CN110902305A - Buffer bed installation construction method - Google Patents
Buffer bed installation construction method Download PDFInfo
- Publication number
- CN110902305A CN110902305A CN201911129148.4A CN201911129148A CN110902305A CN 110902305 A CN110902305 A CN 110902305A CN 201911129148 A CN201911129148 A CN 201911129148A CN 110902305 A CN110902305 A CN 110902305A
- Authority
- CN
- China
- Prior art keywords
- buffer
- bed
- installation
- buffer bed
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G39/00—Rollers, e.g. drive rollers, or arrangements thereof incorporated in roller-ways or other types of mechanical conveyors
- B65G39/10—Arrangements of rollers
- B65G39/12—Arrangements of rollers mounted on framework
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Vibration Dampers (AREA)
Abstract
The invention relates to the technical field of installation engineering, and discloses a buffer bed installation construction method, which comprises the following steps: s1: handling the permission of shutdown and power-off and fire operation; s2: disassembling the original buffer carrier roller; s3: installing a buffer bed frame; s4: installing a buffer strip, a buffer strip plate and a T-shaped bolt; s5: locking the T-shaped bolt and checking whether the T-shaped bolt is locked or not; s6: positioning the mounting position of the buffer bed and hoisting the buffer bed to form a frame opening to increase a base plate; s7: putting down the buffer bed and checking whether the bottom corner bolt is locked or not by using the locking bolt; s8: resetting all the equipment such as the buffer rollers and the like which are moved on site and carrying out inspection; s9: cleaning the construction surrounding environment and debugging equipment; the method has high efficiency, and the buffering bed installed by the method can achieve good buffering effect.
Description
Technical Field
The invention relates to the technical field of installation engineering, in particular to a buffer bed installation construction method.
Background
The buffer bed is mainly used for replacing buffer carrier rollers and consists of buffer strips, and the buffer strips are mainly applied to excellent high-elasticity special rubber layers to fully and effectively absorb the impact force of falling materials, so that the impact of the falling materials on a conveying belt is greatly reduced, and the stress condition of a falling point is really improved. The belt line blanking point buffer carrier roller is reformed into a buffer bed, so that the belt tearing risk can be reduced, and dust pollution in a machine room can be inhibited. However, the existing buffer bed mounting construction method cannot achieve the purpose of buffering, the belt is easy to tear, the traditional mounting method is complicated, a plurality of workers and a plurality of devices are required to work simultaneously, and the efficiency is low.
Disclosure of Invention
The invention aims to solve the technical problem of providing a buffer bed installation construction method which is high in efficiency, and the buffer bed installed by using the method can achieve a good buffer effect.
In order to solve the technical problem, the technical scheme of the invention is that the buffer bed installation construction method comprises the following steps:
s1: handling the permission of shutdown and power-off and fire operation;
s2: disassembling the original buffer carrier roller;
s3: installing a buffer bed frame;
s4: installing a buffer strip, a buffer strip plate and a T-shaped bolt;
s5: locking the T-shaped bolt and checking whether the T-shaped bolt is locked or not;
s6: positioning the mounting position of the buffer bed and hoisting the buffer bed to form a frame opening to increase a base plate;
s7: putting down the buffer bed and checking whether the bottom corner bolt is locked or not by using the locking bolt;
s8: resetting all the equipment such as the buffer rollers and the like which are moved on site and carrying out inspection;
s9: cleaning the construction surrounding environment and debugging equipment;
further, the step S2 of detaching the original impact idler specifically includes: knowing a blanking center of the blanking bin with field personnel, determining an approximate installation position of a buffer bed, dismantling a field buffer carrier roller, a material collecting plate and the like, and moving out the buffer carrier roller, the material collecting plate and the like.
Further, the step S3 of installing the buffer bed frame specifically includes: and displacing the buffer frame to the installation approximate position to determine the installation direction of the buffer frame.
Further, the step S4 of installing the buffer strip, the buffer strip plate and the T-shaped bolt specifically includes: the long strip plate, the buffer strip and the T-shaped bolt are combined together and fixed by a binding belt.
Further, the step S5 of locking the T-bolt and checking whether the T-bolt is locked specifically includes: and assembling the buffer frame and the buffer strip together, pre-locking the nut, determining the direction of the T-shaped bolt, and locking the buffer strip.
Further, the positioning the mounting position of the buffer bed and the adding of the pad to the opening of the buffer bed hoisting frame in the step S6 specifically includes: and determining the accurate installation position of the buffer bed, and hoisting the buffer bed by using four hand hoists to reach the height of about 13 cm. Holes are arranged on the frame, holes are arranged on the cushion block, and the cushion bed is locked by M16 and 180 bolts after falling.
Compared with the prior art, the invention discloses a buffer bed installation construction method, wherein the buffer bed is composed of buffer strips, and the buffer strips are mainly applied to excellent high-elasticity special rubber layers to fully and effectively absorb the impact force of falling materials, so that the impact of the falling materials on a conveying belt is greatly reduced, and the stress condition of a falling point is really improved. The method has high efficiency, and the buffering bed installed by the method can achieve good buffering effect.
Drawings
FIG. 1 is a flow chart of a buffer bed installation construction method;
FIG. 2 is a schematic view of a structure in which a plurality of buffer beds are used side by side;
FIG. 3 is a schematic view of a buffer bed;
in the figure: the buffer roller comprises a buffer roller supporting belt 1, a buffer strip 2, a buffer roller 3, a buffer support 4 and a conveyor support 5.
Detailed Description
The following further describes embodiments of the present invention with reference to the drawings. It should be noted that the description of the embodiments is provided to help understanding of the present invention, but the present invention is not limited thereto. In addition, the technical features involved in the embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are therefore not to be considered limiting of the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
As shown in fig. 1, fig. 1 is a flow chart of a buffer bed installation construction method. The invention discloses a buffer bed installation construction method, which comprises the following steps:
s1: handling the permission of shutdown and power-off and fire operation;
s2: disassembling the original buffer carrier roller;
s3: installing a buffer bed frame;
s4: installing a buffer strip, a buffer strip plate and a T-shaped bolt;
s5: locking the T-shaped bolt and checking whether the T-shaped bolt is locked or not;
s6: positioning the mounting position of the buffer bed and hoisting the buffer bed to form a frame opening to increase a base plate;
s7: putting down the buffer bed and checking whether the bottom corner bolt is locked or not by using the locking bolt;
s8: resetting all the equipment such as the buffer rollers and the like which are moved on site and carrying out inspection;
s9: cleaning the construction surrounding environment and debugging equipment;
specifically, the step S2 of detaching the original impact idler specifically includes: knowing the blanking center of the blanking bin with field personnel, determining the approximate installation position of the buffer bed, dismantling the field buffer carrier roller, the material collecting plate and the like, and moving out the buffer carrier roller, the material collecting plate and the like. Here the skirt guard need not be removed and the counterweight need not be changed.
Specifically, the step S3 of installing the buffer bed frame specifically includes: and displacing the buffer frame to the installation approximate position to determine the installation direction of the buffer frame.
Specifically, the step S4 of installing the buffer strip, the buffer strip plate and the T-shaped bolt specifically includes: the long strip plate, the buffer strip and the T-shaped bolt are combined together and fixed by a binding belt.
Specifically, the step S5 of locking the T-bolt and checking whether the T-bolt is locked specifically includes: and assembling the buffer frame and the buffer strip together, pre-locking the nut, determining the direction of the T-shaped bolt, and locking the buffer strip.
Specifically, the step S6 of positioning the mounting position of the buffer bed and adding the pad to the opening of the buffer bed hoisting frame specifically includes: and determining the accurate installation position of the buffer bed, and hoisting the buffer bed by using four hand hoists to reach the height of about 13 cm. Holes are formed in the frame, holes are formed in the cushion block, and the holes need to be confirmed according to the positions of the holes formed in the base bolts of the buffer bed. The buffer bed was dropped and locked by M16 x 180 bolts.
And finally, resetting the buffer carrier roller which is moved and dismantled around, and cleaning all field tools and environments.
The principle and the advantages of the invention are as follows: according to the mounting construction method of the buffer bed disclosed by the invention, the buffer bed is composed of the buffer strips, and the buffer strips are mainly applied to the excellent high-elasticity special rubber layer to fully and effectively absorb the impact force of falling materials, so that the impact of falling materials on a conveying belt is greatly reduced, and the stress condition of a falling point is really improved. The method has high efficiency, and the buffering bed installed by the method can achieve good buffering effect.
Figure 2 shows the installation of multiple buffer beds in side-by-side use with additional idler support belts 1 between the two buffer beds.
Fig. 3 shows that the distance between the buffer strip 2, the buffer rollers 3, the buffer support 4, the conveyor support 5, the conveyor belt and the buffer strip 2 should be at least 25mm under no load, and this distance can be achieved by adjusting the positions of the buffer rollers 3 adjacent to each other in front of and behind the buffer bed.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, the first feature "on" or "under" the second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art within the scope of the present invention.
Claims (6)
1. The buffer bed installation construction method is characterized by comprising the following steps:
s1: handling the permission of shutdown and power-off and fire operation;
s2: disassembling the original buffer carrier roller;
s3: installing a buffer bed frame;
s4: installing a buffer strip, a buffer strip plate and a T-shaped bolt;
s5: locking the T-shaped bolt and checking whether the T-shaped bolt is locked or not;
s6: positioning the mounting position of the buffer bed and hoisting the buffer bed to form a frame opening to increase a base plate;
s7: putting down the buffer bed and checking whether the bottom corner bolt is locked or not by using the locking bolt;
s8: resetting all the equipment such as the buffer rollers and the like which are moved on site and carrying out inspection;
s9: cleaning the construction surrounding environment and debugging equipment.
2. The buffer bed installation and construction method according to claim 1, wherein: the step S2 of disassembling the original impact idler specifically includes: knowing a blanking center of the blanking bin with field personnel, determining an approximate installation position of a buffer bed, dismantling a field buffer carrier roller, a material collecting plate and the like, and moving out the buffer carrier roller, the material collecting plate and the like.
3. The buffer bed installation and construction method according to claim 2, wherein: the step S3 of installing the buffer bed frame specifically includes: and displacing the buffer frame to the installation approximate position to determine the installation direction of the buffer frame.
4. The buffer bed installation and construction method according to claim 3, wherein: the step S4 of installing the buffer strip, the buffer strip plate and the T-shaped bolt specifically includes: the long strip plate, the buffer strip and the T-shaped bolt are combined together and fixed by a binding belt.
5. The buffer bed installation and construction method according to claim 4, wherein: the locking the T-bolt and checking whether the T-bolt is locked in the step S5 specifically includes: and assembling the buffer frame and the buffer strip together, pre-locking the nut, determining the direction of the T-shaped bolt, and locking the buffer strip.
6. The buffer bed installation and construction method according to claim 5, wherein: the step S6 of positioning the mounting position of the buffer bed and adding the pad to the opening of the rack of the buffer bed includes: and determining the accurate installation position of the buffer bed, and hoisting the buffer bed by using four hand hoists to reach the height of about 13 cm. Holes are arranged on the frame, holes are arranged on the cushion block, and the cushion bed is locked by M16 and 180 bolts after falling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911129148.4A CN110902305A (en) | 2019-11-18 | 2019-11-18 | Buffer bed installation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911129148.4A CN110902305A (en) | 2019-11-18 | 2019-11-18 | Buffer bed installation construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110902305A true CN110902305A (en) | 2020-03-24 |
Family
ID=69816970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911129148.4A Pending CN110902305A (en) | 2019-11-18 | 2019-11-18 | Buffer bed installation construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110902305A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29521252U1 (en) * | 1995-12-23 | 1996-10-17 | Indumont Industrie-Montage GmbH, 44809 Bochum | Device for sealing off the source of the fire carried by a belt conveyor |
CN200942972Y (en) * | 2006-08-31 | 2007-09-05 | 廖政宗 | Damping bed for material transfer point |
CN201186807Y (en) * | 2008-04-09 | 2009-01-28 | 开滦(集团)有限责任公司唐山多种经营分公司 | Teeth belt type feeder |
CN201907821U (en) * | 2010-12-14 | 2011-07-27 | 于波涛 | Buffering bed for belt conveyor |
CN203624363U (en) * | 2013-12-10 | 2014-06-04 | 厦门力祺环境工程有限公司 | Curved buffer bed capable of realizing quick and gapless buffer block replacement |
CN204688950U (en) * | 2015-04-19 | 2015-10-07 | 广东梅雁吉祥水电股份有限公司 | Flute profile with disc spring is buffer bed |
CN205708455U (en) * | 2016-03-30 | 2016-11-23 | 江苏鑫三和机械有限公司 | Troughed belt conveyor is buffer bed |
CN208181982U (en) * | 2018-04-16 | 2018-12-04 | 龙钢集团华山冶金设备有限公司 | A kind of novel belt machine is buffer bed |
CN208278851U (en) * | 2018-05-16 | 2018-12-25 | 安徽马钢输送设备制造有限公司 | A kind of spring is buffer bed |
CN208790458U (en) * | 2018-07-24 | 2019-04-26 | 南京苏之晟环保设备有限公司 | Blanking sound zone system it is buffer bed |
-
2019
- 2019-11-18 CN CN201911129148.4A patent/CN110902305A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29521252U1 (en) * | 1995-12-23 | 1996-10-17 | Indumont Industrie-Montage GmbH, 44809 Bochum | Device for sealing off the source of the fire carried by a belt conveyor |
CN200942972Y (en) * | 2006-08-31 | 2007-09-05 | 廖政宗 | Damping bed for material transfer point |
CN201186807Y (en) * | 2008-04-09 | 2009-01-28 | 开滦(集团)有限责任公司唐山多种经营分公司 | Teeth belt type feeder |
CN201907821U (en) * | 2010-12-14 | 2011-07-27 | 于波涛 | Buffering bed for belt conveyor |
CN203624363U (en) * | 2013-12-10 | 2014-06-04 | 厦门力祺环境工程有限公司 | Curved buffer bed capable of realizing quick and gapless buffer block replacement |
CN204688950U (en) * | 2015-04-19 | 2015-10-07 | 广东梅雁吉祥水电股份有限公司 | Flute profile with disc spring is buffer bed |
CN205708455U (en) * | 2016-03-30 | 2016-11-23 | 江苏鑫三和机械有限公司 | Troughed belt conveyor is buffer bed |
CN208181982U (en) * | 2018-04-16 | 2018-12-04 | 龙钢集团华山冶金设备有限公司 | A kind of novel belt machine is buffer bed |
CN208278851U (en) * | 2018-05-16 | 2018-12-25 | 安徽马钢输送设备制造有限公司 | A kind of spring is buffer bed |
CN208790458U (en) * | 2018-07-24 | 2019-04-26 | 南京苏之晟环保设备有限公司 | Blanking sound zone system it is buffer bed |
Non-Patent Citations (2)
Title |
---|
孙善文: "胶带输送机接料点缓冲装置改造体会", 《水泥》 * |
清扫器: "《皮带机缓冲床安装说明和维护》", 15 March 2019, HTTP://WWW.518MAOSHUA.COM * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110902305A (en) | Buffer bed installation construction method | |
CN202465194U (en) | Large-size modularized component transporting device of steel containment vessel of nuclear power station nuclear island | |
CN210829303U (en) | Combined tool type inner supporting steel ring for tunnel | |
CN203491651U (en) | Telescoping cover plate support frame | |
CN214329965U (en) | Assembly type construction is with platform of unloading | |
JP3167834U (en) | Foreign object fall prevention device for lifting scaffold | |
JP6547485B2 (en) | How to replace the seismic isolation system | |
CN211385364U (en) | Ore feeding conveying device of crusher | |
JP3822125B2 (en) | Temporary restraint jig for seismic isolation device and restraint method | |
JP2014101213A (en) | Falling prevention device for passenger conveyor | |
CN207526087U (en) | A kind of scaffold cradle for sliding mode system | |
CN220986294U (en) | Tun material platform | |
JP6439880B1 (en) | Elevator long object carrying jig, elevator guide rail removal method and elevator guide rail installation method | |
JP6832495B2 (en) | How to replace the seismic isolation device | |
CN110847352A (en) | Bolt ball net rack purline assembling construction method | |
CN115573578A (en) | Movable hoisting platform and use method thereof | |
CN211894363U (en) | Assembled building wall transportation protection device | |
CN220150926U (en) | Discharging platform | |
CN216641381U (en) | Regularization scaffold frame work platform of ascending a height | |
CN213557450U (en) | Ball mill supporting device | |
CN212689614U (en) | Simply-supported beam type unloading platform at opening part of constructional engineering | |
CN213836819U (en) | Excavator cab heightening support | |
CN219080792U (en) | Detachable gutter snow melting overhauling horse way system | |
CN214220537U (en) | But height-adjusting's assembled is multi-layer balcony glass frame for fitment | |
KR101498769B1 (en) | Zig Apparatus for Transferring a Plurality of Hollow Slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200324 |