 11 is connected with a ground oil pumping unit 12, and the top oil pipe 13.
Preferably, as shown in fig. 1, the multi-stage connection unit includes a plurality of storage pressure gauges and a plurality of packers, the plurality of packers are used for blocking off a plurality of test intervals of the test well, and the plurality of storage pressure gauges are used for performing a step pressure test, wherein one storage pressure gauge corresponds to one test interval.
Preferably, as shown in fig. 1, the multistage connection unit includes a first storage type pressure gauge 3, a first packer 4, a second storage type pressure gauge 5, a second packer 6, a third storage type pressure gauge 7 … …, an n-1 th packer and an n-1 th storage type pressure gauge which are sequentially connected through a connecting oil pipe 9, wherein the first storage type pressure gauge 3 is connected with a tail pipe 2, the n-th storage type pressure gauge is communicated with an oil well pump 10 through the connecting oil pipe 9, the first packer 4, the second packer 6 … … and the n-1 th packer are respectively arranged between two adjacent test intervals, and the first storage type pressure gauge 3, the second storage type pressure gauge 5, the third storage type pressure gauge 7 … … and the n-1 th storage type pressure gauge are respectively arranged at each test interval.
Preferably, each storage type pressure gauge is a CY-2 type storage type pressure gauge, the pressure measuring range of the pressure gauge is 0-70 Mpa, and each packer is a compression packer.
Example 5
As shown in figure 1, the invention discloses a horizontal well shaft reservoir heterogeneous degree judging pipe column which comprises a guide plug 1, a tail pipe 2, a multi-stage connecting unit, a connecting oil pipe 9 and a top oil pipe 13, wherein the guide plug 1 is connected with one end of the tail pipe 2, the other end of the tail pipe 2 is connected with the multi-stage connecting unit, the multi-stage connecting unit is communicated with an oil well pump 10 through the connecting oil pipe 9, the upper end of the oil well pump 10 is connected with one end of a sucker rod 11 arranged in the top oil pipe 13, the other end of the sucker rod 11 is connected with a ground oil pumping unit 12, and the top oil pipe 13.
Preferably, as shown in fig. 1, the multi-stage connection unit includes a plurality of storage pressure gauges and a plurality of packers, the plurality of packers are used for blocking off a plurality of test intervals of the test well, and the plurality of storage pressure gauges are used for performing a step pressure test, wherein one storage pressure gauge corresponds to one test interval.
Preferably, as shown in fig. 1, the multistage connection unit includes a first storage type pressure gauge 3, a first packer 4, a second storage type pressure gauge 5, a second packer 6, a third storage type pressure gauge 7 … …, an n-1 th packer and an n-1 th storage type pressure gauge which are sequentially connected through a connecting oil pipe 9, wherein the first storage type pressure gauge 3 is connected with a tail pipe 2, the n-th storage type pressure gauge is communicated with an oil well pump 10 through the connecting oil pipe 9, the first packer 4, the second packer 6 … … and the n-1 th packer are respectively arranged between two adjacent test intervals, and the first storage type pressure gauge 3, the second storage type pressure gauge 5, the third storage type pressure gauge 7 … … and the n-1 th storage type pressure gauge are respectively arranged at each test interval.
Preferably, each storage type pressure gauge is a CY-2 type storage type pressure gauge, the pressure measuring range of the pressure gauge is 0-70 Mpa, and each packer is a compression packer.
Preferably, as shown in fig. 1, a screen 8 is arranged on a connecting oil pipe 9 between the multi-stage connecting unit and the oil well pump 10.
Example 6
As shown in figure 1, the invention discloses a horizontal well shaft reservoir heterogeneous degree judging pipe column which comprises a guide plug 1, a tail pipe 2, a multi-stage connecting unit, a connecting oil pipe 9 and a top oil pipe 13, wherein the guide plug 1 is connected with one end of the tail pipe 2, the other end of the tail pipe 2 is connected with the multi-stage connecting unit, the multi-stage connecting unit is communicated with an oil well pump 10 through the connecting oil pipe 9, the upper end of the oil well pump 10 is connected with one end of a sucker rod 11 arranged in the top oil pipe 13, the other end of the sucker rod 11 is connected with a ground oil pumping unit 12, and the top oil pipe 13.
Preferably, as shown in fig. 1, the multi-stage connection unit includes a plurality of storage pressure gauges and a plurality of packers, the plurality of packers are used for blocking off a plurality of test intervals of the test well, and the plurality of storage pressure gauges are used for performing a step pressure test, wherein one storage pressure gauge corresponds to one test interval.
Preferably, as shown in fig. 1, the multistage connection unit includes a first storage type pressure gauge 3, a first packer 4, a second storage type pressure gauge 5, a second packer 6, a third storage type pressure gauge 7 … …, an n-1 th packer and an n-1 th storage type pressure gauge which are sequentially connected through a connecting oil pipe 9, wherein the first storage type pressure gauge 3 is connected with a tail pipe 2, the n-th storage type pressure gauge is communicated with an oil well pump 10 through the connecting oil pipe 9, the first packer 4, the second packer 6 … … and the n-1 th packer are respectively arranged between two adjacent test intervals, and the first storage type pressure gauge 3, the second storage type pressure gauge 5, the third storage type pressure gauge 7 … … and the n-1 th storage type pressure gauge are respectively arranged at each test interval.
Preferably, each storage type pressure gauge is a CY-2 type storage type pressure gauge, the pressure measuring range of the pressure gauge is 0-70 Mpa, and each packer is a compression packer.
Preferably, as shown in fig. 1, a screen 8 is arranged on a connecting oil pipe 9 between the multi-stage connecting unit and the oil well pump 10.
Preferably, as shown in fig. 1 to 2, the method for judging the heterogeneous degree of the horizontal well shaft reservoir stratum comprises the following steps:
step 1) connecting and judging tubular columns: preparing a corresponding guide plug 1, a tail pipe 2, a plurality of storage type pressure gauges, a plurality of packers, a connecting oil pipe 9 and a top oil pipe 13 according to the number of test intervals of the test well, sequentially connecting the guide plug, the tail pipe 2, the plurality of storage type pressure gauges, the plurality of packers, the connecting oil pipe 9 and the top oil pipe 13, and setting the acquisition time of each storage type pressure gauge on the ground by taking minutes as a time unit;
step 2), a judging pipe column is put in: combining the pipe columns according to the number of test intervals of the test well, then putting the pipe columns into the well, putting each packer to a preset position, ensuring that each test interval corresponds to a storage type pressure gauge, connecting an oil well pump 10 with a sucker rod 11, putting the sucker rod 11 into a top oil pipe 13, and connecting the sucker rod 11 with a ground pumping unit 12;
step 3), swabbing production: continuously producing for a period of time t by using the ground pumping unit 12pThen, measuring the total liquid amount of the well head to be q through the ground;
step 4) pressure recovery test: setting sealEach packer is clamped to open each testing layer section, each testing layer section is correspondingly provided with a storage type pressure gauge, the well closing pressure recovery is carried out, and the well closing time is
Figure 529455DEST_PATH_IMAGE002
Carrying out a segmented pressure recovery test by using a storage type pressure gauge;
step 5), pulling out a distinguishing pipe column: lifting the distinguishing pipe column, unsealing each packer and pulling out the distinguishing pipe column;
step 6) playback data: taking down each storage type pressure gauge, playing back data, drawing a pressure curve of each test interval, obtaining the ratio of the initial pressure of each test interval to the tail end recovery pressure, and dividing the total liquid amount of the well mouth into absolute liquid production of each test interval according to the speed of pressure recovery of each test interval;
step 7) data analysis: and fitting a curve slope according to the pressure curve of each test interval, obtaining the slope of a straight line segment of the curve by using a formula of a Horner curve analysis method, enabling the slope of the straight line segment to be the same as the slope of the fitted curve, and reversely calculating the permeability k of each test interval of the stratum.
Example 7
As shown in figure 1, the invention discloses a horizontal well shaft reservoir heterogeneous degree judging pipe column which comprises a guide plug 1, a tail pipe 2, a multi-stage connecting unit, a connecting oil pipe 9 and a top oil pipe 13, wherein the guide plug 1 is connected with one end of the tail pipe 2, the other end of the tail pipe 2 is connected with the multi-stage connecting unit, the multi-stage connecting unit is communicated with an oil well pump 10 through the connecting oil pipe 9, the upper end of the oil well pump 10 is connected with one end of a sucker rod 11 arranged in the top oil pipe 13, the other end of the sucker rod 11 is connected with a ground oil pumping unit 12, and the top oil pipe 13.
Preferably, as shown in fig. 1, the multi-stage connection unit includes a plurality of storage pressure gauges and a plurality of packers, the plurality of packers are used for blocking off a plurality of test intervals of the test well, and the plurality of storage pressure gauges are used for performing a step pressure test, wherein one storage pressure gauge corresponds to one test interval.
Preferably, as shown in fig. 1, the multistage connection unit includes a first storage type pressure gauge 3, a first packer 4, a second storage type pressure gauge 5, a second packer 6, a third storage type pressure gauge 7 … …, an n-1 th packer and an n-1 th storage type pressure gauge which are sequentially connected through a connecting oil pipe 9, wherein the first storage type pressure gauge 3 is connected with a tail pipe 2, the n-th storage type pressure gauge is communicated with an oil well pump 10 through the connecting oil pipe 9, the first packer 4, the second packer 6 … … and the n-1 th packer are respectively arranged between two adjacent test intervals, and the first storage type pressure gauge 3, the second storage type pressure gauge 5, the third storage type pressure gauge 7 … … and the n-1 th storage type pressure gauge are respectively arranged at each test interval.
Preferably, each storage type pressure gauge is a CY-2 type storage type pressure gauge, the pressure measuring range of the pressure gauge is 0-70 Mpa, and each packer is a compression packer.
Preferably, as shown in fig. 1, a screen 8 is arranged on a connecting oil pipe 9 between the multi-stage connecting unit and the oil well pump 10.
Preferably, as shown in fig. 1 to 2, the method for judging the heterogeneous degree of the horizontal well shaft reservoir stratum comprises the following steps:
step 1) connecting and judging tubular columns: preparing a corresponding guide plug 1, a tail pipe 2, a plurality of storage type pressure gauges, a plurality of packers, a connecting oil pipe 9 and a top oil pipe 13 according to the number of test intervals of the test well, sequentially connecting the guide plug, the tail pipe 2, the plurality of storage type pressure gauges, the plurality of packers, the connecting oil pipe 9 and the top oil pipe 13, and setting the acquisition time of each storage type pressure gauge on the ground by taking minutes as a time unit;
step 2), a judging pipe column is put in: combining the pipe columns according to the number of test intervals of the test well, then putting the pipe columns into the well, putting each packer to a preset position, ensuring that each test interval corresponds to a storage type pressure gauge, connecting an oil well pump 10 with a sucker rod 11, putting the sucker rod 11 into a top oil pipe 13, and connecting the sucker rod 11 with a ground pumping unit 12;
step 3), swabbing production: continuously producing for a period of time t by using the ground pumping unit 12pThen, measuring the total liquid amount of the well head to be q through the ground;
step 4) pressure recovery test: setting each packer to block each test interval, each test intervalCorresponding to a storage type pressure gauge, the shut-in pressure is recovered, and the shut-in time is
Figure 335169DEST_PATH_IMAGE002
Carrying out a segmented pressure recovery test by using a storage type pressure gauge;
step 5), pulling out a distinguishing pipe column: lifting the distinguishing pipe column, unsealing each packer and pulling out the distinguishing pipe column;
step 6) playback data: taking down each storage type pressure gauge, playing back data, drawing a pressure curve of each test interval, obtaining the ratio of the initial pressure of each test interval to the tail end recovery pressure, and dividing the total liquid amount of the well mouth into absolute liquid production of each test interval according to the speed of pressure recovery of each test interval;
step 7) data analysis: and fitting a curve slope according to the pressure curve of each test interval, obtaining the slope of a straight line segment of the curve by using a formula of a Horner curve analysis method, enabling the slope of the straight line segment to be the same as the slope of the fitted curve, and reversely calculating the permeability k of each test interval of the stratum.
Preferably, the formula of the Horner curve analysis method in the step 7) and the slope formula of the straight line segment are as follows:
Figure DEST_PATH_IMAGE009
Figure DEST_PATH_IMAGE010
in the formula:
Pwsrecovering pressure, MPa, for the tail end;
Piinitial pressure, MPa;
b is the volume coefficient of the crude oil;
u is the fluid viscosity, mPa · s;
k is the formation permeability, um2
h is the formation thickness, m;
q is the total liquid amount of the well head measured on the ground, m3/d;
tpFor the life of a living beingProduction time h;
Figure 63885DEST_PATH_IMAGE002
closing the well for time h;
Figure 252204DEST_PATH_IMAGE008
the slope of the straight line segment.
Example 8
The invention is further detailed by taking a test of one fracturing reconstruction three-section horizontal well as an example:
three test intervals are reformed by fracturing a certain horizontal well, wherein the oil deposit porosity of a spray point 1 is 11.1%, the oil layer thickness is 11.3m, the oil deposit porosity of a spray point 2 is 10.54%, the oil layer thickness is 32m, the oil deposit porosity of a spray point 3 is 10.8%, the oil layer thickness is 38.4m, the fluid viscosity is 1.85mPa & s, the crude oil volume coefficient is 1.2, and the comprehensive compression coefficient is 0.00149MPa-1The well has a production rate of 12.48m3D produced 100 h.
The field testing process of the tubular column for judging the heterogeneous degree of the horizontal well shaft reservoir is as follows:
step 1) connecting and judging tubular columns: according to a design scheme, preparing a corresponding guide plug 1, a tail pipe 2, a plurality of storage type pressure gauges, a plurality of packers, a connecting oil pipe 9 and a top oil pipe 13 according to the number of test intervals of a test well, wherein the plurality of storage type pressure gauges comprise a first packer 4, a second packer 6, a first storage type pressure gauge 3, a second storage type pressure gauge 5 and a third storage type pressure gauge 7, and the acquisition time of each storage type pressure gauge is set on the ground in minutes as a time unit;
step 2), setting a distinguishing pipe column: combining pipe columns according to the number of test intervals of the test well, then putting the pipe columns into the well, putting a first packer 4 and a second packer 6 to preset positions, ensuring that each test interval corresponds to a storage type pressure gauge, connecting an oil well pump 10 and a sucker rod 11, putting the oil well pump 10 and the sucker rod 11 into a top oil pipe 13, and connecting the sucker rod 11 and a ground oil pumping unit 12;
step 3), swabbing production: the ground pumping unit 12 continuously produces for a period of time tpThen, the total liquid amount of the well head is obtained through surface measurementIs q;
step 4) pressure recovery test: setting a first packer 4 and a second packer 6 to open each test layer section, wherein each test layer section is correspondingly provided with a storage type pressure gauge, and closing the well to measure pressure recovery for the time of closing the well
Figure 765007DEST_PATH_IMAGE002
Carrying out a segmented pressure recovery test by using a storage type pressure gauge;
step 5), pulling out a distinguishing pipe column: lifting the distinguishing pipe column, unsealing each packer and pulling out the distinguishing pipe column;
step 6) playback data: taking down the first storage type pressure gauge 3, the second storage type pressure gauge 5 and the third storage type pressure gauge 7, and playing back data, wherein the initial pressure of the spraying point 1 is 16.6MPa, and the tail end recovery pressure is 18.5 MPa; the initial pressure of the spraying point 2 is 16.4MPa, and the tail end recovery pressure is 16.8 MPa; the initial pressure of the spraying point 3 is 16.1MPa, and the tail end recovery pressure is 22.5 MPa; drawing pressure curves of all sections, solving the ratio of the initial pressure of each section to the recovery pressure of the tail end, wherein the ratio of the pressure at the spraying point 1 is 1.11, the ratio of the pressure at the spraying point 2 is 1.02, the ratio of the pressure at the spraying point 3 is 1.40, the total liquid amount of the well head is poured into absolute liquid production of each section according to the recovery speed of the pressure of each section, and the absolute liquid production of the spraying point 1 is 3.93m3The absolute liquid production at the spraying point 2 is 3.61m3The absolute liquid production at the spray point 3 is 4.93m3
Step 7) data analysis: fitting a curve slope M according to the measured pressure data Honer curve, and M at the position of the spraying point 11=0.92, M at the position of the spray point 22=0.652, M at the spray point 3 position3=0.135, and then using Horner curve analysis formula
Figure 318210DEST_PATH_IMAGE009
Wherein the slope of the straight line segment is
Figure 593903DEST_PATH_IMAGE010
Making the slope of the straight line segment the same as the slope of the fitted curve, reversely calculating the formation permeability k to obtain the equivalent formation permeability at the spraying point 1 as 1.77mD,the equivalent formation permeability at the injection point 2 is 0.81mD and the equivalent formation permeability at the injection point 3 is 4.47 mD.
The working principle and the working process of the invention are as follows:
as shown in figures 1-2, the invention discloses a horizontal well shaft reservoir heterogeneous degree judging pipe column and a judging method, which are designed for providing basis for judging the water outlet position of a subsequent horizontal well and selecting a well by measures, wherein a guide plug 1, a tail pipe 2, a first storage type pressure gauge 3, a first packer 4, a second storage type pressure gauge 5, a second packer 6, a third storage type pressure gauge 7 … … sieve pipe 8, a connecting oil pipe 9 and a top oil pipe 13 are sequentially connected to the underground horizontal section of the pipe column from a toe part to a heel part, an oil well pump 10 is arranged in the top oil pipe 13, the oil well pump 10 is connected with an oil pumping rod 11, and the oil pumping rod 11 is connected with a ground oil pumping unit 12. The invention is characterized in that the pipe column seals each test layer section by putting in a packer, 12 pumping production is carried out by a ground pumping unit, a storage type pressure gauge is utilized to carry out segmented pressure test underground, the total liquid quantity of a well head for well opening production is q, and the oil well continuously produces for a period of time tpThe pressure recovery is measured after the well is closed, and the test time is
Figure 636728DEST_PATH_IMAGE002
The method comprises the steps of dividing the total liquid amount of an oil well mouth into absolute liquid production of each test interval according to the change speed of a pressure test curve, fitting a curve slope M according to an actually measured pressure curve, and reversely calculating the formation permeability k by utilizing the slope of a straight line segment in a Horner curve analysis method.
The judging pipe column comprises a guide plug, a tail pipe, a multi-stage connecting unit, a connecting oil pipe and a top oil pipe which are sequentially connected, an oil well pump and a sucker rod are connected and then are put into the top oil pipe, the sucker rod is connected with a ground pumping unit, the multi-stage connecting unit comprises a plurality of storage type pressure gauges and a plurality of packers, the corresponding storage type pressure gauges and the corresponding packers can be arranged according to the number of testing intervals, the plurality of packers are utilized to block off a plurality of testing intervals of a testing well, a plurality of storage type pressure gauges are utilized to carry out segmented pressure testing, pressure data are played back through ground swabbing production, the storage type pressure gauges are used to play back pressure data, the stratum permeability of each testing interval is inversely worked out according to an actually measured pressure recovery curve, the permeability of each testing interval can be effectively obtained.
The method for judging the permeability of the stratum of each test interval is explained by a method for simultaneously measuring the pressure in sections after the production of the horizontal well, the heterogeneous degree of the reservoir in the shaft direction of the horizontal well is judged, meanwhile, the position of high liquid production and the water incoming direction can be determined, and parameters such as the pressure, the liquid quantity, the half length of a crack and the like of the relevant test interval are provided.
The tubular column for distinguishing the heterogeneous degree of the horizontal well shaft reservoir is simple in structure, convenient to use and high in practicability, and can be widely applied to distinguishing the heterogeneous degree of various horizontal well shaft reservoirs.
The guide plug, the oil pipe, the storage type pressure gauge, the packer and the sieve pipe are all in the prior art.
While the preferred embodiments of the present invention have been described in detail, the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.
Many other changes and modifications can be made without departing from the spirit and scope of the invention. It is to be understood that the invention is not to be limited to the specific embodiments, but only by the scope of the appended claims.

Claims (7)

1. The utility model provides a tubular column is differentiateed to heterogeneous degree in horizontal well pit shaft reservoir, its characterized in that: including guide plug (1), tail pipe (2), multi-stage connection unit, connection oil pipe (9) and top oil pipe (13), wherein tail pipe (2) one end is connected in guide plug (1), multi-stage connection unit is connected to the tail pipe (2) other end, and wherein multi-stage connection unit is through connecting oil pipe (9) and oil-well pump (10) intercommunication, oil-well pump (10) upper end is connected and is established sucker rod (11) one end in top oil pipe (13), and wherein ground beam-pumping unit (12) are connected to sucker rod (11) other end, and wherein top oil pipe (13) are connected to the well head.
2. The horizontal well shaft reservoir heterogeneous degree distinguishing pipe column according to claim 1, characterized in that: the multi-stage connection unit comprises a plurality of storage type pressure gauges and a plurality of packers, a plurality of test layer sections of the test well are clamped and opened by the packers, and segmented pressure testing is performed by the storage type pressure gauges, wherein one storage type pressure gauge corresponds to one test layer section.
3. The horizontal well shaft reservoir heterogeneous degree distinguishing pipe column according to claim 2, characterized in that: the multistage connecting unit comprises a first storage type pressure gauge (3), a first packer (4), a second storage type pressure gauge (5), a second packer (6), a third storage type pressure gauge (7) … …, an n-1 th packer and an n-1 th storage type pressure gauge which are sequentially connected through a connecting oil pipe (9), wherein the first storage type pressure gauge (3) is connected with a tail pipe (2), the n-th storage type pressure gauge is communicated with an oil well pump (10) through the connecting oil pipe (9), the first packer (4), the second packer (6) … … and the n-1 th packer are respectively arranged between two adjacent test layer sections, and the first storage type pressure gauge (3), the second storage type pressure gauge (5), the third storage type pressure gauge (7) … … and the n-th pressure gauge are respectively arranged at each test layer section.
4. The horizontal well shaft reservoir heterogeneous degree distinguishing pipe column according to claim 3, characterized in that: each storage type pressure gauge is CY-2 type storage type pressure gauge, the pressure measuring range is 0-70 Mpa, and each packer is a compression packer.
5. The horizontal well shaft reservoir heterogeneous degree distinguishing pipe column according to claim 3, characterized in that: and a screen pipe (8) is arranged on a connecting oil pipe (9) between the multistage connecting unit and the oil well pump (10).
6. The method for judging the nonhomogeneous degree of the horizontal well shaft reservoir stratum according to any one of claims 2 to 5 is characterized by comprising the following steps:
step 1) connecting and judging tubular columns: preparing a corresponding guide plug (1), a tail pipe (2), a plurality of storage type pressure gauges, a plurality of packers, a connecting oil pipe (9) and a top oil pipe (13) according to the number of test intervals of the test well, sequentially connecting the guide plug, the tail pipe, the storage type pressure gauges, the packers, the connecting oil pipe (9) and the top oil pipe, and setting the acquisition time of each storage type pressure gauge on the ground by taking minutes as a time unit;
step 2), a judging pipe column is put in: combining pipe columns according to the number of test intervals of the test well, then putting the pipe columns into the well, putting each packer to a preset position, ensuring that each test interval corresponds to a storage pressure gauge, connecting an oil well pump (10) with a sucker rod (11), putting the oil well pump into a top oil pipe (13), and connecting the sucker rod (11) with a ground oil pumping unit (12);
step 3), swabbing production: continuously producing for a period of time t by using a ground pumping unit (12)pThen, measuring the total liquid amount of the well head to be q through the ground;
step 4) pressure recovery test: setting each packer to open each testing layer section, wherein each testing layer section is correspondingly provided with a storage type pressure gauge, closing the well to measure pressure recovery, and the closing time is
Figure 285819DEST_PATH_IMAGE001
Carrying out a segmented pressure recovery test by using a storage type pressure gauge;
step 5), pulling out a distinguishing pipe column: lifting the distinguishing pipe column, unsealing each packer and pulling out the distinguishing pipe column;
step 6) playback data: taking down each storage type pressure gauge, playing back data, drawing a pressure curve of each test interval, obtaining the ratio of the initial pressure of each test interval to the tail end recovery pressure, and dividing the total liquid amount of the well mouth into absolute liquid production of each test interval according to the speed of pressure recovery of each test interval;
step 7) data analysis: and fitting a curve slope according to the pressure curve of each test interval, obtaining the slope of a straight line segment of the curve by using a formula of a Horner curve analysis method, enabling the slope of the straight line segment to be the same as the slope of the fitted curve, and reversely calculating the permeability k of each test interval of the stratum.
7. The method for distinguishing the nonhomogeneous degree of the horizontal well shaft reservoir stratum according to claim 6, wherein the Horner curve analysis method in the step 7) has a formula and a slope formula of a straight line segment thereof, wherein the formula comprises:
Figure 580238DEST_PATH_IMAGE002
Figure 854008DEST_PATH_IMAGE003
in the formula:
Pwsrecovering pressure, MPa, for the tail end;
Piinitial pressure, MPa;
b is the volume coefficient of the crude oil;
u is the fluid viscosity, mPa · s;
k is the formation permeability, um2
h is the formation thickness, m;
q is the total liquid amount of the well head measured on the ground, m3/d;
tpProduction time, h;
Figure 110459DEST_PATH_IMAGE001
closing the well for time h;
Figure 153284DEST_PATH_IMAGE004
the slope of the straight line segment.
CN201911153958.3A 2019-11-22 2019-11-22 Horizontal well shaft reservoir heterogeneous degree judging pipe column and judging method Pending CN110905494A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911153958.3A CN110905494A (en) 2019-11-22 2019-11-22 Horizontal well shaft reservoir heterogeneous degree judging pipe column and judging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911153958.3A CN110905494A (en) 2019-11-22 2019-11-22 Horizontal well shaft reservoir heterogeneous degree judging pipe column and judging method

Publications (1)

Publication Number Publication Date
CN110905494A true CN110905494A (en) 2020-03-24

Family

ID=69818814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911153958.3A Pending CN110905494A (en) 2019-11-22 2019-11-22 Horizontal well shaft reservoir heterogeneous degree judging pipe column and judging method

Country Status (1)

Country Link
CN (1) CN110905494A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113266320A (en) * 2021-05-31 2021-08-17 郭子晨 Comprehensive intelligent water finding and blocking technology for oil well

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6116340A (en) * 1998-12-24 2000-09-12 Atlantic Richfield Company Downhole build-up pressure test using coiled tubing
US20130205886A1 (en) * 2012-02-13 2013-08-15 Peter S. Hegeman Method For Determining A Permeability Or Mobility Of A Radial Flow Response Of A Reservoir
CN204457756U (en) * 2014-12-17 2015-07-08 中国石油天然气股份有限公司 A kind of horizontal well in segments pressure and pressure fall-off test tubing string
CN105114061A (en) * 2015-08-31 2015-12-02 中国石油天然气股份有限公司 String and method for quickly surveying water in horizontal well by multi-parameter combined test without moving string
CN105781504A (en) * 2016-03-07 2016-07-20 中国石油天然气股份有限公司 Pressure testing method for segmented oil pool and segmented trial-squeezing tubing string
CN212054672U (en) * 2019-11-22 2020-12-01 中国石油天然气股份有限公司 Horizontal well shaft reservoir heterogeneous degree judgment pipe column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6116340A (en) * 1998-12-24 2000-09-12 Atlantic Richfield Company Downhole build-up pressure test using coiled tubing
US20130205886A1 (en) * 2012-02-13 2013-08-15 Peter S. Hegeman Method For Determining A Permeability Or Mobility Of A Radial Flow Response Of A Reservoir
CN204457756U (en) * 2014-12-17 2015-07-08 中国石油天然气股份有限公司 A kind of horizontal well in segments pressure and pressure fall-off test tubing string
CN105114061A (en) * 2015-08-31 2015-12-02 中国石油天然气股份有限公司 String and method for quickly surveying water in horizontal well by multi-parameter combined test without moving string
CN105781504A (en) * 2016-03-07 2016-07-20 中国石油天然气股份有限公司 Pressure testing method for segmented oil pool and segmented trial-squeezing tubing string
CN212054672U (en) * 2019-11-22 2020-12-01 中国石油天然气股份有限公司 Horizontal well shaft reservoir heterogeneous degree judgment pipe column

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中国石油天然气总公司劳资局: "地层测试工", vol. 1, 石油工业出版社, pages: 200 *
牛彩云等: "分段压裂水平井各段压力及供液能力研究", 石油化工应用, vol. 34, no. 03, pages 32 - 35 *
王百等: "低渗透气田水平井试井解释方法探讨", 油气井测试, vol. 21, no. 03, pages 4 - 7 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113266320A (en) * 2021-05-31 2021-08-17 郭子晨 Comprehensive intelligent water finding and blocking technology for oil well

Similar Documents

Publication Publication Date Title
WO2018184397A1 (en) Integrated evaluation, testing and simulation apparatus for wellbore sand-control blocking and unblocking, and method
CN109838279B (en) Method for improving salt cavern storage utilization rate by discharging brine from cavity bottom through communicating well
CN108104801A (en) A kind of horizontal well tracer producing profile testing tubing string and method
CN107725034B (en) Pressure monitoring method for judging water incoming direction of multi-stage fractured horizontal well
CN106522928B (en) Well testing method for unstable pressure drop of well logging head by stopping pump after acidizing and fracturing
CN105822298B (en) The acquisition methods of shale gas-bearing formation absolute open flow (AOF) based on index number of producing gas
CN107503727B (en) It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring
CN104594889B (en) A kind of Accurate Determining oil well remaining oil preserves the devices and methods therefor of position
CN104100254A (en) Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof
CN104406895A (en) Novel coal bed permeability testing device and method
CN205538580U (en) Indoor survey device of fissuted medium system infiltration tensor
CN105507887A (en) High-water-content horizontal well tracer injection water exploration process and string
CN202152643U (en) Layering production pressure measuring tubular column for exploiting oil wells in multilayer mode
CN109826600A (en) A kind of fracture-pore reservoir nitrogen injection oil recovery opportunity preferred method
CN202064936U (en) Wireless-transmission borehole shutin pressure measuring device
CN109187321B (en) Large-size salt level communication well group water-soluble cavity-making simulation experiment method
CN109973059B (en) Rapid analysis method for gas injection mechanism of fracture-cavity oil reservoir
CN105678082B (en) Double-pressure drop method for identifying type of oil-gas well acid fracturing communication reservoir
CN110905494A (en) Horizontal well shaft reservoir heterogeneous degree judging pipe column and judging method
CN212054672U (en) Horizontal well shaft reservoir heterogeneous degree judgment pipe column
CN204255815U (en) A kind of novel coal seam permeability tester for testing
CN107339096B (en) Rapid water exploration method for horizontal well
CN105804713A (en) Method for rapidly determining water-injection starting pressure of wellheads in all small layers of water injection well
CN109594960A (en) The visual experimental apparatus and its visualization sandpack column of analog composite foam profile control
CN203321507U (en) Sectional flow rate and water content synchronous monitoring and water detection tubular column for multi-stage fractured horizontal well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination