CN110778066A - Skirting line mounting structure and method applied to wallboard dry-hanging system - Google Patents

Skirting line mounting structure and method applied to wallboard dry-hanging system Download PDF

Info

Publication number
CN110778066A
CN110778066A CN201911210190.9A CN201911210190A CN110778066A CN 110778066 A CN110778066 A CN 110778066A CN 201911210190 A CN201911210190 A CN 201911210190A CN 110778066 A CN110778066 A CN 110778066A
Authority
CN
China
Prior art keywords
skirting line
keel
adjusting
main body
wallboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911210190.9A
Other languages
Chinese (zh)
Inventor
陆晓朋
王杨
周书棋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Original Assignee
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold Mantis Fine Decoration Technology Suzhou Co Ltd filed Critical Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority to CN201911210190.9A priority Critical patent/CN110778066A/en
Publication of CN110778066A publication Critical patent/CN110778066A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/06Borders; Finishing strips, e.g. beadings; Light coves specially designed for securing panels or masking the edges of wall- or floor-covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/06Borders; Finishing strips, e.g. beadings; Light coves specially designed for securing panels or masking the edges of wall- or floor-covering elements
    • E04F19/061Borders; Finishing strips, e.g. beadings; Light coves specially designed for securing panels or masking the edges of wall- or floor-covering elements used to finish off an edge or corner of a wall or floor covering area

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention provides a skirting line mounting structure applied to a wallboard dry-hanging system, which comprises: the keel mechanism is fixedly connected to the wall; the skirting line mechanism is installed in a gap between a wallboard and the ground, the skirting line mechanism comprises an adjustable underframe, a skirting line main body and a height adjusting foot, an adjusting groove in the vertical direction is formed at the bottom of the skirting line main body, an adjusting rod clamped into the adjusting groove is arranged at the top of the height adjusting foot, the end of the adjusting rod is provided with an adjusting head which is matched with the inner wall of the adjusting groove in a addiction mode, and the adjusting rod moves back and forth in the adjusting groove in the vertical direction. The invention also provides an installation method. The movable skirting line design formed by the invention realizes positioning self-adjustment, manual adjustment is not needed, the construction is more convenient, and even if the inclination angle is overlarge, the gap between the skirting line and the wall plate or the ground can be adjusted and overcome, so that the whole skirting line is more attractive.

Description

Skirting line mounting structure and method applied to wallboard dry-hanging system
Technical Field
The invention relates to a skirting line mounting structure, in particular to a skirting line mounting structure and a skirting line mounting method applied to a wallboard dry-hanging system.
Background
At present, in the assembly type skirting line decoration construction, in order to meet the requirements of rapid construction and installation and reduce the requirements of construction on the handcrafts of workers, a construction mode of a buckle type skirting line system is adopted. The existing skirting line system also has the following problems:
1) positioning: the buckle at the back of the skirting line has no adjustable design, and when the mounting fixing hole has deviation, the installation of the skirting line can incline;
2) installation adjustability: the existing skirting line has no adjustable design, when the skirting line is installed and inclined, the upper end of the skirting line can only be used for shielding the seam, the gap between the skirting line and the wall board or the ground is adjusted slightly, when the inclination angle is too large, the gap between the skirting line and the wall board or the ground can be formed, and the whole appearance is influenced.
Disclosure of Invention
In view of the above, the invention provides a skirting line mounting structure and a skirting line mounting method applied to a wallboard dry-hanging system, which improve the structure of the skirting line, and add a height adjusting pin, so that a base can be adjusted, the construction and the mounting are more convenient, and meanwhile, the formed movable skirting line design realizes positioning self-adjustment, manual adjustment is not needed, the construction is more convenient, and the whole skirting line is more beautiful.
To this end, in one aspect, the present invention provides a skirting line mounting structure applied to a wallboard dry-hang system, comprising:
the keel mechanism is fixedly connected to the wall body, the keel mechanism is positioned at the bottom of the wall body, the wallboard is fixedly hung on the keel mechanism, and a gap is reserved between the wallboard and the ground;
skirting line mechanism, it is installed in the clearance between wallboard and ground, skirting line mechanism includes adjustable chassis, skirting line main part and altitude mixture control foot, the back fixed connection of adjustable chassis is in fossil fragments mechanism, form two first trips on the positive two first trips of adjustable chassis, form two second trips on the back of skirting line main part, form the second trip of the first trip of joint on the second trip, the top of skirting line main part forms the shrouding, the bottom of wallboard is supported on the shrouding, the bottom of skirting line main part forms the adjustment tank along the vertical direction, the top of altitude mixture control foot has the regulation pole of card income adjustment tank, the tip of adjusting the pole has the regulation head of overfitting the complex with the inner wall of adjustment tank, adjust the pole along the vertical direction round trip movement in the adjustment tank.
Furthermore, the height adjusting foot and the adjusting rod form an inverted Y-shaped structure.
Further, the bottom of the height adjusting foot forms a U-shaped groove.
Further, the sealing plate is L-shaped and is fixedly connected with the top of the skirting line main body through a vertical connecting plate, and the bottom of the wallboard is supported on the step of the sealing plate.
Further, a soft cushion layer is arranged between the back surface of the adjustable underframe and the keel mechanism, and the soft cushion layer is made of rubber or cork.
Further, the keel mechanism comprises:
the first transverse keel is provided with a first connecting surface and a second connecting surface which are equivalent, the first connecting surface is connected to the wall, the second connecting surface is provided with a W-shaped bending surface which is bent towards the inside of the first transverse keel, two opposite sides of the W-shaped bending surface are respectively connected with the edge of the second connecting surface through a step, the edge of the W-shaped bending surface forms a chamfer surface which extends outwards at the step, and a clamping groove is formed between the end part of the chamfer surface and the step;
the second transverse keel is bent into a W shape, the central part of the second transverse keel is screwed on the central part of the first transverse keel through a screw, two right-angle bending parts are respectively arranged on two opposite sides of the second transverse keel, right-angle bending hooks are arranged at the end parts of the right-angle bending parts and clamped into the clamping grooves, and L-shaped clamping plates extending outwards along the vertical direction are arranged at the bending parts of the right-angle bending parts;
adjustable dry pendant, it includes dry pendant main part and elastic plate, and the side of dry pendant main part is L shape, and elastic plate fixed connection is in the bottom of dry pendant main part, and the elastic plate is the V-arrangement, and the outside of L shape cardboard is supported in the department of bending of elastic plate, and the screw penetrates in the dry pendant main part with wallboard fixed connection in dry pendant main part.
Furthermore, the central part of the first transverse keel is a U-shaped bend extending towards the wall body, two opposite sides of the first transverse keel form a bell mouth structure, the central part of the second transverse keel is matched with the appearance of the central part of the first transverse keel, and a U-shaped gap is reserved between the central part of the first transverse keel and the central part of the second transverse keel.
Furthermore, an expansion bolt sleeve is embedded in the wall body, a screw penetrates through the adjusting base and penetrates into the expansion bolt sleeve, the cross section of the adjusting base is in a right trapezoid shape, a first step surface is formed on the inclined surface of the adjusting base, a second step surface is formed on the first connecting surface, and the second step surface is in butt joint with the first step surface.
In another aspect, the present invention provides a method for installing a skirting line installation structure applied to a wallboard dry-hang system, comprising the following installation steps:
1) an expansion bolt sleeve is driven into a wall body;
2) the right-angle bending hook of the second transverse keel is clamped into the clamping groove of the first transverse keel, then the mounting height of the first transverse keel on the adjusting base is adjusted through the first step surface and the second step surface, and then the second transverse keel, the first transverse keel and the adjusting base are fixed on the wall body through screws sequentially penetrating through the second transverse keel, the first transverse keel, the adjusting base and the expansion bolt sleeve;
3) fixing the adjustable dry hanging piece on the inner side of the wallboard, and clamping the elastic plate of the adjustable dry hanging piece on the L-shaped clamping plate of the second transverse keel;
4) fixedly connecting the back of the adjustable underframe to the second transverse keel through screws, and padding a soft cushion layer between the adjustable underframe and the second transverse keel to prevent the skirting line from loosening;
5) the adjusting rod card with the altitude mixture control foot is gone into the adjustment tank of skirting line main part bottom, then with the subassembly fixed connection that altitude mixture control foot and skirting line main part are constituteed on adjustable chassis, then insert the degree of depth of adjustment tank according to the adjusting rod of the clearance altitude mixture control foot between wallboard and the ground, then with the bottom sprag of wallboard can in the top of skirting line main part.
The invention provides a skirting line mounting structure and a skirting line mounting method applied to a wallboard dry-hanging system, which improve the structure of a skirting line, and add a height adjusting pin to enable a base to be adjustable, wherein the specific adjusting principle is that an adjusting rod of the height adjusting pin is clamped into an adjusting groove at the bottom of a skirting line main body, then an assembly consisting of the height adjusting pin and the skirting line main body is fixedly connected onto an adjustable underframe, then the adjusting rod of the height adjusting pin is inserted into the adjusting groove according to the gap height between a wallboard and the ground, and then the bottom of the wallboard is supported at the top of the skirting line main body;
therefore, compared with the prior art, the invention mainly has the following advantages:
1. the base is adjustable, so that construction and installation are more convenient;
2. the design of the movable skirting line that forms has realized the location self-interacting, need not artifical adjustment, and it is more convenient to be under construction, even when inclination is too big, the gap that appears between skirting line and wallboard or ground also can adjust and overcome for the skirting line is whole more pleasing to the eye.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a schematic structural diagram of a skirting line mounting structure applied to a wallboard dry-hang system according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of an adjustable base frame applied to a skirting line mounting structure of a wall panel dry hanging system according to an embodiment of the present invention;
fig. 3 is a schematic structural view of a skirting line body and a height adjusting foot in a skirting line installation structure applied to a wallboard dry-hanging system according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a skirting line main body and a height adjusting foot in a first adjusting state in a skirting line mounting structure applied to a wallboard dry-hanging system according to an embodiment of the present invention;
fig. 5 is a schematic structural view of a skirting line main body and a height adjusting foot in a second adjusting state in a skirting line mounting structure applied to a wallboard dry-hanging system according to an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
The first embodiment is as follows:
referring to fig. 1 to 5, a skirting line mounting structure applied to a wallboard dry-hang system according to an embodiment of the present invention is shown, and mainly includes a keel mechanism and a skirting line mechanism 7.
Referring to fig. 1, the keel mechanism is fixedly connected to the wall 2, the keel mechanism is located at the bottom of the wall 2, the wall plate 5 is fixedly hung on the keel mechanism, and a gap is reserved between the wall plate 5 and the ground.
Referring to fig. 1, the keel mechanism specifically includes a first transverse keel 1, a second transverse keel 3 and an adjustable hanger 4.
Referring to fig. 1, the first cross keel 1 has a first connection surface 11 and a second connection surface 12 corresponding to each other, the first connection surface 11 is connected to the wall 2, the second connection surface 12 has a W-shaped bending surface 13 bending towards the inside of the first cross keel 1, opposite sides of the W-shaped bending surface 13 are respectively connected to edges of the second connection surface 12 through a step 131, the edges of the W-shaped bending surface 13 form a chamfered surface 132 extending outwards at the step 131, and a slot 133 is formed between an end of the chamfered surface 132 and the step 131.
Referring to fig. 1, the second transverse keel 3 is bent into a W shape, the central portion of the second transverse keel 3 is screwed on the central portion of the first transverse keel 1 through a screw 31, two right-angled bending portions 32 are respectively arranged on two opposite sides of the second transverse keel 3, the end portion of each right-angled bending portion 32 is provided with a right-angled bending hook 33, each right-angled bending hook 33 is clamped into a clamping groove 133, and the bending portion of each right-angled bending portion 32 is provided with an L-shaped clamping plate 34 extending outwards along the vertical direction.
Referring to fig. 1, the adjustable dry hanging piece 4 comprises a dry hanging piece main body 41 and an elastic plate 42, wherein the side surface of the dry hanging piece main body 41 is L-shaped, the elastic plate 42 is fixedly connected to the bottom end of the dry hanging piece main body 41, the elastic plate 42 is V-shaped, and a screw 412 penetrates into the dry hanging piece main body 41 to fixedly connect the wall plate 5 to the dry hanging piece main body 41.
Referring to fig. 1 to 5, the skirting line mechanism 7 is installed in the gap between the wall panel 5 and the ground, the skirting line mechanism 7 includes an adjustable base frame 71, a skirting line body 72 and a height adjusting foot 73, the back of the adjustable underframe 71 is fixedly connected to the keel mechanism, two first clamping plates 711 on the front of the adjustable underframe 71 are provided with two first clamping hooks 712, the back of the skirting line main body 72 is provided with two second clamping plates 721, the second clamping plates 721 are provided with second clamping hooks 722 for clamping the first clamping hooks 712, the top of the skirting line main body 72 is provided with a sealing plate 723, the bottom of the wall plate 5 is supported on the sealing plate 723, the bottom of the skirting line main body 72 is provided with an adjusting groove 76 along the vertical direction, the top of the height adjusting foot 73 is provided with an adjusting rod 74 clamped in the adjusting groove 76, the end of the adjusting rod 74 is provided with an adjusting head 75 which is in excessive cooperation with the inner wall of the adjusting groove 76, and the adjusting rod 74 moves back and forth in the adjusting groove 76 along the vertical direction.
Referring to fig. 1 to 5, the height-adjusting foot 73 and the adjusting lever 74 constitute an inverted Y-shaped structure, and the bottom of the height-adjusting foot 73 forms a U-shaped groove.
In the skirting line mounting structure applied to the wallboard dry hanging system provided by the embodiment, the structure of the skirting line is improved, and the height adjusting foot is added, so that the base is adjustable, the specific adjusting principle is that the adjusting rod of the height adjusting foot is clamped into the adjusting groove at the bottom of the skirting line main body, then the assembly formed by the height adjusting foot and the skirting line main body is fixedly connected onto the adjustable underframe, then the adjusting rod of the height adjusting foot is inserted into the adjusting groove according to the gap between the wallboard and the ground, and then the bottom of the wallboard is supported at the top of the skirting line main body;
therefore, the present embodiment has the following advantages compared to the prior art:
1. the base is adjustable, so that construction and installation are more convenient;
2. the design of the movable skirting line that forms has realized the location self-interacting, need not artifical adjustment, and it is more convenient to be under construction, even when inclination is too big, the gap that appears between skirting line and wallboard or ground also can adjust and overcome for the skirting line is whole more pleasing to the eye.
Example two:
referring to fig. 1 to 5, a skirting line installation structure applied to a wallboard dry-hang system according to a second embodiment of the present invention is shown, and the present embodiment further adopts the following technical solutions as improvements on the basis of the above embodiments: the plate 723 is L-shaped and is fixedly attached to the top of the skirting line body 72 by a vertical web 7231, and the bottom of the wall panel 5 is supported on the step 7232 of the plate 723. Through the arrangement of the structure, the stable support for the wallboard can be realized.
Example three:
referring to fig. 1 to 5, a skirting line installation structure applied to a wallboard dry-hang system according to a third embodiment of the present invention is shown, and the present embodiment further adopts the following technical solutions as improvements on the basis of the above embodiments: a soft cushion layer 6 made of rubber or cork is arranged between the back of the adjustable bottom frame 71 and the keel mechanism. Through the arrangement of the structure, seamless installation of the skirting line and the keel mechanism can be realized, so that the problem of looseness of the installation of the skirting line cannot be caused.
Example four:
referring to fig. 1, a skirting line installation structure applied to a wallboard dry-hang system according to a fourth embodiment of the present invention is shown, and the present embodiment further provides the following improvements on the basis of the above embodiments: the central part of first horizontal fossil fragments 1 is the U-shaped bending that extends towards wall body 2, and its relative both sides form the horn mouth structure, and the appearance of the central part of first horizontal fossil fragments 1 is matchd to the central part of second horizontal fossil fragments 3, and leaves the space of U-shaped between the central part of first horizontal fossil fragments 1 and the central part of second horizontal fossil fragments 3. Through the arrangement of the structure, the arrangement of the U-shaped gap can ensure that the screw is not too tight to cause the deformation of the keel.
Example five:
referring to fig. 1, a skirting line installation structure applied to a wallboard dry-hang system according to a fifth embodiment of the present invention is shown, and the present embodiment further provides the following improvements on the basis of the above embodiments: an expansion bolt sleeve 23 is embedded in the wall body 2, a screw 31 penetrates through the adjusting base 21 and penetrates into the expansion bolt sleeve 23, the cross section of the adjusting base 21 is in a right trapezoid shape, a first step surface 22 is formed on the inclined surface of the adjusting base 21, a second step surface is formed on the first connecting surface 11, and the second step surface is in butt joint with the first step surface 22. Through the arrangement of the structure, the installation height of the whole wallboard can be conveniently adjusted.
Referring to fig. 1 to 5, a skirting line mounting structure applied to a wallboard dry-hang system according to the above embodiment is mounted by the following mounting method, which comprises the following mounting steps:
s1: an expansion bolt sleeve 23 is driven into the wall body 2;
s2: the right-angle bending hook 33 of the second transverse keel 3 is clamped into the clamping groove 133 of the first transverse keel 1, then the installation height of the first transverse keel 1 on the adjusting base 21 is adjusted through the first step surface 22 and the second step surface, and then the second transverse keel 3, the first transverse keel 1 and the adjusting base 21 are fixed on the wall 2 by sequentially penetrating the second transverse keel 3, the first transverse keel 1, the adjusting base 21 and the expansion bolt sleeve 23 through screws 31;
s3: fixing the adjustable dry hanging piece 4 on the inner side of the wall plate 5, and clamping the elastic plate 42 of the adjustable dry hanging piece 4 on the L-shaped clamping plate 34 of the second transverse keel 3;
s4: fixedly connecting the back of the adjustable underframe 71 to the second transverse keel 3 through screws, and padding a soft cushion layer 6 between the adjustable underframe 71 and the second transverse keel 3 to prevent the skirting line from loosening;
s5: the adjusting rod 74 of the height adjusting foot 73 is clamped into the adjusting groove 76 at the bottom of the skirting line main body 72, then the assembly of the height adjusting foot 73 and the skirting line main body 72 is fixedly connected to the adjustable underframe 71, then the adjusting rod 74 of the height adjusting foot 73 is inserted into the depth of the adjusting groove 76 according to the gap between the wall board 5 and the ground (as shown in fig. 4 to 5), and then the bottom of the wall board 5 is supported at the top of the skirting line main body 72.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (9)

1. The utility model provides a be applied to skirting line mounting structure of wallboard system of hanging futilely which characterized in that includes:
the keel mechanism is fixedly connected to a wall body (2), the keel mechanism is positioned at the bottom of the wall body (2), a wallboard (5) is fixedly hung on the keel mechanism, and a gap is reserved between the wallboard (5) and the ground;
the skirting line mechanism (7) is arranged in a gap between the wall plate (5) and the ground, the skirting line mechanism (7) comprises an adjustable underframe (71), a skirting line main body (72) and a height adjusting foot (73), the back of the adjustable underframe (71) is fixedly connected to the keel mechanism, two first clamping hooks (712) are formed on two first clamping plates (711) on the front of the adjustable underframe (71), two second clamping plates (721) are formed on the back of the skirting line main body (72), a second clamping hook (722) for clamping the first clamping hooks (712) is formed on the second clamping plate (721), a sealing plate (723) is formed at the top of the skirting line main body (72), the bottom of the wall plate (5) is supported on the sealing plate (723), and an adjusting groove (76) along the vertical direction is formed at the bottom of the skirting line main body (72), the top of the height adjusting foot (73) is provided with an adjusting rod (74) clamped in the adjusting groove (76), the end part of the adjusting rod (74) is provided with an adjusting head (75) which is in addiction fit with the inner wall of the adjusting groove (76), and the adjusting rod (74) moves back and forth in the adjusting groove (76) along the vertical direction.
2. The skirting line mounting structure applied to wallboard dry-hang system of claim 1, characterized in that said height adjustment foot (73) and said adjustment bar (74) constitute an inverted Y-shaped structure.
3. The skirting line mounting structure applied to wallboard dry-hang system of claim 2, characterized in that the bottom of said height adjusting foot (73) forms a U-shaped groove.
4. The skirting line mounting structure as claimed in claim 1, wherein said closing plate (723) is in an L-shape, and is fixedly connected to the top of said skirting line body (72) by a vertical connecting plate (7231), and the bottom of said wall plate (5) is supported on the step (7232) of said closing plate (723).
5. The skirting line mounting structure of claim 1, wherein a soft cushion layer (6) is disposed between the back surface of the adjustable bottom frame (71) and the keel mechanism, and is made of rubber or cork.
6. A skirting line mounting structure as claimed in claim 1 or 5, wherein said keel mechanism comprises:
the first transverse keel (1) is provided with a first connecting surface (11) and a second connecting surface (12) which are equivalent, the first connecting surface (11) is connected to a wall body (2), the second connecting surface (12) is provided with a W-shaped bending surface (13) which is bent towards the inside of the first transverse keel (1), two opposite sides of the W-shaped bending surface (13) are respectively connected with the edge of the second connecting surface (12) through a step (131), the edge of the W-shaped bending surface (13) forms a chamfer surface (132) which extends outwards at the step (131), and a clamping groove (133) is formed between the end part of the chamfer surface (132) and the step (131);
the second transverse keel (3) is bent into a W shape, the central part of the second transverse keel (3) is in screwed connection with the central part of the first transverse keel (1) through a screw (31), two right-angle bending parts (32) are respectively arranged on two opposite sides of the second transverse keel (3), a right-angle bending hook (33) is arranged at the end part of each right-angle bending part (32), the right-angle bending hook (33) is clamped into the clamping groove (133), and an L-shaped clamping plate (34) extending outwards along the vertical direction is arranged at the bending part of each right-angle bending part (32);
the adjustable dry hanging piece (4) comprises a dry hanging piece main body (41) and an elastic plate (42), wherein the side face of the dry hanging piece main body (41) is L-shaped, the elastic plate (42) is fixedly connected to the bottom end of the dry hanging piece main body (41), the elastic plate (42) is V-shaped, the bending part of the elastic plate (42) props against the outer side of the L-shaped clamping plate (34), and a screw (412) penetrates into the dry hanging piece main body (41) to fixedly connect the wallboard (5) to the dry hanging piece main body (41).
7. The skirting line mounting structure applied to wallboard dry hanging system according to claim 6, characterized in that the central part of the first cross keel (1) is a U-shaped bend extending towards the wall body (2), two opposite sides of the first cross keel form a bell mouth structure, the central part of the second cross keel (3) matches the shape of the central part of the first cross keel (1), and a U-shaped gap is left between the central part of the first cross keel (1) and the central part of the second cross keel (3).
8. The skirting line mounting structure applied to wallboard dry-hanging system of claim 1, wherein said wall body (2) is embedded with an expansion bolt sleeve (23), said screw (31) passes through an adjusting base (21) and penetrates into said expansion bolt sleeve (23), the cross section of said adjusting base (21) is in a right trapezoid shape, a first step surface (22) is formed on the inclined surface of said adjusting base (21), a second step surface is formed on said first connecting surface (11), and said second step surface is butted on said first step surface (22).
9. A method of installing a skirting line mounting structure applied to a wall panel dry-hang system according to any one of claims 1-8, characterized by comprising the following installation steps:
1) an expansion bolt sleeve (23) is driven into the wall body (2);
2) the right-angle bending hook (33) of the second transverse keel (3) is clamped into the clamping groove (133) of the first transverse keel (1), then the installation height of the first transverse keel (1) on the adjusting base (21) is adjusted through the first step surface (22) and the second step surface, and then the second transverse keel (3), the first transverse keel (1) and the adjusting base (21) are fixed on the wall body (2) through the second transverse keel (3), the first transverse keel (1), the adjusting base (21) and the expansion bolt sleeve (23) in sequence by using the screw (31);
3) fixing the adjustable dry hanging piece (4) on the inner side of a wallboard (5), and clamping an L-shaped clamping plate (34) of the second transverse keel (3) by an elastic plate (42) of the adjustable dry hanging piece (4);
4) fixedly connecting the back surface of the adjustable underframe (71) to the second transverse keel (3) through screws, and padding a soft cushion layer (6) between the adjustable underframe (71) and the second transverse keel (3) to prevent the skirting line from loosening;
5) the adjusting rod (74) of the height adjusting foot (73) is clamped into the adjusting groove (76) at the bottom of the skirting line main body (72), then the height adjusting foot (73) and the assembly consisting of the skirting line main body (72) are fixedly connected onto the adjustable underframe (71), then the adjusting rod (74) of the height adjusting foot (73) is inserted into the depth of the adjusting groove (76) according to the gap height between the wall plate (5) and the ground, and then the bottom of the wall plate (5) is supported at the top of the skirting line main body (72).
CN201911210190.9A 2019-11-29 2019-11-29 Skirting line mounting structure and method applied to wallboard dry-hanging system Pending CN110778066A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911210190.9A CN110778066A (en) 2019-11-29 2019-11-29 Skirting line mounting structure and method applied to wallboard dry-hanging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911210190.9A CN110778066A (en) 2019-11-29 2019-11-29 Skirting line mounting structure and method applied to wallboard dry-hanging system

Publications (1)

Publication Number Publication Date
CN110778066A true CN110778066A (en) 2020-02-11

Family

ID=69393465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911210190.9A Pending CN110778066A (en) 2019-11-29 2019-11-29 Skirting line mounting structure and method applied to wallboard dry-hanging system

Country Status (1)

Country Link
CN (1) CN110778066A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160547A (en) * 2020-09-26 2021-01-01 黄志达设计(深圳)有限公司 Skirting line decorative structure applied to wallboard dry-hanging system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160547A (en) * 2020-09-26 2021-01-01 黄志达设计(深圳)有限公司 Skirting line decorative structure applied to wallboard dry-hanging system

Similar Documents

Publication Publication Date Title
US4228980A (en) Valance hanger bracket and system
CN110778066A (en) Skirting line mounting structure and method applied to wallboard dry-hanging system
CN211873696U (en) Skirting line mounting structure applied to wallboard dry-hanging system
CN214696609U (en) Wallboard connecting buckle
CN102071768B (en) Edge keel structure
CN210563218U (en) Install skirting line component device fast
CN208997878U (en) A kind of bright dress panel light with mounting hole deviation margin
CN205840099U (en) Metal batten Os Draconis ceiling structure
CN214117149U (en) Stone dry hanging hanger
CN209762664U (en) TV wall hanging support
CN202390994U (en) Layered installation structure for integrated ceiling panel
CN203008297U (en) Gravity sloping sliding type installation piece
CN208267215U (en) Partly hang the multilayer mounting structure on integrated top
US2198089A (en) Adjustable bracket
CN208725233U (en) A kind of clothes hanger
JPS6244686Y2 (en)
CN214658184U (en) Adjustable secondary aluminum beam
CN205296684U (en) Bright frame anchor subassembly of ultra -thin stone material
CN217400064U (en) Gypsum furred ceiling board
CN211775458U (en) Curtain wall decoration strip with adjustable angle
CN212405713U (en) Mounting structure of assembled wall face terminal line binding off lines
CN215054446U (en) Stable second-stage beam
CN215054447U (en) Building ceiling structure
CN214614839U (en) Dry pendant of stone material
CN213807353U (en) Corner connector assembly and frame body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination