CN110821134A - Operation platform for pump station dilatation runner surface of water pump base foundation beam reinforcing apparatus - Google Patents
Operation platform for pump station dilatation runner surface of water pump base foundation beam reinforcing apparatus Download PDFInfo
- Publication number
- CN110821134A CN110821134A CN201810919043.8A CN201810919043A CN110821134A CN 110821134 A CN110821134 A CN 110821134A CN 201810919043 A CN201810919043 A CN 201810919043A CN 110821134 A CN110821134 A CN 110821134A
- Authority
- CN
- China
- Prior art keywords
- platform
- angle steel
- water pump
- steel
- operation platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
Abstract
The invention discloses an operating platform for a pump station foundation beam reinforcing device on a water surface of a pump station expansion flow channel, which comprises a frame, wherein platform suspension angle steel is welded on two sides of the center of the top of the frame, galvanized angle steel is welded on the inner side of the platform suspension angle steel, two sides of the bottom of the galvanized angle steel are connected with platform suspender angle steel through bolt threads, and a water pump mounting area is arranged at the bottom of the inner side of the platform suspender angle steel. According to the invention, through the matching of the frame, the platform suspension angle steel, the galvanized angle steel, the platform suspender angle steel, the raw water pump beam, the reinforced water pump beam, the reinforcing steel bar, the scaffold pedal, the galvanized channel steel, the bottom beam, the jacking stabilizing device, the concrete cylinder and the bolt, the hardness and firmness of the operation platform material are enhanced, the safety of the operation platform is improved, the problem of low safety performance of the traditional operation platform is solved, the construction safety of a user is ensured, and meanwhile, the circulation of a flow channel is not influenced.
Description
Technical Field
The invention relates to the technical field of pump station construction, in particular to an operating platform for a pump station expansion flow channel water surface upper pump base foundation beam reinforcing device.
Background
The pump station is the device and the engineering title pump and pump station engineering that can provide the hydraulic power and the atmospheric pressure power of certain pressure and flow, the user when building the pump station in the runner, need drain the ponding in the runner when pump base foundation beam consolidates, can not carry out the reinforcement construction of concrete beam on the surface of water, influence runner normal use, according to the distance between the surface of water and the reinforcement foundation beam in the runner, thereby operation platform need be used, however, traditional operation platform security performance is low, can not guarantee the hardness and the fastness of operation platform material, user's construction safety can not be guaranteed.
Disclosure of Invention
The invention aims to provide an operation platform for a pump station foundation beam reinforcing device on a pump station expansion flow channel water surface, which has the advantage of high safety performance and solves the problem of low safety performance of the traditional operation platform.
In order to achieve the purpose, the invention provides the following technical scheme: an operation platform for a pump base foundation beam reinforcing device on the water surface of a pump station dilatation runner comprises a frame, wherein platform suspension angle steel is welded on two sides of the center of the top of the frame, galvanized angle steel is welded on the inner side of the platform suspension angle steel, two sides of the bottom of the galvanized angle steel are connected with platform suspender angle steel through bolt threads, a water pump installation area is arranged at the bottom of the inner side of the platform suspender angle steel, a raw water pump beam is poured on the top of the platform suspender angle steel, a reinforced water pump beam is poured on the bottom of the raw water pump beam, concrete cylinders are poured on the outer sides of the raw water pump beam and the reinforced water pump beam, a plurality of reinforcing steel bars are sequentially arranged in the inner cavity of the reinforced water pump beam from top to bottom, the bottom of the platform suspender angle steel is connected with a bottom beam through bolt threads, and two sides of the bottom beam are in, the outside of the tight stabilising arrangement in top and the inboard fixed connection of concrete cylinder, the top of floorbar loops through bolt threaded connection from a left side to the right side has a plurality of zinc-plated channel-section steels, the top welding of zinc-plated channel-section steel has the scaffold footboard, the scaffold footboard is located the outside of platform jib angle steel.
Preferably, the number of the reinforcing steel bars is eight, and the surfaces of the reinforcing steel bars are subjected to galvanizing treatment.
Preferably, the length of the platform suspender angle steel is not less than six hundred millimeters, and a graduated scale is vertically arranged on the surface of the right side of the frame.
Preferably, the thickness of the reinforced water pump beam is larger than that of the raw water pump beam, and the scaffold pedals are made of steel plates and steel pipe materials.
Compared with the prior art, the invention has the following beneficial effects:
1. according to the invention, through the matching of the frame, the platform suspension angle steel, the galvanized angle steel, the platform suspender angle steel, the raw water pump beam, the reinforced water pump beam, the reinforcing steel bar, the scaffold pedal, the galvanized channel steel, the bottom beam, the jacking stabilizing device, the concrete cylinder and the bolt, the hardness and firmness of the operation platform material are enhanced, the safety of the operation platform is improved, the problem of low safety performance of the traditional operation platform is solved, the construction safety of a user is ensured, meanwhile, the circulation of a flow channel is not influenced, and the operation platform is worthy of popularization and use.
2. According to the invention, the number of the reinforcing steel bars is eight, the strength of the reinforced water pump beam material is increased, the reinforcing steel bars can be protected through the surface galvanizing treatment of the reinforcing steel bars, the service life of the reinforcing steel bars is prolonged, the length of the platform suspender angle steel is not less than six hundred millimeters, the construction space of a user is ensured, the water level of the runner can be monitored through the graduated scale, the firmness of the reinforced water pump beam is enhanced through the fact that the thickness of the reinforced water pump beam is greater than that of the original water pump beam, and the safety of the scaffold pedal is improved through the fact that the scaffold pedal is made of steel plates and steel pipe materials.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of A of the structure of FIG. 1 in accordance with the present invention;
fig. 3 is a side view of a in the structure of fig. 1 in accordance with the present invention.
In the figure: the steel-concrete composite scaffold comprises a frame 1, a platform 2, suspension angle steels, galvanized angle steels, platform 4, suspender angle steels, raw water pump beams 5, reinforced rear water pump beams 6, reinforcing steel bars 7, scaffold pedals 8, galvanized channel steels 9, bottom beams 10, a jacking stabilizing device 11, concrete columns 12, bolts 13 and water pump installation areas 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, an operation platform for a pump station foundation beam reinforcement device on a water surface of a pump station expansion flow channel comprises a frame 1, wherein a graduated scale is vertically arranged on the surface of the right side of the frame 1, the water level of the flow channel can be monitored through the graduated scale, platform suspension angle steel 2 is welded on two sides of the center of the top of the frame 1, galvanized angle steel 3 is welded on the inner side of the platform suspension angle steel 2, platform suspender angle steel 4 is connected on two sides of the bottom of the galvanized angle steel 3 through bolts 13 in a threaded manner, the length of the platform suspender angle steel 4 is not less than six hundred millimeters, the construction space of a user is ensured, a water pump installation area 14 is arranged at the bottom of the inner side of the platform suspender angle steel 4, a raw water pump beam 5 is poured on the top of the platform suspender angle steel, the thickness of the reinforced water pump beam 6 is larger than that of the original water pump beam 5, the firmness of the reinforced water pump beam 6 is enhanced by the fact that the thickness of the reinforced water pump beam 6 is larger than that of the original water pump beam 5, concrete columns 12 are poured on the outer sides of the original water pump beam 5 and the reinforced water pump beam 6, a plurality of reinforcing steel bars 7 are sequentially arranged in an inner cavity of the reinforced water pump beam 6 from top to bottom, the number of the reinforcing steel bars 7 is eight, the strength of the material of the reinforced water pump beam 6 is enhanced by the fact that the number of the reinforcing steel bars 7 is eight, the surface of each reinforcing steel bar 7 is subjected to galvanizing treatment, the reinforcing steel bars 7 can be protected by the galvanizing treatment of the surface of each reinforcing steel bar 7, the service life of each reinforcing steel bar 7 is prolonged, the bottom of the platform suspender angle steel 4 is in threaded connection with a bottom beam 10 through bolts 13, both sides of the bottom beam 10 are in threaded connection with tightening stabilizing devices 11, the outer sides of each, the top of the bottom beam 10 is connected with a plurality of galvanized steel channels 9 sequentially through bolts 13 in a threaded manner from left to right, the top of each galvanized steel channel 9 is welded with a scaffold pedal 8, each scaffold pedal 8 is made of steel plates and steel pipe materials, the safety of each scaffold pedal 8 is improved through the steel plates and the steel pipe materials of the scaffold pedals 8, each scaffold pedal 8 is positioned on the outer side of each platform suspender angle steel 4, and through the matching of the frame 1, the platform suspension angle steel 2, the galvanized angle steel 3, the platform suspender angle steel 4, the raw water pump beam 5, the reinforced water pump beam 6, the reinforcing steel bars 7, the scaffold pedals 8, the galvanized steel channels 9, the bottom beam 10, the tightening stabilizing device 11, the concrete cylinder 12 and the bolts 13, the hardness and the firmness of the material of the operation platform are improved, the safety of the operation platform is improved, the problem of low safety performance of the traditional operation platform is solved, and meanwhile, the circulation of the flow channel is not influenced.
When the scaffold pedal is used, concrete columns 12 are poured on two sides of an inner cavity of a frame 1 by a user, the scaffold pedal is welded and supported with the frame 1 through platform suspension angle steel 2, the galvanized angle steel 3 and platform suspender angle steel 4 are welded and fixed by the user, then the reinforced water pump beam 6 is poured at the bottom of a raw water pump beam 5 by the user, the firmness of the reinforced water pump beam 6 is enhanced through the fact that the thickness of the reinforced water pump beam 6 is larger than that of the raw water pump beam 5, reinforcing steel bars 7 are additionally arranged in the inner cavity of the reinforced water pump beam 6, the strength of the material of the reinforced water pump beam 6 is increased through the fact that the number of the reinforcing steel bars 7 is eight, the reinforcing steel bars 7 can be protected through surface galvanizing treatment of the reinforcing steel bars 7, the galvanized angle steel 3, the platform suspender angle steel 4 and a bottom beam 10 are respectively fixed through bolts 13 by the user through the bolts 13 and galvanized channel steel 9, then the scaffold pedal 8, all adopt steel sheet and steel pipe material through scaffold frame footboard 8, improve scaffold frame footboard 8's security, will push up in tight stabilising arrangement 11 embedding concrete column 12 at last to reinforcing floorbar 10 and scaffold frame footboard 8's stable effect, the user can install the water pump in water pump installation area 14, thereby improves operation platform's firm security performance.
The standard parts used in the present application document can be purchased from the market, the specific connection mode of each part adopts the conventional means of mature bolts, rivets, welding and the like in the prior art, the machines, the parts and the equipment adopt the conventional models in the prior art, and the circuit connection adopts the conventional connection mode in the prior art, so that the detailed description is not given.
In summary, the following steps: this pump station dilatation runner is pump seat foundation beam operation platform for reinforcing apparatus on surface of water, through frame 1, platform suspension angle steel 2, galvanized angle steel 3, platform jib angle steel 4, raw water pump roof beam 5, consolidate back water pump roof beam 6, reinforcing bar 7, scaffold footboard 8, galvanized channel-section steel 9, floorbar 10, the tight stabilising arrangement 11 in top, the cooperation of concrete cylinder 12 and bolt 13, solved the problem that traditional operation platform security performance is low.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a pump station dilatation runner is pump seat foundation beam operation platform for reinforcing apparatus on surface of water, includes frame (1), its characterized in that: the concrete pump is characterized in that platform suspension angle steel (2) is welded on two sides of the center of the top of the frame (1), galvanized angle steel (3) is welded on the inner side of the platform suspension angle steel (2), platform suspender angle steel (4) is connected on two sides of the bottom of the galvanized angle steel (3) through bolts (13) in a threaded manner, a water pump installation region (14) is arranged at the bottom of the inner side of the platform suspender angle steel (4), a raw water pump beam (5) is poured on the top of the platform suspender angle steel (4), a reinforced rear water pump beam (6) is poured on the bottom of the raw water pump beam (5), concrete cylinders (12) are poured on the outer sides of the raw water pump beam (5) and the reinforced rear water pump beam (6), a plurality of reinforcing steel bars (7) are sequentially arranged in the inner cavity of the reinforced rear water pump beam (6) from top to bottom, and a bottom beam (10) is connected on the bottom, the equal threaded connection in both sides of floorbar (10) has the tight stabilising arrangement in top (11), the outside of the tight stabilising arrangement in top (11) and the inboard fixed connection of concrete cylinder (12), the top of floorbar (10) loops through bolt (13) threaded connection from a left side to the right side has a plurality of zinc-plated channel-section steel (9), the top welding of zinc-plated channel-section steel (9) has scaffold footboard (8), scaffold footboard (8) are located the outside of platform jib angle steel (4).
2. The operation platform for the pump station foundation beam reinforcing device on the pump station dilatation runner surface of water according to claim 1, characterized in that: the number of the reinforcing steel bars (7) is eight, and the surface of each reinforcing steel bar (7) is subjected to galvanizing treatment.
3. The operation platform for the pump station foundation beam reinforcing device on the pump station dilatation runner surface of water according to claim 1, characterized in that: the length of the platform suspender angle steel (4) is not less than six hundred millimeters, and a graduated scale is vertically arranged on the surface of the right side of the frame (1).
4. The operation platform for the pump station foundation beam reinforcing device on the pump station dilatation runner surface of water according to claim 1, characterized in that: the thickness of the reinforced water pump beam (6) is larger than that of the raw water pump beam (5), and the scaffold pedals (8) are made of steel plates and steel pipe materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810919043.8A CN110821134B (en) | 2018-08-14 | 2018-08-14 | Operation platform for pump station dilatation runner surface of water pump base foundation beam reinforcing apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810919043.8A CN110821134B (en) | 2018-08-14 | 2018-08-14 | Operation platform for pump station dilatation runner surface of water pump base foundation beam reinforcing apparatus |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110821134A true CN110821134A (en) | 2020-02-21 |
CN110821134B CN110821134B (en) | 2021-05-28 |
Family
ID=69546916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810919043.8A Active CN110821134B (en) | 2018-08-14 | 2018-08-14 | Operation platform for pump station dilatation runner surface of water pump base foundation beam reinforcing apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110821134B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202248814U (en) * | 2011-09-24 | 2012-05-30 | 华红令 | Portable folding lifting rack for building and indoor decoration |
CN202577925U (en) * | 2012-03-14 | 2012-12-05 | 江苏南通二建集团有限公司无锡分公司 | Lifting type platform in elevator shaft |
JP3181041U (en) * | 2012-11-05 | 2013-01-24 | 有限会社浜口組 | Mounting member for scaffolding for bridge |
CN103982036A (en) * | 2014-04-11 | 2014-08-13 | 成都科创佳思科技有限公司 | Steel structure operating platform |
CN205975510U (en) * | 2016-08-12 | 2017-02-22 | 唐山港集团股份有限公司 | Pier fender maintenance platform |
CN207685879U (en) * | 2017-11-07 | 2018-08-03 | 安徽皖通高速公路股份有限公司 | A kind of lift stake reinforcing bearing platform construction platform |
-
2018
- 2018-08-14 CN CN201810919043.8A patent/CN110821134B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202248814U (en) * | 2011-09-24 | 2012-05-30 | 华红令 | Portable folding lifting rack for building and indoor decoration |
CN202577925U (en) * | 2012-03-14 | 2012-12-05 | 江苏南通二建集团有限公司无锡分公司 | Lifting type platform in elevator shaft |
JP3181041U (en) * | 2012-11-05 | 2013-01-24 | 有限会社浜口組 | Mounting member for scaffolding for bridge |
CN103982036A (en) * | 2014-04-11 | 2014-08-13 | 成都科创佳思科技有限公司 | Steel structure operating platform |
CN205975510U (en) * | 2016-08-12 | 2017-02-22 | 唐山港集团股份有限公司 | Pier fender maintenance platform |
CN207685879U (en) * | 2017-11-07 | 2018-08-03 | 安徽皖通高速公路股份有限公司 | A kind of lift stake reinforcing bearing platform construction platform |
Also Published As
Publication number | Publication date |
---|---|
CN110821134B (en) | 2021-05-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109488039B (en) | Reinforcement structure for reinforced concrete column with built-in screw adjusting jack and reinforcement method of reinforcement structure | |
CN204919347U (en) | Iron wedge support system with adjustable pier is accepted bent cap construction and is used | |
CN102409852B (en) | Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge | |
CN110821134B (en) | Operation platform for pump station dilatation runner surface of water pump base foundation beam reinforcing apparatus | |
CN109137760A (en) | The active reinforcement means of multispan normal reinforced concrete beam bridge | |
CN210797296U (en) | Steel-concrete combination beam bridge floor flange plate bracket mounting structure | |
CN103046743B (en) | A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method | |
CN108035544A (en) | A kind of expansion joint position shear wall side form bracing means and construction method | |
CN203846793U (en) | Active reinforcing support rack used during monolithic movement of tower building | |
CN109162212A (en) | The active reinforcement means of single span normal reinforced concrete beam bridge | |
CN203007933U (en) | Compound reinforcing bar non-round concrete precast pile | |
CN201254774Y (en) | Steel frame and concrete column combination heavy frame | |
CN104947608A (en) | Steel corrugated plate arch culvert reinforced by steel frames | |
CN201687204U (en) | Reinforcement supporting system at the top of thick bearing platform | |
CN213137167U (en) | Box girder steel ground child | |
CN204781601U (en) | Antidetonation type RC frame construction post | |
CN205259417U (en) | Novel connection structure of steel construction house floor and girder steel | |
CN210029721U (en) | Prefabricated bridge deck hoisting frame | |
CN203668971U (en) | Waterproof formwork system for open trench tunnel | |
CN103526698B (en) | Cast-in-cantilever construction 0# block concrete supporting system and construction method | |
CN206667056U (en) | A kind of new V supports support | |
CN201679228U (en) | Shell support steel mould structure of hydraulic power plant | |
CN205116511U (en) | Non - compoboard structure of die mould steel plate concrete between two girder steels | |
CN203741988U (en) | Large section girder and column joint construction joint processing structure | |
CN108894422A (en) | Assembled Profiled Steel Sheet and Concrete Composite Floor and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |