CN100336649C - Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method - Google Patents

Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method Download PDF

Info

Publication number
CN100336649C
CN100336649C CNB2004100407175A CN200410040717A CN100336649C CN 100336649 C CN100336649 C CN 100336649C CN B2004100407175 A CNB2004100407175 A CN B2004100407175A CN 200410040717 A CN200410040717 A CN 200410040717A CN 100336649 C CN100336649 C CN 100336649C
Authority
CN
China
Prior art keywords
centrifugal
pile
steam curing
mold
hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
CNB2004100407175A
Other languages
Chinese (zh)
Other versions
CN1597286A (en
Inventor
颜小荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34664762&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN100336649(C) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CNB2004100407175A priority Critical patent/CN100336649C/en
Publication of CN1597286A publication Critical patent/CN1597286A/en
Application granted granted Critical
Publication of CN100336649C publication Critical patent/CN100336649C/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention relates to a foundation pile for the base treatment of construction engineering foundations, such as industrial and civil buildings, highways, railways, harbors, etc., particularly a hollow square pile formed by centrifugal forming and steam curing. The present invention is formed by the processes of centrifugal forming (including three stages-low speed, medium speed and high speed) and steam curing (including autoclave steam curing if necessary). The two processes can shorten the time of molding and curing (the curing time is shortened to 3 days from 28 days of natural curing for delivering out of a factory) to build foundation for enhancing production efficiency, enhance concrete strength and the stability of product quality, and greatly enhance land utilization rate and production efficiency. The whole production processes of the present invention from concrete proportioning to the centrifugal forming are automatically controlled by a microcomputer, which realizes production automation, and enhances the quality of products and production benefit.

Description

The method of prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing
Technical field: the present invention relates to a kind ofly be used for industry and handle with architectural engineering foundations such as civil buildings, highway, railway, harbour and use foundation pile, particularly a kind of centrifugal forming that utilizes, steam-cured hollow square pile.Dependent territory wood building engineering field.
Background technology: usually need to make of armored concrete the foundation pile of ground in native water architectural engineering, with pile press machine stake being pressed into becomes foundation pile after underground, allows the top carrying building of foundation pile.When particularly building large-scale or high-rise on the ground of geological structure more complicated, adopting foundation pile to strengthen the basis is present requisite means.Foundation pile can be divided into hollow pile and solid pile by its structure at present; Can be divided into prefabricated and bored concrete pile by the preparation method branch; By being divided into regular reinforcement and deformed bar with steel; Divide by the moulding mode and can be divided into artificial moulding and centrifugal forming etc.China has all stipulated corresponding standard to design, production, the application of this class stake.For example: " Code for design of building " (GB50007-2002) and " pretensioned prestressed concrete pipe pile " (GB13476-1999) etc.But employed precast square pile (no matter solid or hollow) all is to adopt artificial formwork moulding by casting, natural curing to form in the civil construction project ground at home.The defective of this mode of production is: the one, and labor strength is big, and production efficiency is low, and the production cycle is long, is difficult to form large-scale production; The 2nd, the concrete leakiness of building, there is pore the centre, the quality instability, product strength is not high relatively; The 3rd, it is big to take production site, natural curing time long (being no less than 28 days by 97G361 atlas regulation), waste land resource and contaminated environment; The 4th, waste of raw materials is big, the production cost height.
Summary of the invention: the defective that the objective of the invention is to overcome above-mentioned prior art; invent the prestress high intensity concrete hollow square pile that a kind of mode that adopts centrifugal forming and steam curing is made; thereby realize automation, the large-scale production of whole pile foundation stake; reach high-strength concrete, the application of economic arrangement of reinforcement in foundation pile of building; to reach energy-saving and cost-reducing; environmental protection, steady quality is reliable, and remarkable in economical benefits improves.
The objective of the invention is to finish like this: the method for prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing, it is characterized in that whole pile centrifugal forming and carries out steam curing, and its technology comprises:
A, preparatory stage: make steel reinforcement cage, proportioning is made concrete, cleared up centrifugal mold and be coated with separation layer in accordance with regulations;
B, installation steel reinforcement cage: be put in the centrifugal mold steel reinforcement cage of making and the location;
C, mechanical cloth: the concrete for preparing is injected centrifugal mold with mechanical system;
D, matched moulds: close up centrifugal mold, and be fixed with the locating locking bolt from the outside with centrifugal mold, the assurance centrifugal mold can not be opened when rotating;
E, usefulness stretch-draw machine stretch-draw prestressing force rod iron are to increase its prestressing force;
F, centrifugal forming: will fill raw-material centrifugal mold and lift on the centrifuge, start centrifuge and quicken gradually by low speed, middling speed, at a high speed order, under centrifugal action, concrete in the centrifugal mold is (the realization concrete density is more manually poured into a mould and increased substantially) around the center of circle is got rid of laterally with the centrifugal mold axis, finally forms the hollow square pile of square-outside and round-inside or the hollow pile of other profile.
G, steam curing: the whole centrifugal mold that will be enclosed with hollow pile is put into the steam curing pond, injects water vapour maintenance a few hours;
H, the demoulding: open the locating locking bolt of centrifugal mold outside, slough centrifugal mold, take out the hollow pile of moulding;
I, pile: hollow pile was deposited in the open-air atmosphere after natural curing 3-7 days, can dispatches from the factory through being up to the standards.
Described steam curing comprises general water vapour maintenance and autoclave steam maintenance, and general water vapour curing time is approximately 5-9 hour; Best 7 hours.
Described autoclave steam maintenance is: the whole centrifugal mold that will be enclosed with hollow pile is put into autoclave, under high temperature, high pressure and water vapour acting in conjunction, maintenance through about 10-14 hour, (operating pressure in the autoclave is 1MPa, concrete strength>C80, high temperature are 180 ℃).
The centrifugal forming stage has two stages at least, then slowly runs the eccentric phase: centrifugal rotational speed is 208 rev/mins; Time is 5-20 minute; The high speed rotating eccentric phase; Centrifugal rotational speed is 1400 rev/mins; Time is 5-20 minute; But the centrifugal forming stage preferably includes three phases, and the eccentric phase that then slowly runs, middling speed are rotated eccentric phase and high speed rotating eccentric phase; The centrifugal rotational speed that middling speed is rotated the eccentric phase is 860 rev/mins; Time is 5-20 minute;
The shape of cross section of hollow pile of the present invention is the hollow geometry of square-outside and round-inside.
Described each centrifugal mold of above-mentioned technology is formed, also can the several piece template be formed jointly by two templates usually, and finally the length of each centrifugal mold meets design requirement and gets final product.
When the present invention made whole hollow pile, owing to adopt whole of centrifugation to produce once, the prefabricated pile body concrete after the moulding was evenly closely knit, and the centre does not have the space, constant product quality, intensity height; Steam curing process shortens the production cycle greatly, reduces to take production site and natural curing to the pollution of surrounding environment, reduces labor strength and production cost; Automation, the large-scale production of whole pile foundation stake reach high-strength concrete, the application of economic arrangement of reinforcement in foundation pile of building, can reach energy-saving and cost-reducing, environmental protection, and steady quality is reliable.
Description of drawings: further specify below in conjunction with accompanying drawing, but protection domain is not limited to embodiment---hollow square pile also comprises the hollow pile of other shape.
Fig. 1 makes the method process chart of prestress high intensity concrete hollow square pile for a kind of centrifugal process steam curing of the present invention.
The specific embodiment:
The embodiment of the invention 1: making cross section is the hollow geometry of interior round foreign side, the outside length of side of stake is 200mm-2000mm, hollow pile body is long to be 6-15m (deciding according to the design needs), and its pile body is made up of raw material such as end plate, cuff, prestressed steel bar, stirrup and high-grade (more than the C60) concrete.Manufacture craft is: a rolls steel reinforcement cage on demand, proportioning is made concrete, cleared up centrifugal mold and be coated with separation layer (centrifugal mold length makes in advance according to designing requirement) in accordance with regulations; B, the steel reinforcement cage of making is put in the centrifugal mold and the location; C, the concrete for preparing is distributed in the centrifugal mold with machinery; D, close up centrifugal mold, and be fixed with the locating locking bolt, guarantee that centrifugal mold can not open when high speed rotating from the outside with centrifugal mold; E, usefulness stretch-draw machine stretch-draw prestressing force rod iron are to increase its prestressing force; F, elder generation are by the mode that slowly runs, and (centrifugal rotational speed is 208 rev/mins to start motor; Time is 10 minutes) allow whole centrifugal mold rotate, under centrifugal action, the concrete of centrifugal mold middle part presses to the centrifugal mold outside, and the middle part forms hollow shape gradually; Use the middling speed rotating manner again, the starter motor centrifugal rotational speed is 860 rev/mins; Time is 8 minutes), pile body outside concrete is more closely knit, and the middle part is more hollow; Start the high speed rotating mode at last; (centrifugal rotational speed is 1400 rev/mins to motor; Time is 20 minutes), whole pile body concrete is evenly closely knit, and intermediate hollow portion diameter is equal substantially; G, the whole centrifugal mold that will be enclosed with hollow pile are put into the steam curing pond, inject water vapour maintenance 7 hours (can use the autoclave steam test maintenance in case of necessity); H, open the locating locking bolt of centrifugal mold outside, take out the hollow pile of moulding; I, hollow pile is deposited in open-air atmosphere natural curing a couple of days after, through dispatching from the factory after the assay was approved.
Manufactured goods of the present invention---hollow square pile, in pile driving process, because the native reaction force for pile crown of base, a part of basic soil pours in the hollow tube chamber, and it has reduced the crowded ground effect of foundation pile on the one hand, has increased the accuracy of pile; Strengthened the rubbing surface of foundation pile with base soil on the other hand, under the certain condition of coefficient of friction, rubbing surface is big more, and frictional force is also big more, thereby increases substantially the foundation bearing capacity of single stake.Because the hollow square pile concrete that adopts technology of the present invention to make is evenly closely knit, also increase the bearing capacity of single hollow pile greatly simultaneously, the final quantity of using foundation pile that reduces.

Claims (7)

1, the method for prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing, it is characterized in that whole pile centrifugal forming and carries out steam curing, and its technology comprises:
A, preparatory stage: make steel reinforcement cage, proportioning is made concrete, cleared up centrifugal mold and be coated with separation layer in accordance with regulations;
B, installation steel reinforcement cage: be put in the centrifugal mold steel reinforcement cage of making and the location;
C, mechanical cloth: the concrete for preparing is injected centrifugal mold with mechanical system;
D, matched moulds: close up centrifugal mold, and be fixed with the locating locking bolt from the outside with centrifugal mold, the assurance centrifugal mold can not be opened when rotating;
E, usefulness stretch-draw machine stretch-draw prestressing force rod iron are to increase its prestressing force;
F, centrifugal forming: start centrifuge and allow whole centrifugal mold rotate, under centrifugal action, the concrete of centrifugal mold middle part gets rid of around the centrifugal mold outside, and the middle part forms hollow shape;
G, steam curing: the whole centrifugal mold that will be enclosed with hollow pile is put into the steam curing pond, injects water vapour maintenance a few hours;
H, the demoulding: open the locating locking bolt of centrifugal mold outside, slough centrifugal mold, take out the hollow pile of moulding;
I, pile: hollow pile was deposited in open-air atmosphere after 3~7 days, through dispatching from the factory after the assay was approved;
The centrifugal forming stage has two stages at least, then slowly runs the eccentric phase: centrifugal rotational speed is 208 rev/mins, and the time is 5-20 minute; The high speed rotating eccentric phase: centrifugal rotational speed is 1400 rev/mins, and the time is 5-20 minute.
2, the method for prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing according to claim 1, it is characterized in that described steam curing comprises water vapour maintenance and autoclave steam maintenance, and the water vapour curing time is 5-9 hour.
3, the method for prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing according to claim 1 and 2, it is characterized in that described autoclave steam maintenance is: the whole centrifugal mold that will be enclosed with hollow pile is put into autoclave steam maintenance device, under high temperature, high pressure and water vapor acting, maintenance 10-14 hour, operating pressure in the autoclave is 1MPa, concrete strength>C80, high temperature are 180 ℃.
4, the method for prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing according to claim 1, it is characterized in that there is three phases in the centrifugal forming stage, then slowly run eccentric phase, middling speed rotated eccentric phase and high speed rotating eccentric phase, and the centrifugal rotational speed that middling speed is rotated the eccentric phase is 860 to change minute; Time is 5-20 minute.
5, the method for prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing according to claim 1, it is characterized in that described each centrifugal mold is made of jointly the several piece template.
6, the method for prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing according to claim 1 and 2, it is characterized in that the shape of cross section that adopts above-mentioned technology to make hollow pile is the hollow body of square-outside and round-inside shape.
7, the method for prestress high intensity concrete hollow square pile is made in a kind of centrifugal process steam curing according to claim 2, it is characterized in that the water vapour curing time is 7 hours.
CNB2004100407175A 2004-09-16 2004-09-16 Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method Ceased CN100336649C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100407175A CN100336649C (en) 2004-09-16 2004-09-16 Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100407175A CN100336649C (en) 2004-09-16 2004-09-16 Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method

Publications (2)

Publication Number Publication Date
CN1597286A CN1597286A (en) 2005-03-23
CN100336649C true CN100336649C (en) 2007-09-12

Family

ID=34664762

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100407175A Ceased CN100336649C (en) 2004-09-16 2004-09-16 Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method

Country Status (1)

Country Link
CN (1) CN100336649C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105666646A (en) * 2016-02-23 2016-06-15 初明进 Concrete hollow square pile production process
CN105690557A (en) * 2016-02-23 2016-06-22 初明进 Production technique for hollow square concrete pile
CN105751359A (en) * 2016-02-23 2016-07-13 初明进 Production process of concrete hollow square pile

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101885208B (en) * 2009-09-21 2012-09-05 宁波一中管桩有限公司 System for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile
CN101804793B (en) * 2010-04-12 2012-01-11 黄贺明 Concrete contact network strut of railway electrification engineering and preparation method thereof
CN101863078A (en) * 2010-06-12 2010-10-20 江苏建华管桩有限公司 Production method of concrete tube pile
CN101886388B (en) * 2010-07-01 2012-08-22 江苏建华管桩有限公司 Pretensioned prestressed concrete polygonal pile and production method thereof
CN101914913A (en) * 2010-08-16 2010-12-15 句容长江建材有限公司 Pretensioned prestressed concrete quadrilateral pile and production method thereof
CN102001133B (en) * 2010-09-20 2015-08-19 浙江金鑫管桩有限公司 A kind of three-dimensional circular production process for tubular pile
CN102398305B (en) * 2010-12-24 2014-04-16 宁波一中管桩有限公司 Method for producing precast concrete piles
CN102211353B (en) * 2011-05-26 2018-03-09 江苏固丰管桩集团有限公司 A kind of manufacturing process of centrifugal concrete pile
CN102642243A (en) * 2012-02-28 2012-08-22 上海中技桩业股份有限公司 Normal-pressure hot water curing process of concrete pile
CN102979086B (en) * 2012-12-17 2013-09-04 青岛兴河建材有限公司 Prestressed concrete square pile and manufacturing method thereof
CN103223694A (en) * 2013-03-29 2013-07-31 南通中技桩业有限公司 Technology for producing novel prestressing hollow square pile
CN103950101A (en) * 2014-04-21 2014-07-30 南通华柱水泥制品有限公司 Manufacturing method for high-strength concrete pile
CN104552597B (en) * 2014-12-05 2017-06-20 南通中技桩业有限公司 A kind of production maintenance process of pre-stressed concrete hollow square stake
CN104589495B (en) * 2014-12-05 2016-11-02 南通中技桩业有限公司 A kind of manufacture method of seismic crack concrete square pile
CN105649014A (en) * 2016-02-23 2016-06-08 初明进 Production process for concrete hollow square pile
CN105690540A (en) * 2016-02-23 2016-06-22 初明进 Production technique of hollow square concrete pile
CN105751358A (en) * 2016-02-23 2016-07-13 初明进 Production process of concrete hollow square pile
CN105751357A (en) * 2016-02-23 2016-07-13 初明进 Production process of concrete hollow square pile
CN105729622A (en) * 2016-02-23 2016-07-06 初明进 Production process of concrete hollow square pile
CN107584633A (en) * 2017-09-29 2018-01-16 汕头市宏基混凝土构件有限公司 A kind of autoclave condensation water is applied to the method for concrete tubular pile production
CN108484034B (en) * 2018-04-03 2021-05-07 中国矿业大学 Fiber reinforced cement-based composite material concrete reinforced restraint pipe and preparation method thereof
CN110053154A (en) * 2019-04-11 2019-07-26 上海大禺预制构件有限公司 A kind of mold and its production method of centrifugation production U-shaped board stake
CN113334565A (en) * 2021-05-08 2021-09-03 广东三和管桩股份有限公司 Preparation method of diamond pile

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2092560U (en) * 1991-01-17 1992-01-08 宁波混凝土管桩厂 Pre-stressed concrete tubular pile
CN1410238A (en) * 2002-11-18 2003-04-16 蒋元海 Manufacturing method of polypropylene fiber reinforced prefabricated steel concrete square pole

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2092560U (en) * 1991-01-17 1992-01-08 宁波混凝土管桩厂 Pre-stressed concrete tubular pile
CN1410238A (en) * 2002-11-18 2003-04-16 蒋元海 Manufacturing method of polypropylene fiber reinforced prefabricated steel concrete square pole

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
预应力混凝土管桩 阮超南,29,65,70,71,73,81,82,85,86,87页,中国建筑工业出版社 2000 *
高效预应力结构设计施工实例 陈惠玲,902.904页,中国建筑工业出版社 1998 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105666646A (en) * 2016-02-23 2016-06-15 初明进 Concrete hollow square pile production process
CN105690557A (en) * 2016-02-23 2016-06-22 初明进 Production technique for hollow square concrete pile
CN105751359A (en) * 2016-02-23 2016-07-13 初明进 Production process of concrete hollow square pile

Also Published As

Publication number Publication date
CN1597286A (en) 2005-03-23

Similar Documents

Publication Publication Date Title
CN100336649C (en) Method of manufacturing prestressed high strength concrete hollow square pile centrifugal, steam, maintenance method
CN102383418B (en) Anti-seismic prefabricated concrete solid square pile and production method thereof
CN102259386B (en) Production method of high-strength concrete precast pile doped with fiber enhanced plastic tendon
CN101831875A (en) Precast assembly process of prestressed concrete cylindrical hollow pier
CN1954982A (en) Method for manufacturing prestressed high strength pile material
CN104416675A (en) Manufacturing process of pre-tensioned prestressed centrifugal concrete square pile
CN202519664U (en) High tensile reinforcement reinforced prestressed UHPC (Ultra High Performance Concrete) thin-wall tubular pile component
CN106223544A (en) A kind of ultra-high performance concrete post permanent template and preparation method thereof
CN102121246A (en) Toughening prestressed centrifugal concrete pile
CN102211353A (en) Process for manufacturing centrifugal concrete pile
CN202000251U (en) Cylindrical hollow prefabricated prestressed concrete pier structure
CN113718765A (en) Hollow fender pile of prestressing force high-strength concrete
CN106193454A (en) A kind of permanent template of post ultra-high performance concrete and preparation method thereof
CN102587578A (en) High-strength steel bar enhanced engineered cementitious composites (ECC)-hollow steel pipe ultra high performance concrete (UHPC) combination column member and manufacturing method thereof
CN202090337U (en) Centrifugal concrete pile
CN107932700A (en) Prefabricated high-strength concrete bridge pier and its molding die and manufacture method
CN1944325A (en) Method for producing cementitious materials concrete pipe
CN205990762U (en) A kind of cylinder ultra-high performance concrete permanent template
CN201943070U (en) Toughened type prestress centrifugal concrete pile
CN102071701A (en) Non-prestressed centrifugal concrete pile
CN207656905U (en) A kind of molding die of prefabricated high-strength concrete bridge pier
CN103266595B (en) A kind of rigid pile for complex ground treatment and production method thereof
CN203284774U (en) Rigid pile for processing composite foundation
CN206070876U (en) A kind of ultra-high performance concrete post permanent template
CN1410238A (en) Manufacturing method of polypropylene fiber reinforced prefabricated steel concrete square pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C35 Partial or whole invalidation of patent or utility model
IW01 Full invalidation of patent right

Decision date of declaring invalidation: 20080801

Decision number of declaring invalidation: 11927

C35 Partial or whole invalidation of patent or utility model
IW01 Full invalidation of patent right

Decision date of declaring invalidation: 20080801

Decision number of declaring invalidation: 11927

Granted publication date: 20070912