CN110887177B - Control method, equipment and storage medium for transformer substation air conditioner linkage - Google Patents

Control method, equipment and storage medium for transformer substation air conditioner linkage Download PDF

Info

Publication number
CN110887177B
CN110887177B CN201910957677.7A CN201910957677A CN110887177B CN 110887177 B CN110887177 B CN 110887177B CN 201910957677 A CN201910957677 A CN 201910957677A CN 110887177 B CN110887177 B CN 110887177B
Authority
CN
China
Prior art keywords
air conditioner
transformer substation
air
state
fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910957677.7A
Other languages
Chinese (zh)
Other versions
CN110887177A (en
Inventor
徐睿
雷鸣
章荣兵
李亦宁
彭龙生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Comprehensive Energy of China Southern Power Grid Co Ltd
Original Assignee
Comprehensive Energy of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Comprehensive Energy of China Southern Power Grid Co Ltd filed Critical Comprehensive Energy of China Southern Power Grid Co Ltd
Priority to CN201910957677.7A priority Critical patent/CN110887177B/en
Publication of CN110887177A publication Critical patent/CN110887177A/en
Application granted granted Critical
Publication of CN110887177B publication Critical patent/CN110887177B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/32Responding to malfunctions or emergencies
    • F24F11/38Failure diagnosis
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/20Humidity

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a control method, equipment and a storage medium for transformer substation air conditioner linkage, which comprise the following steps: step 1, collecting environmental parameters of a set area in real time, and judging whether the environmental parameters are in a preset range; if yes, executing step 5; if not, executing the step 2; step 2, if the environmental parameter exceeds the upper limit of the preset range, executing step 3; if the environmental parameter is lower than the lower limit of the preset range, executing the step 4; and step 3: collecting the current operating state of each air conditioner, selecting the air conditioner with the highest air conditioner state grade from the air conditioners in the unopened state, controlling the air conditioners to be opened and operated, and executing the step 1; and 4, step 4: collecting the current running state of each air conditioner, selecting the air conditioner with the lowest air conditioner state grade from the air conditioners in the started state, controlling the air conditioners to be turned off, and executing the step 1; and 5: and keeping the current running state of each air conditioner in the set area. The invention solves the problem of overuse of the air conditioner of the transformer substation and also ensures the optimal comprehensive operation efficiency.

Description

Control method, equipment and storage medium for transformer substation air conditioner linkage
Technical Field
The invention relates to the field of air conditioner linkage control in a transformer substation, in particular to a control method, equipment and a storage medium for transformer substation air conditioner linkage.
Background
At present, a plurality of air conditioners are arranged in most equipment or working rooms of the transformer substation in order to meet the indoor environment requirement of the transformer substation, operators save trouble, all the air conditioners in the transformer substation are directly turned on in summer, and the indoor temperature is easily lower than the specified lower limit value. Although the operating mode does not need to worry that the indoor temperature exceeds the operating requirement of the electrical equipment when the air conditioning equipment is in normal operation, the direct consequence is that the air conditioner can operate uninterruptedly for a long time, the service life of the air conditioner is shortened while the electric energy is greatly wasted, and the maintenance cost of the air conditioner is increased.
This situation is improved in the prior art: by monitoring the indoor temperature and humidity in real time, once the temperature or the humidity exceeds the upper limit and the lower limit, an air conditioner with the least starting times or an air conditioner with the most starting times is started by adopting a data model of the service life and the starting times. Although the problem of blind abuse of the air conditioner of the transformer substation is solved by the control method, the method lacks monitoring and consideration of indoor actual load, air conditioner operation time and fault state, the transformer substation is usually unattended, the air conditioner is often overused due to temperature setting of the air conditioner, even if one air conditioner is started for the minimum time, the air conditioner still has high fault rate, high maintenance cost is required, and use and management of the air conditioner in the transformer substation are not facilitated.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide a control method, equipment and a storage medium for the linkage of the air conditioners of the transformer substation, monitor the temperature and the humidity of the transformer substation in real time, perform linkage control on a plurality of air conditioners by combining the actual indoor load and the air conditioner state of the transformer substation, solve the problem of excessive use of the air conditioners of the transformer substation, ensure the optimal comprehensive operation efficiency and prolong the comprehensive service life of the equipment.
One of the purposes of the invention is realized by adopting the following technical scheme:
a control method for linkage of air conditioners of a transformer substation comprises the following steps:
s1, collecting environmental parameters of a set area in the transformer substation in real time, and judging whether the environmental parameters are in a preset range; if the environmental parameter is within the preset range, executing step S5; if not, go to step S2; the environmental parameters are obtained by detecting a plurality of detection devices uniformly distributed in the transformer substation;
step S2, if the environmental parameter exceeds the upper limit value in the preset range, executing step S3; if the environmental parameter is lower than the lower limit value in the preset range, executing step S4;
step S3: collecting the current operating state of each air conditioner in the transformer substation, selecting the air conditioner with the highest air conditioner state grade from the air conditioners in the unopened state, controlling the air conditioners to be opened and operated, and skipping to execute the step S1;
step S4: collecting the current operating state of each air conditioner in the transformer substation, selecting the air conditioner with the lowest air conditioner state grade from the air conditioners in the started state, controlling the air conditioners to be shut down and unloaded, and skipping to execute the step S1;
step S5: and keeping the current operation state of each air conditioner in the set area.
Further, the method for calculating the air conditioner state grade comprises the following steps:
collecting the fault type ft and the fault grade fd of each air conditioner;
and evaluating the air conditioner state grade according to the fault type ft and the fault grade fd.
Further, the fault type ft comprises a type a fault affecting the service life of the air conditioner, the refrigeration effect and the power consumption, a type B fault affecting the refrigeration effect and the power consumption of the air conditioner, and a type C fault affecting the power consumption; and dividing the fault grade fd according to the percentage form of the refrigeration effect and the current operation state of the air conditioner.
Further, the air conditioning state grades are classified in the order of a + 100% < a + 10% < B + 100% < B + 10% < C + 100% < C + 10% < no failure.
Further, if a plurality of air conditioners with the same air conditioner state grade appear, the detection result obtained by real-time detection of the detection equipment adjacent to each air conditioner with the same air conditioner state grade is judged, and the air conditioner corresponding to the detection equipment with the highest detection result is preferentially controlled to be turned on or the air conditioner corresponding to the detection equipment with the lowest detection result is controlled to be turned off.
Furthermore, the set area is a local area in the transformer substation or the inside of the whole transformer substation; if the set area is a local area in the transformer substation, controlling the detection equipment in the local area to start, averaging all detection results of the started detection equipment, taking the average value as an environmental parameter of the local area, and comparing the environmental parameter with a preset range; and if the set area is inside the whole transformer substation, controlling all detection equipment in the transformer substation to start, averaging all detection results of the started detection equipment, taking the average value as an environmental parameter inside the whole transformer substation, and comparing the average value with a preset range.
Further, the current operation state of the air conditioner comprises an air conditioner electrical parameter, an operation parameter and an indoor and outdoor environment parameter.
Further, the current operation state of the air conditioner is detected by a detection device inside the air conditioner.
The second purpose of the invention is realized by adopting the following technical scheme:
the equipment comprises a processor, a memory and a computer program which is stored on the memory and can run on the processor, wherein the processor executes the computer program to realize the control method for the air-conditioner linkage of the transformer substation.
The third purpose of the invention is realized by adopting the following technical scheme:
a storage medium having stored thereon a computer program which, when executed, implements a control method of a substation air conditioning linkage as described above.
Compared with the prior art, the invention has the beneficial effects that:
the invention monitors the environmental parameters of the transformer substation in real time, not only ensures that the environmental parameters of the transformer substation are maintained in a reasonable range, but also avoids the phenomenon that the air conditioners are all started and the low temperature is set blindly in the past in the transformer substation, and saves energy consumption. By selecting the priority of shutdown and unloading according to the health degree of the air conditioner, the energy consumption increase caused by low comprehensive operation efficiency due to fault operation of the air conditioner is reduced to the maximum extent, the combination of the air conditioning equipment participating in operation is guaranteed to be the most stable, the operation reliability is guaranteed, and the comprehensive service life of the equipment is prolonged to the maximum extent.
Drawings
FIG. 1 is a schematic flow chart of an embodiment of the present invention;
fig. 2 is a block diagram of a second structure according to the second embodiment of the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description, and it should be noted that any combination of the embodiments or technical features described below can be used to form a new embodiment without conflict.
As shown in fig. 1, the invention discloses a control method for air conditioner linkage of a transformer substation, which comprises the following steps:
s1, collecting environmental parameters of a set area in the transformer substation in real time, and judging whether the environmental parameters are in a preset range; if the environmental parameter is within the preset range, executing step S5; if not, go to step S2; the environmental parameters are obtained by detecting a plurality of detection devices uniformly distributed in the transformer substation;
step S2, if the environmental parameter exceeds the upper limit value in the preset range, executing step S3; if the environmental parameter is lower than the lower limit value in the preset range, executing step S4;
step S3: collecting the current operating state of each air conditioner in the transformer substation, selecting the air conditioner with the highest air conditioner state grade from the air conditioners in the unopened state, controlling the air conditioners to be opened and operated, and skipping to execute the step S1;
step S4: collecting the current operating state of each air conditioner in the transformer substation, selecting the air conditioner with the lowest air conditioner state grade from the air conditioners in the started state, controlling the air conditioners to be shut down and unloaded, and skipping to execute the step S1;
step S5: and keeping the current operation state of each air conditioner in the set area.
According to the control method for the air conditioner linkage of the transformer substation, provided by the invention, the environmental parameters of the transformer substation are monitored in real time, so that the environmental parameters of the transformer substation are maintained in a reasonable range, the phenomenon that the conventional transformer substation is completely started and low temperature is set blindly is avoided, and the energy consumption is saved. Through the priority selection of loading and unloading according to the health degree of the air conditioner, the energy consumption increase caused by low comprehensive operation efficiency due to fault operation of the air conditioner is reduced to the maximum extent, the air conditioner combination participating in operation is guaranteed to be the most stable, the operation reliability is guaranteed, and the comprehensive service life of the air conditioner is prolonged to the maximum extent.
Step S1: collecting environmental parameters of a set area in the transformer substation in real time, judging whether the environmental parameters are in a preset range, and if so, executing step S5; if not, go to step S2;
in the embodiment, in order to ensure that the temperature and humidity conditions of different areas in the transformer substation are consistent, a plurality of air conditioners are uniformly distributed in the transformer substation, a plurality of uniformly distributed detection devices are arranged in the transformer substation, and the air conditioners and the detection devices can be in one-to-one correspondence so as to improve the accuracy of collecting environmental parameters in the transformer substation; in this embodiment, the detection device can be set as a temperature and humidity sensor, and the temperature and humidity condition in the substation is detected in real time through the detection device.
In this embodiment, the inside of the whole substation may be divided into a plurality of local areas, the set area may be defined as the whole internal space of the substation, or a certain local area in the substation may be designated as the set area, and then the detection device in the set area is controlled to start, so that the environmental parameters of the local area or the whole area may be detected in a targeted manner, thereby implementing the air-conditioning linkage control of the local area or the whole area.
In this embodiment, the setting area is set as the whole inner space of the transformer substation, the detection devices in the setting area are controlled to start, all the detection devices in the transformer substation are controlled to start, each detection device detects a corresponding detection result, the detection results obtained by detecting all the detection devices are averaged, an environmental parameter of the whole inner space of the transformer substation can be obtained, and the whole temperature and humidity condition in the transformer substation can be obtained more evenly and accurately.
And then, comparing the environmental parameters with a preset range, and if the numerical values of the environmental parameters are maintained in the preset range, indicating that the overall temperature and humidity condition in the transformer substation is normal, and keeping the current operation state of each air conditioner in the transformer substation without adjusting the air conditioner in the transformer substation.
Step S2, if the environmental parameter exceeds the upper limit value in the preset range, executing step S3; if the environmental parameter is lower than the lower limit value in the preset range, executing step S4;
if the temperature or humidity value in the environmental parameters exceeds the upper limit value of the preset range, the integral temperature and humidity in the transformer substation are high, and the temperature and humidity in the transformer substation are reduced by starting a local air conditioner; if the temperature of the transformer substation is lower than the lower limit value in the preset range, the temperature of the whole transformer substation is low, and the local air conditioner needs to be turned off to improve the temperature of the transformer substation.
And collecting the current running state of the air conditioner at the colleagues judging whether the environmental parameters exceed the preset range. The method for calculating the air conditioner state grade comprises the following steps:
firstly, acquiring a fault type ft and a fault grade fd of each air conditioner;
and evaluating the air conditioner state grade according to the fault type ft and the fault grade fd.
The fault type ft comprises A-type faults affecting the service life, the refrigeration effect and the power consumption of the air conditioner, including but not limited to a compressor starting fault; b-type faults affecting the refrigeration effect and power consumption of the air conditioner, including but not limited to fluorine deficiency; the class C faults affecting power consumption include, but are not limited to, dirty and blocked outdoor units.
The fault grade fd is the severity of a certain fault type, and is divided according to the refrigeration effect, the standard operation condition and the current air conditioner operation state in percentage, for example, if the compressor is in a starting fault, the compressor cannot refrigerate and the operation state completely deviates from the standard operation condition, the fault grade fd is 100%; the standard operation condition refers to an operation condition of the air conditioner under a certain specific working condition. If the fluorine is absent, the refrigeration is carried out but the temperature cannot be reduced, and the running state completely deviates from the standard running working condition, the fault level fd is also 100 percent; if no fluorine exists, the refrigerant can be cooled, but has a certain cooling effect or the operation state is slightly deviated from the standard operation working condition, and the cooling effect is 30% or 50%, and the specific percentage is analyzed according to the actual condition. The closer the fault level fd is to 100%, the higher the fault level fd is, and the more serious the fault is.
And the air conditioner state grade is evaluated by the comprehensive fault type ft and the fault grade fd. And classifying the air conditioning state grades according to the sequence that A + 100% < A + 10% < B + 100% < B + 10% < C + 100% < C + 10% < no fault, wherein if no fault exists, the air conditioning state grade is the highest, and the air conditioning state grades are sequentially reduced.
And S3, if the temperature and humidity of the whole transformer substation are higher, acquiring the current operation state of each air conditioner in the transformer substation, selecting the air conditioner with the highest air conditioner state grade from the air conditioners in the unopened state, controlling the air conditioners to be opened and operated, jumping to the next step and executing the step S1, judging whether the environment parameters are restored to the preset range after the air conditioners with the highest air conditioner state grade are opened again by detecting the environment parameters in the transformer substation, and if not, continuously selecting the air conditioners with the air conditioner state grade in the unopened state and opening the air conditioners until the environment parameters in the transformer substation are maintained to the preset range.
The number of the air conditioners with the highest air conditioner state grade can be one or more, if the current environmental parameters exceed the preset range in a small range, the air conditioner with the highest air conditioner state grade can be controlled to be started, if a plurality of air conditioners with the same air conditioner state grade appear in the period, the detection equipment corresponding to the air conditioners with the same air conditioner state grade can be controlled to detect the current temperature and humidity in real time, and the air conditioner corresponding to the detection equipment with the highest detected temperature and humidity value is controlled to be started preferentially.
If the current environmental parameters greatly exceed the preset range, the front air conditioners in the health degree sequencing can be started simultaneously, and if a plurality of air conditioners with the same air conditioner state grade appear in the period, the air conditioners are controlled to be started and operated synchronously, so that the environmental parameters in the transformer substation are adjusted quickly.
Step S4: if the whole temperature and humidity in the transformer substation are low, acquiring the current operation state of each air conditioner in the transformer substation, selecting the air conditioner with the lowest air conditioner state grade from the air conditioners in the opened state, and controlling the air conditioners to be turned off and unloaded; thereafter, it jumps to and executes step S1;
the principle of this step is the same as that of step S3, and a repeated description thereof will not be made.
The method for linkage loading and unloading control of the plurality of air conditioners is combined with the actual indoor load of the transformer substation and the health degree state of the air conditioners, the problem of overuse of the air conditioners of the transformer substation is fully solved, the optimal comprehensive operation efficiency is guaranteed, and the comprehensive service life of the air conditioners is longest.
Step S5: when the linkage control in the transformer substation is finished and the environmental parameters are always maintained within the preset range, the current operation state of each air conditioner in the set area can be kept, and the temperature and the humidity of the transformer substation are maintained within a reasonable range.
The application range of the invention is not limited to the interior of a transformer substation, and the air conditioner linkage control method can be used in application places such as machine rooms, meeting rooms and the like which need linkage of a plurality of air conditioners.
A storage medium storing a computer program which, when executed by a processor, implements the steps of a control method for substation air-conditioning linkage as set forth above.
The invention is operational with numerous general purpose or special purpose computing system environments or configurations. For example: personal computers, server computers, hand-held or portable devices, tablet-type devices, multiprocessor systems, microprocessor-based systems, set top boxes, programmable consumer electronics, network PCs, minicomputers, mainframe computers, distributed computing environments that include any of the above systems or devices, and the like, as in embodiment two.
Example two
An electronic device as shown in fig. 2 includes a memory, a processor, and a program stored in the memory, where the program is configured to be executed by the processor, and the processor executes the program to implement the steps of the control method for air conditioning linkage of the substation.
The apparatus in this embodiment and the method in the foregoing embodiment are based on two aspects of the same inventive concept, and the method implementation process has been described in detail in the foregoing, so that those skilled in the art can clearly understand the structure and implementation process of the system in this embodiment according to the foregoing description, and for the sake of brevity of the description, details are not repeated here.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are within the protection scope of the present invention.

Claims (8)

1. A control method for linkage of air conditioners of a transformer substation is characterized by comprising the following steps:
s1, collecting environmental parameters of a set area in the transformer substation in real time, and judging whether the environmental parameters are in a preset range; if the environmental parameter is within the preset range, executing step S5; if not, executing the step 2; the environmental parameters are obtained by detecting a plurality of detection devices uniformly distributed in the transformer substation;
step S2, if the environmental parameter exceeds the upper limit value in the preset range, executing step S3; if the environmental parameter is lower than the lower limit value in the preset range, executing step S4;
step S3: collecting the current operating state of each air conditioner in the transformer substation, selecting the air conditioner with the highest air conditioner state grade from the air conditioners in the unopened state, controlling the air conditioners to be opened and operated, and skipping to execute the step S1; the method for calculating the air conditioner state grade comprises the following steps: collecting the fault type ft and the fault grade fd of each air conditioner; evaluating the air conditioner state grade according to the fault type ft and the fault grade fd; the fault type ft comprises an A-type fault affecting the service life of the air conditioner, the refrigeration effect and the power consumption of the air conditioner, a B-type fault affecting the refrigeration effect and the power consumption of the air conditioner and a C-type fault affecting the power consumption of the air conditioner; dividing the fault grade fd according to the percentage form of the refrigeration effect, the standard operation condition and the current air conditioner operation state;
step S4: collecting the current operating state of each air conditioner in the transformer substation, selecting the air conditioner with the lowest air conditioner state grade from the air conditioners in the started state, controlling the air conditioners to be shut down and unloaded, and skipping to execute the step S1;
step S5: and keeping the current operation state of each air conditioner in the set area.
2. The substation air-conditioning linkage control method according to claim 1, wherein the air-conditioning status levels are divided in the order of a + 100% < a + 10% < B + 100% < B + 10% < C + 100% < C + 10% < no fault ".
3. The transformer substation air conditioner linkage control method according to claim 1, wherein if a plurality of air conditioners with the same air conditioner state grade appear, the detection result obtained by real-time detection of the detection equipment adjacent to each air conditioner with the same air conditioner state grade is judged, and the air conditioner corresponding to the detection equipment with the highest detection result is preferentially controlled to be turned on, or the air conditioner corresponding to the detection equipment with the lowest detection result is controlled to be turned off.
4. The control method for the linkage of the air conditioners of the transformer substation according to claim 1, wherein the set area is a local area in the transformer substation or the inside of the whole transformer substation; if the set area is a local area in the transformer substation, controlling the detection equipment in the local area to start, averaging all detection results of the started detection equipment, taking the average value as an environmental parameter of the local area, and comparing the environmental parameter with a preset range; and if the set area is inside the whole transformer substation, controlling all detection equipment in the transformer substation to start, averaging all detection results of the started detection equipment, taking the average value as an environmental parameter inside the whole transformer substation, and comparing the average value with a preset range.
5. The method for controlling the linkage of the air conditioners of the transformer substation as claimed in claim 1, wherein the current operating conditions of the air conditioners comprise air conditioner electrical parameters, operating parameters and indoor and outdoor environmental parameters.
6. The method for controlling the linkage of the air conditioners in the transformer substation as claimed in claim 1, wherein the current operation state of the air conditioner is detected by detection equipment inside the air conditioner.
7. A computer device, characterized in that the computer device comprises a processor, a memory and a computer program which is stored on the memory and can run on the processor, and when the processor executes the computer program, the method for controlling the linkage of the air conditioner of the transformer substation as claimed in any one of claims 1 to 6 is realized.
8. A storage medium having stored thereon a computer program which, when executed, implements a method of controlling a substation air conditioning linkage according to any one of claims 1 to 6.
CN201910957677.7A 2019-10-10 2019-10-10 Control method, equipment and storage medium for transformer substation air conditioner linkage Active CN110887177B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910957677.7A CN110887177B (en) 2019-10-10 2019-10-10 Control method, equipment and storage medium for transformer substation air conditioner linkage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910957677.7A CN110887177B (en) 2019-10-10 2019-10-10 Control method, equipment and storage medium for transformer substation air conditioner linkage

Publications (2)

Publication Number Publication Date
CN110887177A CN110887177A (en) 2020-03-17
CN110887177B true CN110887177B (en) 2021-10-08

Family

ID=69746007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910957677.7A Active CN110887177B (en) 2019-10-10 2019-10-10 Control method, equipment and storage medium for transformer substation air conditioner linkage

Country Status (1)

Country Link
CN (1) CN110887177B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100388655B1 (en) * 2001-03-05 2003-06-25 삼성전자주식회사 Air conditioner control system and control method thereof
CN102901179B (en) * 2012-09-28 2014-08-13 广州市科维机电设备安装有限公司 Energy-saving group control method of host machine of central air conditioner
CN104392020B (en) * 2014-10-22 2017-06-16 北京必可测科技股份有限公司 The display methods and device of a kind of rotating machinery vibrating failure
CN107490485A (en) * 2016-11-15 2017-12-19 宝沃汽车(中国)有限公司 Vehicle health degree detection method, device and vehicle
US20190145646A1 (en) * 2017-11-14 2019-05-16 Christopher Hamilton Method of evaluating an hvac unit
CN108280019A (en) * 2018-01-08 2018-07-13 郑州云海信息技术有限公司 A kind of method of evaluating server health status
CN109883006A (en) * 2019-02-18 2019-06-14 珠海格力电器股份有限公司 The group system and group control method of the air-conditioning of reliability can be improved
CN110068107B (en) * 2019-04-08 2021-04-13 广东纽恩泰新能源科技发展有限公司 Modular control method
CN110108002B (en) * 2019-05-31 2021-02-26 珠海格力电器股份有限公司 Outdoor unit operation control method and device for improving operation energy efficiency and stability

Also Published As

Publication number Publication date
CN110887177A (en) 2020-03-17

Similar Documents

Publication Publication Date Title
CN109595763B (en) Control strategy optimization method and device of air conditioning system and computer equipment
JP4421423B2 (en) Air conditioner monitoring system and air conditioner monitoring method
JP5290044B2 (en) Air conditioner monitoring system and air conditioner monitoring method
CN111306706B (en) Air conditioner linkage control method and system
US10337964B2 (en) Systems and methods for monitoring, inferring state of health, and optimizing efficiency of refrigeration systems
US20220206484A1 (en) Methods and Apparatuses For Detecting Faults in HVAC Systems Based on Load Level Patterns
CN110094842B (en) Air conditioner running state monitoring method
EP3940307A1 (en) Fault risk analysis system and method, air conditioner and computer readable storage medium
CN102080864B (en) Method and device for monitoring pressure value of air conditioner in real time
CN109974223B (en) Air conditioner control method and device for adjusting air conditioner work according to weather forecast
US20110023503A1 (en) Performance detection method
CN111578447B (en) Air conditioner health degree diagnosis method and device, computer equipment and storage medium
CN110953687B (en) Health degree evaluation method and system of air conditioner and storage medium
CN111322721A (en) Air conditioner fault detection processing method and system, storage medium and air conditioner
CN113654183A (en) Fault monitoring method of air conditioning unit
CN114322262B (en) Multi-system air conditioner scheduling method and device and air conditioner
CN115017006A (en) Auxiliary energy-saving control method and system for data center
CN110887177B (en) Control method, equipment and storage medium for transformer substation air conditioner linkage
US10365002B2 (en) Remote controller of air-conditioning system
KR101830859B1 (en) Method of diagnosing energy being consumed in internet data center by using virtual building model
CN108758977B (en) Control method and device of air conditioner and air conditioner with control device
CN112146903B (en) Fault identification method
CN112696803B (en) Intelligent environment monitoring method and system for electric power machine room and storage medium
CN110962538B (en) Bus air conditioner detection control method, computer readable storage medium and air conditioner
CN114061076A (en) Air conditioner function compensation control method and device and air conditioning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant