CN110774432A - Novel automatic maintenance method for concrete pipe pile - Google Patents

Novel automatic maintenance method for concrete pipe pile Download PDF

Info

Publication number
CN110774432A
CN110774432A CN201911031952.9A CN201911031952A CN110774432A CN 110774432 A CN110774432 A CN 110774432A CN 201911031952 A CN201911031952 A CN 201911031952A CN 110774432 A CN110774432 A CN 110774432A
Authority
CN
China
Prior art keywords
pool
pipe pile
temperature
steam curing
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911031952.9A
Other languages
Chinese (zh)
Inventor
游剑峰
陈天富
周德超
陈金志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN POLY TUBULARPILE Co Ltd
Original Assignee
FUJIAN POLY TUBULARPILE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN POLY TUBULARPILE Co Ltd filed Critical FUJIAN POLY TUBULARPILE Co Ltd
Priority to CN201911031952.9A priority Critical patent/CN110774432A/en
Publication of CN110774432A publication Critical patent/CN110774432A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The invention discloses a novel automatic maintenance method of a concrete pipe pile, which comprises the following steps of standing a semi-finished product of the concrete pipe pile, hoisting the pipe pile into a steam curing pool, injecting water with the temperature of 8-10 ℃, covering a pool cover, sealing with water, and standing for 30 minutes; then heating to 16-22 ℃ every half hour, and stopping heating when the temperature is raised to 90-95 ℃; when the temperature is kept at 90-95 ℃, the temperature rise is stopped, and the constant temperature is kept for 145-155 minutes; and after the steam curing is finished, pumping hot water in the steam curing pool into the other steam curing pool, reducing the temperature in the steam curing pool, cooling, keeping for 25-35 minutes, and then opening the cover to lift the pile and demoulding. The method realizes the effect of recycling by recycling the residual steam in the still kettle and then introducing the hot water in the evaporation tank after maintenance into the other evaporation tank, can improve the economic benefit of enterprises by improving the maintenance process, and is consistent with the environment-friendly production and energy-saving production process advocated by the state.

Description

Novel automatic maintenance method for concrete pipe pile
Technical Field
The invention relates to the technical field of concrete pipe piles, in particular to a novel automatic concrete pipe pile maintenance method.
Background
The tubular pile is divided into a prestressed concrete tubular pile and a prestressed high-strength concrete tubular pile according to the concrete strength grade or effective pre-compressive stress, the prestressed concrete tubular pile is PC in code, the prestressed high-strength concrete tubular pile is PHC in code, the thin-wall tubular pile is PTC in code, the concrete strength of the PC pile is not lower than C60, the thin-wall tubular pile is not lower than C60 in strength grade, the concrete strength of the PHC pile is not lower than C80, the prestressed concrete tubular pile can be divided into a post-tensioning prestressed tubular pile and a pre-tensioning prestressed tubular pile, the pre-tensioning prestressed tubular pile is a thin and long concrete prefabricated component with a cylindrical barrel body, an end plate, a steel ferrule and the like, and is manufactured by adopting a pre-tensioning prestressed process and a centrifugal molding process.
With the improvement of the importance degree of modern buildings and the continuous increase of the building height, higher requirements are put forward on the bearing capacity of the foundation, the natural foundation cannot better bear the load transmitted by the upper buildings, so the natural foundation is used, and a treatment mode is adopted, namely reinforced concrete is used as a foundation pile of the foundation, and the pile is pressed into the ground by a pile press to form a foundation pile, so that the upper part of the foundation pile bears the buildings.
In the production process of the concrete pipe pile, two traditional modes of demoulding and curing of the pipe pile are provided, wherein the first mode is natural curing, and the pipe pile is long in time and gradually eliminated due to slow turnover of a mould; at present, the second steam curing is mostly used, steam is flushed when a steam curing pool cover is opened at the final stage of curing, steam is fumigated, the work safety is high, the waste and the environment pollution are caused, the tubular pile curing cost is increased, the enterprise benefit is greatly influenced by the defects existing in the current curing process, and therefore a novel automatic concrete tubular pile curing method is urgently needed to solve the problems.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides a novel automatic concrete pipe pile maintenance method.
A novel automatic maintenance method of a concrete pipe pile comprises the following steps,
s1, standing the semi-finished product of the concrete pipe pile, lifting the pipe pile into a steam-curing pool, then injecting water with the temperature of 8-10 ℃, covering a pool cover, sealing with water, and standing for 30 minutes;
s2, heating to 16-22 ℃ every half hour, and stopping heating when the temperature is raised to 90-95 ℃;
s3, stopping heating when the temperature is kept at 90-95 ℃, and keeping the constant temperature for 145-155 minutes;
and S4, after the steam curing is finished, pumping hot water in the steam curing pool into the other steam curing pool, reducing the temperature in the steam curing pool, cooling, keeping for 25-35 minutes, and then opening the cover to hang the pile and demoulding.
Preferably, the inner walls of the steam-curing ponds are provided with heat insulation plates, and the side walls of the steam-curing ponds are provided with steam circulation pipelines.
Preferably, the tank cover is sealed by water, and the temperature of the inside of the tank is consistent.
Preferably, the condensed water recovered in the autoclave is injected into the steam-curing pool to be used as the curing water of the steam-curing pool.
Preferably, the cooling time in the steam-curing pool is 35 minutes.
Preferably, the constant temperature in the steam-curing pool is kept for 150 minutes.
Preferably, the steam-curing pool comprises a water inlet, a water outlet, a temperature controller and a liquid level sensor, and when the water level in the S2 is lower than the liquid level sensor, hot water is automatically injected into the steam-curing pool.
According to the novel automatic curing method for the concrete pipe pile, residual steam in the autoclave is recycled, and hot water in the evaporation tank after curing is introduced into the other steam curing tank, so that the recycling effect is realized, the environment of a workshop workpiece is improved, resources are saved, the curing cost is reduced, the temperature in the steam curing tank can be reduced more slowly by arranging the heat insulation plate on the inner wall of the steam curing tank, the heat insulation in the steam curing tank is kept for a long time, the heating time in the steam curing tank is shortened, and the energy is saved.
In conclusion, the economic benefit of enterprises can be improved through the improvement of the maintenance process, and the method is consistent with the environment-friendly production and energy-saving production process advocated by the state.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments.
Example one
The invention provides a novel automatic maintenance method of a concrete pipe pile, which comprises the following steps,
s1, standing the semi-finished product of the concrete pipe pile, then hanging the pipe pile into a steam curing pool, then injecting water with the temperature of 10 ℃, covering a pool cover, sealing with water, and standing for 30 minutes;
s2, heating to 22 ℃ every half hour, and stopping heating when the temperature is raised to 95 ℃;
s3, stopping heating when the temperature is kept at 95 ℃, and keeping the constant temperature for 155 minutes;
and S4, after the steam curing is finished, pumping hot water in the steam curing pool into the other steam curing pool, reducing the temperature in the steam curing pool, cooling, keeping for 35 minutes, and then opening the cover to lift the pile and demoulding.
Example two
The invention provides a novel automatic maintenance method of a concrete pipe pile, which comprises the following steps,
s1, standing the semi-finished product of the concrete pipe pile, then hanging the pipe pile into a steam curing pool, then injecting 9 ℃ water, covering a pool cover, sealing with water, and standing for 30 minutes;
s2, heating to 20 ℃ every half hour, and stopping heating when the temperature is raised to 93 ℃;
s3, stopping heating when the temperature is kept at 93 ℃, and keeping the constant temperature for 150 minutes;
and S4, after the steam curing is finished, pumping hot water in the steam curing pool into the other steam curing pool, reducing the temperature in the steam curing pool, cooling, keeping for 35 minutes, and then opening the cover to lift the pile and demoulding.
EXAMPLE III
The invention provides a novel automatic maintenance method of a concrete pipe pile, which comprises the following steps,
s1, standing the semi-finished product of the concrete pipe pile, then hanging the pipe pile into a steam curing pool, then injecting water with the temperature of 8 ℃, covering a pool cover, sealing with water, and standing for 30 minutes;
s2, heating the mixture for 16 ℃ every half hour, and stopping heating when the temperature is raised to 90 ℃;
s3, stopping heating when the temperature is kept at 90 ℃, and keeping the constant temperature for 145 minutes;
and S4, after the steam curing is finished, pumping hot water in the steam curing pool into the other steam curing pool, reducing the temperature in the steam curing pool, cooling, keeping for 25 minutes, and then opening the cover to lift the pile and demoulding.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (7)

1. A novel automatic maintenance method of a concrete pipe pile is characterized by comprising the following steps,
s1, standing the semi-finished product of the concrete pipe pile, lifting the pipe pile into a steam-curing pool, then injecting water with the temperature of 8-10 ℃, covering a pool cover, sealing with water, and standing for 30 minutes;
s2, heating to 16-22 ℃ every half hour, and stopping heating when the temperature is raised to 90-95 ℃;
s3, stopping heating when the temperature is kept at 90-95 ℃, and keeping the constant temperature for 145-155 minutes;
and S4, after the steam curing is finished, pumping hot water in the steam curing pool into the other steam curing pool, reducing the temperature in the steam curing pool, cooling, keeping for 25-35 minutes, and then opening the cover to hang the pile and demoulding.
2. The novel automatic concrete pipe pile curing method according to claim 1, wherein insulation boards are arranged on the inner walls of the steam curing pool, and steam circulation pipelines are arranged on the side walls of the steam curing pool.
3. The novel automatic maintenance method for the concrete pipe pile according to claim 1, wherein the pool cover is sealed by water, and the temperature of the pool is consistent from top to bottom.
4. The method for automatically curing the concrete pipe pile according to claim 1, wherein the condensed water recovered from the autoclave is injected into the steam curing pool as curing water of the steam curing pool.
5. The novel automatic curing method for the concrete pipe pile according to claim 1, wherein the cooling time in the steam curing pool is 35 minutes.
6. The novel automatic curing method for the concrete pipe pile according to claim 1, wherein the constant temperature in the steam curing pool is kept for 150 minutes.
7. The novel automatic concrete pipe pile curing method according to claim 1, wherein the steam curing pool comprises a water inlet, a water outlet, a temperature controller and a liquid level sensor, and when the water level in the S2 is lower than the liquid level sensor, hot water is automatically injected into the steam curing pool.
CN201911031952.9A 2019-10-28 2019-10-28 Novel automatic maintenance method for concrete pipe pile Pending CN110774432A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911031952.9A CN110774432A (en) 2019-10-28 2019-10-28 Novel automatic maintenance method for concrete pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911031952.9A CN110774432A (en) 2019-10-28 2019-10-28 Novel automatic maintenance method for concrete pipe pile

Publications (1)

Publication Number Publication Date
CN110774432A true CN110774432A (en) 2020-02-11

Family

ID=69387100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911031952.9A Pending CN110774432A (en) 2019-10-28 2019-10-28 Novel automatic maintenance method for concrete pipe pile

Country Status (1)

Country Link
CN (1) CN110774432A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112318703A (en) * 2020-10-31 2021-02-05 宁乡宁华新材料有限公司 Tubular pile steam treatment method
CN114670323A (en) * 2022-03-31 2022-06-28 北京港创瑞博混凝土有限公司 Steam curing device for concrete pipe and steam curing process thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100813216B1 (en) * 2007-04-30 2008-03-18 (주)동산 Manufacturing method of environmentally friend planting block utilizing charcoal powder and recycled aggregates of dolomite
CN201604206U (en) * 2010-02-08 2010-10-13 江苏建华管桩有限公司 Circulating water curing device for post-centrifugal pretensioned prestressed concrete pipe pile
CN101905486A (en) * 2010-02-08 2010-12-08 江苏建华管桩有限公司 Water curing method and device for centrifuged pretensioned prestressed concrete pipe pile
CN102756423A (en) * 2012-07-17 2012-10-31 天津中技桩业有限公司 Maintenance device and maintenance method for prestressed centrifugal concrete hollow square pile water maintenance pile
KR20140138462A (en) * 2013-05-24 2014-12-04 다성기업(주) A composition for high strength concreat brick using waste CRT and its production method
CN203994186U (en) * 2014-07-23 2014-12-10 成都银线电杆有限公司 The steam-cured pond of concrete wire pole
KR101543307B1 (en) * 2014-02-24 2015-08-11 케이하나시멘트(주) Method of manufacture and Environment-Friendly Quarry Landfill filler of occurred in the circulating fluidized bed boiler using gas desulfurization gypsum
CN105382924A (en) * 2015-10-13 2016-03-09 福建省大地管桩有限公司 Method for maintaining pipe pile through steam permeating into warm water
CN206085305U (en) * 2016-08-31 2017-04-12 湖南贵庭住宅工业集团有限公司 Steam curing means of PC component
CN108453877A (en) * 2018-04-06 2018-08-28 黄桂芳 A kind of steam-cured pond of fabrication of concrete electric pole

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100813216B1 (en) * 2007-04-30 2008-03-18 (주)동산 Manufacturing method of environmentally friend planting block utilizing charcoal powder and recycled aggregates of dolomite
CN201604206U (en) * 2010-02-08 2010-10-13 江苏建华管桩有限公司 Circulating water curing device for post-centrifugal pretensioned prestressed concrete pipe pile
CN101905486A (en) * 2010-02-08 2010-12-08 江苏建华管桩有限公司 Water curing method and device for centrifuged pretensioned prestressed concrete pipe pile
CN102756423A (en) * 2012-07-17 2012-10-31 天津中技桩业有限公司 Maintenance device and maintenance method for prestressed centrifugal concrete hollow square pile water maintenance pile
KR20140138462A (en) * 2013-05-24 2014-12-04 다성기업(주) A composition for high strength concreat brick using waste CRT and its production method
KR101543307B1 (en) * 2014-02-24 2015-08-11 케이하나시멘트(주) Method of manufacture and Environment-Friendly Quarry Landfill filler of occurred in the circulating fluidized bed boiler using gas desulfurization gypsum
CN203994186U (en) * 2014-07-23 2014-12-10 成都银线电杆有限公司 The steam-cured pond of concrete wire pole
CN105382924A (en) * 2015-10-13 2016-03-09 福建省大地管桩有限公司 Method for maintaining pipe pile through steam permeating into warm water
CN206085305U (en) * 2016-08-31 2017-04-12 湖南贵庭住宅工业集团有限公司 Steam curing means of PC component
CN108453877A (en) * 2018-04-06 2018-08-28 黄桂芳 A kind of steam-cured pond of fabrication of concrete electric pole

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姚杨 张鸿: "《混凝土电杆生产工艺设计质量控制》", 30 November 1999 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112318703A (en) * 2020-10-31 2021-02-05 宁乡宁华新材料有限公司 Tubular pile steam treatment method
CN114670323A (en) * 2022-03-31 2022-06-28 北京港创瑞博混凝土有限公司 Steam curing device for concrete pipe and steam curing process thereof
CN114670323B (en) * 2022-03-31 2023-08-29 北京港创瑞博混凝土有限公司 Steam curing device for concrete pipe and steam curing process thereof

Similar Documents

Publication Publication Date Title
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN101905486B (en) Water curing method and device for centrifuged pretensioned prestressed concrete pipe pile
CN100336649C (en) Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method
CN110774432A (en) Novel automatic maintenance method for concrete pipe pile
CN109183607A (en) Precast spliced UHPC pipe-concrete super-high pier and construction method
CN110259184A (en) Column construction method is pulled out based on Removing Columns combined support jack-up system
CN106836002A (en) A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function
CN103866761A (en) Mechanical connection pile head using repetitively used precast concrete pile as end plate and manufacturing method of mechanical connection pile head
CN102528917B (en) Energy-saving environment friendly production method of concrete lining segment
CN201604206U (en) Circulating water curing device for post-centrifugal pretensioned prestressed concrete pipe pile
CN203994186U (en) The steam-cured pond of concrete wire pole
CN206800199U (en) A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function
CN208293744U (en) Precast concrete tubulose integral sewage treatment pool
CN104563102B (en) A kind of screw pile and manufacture method thereof and the construction method of screw pile
CN203768893U (en) End plate-reusable mechanical connecting pile head of prefabricated concrete pile
CN219034104U (en) Control device for crack of steel plate concrete shear wall
CN204221964U (en) A kind of extruding demolding structure producing reinforced concrete pipe
CN204626732U (en) A kind of precast reinforced concrete construction superposed beam antipriming
CN205224781U (en) Cooling tower pond structure of in cold areas prestressing without bondn structure
CN106639300A (en) Assembly type inner connecting concrete heat preservation formwork and concrete formwork for building
CN111470804A (en) Non-metal composite material cover for tunnel and its making method
CN106351801A (en) Tower tube pouring construction method and tower tube
CN205224417U (en) An anticorrosive industry factory building precast concrete U type supporting beam
CN105382924A (en) Method for maintaining pipe pile through steam permeating into warm water
CN213572325U (en) Bury anti device that floats of prefabricated pump station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200211

RJ01 Rejection of invention patent application after publication