CN110829250A - A maintenance protection component - Google Patents
A maintenance protection component Download PDFInfo
- Publication number
- CN110829250A CN110829250A CN201911161822.7A CN201911161822A CN110829250A CN 110829250 A CN110829250 A CN 110829250A CN 201911161822 A CN201911161822 A CN 201911161822A CN 110829250 A CN110829250 A CN 110829250A
- Authority
- CN
- China
- Prior art keywords
- hoop
- pair
- plate body
- column
- workbench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B3/00—Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Power Engineering (AREA)
- Ladders (AREA)
Abstract
一种检修防护组件。涉及供电领域,尤其涉及一种检修防护组件。提供了一种结构简单,方便操作,提高安全性的检修防护组件。包括立柱,所述立柱的顶部设有瓷柱绝缘子,所述瓷柱绝缘子的顶部设有闸刀,所述立柱上位于瓷柱绝缘子的下方设有工作台;还包括抱箍和一对支撑板,所述抱箍包括一对箍环,一对箍环连接在立柱上、且位于工作台的下方,所述支撑板包括板体,所述板体的底部设有用于连接安全带挂钩的挂环,所述箍环与支撑板一一对应,所述板体和箍环之间连接设有伸缩杆。本发明方便加工,对高空检修作业人员起到保护作用,提高检修效率。
An overhaul guard assembly. The invention relates to the field of power supply, in particular to a maintenance protection component. Provided is an overhaul protection component with simple structure, convenient operation and improved safety. Including a column, the top of the column is provided with a ceramic column insulator, the top of the ceramic column insulator is provided with a knife, the column is located below the ceramic column insulator with a workbench; it also includes a hoop and a pair of support plates , the holding hoop includes a pair of hoop rings, a pair of hoop rings is connected to the upright column and is located below the workbench, the support plate includes a plate body, and the bottom of the plate body is provided with a hook for connecting the seat belt hook The hoop is in one-to-one correspondence with the support plate, and a telescopic rod is connected between the plate body and the hoop. The invention is convenient for processing, plays a protective role for high-altitude maintenance operators, and improves maintenance efficiency.
Description
技术领域technical field
本发明涉及供电领域,尤其涉及一种检修防护组件。The invention relates to the field of power supply, in particular to a maintenance protection component.
背景技术Background technique
电力检修包括发电部分、供电部分、变电部分以及配电部分,每个部分都是由专门的人员进行负责的,其主要负责日常设备安装及维护,故障排除,巡线排查等,是对电网及其附属设备维护保养的职业,专业性要求很高,且有一定的危险性。Power overhaul includes the power generation part, power supply part, substation part and power distribution part. Each part is in charge of special personnel, who are mainly responsible for daily equipment installation and maintenance, troubleshooting, line inspection, etc. The occupation of maintenance and maintenance of its ancillary equipment has high professional requirements and certain risks.
闸刀检修属于高空检修作业,为保证闸刀检修时检修人员安全需使用安全带,但闸刀支柱瓷瓶不属于牢固构件,根据电力《安规》规定需要将安全带高挂低用,禁止将安全带挂在非牢固构件上,且其他公司发生过安全带直接挂在支柱瓷瓶上导致支柱瓷瓶断裂的事故,使得闸刀检修必须借用其他装置。The knife maintenance is a high-altitude maintenance operation. In order to ensure the safety of the maintenance personnel during the knife maintenance, the safety belt should be used. However, the knife pillar porcelain bottle is not a solid component. The seat belt is hung on a non-firm component, and other companies have had an accident in which the seat belt was directly hung on the pillar porcelain bottle, causing the pillar porcelain bottle to break.
现有闸刀检修过程中,在超过2米时,需采取搭建脚手架或使用高空斗臂车作进行辅助,提高安全性。然而,这两种方法成本较高,需要花费的时间较长,降低了工作效率。During the maintenance process of the existing blade, when it exceeds 2 meters, it is necessary to build a scaffold or use a high-altitude bucket arm truck for assistance to improve safety. However, these two methods have high cost, take a long time, and reduce work efficiency.
发明内容SUMMARY OF THE INVENTION
本发明针对以上问题,提供了一种结构简单,方便操作,提高安全性的检修防护组件。In view of the above problems, the present invention provides a maintenance and protection assembly with a simple structure, convenient operation and improved safety.
本发明的技术方案是:包括立柱,所述立柱的顶部设有瓷柱绝缘子,所述瓷柱绝缘子的顶部设有闸刀,所述立柱上位于瓷柱绝缘子的下方设有工作台;The technical scheme of the present invention is as follows: comprising a column, the top of the column is provided with a ceramic column insulator, the top of the ceramic column insulator is provided with a knife, and a workbench is provided on the column below the ceramic column insulator;
还包括抱箍和一对支撑板,所述抱箍包括一对箍环,一对箍环连接在立柱上、且位于工作台的下方,Also includes a hoop and a pair of support plates, the hoop includes a pair of hoop, a pair of hoop is connected on the column, and is located below the workbench,
所述支撑板包括板体,所述板体的底部设有用于连接安全带挂钩的挂环,The support plate includes a plate body, and the bottom of the plate body is provided with a hanging ring for connecting the seat belt hook,
所述箍环与支撑板一一对应,所述板体和箍环之间连接设有伸缩杆,The hoop is in one-to-one correspondence with the support plate, and a telescopic rod is connected between the plate body and the hoop.
所述工作台的顶面设有一对对称设置的容置槽,所述容置槽包括连通的槽体一和槽体二,所述槽体一用于放置支撑板,所述槽体二用于放置伸缩杆。The top surface of the worktable is provided with a pair of symmetrically arranged accommodating grooves. The accommodating grooves include a groove body 1 and a groove body 2 that are communicated. The groove body 1 is used for placing the support plate, and the groove body is used for two for placing telescopic poles.
所述立柱上固定设有支撑环,所述支撑环位于抱箍的底部。A support ring is fixed on the upright column, and the support ring is located at the bottom of the hoop.
所述板体和箍环之间设有至少两个伸缩杆。At least two telescopic rods are arranged between the plate body and the hoop.
所述板体的顶面设有把手。The top surface of the plate body is provided with a handle.
还包括伸缩梯,所述伸缩梯包括一对平行的立杆,所述立杆的顶部设有销孔一,所述工作台的两端分别设有销孔二,所述销孔一和销孔二一一对应、且用于放置销轴。It also includes a telescopic ladder, the telescopic ladder includes a pair of parallel vertical rods, the top of the vertical rod is provided with a pin hole 1, the two ends of the worktable are respectively provided with a pin hole 2, the pin hole 1 and the pin The holes are in one-to-one correspondence and are used to place the pins.
本发明在工作中,首先将抱箍连接在立柱上,然后在工作台上开设容置槽,将伸缩杆的一端连接箍环,另一端穿过槽体二、连接位于槽体一内的支撑板,完成安装。检修人员通过梯子登上工作台后,将身上的安全带挂钩可连接在挂环上,同时,伸缩杆便于检修人员抓取,提高了安全性。支撑板和抱箍之间设置伸缩杆,通过伸缩动作,可节省空间,提高美观性。In the operation of the present invention, the hoop is first connected to the upright column, and then a accommodating groove is opened on the worktable, one end of the telescopic rod is connected to the hoop, the other end passes through the second groove body, and is connected to the support located in the first groove body. board to complete the installation. After the maintenance personnel board the workbench through the ladder, the safety belt hook on the body can be connected to the hanging ring. At the same time, the telescopic rod is convenient for the maintenance personnel to grasp, which improves the safety. A telescopic rod is arranged between the support plate and the hoop. Through the telescopic action, the space can be saved and the aesthetics can be improved.
本发明方便加工,对高空检修作业人员起到保护作用,提高检修效率。The invention is convenient for processing, plays a protective role for high-altitude maintenance operators, and improves maintenance efficiency.
附图说明Description of drawings
图1是本发明的结构示意图,Fig. 1 is the structural representation of the present invention,
图2是工作台的结构示意图,Figure 2 is a schematic structural diagram of a workbench,
图3是本发明的工作状态图;Fig. 3 is the working state diagram of the present invention;
图中1是立柱,2是瓷柱绝缘子,3是工作台,31是槽体一,32是槽体二,4是抱箍,5是支撑板,51是板体,52是挂环,6是伸缩杆,7是支撑环,8是伸缩梯,80是立杆,9是销轴,10是把手。In the figure, 1 is a column, 2 is a porcelain column insulator, 3 is a workbench, 31 is a tank body, 32 is a tank body two, 4 is a hoop, 5 is a support plate, 51 is a plate body, 52 is a hanging ring, 6 It is a telescopic rod, 7 is a support ring, 8 is a telescopic ladder, 80 is a pole, 9 is a pin, and 10 is a handle.
具体实施方式Detailed ways
本发明如图1-3所示,包括立柱1,所述立柱的顶部设有瓷柱绝缘子2,所述瓷柱绝缘子的顶部设有闸刀(图中未示出),所述立柱上位于瓷柱绝缘子的下方设有工作台3;As shown in Figures 1-3, the present invention includes a column 1, the top of the column is provided with a ceramic column insulator 2, the top of the ceramic column insulator is provided with a knife (not shown in the figure), and the column is located on the top of the column. A
还包括抱箍4和一对支撑板5,所述抱箍包括一对箍环,一对箍环连接在立柱上、且位于工作台的下方,Also includes a
所述支撑板5包括板体51,所述板体的底部设有用于连接安全带挂钩的挂环52,由于具有两个挂钩,可与挂环一一对应连接,提高安全性。The
所述箍环与支撑板一一对应,所述板体和箍环之间连接设有伸缩杆6,The hoop is in one-to-one correspondence with the support plate, and a telescopic rod 6 is connected between the plate body and the hoop.
所述工作台3的顶面设有一对对称设置的容置槽,所述容置槽包括连通的槽体一31和槽体二32,所述槽体一用于放置支撑板,所述槽体二用于放置伸缩杆。The top surface of the
本发明在工作中,首先将抱箍连接在立柱上,然后在工作台上开设容置槽,将伸缩杆的一端连接箍环,另一端穿过槽体二、连接位于槽体一内的支撑板,完成安装。检修人员通过梯子登上工作台后,将身上的安全带挂钩可连接在挂环上,同时,伸缩杆便于检修人员抓取,提高了安全性。支撑板和抱箍之间设置伸缩杆,通过伸缩动作,可节省空间,提高美观性。During the operation of the present invention, the hoop is first connected to the upright column, then a accommodating groove is opened on the worktable, one end of the telescopic rod is connected to the hoop, the other end passes through the second groove body, and is connected to the support located in the first groove body. board to complete the installation. After the maintenance personnel board the workbench through the ladder, the safety belt hook on the body can be connected to the hanging ring. At the same time, the telescopic rod is convenient for the maintenance personnel to grasp, which improves the safety. A telescopic rod is arranged between the support plate and the hoop. Through the telescopic action, the space can be saved and the aesthetics can be improved.
所述立柱上固定设有支撑环7,所述支撑环位于抱箍的底部。A support ring 7 is fixed on the column, and the support ring is located at the bottom of the hoop.
设置支撑环,起到对抱箍的可靠支撑,提高稳固性。A support ring is provided to reliably support the hoop and improve the stability.
所述板体和箍环之间设有至少两个伸缩杆6。At least two telescopic rods 6 are arranged between the plate body and the hoop.
这样,起到对支撑板的可靠支撑作用,便于提高检修人员的安全性。In this way, it plays a reliable supporting role for the support plate, which is convenient to improve the safety of maintenance personnel.
所述板体的顶面设有把手10。The top surface of the plate body is provided with a
设置把手,便于检修人员抓取,方便操作。A handle is provided, which is convenient for maintenance personnel to grasp and operate.
还包括伸缩梯8,所述伸缩梯包括一对平行的立杆80,所述立杆的顶部设有销孔一,所述工作台的两端分别设有销孔二,所述销孔一和销孔二一一对应、且用于放置销轴9。Also includes a
通过设置伸缩梯,检修人员可直接开启进行登梯作业,节省了时间,同时,避免携带梯子,节省了劳力。By setting up the telescopic ladder, the maintenance personnel can directly start the ladder operation, which saves time, and at the same time, avoids carrying the ladder and saves labor.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911161822.7A CN110829250A (en) | 2019-11-25 | 2019-11-25 | A maintenance protection component |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911161822.7A CN110829250A (en) | 2019-11-25 | 2019-11-25 | A maintenance protection component |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110829250A true CN110829250A (en) | 2020-02-21 |
Family
ID=69558735
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201911161822.7A Pending CN110829250A (en) | 2019-11-25 | 2019-11-25 | A maintenance protection component |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110829250A (en) |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005151775A (en) * | 2003-11-19 | 2005-06-09 | Kawamura Electric Inc | Cubicle base |
| JP2008154947A (en) * | 2006-12-26 | 2008-07-10 | Chugoku Electric Power Co Inc:The | Auxiliary work tool |
| CN201997018U (en) * | 2011-03-23 | 2011-10-05 | 邢台供电公司 | Safety belt hanging device |
| CN202363769U (en) * | 2011-11-23 | 2012-08-01 | 台前县供电局 | Work safety belt hanging buckle support for transformer station |
| CN202997365U (en) * | 2012-11-14 | 2013-06-12 | 宜阳县电业管理公司 | Isolating switch maintenance scaffold |
| CN203301013U (en) * | 2013-06-21 | 2013-11-20 | 国家电网公司 | Knife brake and switch maintenance frame |
| CN104399203A (en) * | 2014-11-22 | 2015-03-11 | 国网河南省电力公司南阳供电公司 | Fixed safety belt hanger |
| CN204760830U (en) * | 2015-07-02 | 2015-11-11 | 国网山东省电力公司烟台供电公司 | Isolator maintenance work frame |
| CN105083350A (en) * | 2015-08-25 | 2015-11-25 | 国家电网公司 | Special vehicle for power maintenance |
| CN108390291A (en) * | 2018-03-30 | 2018-08-10 | 广东电网有限责任公司 | A kind of outdoor voltage transformer maintenance special hoisting bar |
| CN210608262U (en) * | 2019-11-25 | 2020-05-22 | 国网江苏省电力有限公司仪征市供电分公司 | Overhaul guard components |
-
2019
- 2019-11-25 CN CN201911161822.7A patent/CN110829250A/en active Pending
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005151775A (en) * | 2003-11-19 | 2005-06-09 | Kawamura Electric Inc | Cubicle base |
| JP2008154947A (en) * | 2006-12-26 | 2008-07-10 | Chugoku Electric Power Co Inc:The | Auxiliary work tool |
| CN201997018U (en) * | 2011-03-23 | 2011-10-05 | 邢台供电公司 | Safety belt hanging device |
| CN202363769U (en) * | 2011-11-23 | 2012-08-01 | 台前县供电局 | Work safety belt hanging buckle support for transformer station |
| CN202997365U (en) * | 2012-11-14 | 2013-06-12 | 宜阳县电业管理公司 | Isolating switch maintenance scaffold |
| CN203301013U (en) * | 2013-06-21 | 2013-11-20 | 国家电网公司 | Knife brake and switch maintenance frame |
| CN104399203A (en) * | 2014-11-22 | 2015-03-11 | 国网河南省电力公司南阳供电公司 | Fixed safety belt hanger |
| CN204760830U (en) * | 2015-07-02 | 2015-11-11 | 国网山东省电力公司烟台供电公司 | Isolator maintenance work frame |
| CN105083350A (en) * | 2015-08-25 | 2015-11-25 | 国家电网公司 | Special vehicle for power maintenance |
| CN108390291A (en) * | 2018-03-30 | 2018-08-10 | 广东电网有限责任公司 | A kind of outdoor voltage transformer maintenance special hoisting bar |
| CN210608262U (en) * | 2019-11-25 | 2020-05-22 | 国网江苏省电力有限公司仪征市供电分公司 | Overhaul guard components |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203242941U (en) | Novel electric power overhaul frame | |
| CN106129895B (en) | Portable power grid overhead line construction maintenance protection device | |
| CN110829250A (en) | A maintenance protection component | |
| CN210608261U (en) | Simple knife auxiliary maintenance device | |
| CN210608262U (en) | Overhaul guard components | |
| CN207879242U (en) | A kind of electric power overhaul emergency staircase | |
| CN203260948U (en) | Special tool for replacing support insulator of 35 kV bus | |
| CN202550348U (en) | Folding multifunctional overhauling frame for overhauling isolating switch | |
| CN201541071U (en) | Isolation switch maintenance platform | |
| CN210608296U (en) | Safety protection climbing rod assembly | |
| CN205381879U (en) | A lift by crane instrument for 35 -110kV isolator overhauls | |
| CN101972524B (en) | Substation isolating switch installation safety belt suspension device | |
| CN202423906U (en) | Overhaul platform for isolating switch | |
| CN206874212U (en) | A kind of electrician is with anti-inclination insulating ladder | |
| CN201238159Y (en) | GW4-110 type isolation switch examination stand | |
| CN110829251A (en) | A simple guillotine auxiliary maintenance device | |
| CN204118541U (en) | A kind of field work service kit | |
| CN203607723U (en) | Overhead operation platform of isolation switch in electrical network | |
| CN204391603U (en) | Charged insulating ceiling plate | |
| CN201549792U (en) | 220 kV transformer maintenance workbench | |
| CN212076298U (en) | Electrical equipment synchronous adjustment support for exhibition | |
| CN221305477U (en) | Photovoltaic drop-out arrester dismouting structure | |
| CN105923563A (en) | Hoisting device for electric power overhaul device | |
| CN214192462U (en) | Special miniature maintenance platform of aerial work | |
| CN221524176U (en) | A simple platform for aerial work |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200221 |