CN110817232A - Large-scale fragment of brick clamping device for building wall - Google Patents

Large-scale fragment of brick clamping device for building wall Download PDF

Info

Publication number
CN110817232A
CN110817232A CN201911123582.1A CN201911123582A CN110817232A CN 110817232 A CN110817232 A CN 110817232A CN 201911123582 A CN201911123582 A CN 201911123582A CN 110817232 A CN110817232 A CN 110817232A
Authority
CN
China
Prior art keywords
clamping
cross beam
sliding sleeve
ring
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911123582.1A
Other languages
Chinese (zh)
Inventor
黄为英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201911123582.1A priority Critical patent/CN110817232A/en
Publication of CN110817232A publication Critical patent/CN110817232A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G7/00Devices for assisting manual moving or tilting heavy loads
    • B65G7/12Load carriers, e.g. hooks, slings, harness, gloves, modified for load carrying

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a large brick clamping device for building walls, and relates to the technical field of building brick clamping moving tools. The brick clamping device comprises a clamping hand for clamping bricks, wherein the clamping hand comprises a cross beam, a limiting ring A is fixed in the middle of the cross beam, first sliding sleeves capable of moving left and right along the cross beam are respectively arranged on the cross beams positioned at two sides of the limiting ring A, a spring A is arranged at the end part of each first sliding sleeve, and the end part of each spring A is connected with a first sliding ring capable of moving left and right along the cross beam; the cross beams positioned at the two sides of the limiting ring A are respectively provided with a second sliding sleeve capable of moving left and right along the cross beams, and the bottom of the second sliding sleeve is provided with a clamping mechanism for clamping bricks; the top of the second sliding sleeve is hinged with a connecting rod; the two connecting rods are also connected with a fixed ring, and a movable rod is movably matched on the fixed ring. The clamping device is used for clamping the large bricks through the clamping hand consisting of the cross beam, the sliding sleeve and the clamping mechanism, and the large bricks are moved to the wall building position after being clamped, so that the construction operation is convenient.

Description

Large-scale fragment of brick clamping device for building wall
Technical Field
The invention belongs to the technical field of building brick clamping and moving tools, and particularly relates to a large brick clamping device for building walls.
Background
The artificial small-sized building blocks include sintered bricks (mainly clay bricks) and non-sintered bricks (lime-sand bricks, fly ash bricks, etc.), which are commonly called bricks. The clay brick is made up by using clay (including shale and coal gangue powder) as main raw material through the processes of clay treatment, forming, drying and roasting. Square and long bricks are created in succession in the spring, autumn and warring countries in China, and the technology, production scale, quality and fancy varieties of brick making in the Qin and Han dynasties are remarkably developed, and the brick is named as 'Qin brick Han tile' in the world.
Bricks are the most traditional masonry material. The method develops from clay as a main raw material to the utilization of industrial waste such as coal gangue, coal ash and the like, and develops from solid to porous and hollow and from sintering to non-sintering. Compared with the traditional clay bricks, a plurality of bricks in the existing market have great difference in volume, are not only large in volume and light in weight, but also are inconvenient to operate in a transmission manual lifting mode, and are difficult to carry by a single person manually in the actual wall building process, so that the brick clamping device is designed, and the brick clamping device is used for clamping large bricks and is convenient to build the wall.
Disclosure of Invention
The invention aims to provide a large brick clamping device for building walls, which solves the problems in the prior art.
In order to solve the technical problems, the invention is realized by the following technical scheme:
the invention relates to a large brick clamping device for building a wall, which comprises a clamping hand for clamping bricks, wherein the clamping hand comprises a cross beam, a limiting ring A is fixed in the middle of the cross beam, first sliding sleeves capable of moving left and right along the cross beam are respectively arranged on the cross beams positioned at two sides of the limiting ring A, a spring A is arranged at the end part of each first sliding sleeve, and the end part of each spring A is connected with a first sliding ring capable of moving left and right along the cross beam;
the cross beams positioned at two sides of the limiting ring A are respectively provided with a second sliding sleeve capable of moving left and right along the cross beams, and the bottom of the second sliding sleeve is provided with a clamping mechanism for clamping bricks; the top of the second sliding sleeve is hinged with a connecting rod;
the two connecting rods are also connected with a fixed ring, a movable rod is movably matched on the fixed ring, a limiting plate is arranged at the bottom end of the movable rod, a spring B is arranged on the upper surface of the limiting plate, and the end part of the spring B is connected with a second sliding ring which can move up and down along the movable rod;
the upper part of the movable rod is also provided with a limiting ring B, and the top of the movable rod is connected with a handle part;
and two ends of the cross beam are respectively provided with a limiting end plate.
Furthermore, the clamping mechanism is a clamping plate fixed at the bottom end of the second sliding sleeve.
Further, fixture includes that one is fixed at second sliding sleeve bottom end fixed plate, the bottom of fixed plate articulates there is a movable splint.
Furthermore, the top of second sliding sleeve is equipped with the first free bearing of articulated with the connecting rod, gu fixed ring's both ends are equipped with one respectively and link articulated second free bearing.
Furthermore, the cross section of the beam is of an I-shaped or T-shaped structure.
The operation handle comprises two L-shaped movable arms, and a connecting sleeve is connected between the two L-shaped movable arms;
the L-shaped movable arm comprises a vertical arm fixed at the end part of the cross beam, and the top end of the vertical arm is provided with a transverse arm;
the transverse arm is in threaded connection with the connecting sleeve, and a rubber sleeve is sleeved outside the connecting sleeve;
the end of the limiting end plate is provided with a fixing column, the end of the fixing column is in threaded connection with a fixing nut, and the bottom end of the vertical arm is provided with a through hole in movable fit with the fixing column.
The frame comprises a rectangular frame body, walking wheels are arranged at the bottom end of the rectangular frame body, a plurality of L-shaped supporting beams are arranged on one side of the rectangular frame body along the edge of the rectangular frame body, and the end parts of the L-shaped supporting beams are connected with a supporting beam;
two ends of the supporting beam are respectively provided with a through hole, and a pulley is arranged at the through hole;
a motor is mounted at the top end of an L-shaped supporting beam positioned on one side of the middle part of the supporting beam, and a winding ring is fixed on an output shaft of the motor;
two hauling ropes are connected to the winding ring, and the bottom ends of the two hauling ropes are connected with a clamping hand.
Furthermore, a balancing weight is arranged on the other side of the rectangular frame body.
Further, the bottom end of the traction rope is bolted to the handle part of the clamp.
Furthermore, a threaded through hole is formed in the first sliding sleeve, and a limiting bolt is connected to the threaded through hole in a threaded mode.
The invention has the following beneficial effects:
the clamping device is used for clamping large bricks through the clamping hand consisting of the cross beam, the sliding sleeve and the clamping mechanism, and the large bricks are moved to the position of building a wall after being clamped, so that construction operation is facilitated; simultaneously, the first sliding sleeve is reset under the action of the spring A, and continuous operation is facilitated.
Drawings
Fig. 1 is a schematic view of a structure of a gripper according to embodiment 1 of the present invention;
FIG. 2 is a schematic view of a structure of a gripper according to embodiment 2 of the present invention;
fig. 3 is a schematic structural view of a large-sized brick clamping device according to embodiment 3 of the present invention;
fig. 4 is a schematic structural view of a large brick clamping device according to embodiment 4 of the present invention.
Detailed Description
Reference herein to an embodiment means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the invention. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is explicitly and implicitly understood by one skilled in the art that the embodiments described herein can be combined with other embodiments.
Example 1
Referring to fig. 1, the invention is a large brick clamping device for building a wall, comprising a clamping hand 10 for clamping bricks, wherein the clamping hand 10 comprises a cross beam 1, a limiting ring a17 is fixed at the middle position of the cross beam 1, the cross beam 1 at the two sides of the limiting ring a17 is also respectively provided with a first sliding sleeve 12 capable of moving left and right along the cross beam 1, the end of the first sliding sleeve 12 is provided with a spring a13, and the end of the spring a13 is connected with a first sliding ring 14 capable of moving left and right along the cross beam 1; the cross beams 1 positioned at the two sides of the limiting ring A17 are respectively provided with a second sliding sleeve 2 capable of moving left and right along the cross beam 1, and the bottom of the second sliding sleeve 2 is provided with a clamping mechanism for clamping bricks; the top of the second sliding sleeve 2 is hinged with a connecting rod 22; the two connecting rods 22 are also connected with a fixed ring 3, a movable rod 32 is movably matched on the fixed ring 3, a limit plate 33 is arranged at the bottom end of the movable rod 32, a spring B34 is arranged on the upper surface of the limit plate 33, and the end part of the spring B34 is connected with a second sliding ring 35 which can move up and down along the movable rod 32; the upper part of the movable rod 32 is also provided with a limit ring B37, and the top of the movable rod 32 is connected with a handle part 36; two ends of the beam 1 are respectively provided with a limit end plate 11.
Preferably, the clamping mechanism is a clamping plate 23 fixed at the bottom end of the second sliding sleeve 2.
Preferably, the top end of the second sliding sleeve 2 is provided with a first hinge base 21 hinged with the connecting rod 22, and both ends of the fixed ring 3 are respectively provided with a second hinge base 31 hinged with the connecting rod 22.
Preferably, the cross section of the beam 1 is in an I-shaped or T-shaped structure.
Preferably, the first sliding sleeve 12 is provided with a threaded through hole, and a limit bolt 15 is connected to the threaded through hole through a thread.
When the device is used, the two clamping plates 23 are controlled to be respectively positioned at two sides of a large brick to be clamped, the control handle part 36 is lifted, at the moment, the movable rod 32 rises along the central hole of the fixing ring 3 until the second sliding ring 35 abuts against the bottom of the fixing ring 3, and simultaneously, under the action of gravity, the fixing ring 3 drives the second sliding sleeve 2 to move along the cross beam 1 to the middle section of the cross beam 1 through the connecting rod 22 until the two clamping plates 23 are respectively clamped at two sides of the large brick; therefore, the large bricks are lifted by the clamping hands 10, and the lifted large bricks are moved to the position where wall building is needed according to the requirement;
when the large-scale brick clamping device is used, in order to save labor, the large-scale bricks with the lengths larger than 70cm can be operated by two persons, and operators clamp the two ends of the large-scale bricks through the clamping hands 10 respectively.
Example 2
Referring to fig. 1-2, the invention relates to a large brick clamping device for building a wall, comprising a clamping hand 10 for clamping bricks, wherein the clamping hand 10 comprises a cross beam 1, a limiting ring a17 is fixed at the middle position of the cross beam 1, the cross beam 1 at the two sides of the limiting ring a17 is also respectively provided with a first sliding sleeve 12 capable of moving left and right along the cross beam 1, the end of the first sliding sleeve 12 is provided with a spring a13, and the end of the spring a13 is connected with a first sliding ring 14 capable of moving left and right along the cross beam 1; the cross beams 1 positioned at the two sides of the limiting ring A17 are respectively provided with a second sliding sleeve 2 capable of moving left and right along the cross beam 1, and the bottom of the second sliding sleeve 2 is provided with a clamping mechanism for clamping bricks; the top of the second sliding sleeve 2 is hinged with a connecting rod 22; the two connecting rods 22 are also connected with a fixed ring 3, a movable rod 32 is movably matched on the fixed ring 3, a limit plate 33 is arranged at the bottom end of the movable rod 32, a spring B34 is arranged on the upper surface of the limit plate 33, and the end part of the spring B34 is connected with a second sliding ring 35 which can move up and down along the movable rod 32; the upper part of the movable rod 32 is also provided with a limit ring B37, and the top of the movable rod 32 is connected with a handle part 36;
two ends of the beam 1 are respectively provided with a limit end plate 11.
Preferably, the clamping mechanism comprises a fixed plate 24 fixed at the bottom end of the second sliding sleeve 2, and a movable clamping plate 25 is hinged at the bottom end of the fixed plate 24.
Preferably, the first sliding sleeve 12 is provided with a threaded through hole, and a limit bolt 15 is connected to the threaded through hole through a thread.
When the device is used, the two clamping mechanisms are controlled to be respectively positioned at two sides of a large brick to be clamped, the control handle part 36 is lifted, at the moment, the movable rod 32 rises along the central hole of the fixed ring 3 until the second sliding ring 35 abuts against the bottom of the fixed ring 3, and simultaneously, under the action of gravity, the fixed ring 3 drives the second sliding sleeve 2 to move along the cross beam 1 to the middle section of the cross beam 1 through the connecting rod 22 until the two movable clamping plates 25 are respectively clamped at two sides of the large brick; therefore, the large bricks are lifted by the clamping hands 10, and the lifted large bricks are moved to the position where wall building is needed according to the requirement;
when the large-scale brick clamping device is used, in order to save labor, the large-scale bricks with the lengths larger than 70cm can be operated by two persons, and operators clamp the two ends of the large-scale bricks through the clamping hands 10 respectively.
Example 3
Referring to fig. 3, the present invention is a large brick clamping device for building a wall, including a clamping handle 10 used in any one of the above embodiments 1-2, and an operation handle, wherein the operation handle includes two L-shaped movable arms, and a connecting sleeve 4 is connected between the two L-shaped movable arms; the L-shaped movable arm comprises a vertical arm 41 fixed at the end part of the cross beam 1, and the top end of the vertical arm 41 is provided with a transverse arm 42; the transverse arm 42 is in threaded connection with the connecting sleeve 4, and a rubber sleeve is sleeved outside the connecting sleeve 4; the tip of spacing end plate 11 is equipped with a fixed column, and the tip threaded connection of fixed column has fixation nut 16, and the bottom of vertical arm 41 is equipped with a perforating hole with fixed column clearance fit.
When the device is used, the two clamping mechanisms are controlled to be respectively positioned at two sides of a large brick to be clamped, the control handle part 36 is lifted, at the moment, the movable rod 32 rises along a central opening of the fixed ring 3 until the second sliding ring 35 abuts against the bottom of the fixed ring 3, and simultaneously, under the action of gravity, the fixed ring 3 drives the second sliding sleeve 2 to move along the cross beam 1 to the middle section of the cross beam 1 through the connecting rod 22 until the two movable clamping plates 25 or the clamping plates 23 are respectively clamped at two sides of the large brick; therefore, the large bricks are lifted by the clamping hands 10, and the lifted large bricks are moved to the position where wall building is needed according to the requirement;
when the connecting sleeve is used, the connecting sleeve 4 is held by the thumb of the hand, and the other four fingers hook the handle part 36 in a hook shape to lift.
And during installation, the two L-shaped movable arms are aligned with the fixed column through the through holes respectively, and the connecting sleeve 4 is rotated to enable the two ends of the connecting sleeve 4 to be in threaded connection with the two symmetrically arranged L-shaped movable arms respectively. And then fixed by the fixing nut 16.
In the above embodiments 1-3, the position of the first sliding sleeve 12 is moved left and right along the cross beam 1, so that adjustment according to the size of the brick can be realized, and the clamping hand is suitable for clamping bricks with different sizes.
Meanwhile, the spring A13 is adopted, so that after the acting force for lifting the movable rod 32 is removed, when the movable rod 32 descends along the central opening of the fixed ring 3, under the reset action of the spring A13, the second sliding sleeve 2 can be reset to the position before clamping, and the subsequent continuous operation is convenient.
Example 4
Referring to fig. 4, the present invention is a large brick clamping device for building a wall, including a clamping arm 10 used in any one of the above embodiments 1-2, and a frame, the frame includes a rectangular frame 5, a walking wheel 51 is disposed at the bottom end of the rectangular frame 5, a plurality of L-shaped supporting beams 52 are disposed along the edge of one side of the rectangular frame 5, and the end of 3L-shaped supporting beams 52 is connected with a supporting beam 53; two ends of the supporting beam 53 are respectively provided with a through hole 54, and a pulley is arranged at the through hole 54; a motor 6 is arranged at the top end of an L-shaped supporting beam 52 positioned on one side of the middle part of the supporting beam 53, and a winding ring 61 is fixed on an output shaft of the motor 6; two pulling ropes 55 are connected to the winding ring 61, and the bottom ends of the two pulling ropes 55 are connected with a clamping hand 10.
Preferably, a weight block 56 is provided on the other side of the rectangular frame 5.
Preferably, the bottom end of the pull cord 55 is bolted to the handle portion 36 of the gripper 10.
When the device is used, the two clamping mechanisms are controlled to be respectively positioned at two sides of a large brick to be clamped, the control handle part 36 is lifted, at the moment, the movable rod 32 rises along a central opening of the fixed ring 3 until the second sliding ring 35 abuts against the bottom of the fixed ring 3, and simultaneously, under the action of gravity, the fixed ring 3 drives the second sliding sleeve 2 to move along the cross beam 1 to the middle section of the cross beam 1 through the connecting rod 22 until the two movable clamping plates 25 or the clamping plates 23 are respectively clamped at two sides of the large brick;
go up and carry handle portion 36 and then start through motor 6, motor 6 starts the back, and the output shaft rotates and drives wire winding ring 61 and carry out the dwang to the realization lifts large-scale fragment of brick, lifts the back and removes the frame to the position of building a wall through walking wheel 51, then the upset of starter motor 6 descends large-scale fragment of brick to the position of building a wall, accomplishes to build a wall.
The arrangement of the balancing weight 56 avoids the phenomenon that the large bricks are hung to extend out of one side of the frame body to cause gravity to topple due to the adoption of the L-shaped supporting beam 52; meanwhile, the large bricks can be conveniently descended to the position of building a wall by adopting the L-shaped supporting beam 52.
The embodiments described above are provided to enable persons skilled in the art to make or use the invention and that modifications or variations can be made to the embodiments described above by persons skilled in the art without departing from the inventive concept of the present invention, so that the scope of protection of the present invention is not limited by the embodiments described above but should be accorded the widest scope consistent with the innovative features set forth in the claims.

Claims (10)

1. Building is built a wall and is used large-scale fragment of brick clamping device, its characterized in that: the brick clamping device comprises a clamping hand (10) used for clamping bricks, wherein the clamping hand (10) comprises a cross beam (1), a limiting ring A (17) is fixed in the middle of the cross beam (1), first sliding sleeves (12) capable of moving left and right along the cross beam (1) are respectively arranged on the cross beam (1) at two sides of the limiting ring A (17), a spring A (13) is arranged at the end part of each first sliding sleeve (12), and a first sliding ring (14) capable of moving left and right along the cross beam (1) is connected to the end part of each spring A (13);
the cross beams (1) positioned at two sides of the limiting ring A (17) are respectively provided with a second sliding sleeve (2) capable of moving left and right along the cross beams (1), and the bottom of the second sliding sleeve (2) is provided with a clamping mechanism for clamping bricks; the top of the second sliding sleeve (2) is hinged with a connecting rod (22);
the two connecting rods (22) are further connected with a fixing ring (3), a movable rod (32) is movably matched on the fixing ring (3), a limiting plate (33) is arranged at the bottom end of the movable rod (32), a spring B (34) is arranged on the upper surface of the limiting plate (33), and the end part of the spring B (34) is connected with a second sliding ring (35) capable of moving up and down along the movable rod (32);
a limiting ring B (37) is further arranged at the upper part of the movable rod (32), and the top of the movable rod (32) is connected with a handle part (36);
and two ends of the cross beam (1) are respectively provided with a limiting end plate (11).
2. The large brick holding device for building a wall according to claim 1, wherein the holding means is a clamping plate (23) fixed to the bottom end of the second sliding sleeve (2).
3. The large brick clamping device for building a wall according to claim 1, wherein the clamping mechanism comprises a fixed plate (24) fixed at the bottom end of the second sliding sleeve (2), and a movable clamping plate (25) is hinged at the bottom end of the fixed plate (24).
4. The large brick clamping device for building walls according to claim 1, wherein the top end of the second sliding sleeve (2) is provided with a first hinged support (21) hinged with the connecting rod (22), and the two ends of the fixed ring (3) are respectively provided with a second hinged support (31) hinged with the connecting rod (22).
5. The large brick clamping device for building walls according to claim 1, wherein the cross section of the cross beam (1) is in an I-shaped or T-shaped structure.
6. The large brick clamping device for building walls according to any one of claims 1-5, characterized by further comprising an operation handle, wherein the operation handle comprises two L-shaped movable arms, and a connecting sleeve (4) is connected between the two L-shaped movable arms;
the L-shaped movable arm comprises a vertical arm (41) fixed at the end part of the cross beam (1), and the top end of the vertical arm (41) is provided with a transverse arm (42);
the transverse arm (42) is in threaded connection with the connecting sleeve (4), and a rubber sleeve is sleeved on the outer side of the connecting sleeve (4);
the end part of the limiting end plate (11) is provided with a fixing column, the end part of the fixing column is in threaded connection with a fixing nut (16), and the bottom end of the vertical arm (41) is provided with a through hole in movable fit with the fixing column.
7. The large brick clamping device for building walls according to any one of claims 1-5, characterized by further comprising a frame, wherein the frame comprises a rectangular frame body (5), the bottom end of the rectangular frame body (5) is provided with a traveling wheel (51), one side of the rectangular frame body (5) is provided with a plurality of L-shaped supporting beams (52) along the edge thereof, and the ends of the plurality of L-shaped supporting beams (52) are connected with a supporting beam (53);
two ends of the supporting beam (53) are respectively provided with a through hole (54), and a pulley is arranged at the through hole (54);
a motor (6) is mounted at the top end of an L-shaped supporting beam (52) positioned on one side of the middle part of the supporting cross beam (53), and a winding ring (61) is fixed on an output shaft of the motor (6);
the winding ring (61) is connected with two pulling ropes (55), and the bottom ends of the two pulling ropes (55) are connected with a clamping hand (10).
8. The large-sized brick holding device for building a wall according to claim 7, wherein a weight block (56) is provided at the other side of the rectangular frame body (5).
9. The large brick clamping device for building walls according to claim 7, wherein the bottom end of the pulling rope (55) is bolted to the handle part (36) of the tong (10).
10. The large brick holding device for building a wall according to claim 7, wherein the first sliding sleeve (12) is provided with a threaded through hole and a limit bolt (15) is screwed at the threaded through hole.
CN201911123582.1A 2019-11-17 2019-11-17 Large-scale fragment of brick clamping device for building wall Pending CN110817232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911123582.1A CN110817232A (en) 2019-11-17 2019-11-17 Large-scale fragment of brick clamping device for building wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911123582.1A CN110817232A (en) 2019-11-17 2019-11-17 Large-scale fragment of brick clamping device for building wall

Publications (1)

Publication Number Publication Date
CN110817232A true CN110817232A (en) 2020-02-21

Family

ID=69555973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911123582.1A Pending CN110817232A (en) 2019-11-17 2019-11-17 Large-scale fragment of brick clamping device for building wall

Country Status (1)

Country Link
CN (1) CN110817232A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111721622A (en) * 2020-06-30 2020-09-29 中冶建工集团有限公司 Mortar setting device for wall brick detection surface
CN114508241A (en) * 2022-03-15 2022-05-17 卢运才 Building device based on building is built dedicated

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4678218A (en) * 1986-06-06 1987-07-07 Babcock Lowell C Salt block carrier
EP0897881A1 (en) * 1997-08-22 1999-02-24 JONES, David John Lifting apparatus
CN206634592U (en) * 2017-03-10 2017-11-14 孙雯琪 A kind of fragment of brick clamping device
CN206782622U (en) * 2017-03-01 2017-12-22 衢州市联橙环保科技有限公司 One kind building brick clamp
CN207174628U (en) * 2017-05-22 2018-04-03 杨建� A kind of brick clamp easy to use
CN207293248U (en) * 2017-09-23 2018-05-01 温州博富市政建筑工程有限公司 A kind of brick clamp for building
CN108100889A (en) * 2017-12-15 2018-06-01 林建盛 Industrial convenient boom hoisting
CN208135248U (en) * 2018-04-21 2018-11-23 温州盛瓯机电信息技术有限公司 One kind is for building to mention brick device
CN208326646U (en) * 2018-06-15 2019-01-04 湖北金湖建设工程有限公司 A kind of clamping device in concrete test block handling device
CN208775589U (en) * 2018-06-27 2019-04-23 中国一冶集团有限公司 A kind of extension type brick clamp

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4678218A (en) * 1986-06-06 1987-07-07 Babcock Lowell C Salt block carrier
EP0897881A1 (en) * 1997-08-22 1999-02-24 JONES, David John Lifting apparatus
CN206782622U (en) * 2017-03-01 2017-12-22 衢州市联橙环保科技有限公司 One kind building brick clamp
CN206634592U (en) * 2017-03-10 2017-11-14 孙雯琪 A kind of fragment of brick clamping device
CN207174628U (en) * 2017-05-22 2018-04-03 杨建� A kind of brick clamp easy to use
CN207293248U (en) * 2017-09-23 2018-05-01 温州博富市政建筑工程有限公司 A kind of brick clamp for building
CN108100889A (en) * 2017-12-15 2018-06-01 林建盛 Industrial convenient boom hoisting
CN208135248U (en) * 2018-04-21 2018-11-23 温州盛瓯机电信息技术有限公司 One kind is for building to mention brick device
CN208326646U (en) * 2018-06-15 2019-01-04 湖北金湖建设工程有限公司 A kind of clamping device in concrete test block handling device
CN208775589U (en) * 2018-06-27 2019-04-23 中国一冶集团有限公司 A kind of extension type brick clamp

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111721622A (en) * 2020-06-30 2020-09-29 中冶建工集团有限公司 Mortar setting device for wall brick detection surface
CN111721622B (en) * 2020-06-30 2022-11-25 中冶建工集团有限公司 Mortar setting device for wall brick detection surface
CN114508241A (en) * 2022-03-15 2022-05-17 卢运才 Building device based on building is built dedicated

Similar Documents

Publication Publication Date Title
CN110817232A (en) Large-scale fragment of brick clamping device for building wall
CN112942855B (en) Large brick block clamping device for building wall construction and use method thereof
CN205257788U (en) Full -automatic intelligent grabbing device
CN209922722U (en) Antiskid zirconium corundum electrically fused brick hoist device that falls
CN220033777U (en) Hoisting equipment for prefabricated parts of building engineering
CN205634643U (en) Concrete panel stone tongs
CN210973651U (en) Hoisting equipment for production of prestressed concrete pile
CN116177377B (en) Argil jar hoist, turning device and transfer equipment
CN219507467U (en) Hoisting mechanism for tunnel construction trestle
CN102416663A (en) Micro-pressure ceramic forming machine
CN111762679A (en) Automatic hoisting clamp
CN212832373U (en) Interim power consumption construction lifting device
CN111320069A (en) Tool for hoisting sand core
CN212151327U (en) Precast pile hoist
CN210821973U (en) Carrying manipulator
CN211283510U (en) Hoisting device for deep foundation unilateral formwork
CN210286475U (en) Prefabricated section lifting device
CN208594199U (en) Turning trolley, lifting truck and SOOT stick automatic turning promote vehicle
CN220618211U (en) Hoisting equipment
CN220222674U (en) Clamp for carrying building blocks
CN211226169U (en) Material elevator
CN218087767U (en) Mechanical automation grabbing device
CN214006418U (en) Door and window mounting machine for construction robot
CN212687434U (en) Lifting device for architectural decoration engineering construction
CN213081826U (en) Demoulding device for large pottery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200221

WD01 Invention patent application deemed withdrawn after publication