CN110727222A - ICT (information communication technology) integrated operation and maintenance system and method - Google Patents
ICT (information communication technology) integrated operation and maintenance system and method Download PDFInfo
- Publication number
- CN110727222A CN110727222A CN201910993214.6A CN201910993214A CN110727222A CN 110727222 A CN110727222 A CN 110727222A CN 201910993214 A CN201910993214 A CN 201910993214A CN 110727222 A CN110727222 A CN 110727222A
- Authority
- CN
- China
- Prior art keywords
- server
- maintenance
- switch
- ict
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 66
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000004891 communication Methods 0.000 title description 2
- 238000005516 engineering process Methods 0.000 title description 2
- 238000012544 monitoring process Methods 0.000 claims abstract description 10
- 239000000779 smoke Substances 0.000 claims abstract description 10
- 230000006870 function Effects 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 230000000737 periodic effect Effects 0.000 claims description 4
- 241000700605 Viruses Species 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 238000007654 immersion Methods 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 230000010354 integration Effects 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
- G05B19/0428—Safety, monitoring
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24024—Safety, surveillance
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Air Conditioning Control Device (AREA)
Abstract
The invention relates to the technical field of ICT, and particularly discloses an ICT integrated operation and maintenance system and a method, wherein the system comprises a server area, a network area, a distribution box, an operation display module and a sensor module; the number of the server areas is 2, and the server areas comprise a plurality of servers; the network area comprises a switch, a router and a firewall; the sensor module comprises an air conditioner remote control, a temperature and humidity sensor and a smoke sensor; the distribution box comprises a UPS module and a gateway; the distribution box is electrically connected with the switch, the router, the firewall and the server respectively; the second switch is in signal connection with the sensor module through the gateway; and the operation display module is in signal connection with the server. The ICT integrated system provided by the invention can automatically send an instruction to the server to carry out shutdown operation by monitoring the mains supply outage from the UPS, thereby realizing a rapid monitoring function.
Description
Technical Field
The invention relates to the technical field of ICT, in particular to an ICT integrated operation and maintenance system and method.
Background
The servers of the existing small and medium-sized enterprises are placed in a mess, the distance between the servers is long, or a multi-stage switch jumps, certain network delay exists in the data acquisition of the servers and the switches, or no sensor is arranged at the placing position, or the operation and maintenance unit only comprises power and environment monitoring, or the operation and maintenance unit only comprises the servers and network monitoring.
Disclosure of Invention
The invention aims to provide an ICT integrated operation and maintenance system and method, which are used for monitoring all servers and network equipment through centralized management of the operation and maintenance system, have low network delay time and integrate power, environment and network monitoring.
In order to solve the technical problems, the invention provides an ICT integrated operation and maintenance system, which comprises a server area, a network area, a distribution box, an operation display module and a sensor module, wherein the server area is connected with the network area; the server area is provided with a first service area and a second service area, and the first server area and the second server area respectively comprise a plurality of servers; the network area comprises a switch, a router and a firewall; the distribution box comprises a UPS module and a gateway; the distribution box is electrically connected with the switch, the router, the firewall and the server respectively; the server comprises a first server and a second server; the switches comprise a first switch and a second switch; the first server is respectively in signal connection with a first switch and a second switch; the first switch is in signal connection with a second server; the second switch is in signal connection with the sensor module through the gateway; and the operation display module is in signal connection with the server.
In order to solve the technical problems, the invention further provides an ICT integrated operation and maintenance method, the UPS module is used for monitoring the condition of the mains supply, and if the mains supply is powered off, the operation and maintenance unit controls the plurality of servers to be powered off.
As a preferred scheme, the operation display module can display the acquired signals of the temperature and humidity, the entrance guard, the air conditioner remote control, the smoke and the water sensor.
As a preferred scheme, the signals include temperature and humidity inside and outside the equipment, set temperature, humidity and air volume of the air conditioner, smoke signals inside and outside the equipment, water immersion signals, electric parameters of each server, total electric parameters and UPS parameters.
Preferably, the electrical parameters include voltage, current, harmonic, reactive power, active power, apparent power, voltage harmonic, current harmonic, reactive power, active power, apparent power and circuit on-off.
Preferably, the UPS parameters include battery temperature, battery power, input voltage, current, power, output voltage, current, power, utility status, load factor, and efficiency.
As a preferred scheme, the system further comprises a remote login module, so that operation and maintenance personnel can log in a server where the operation and maintenance unit is located through a network and access the server, the switch, the firewall and the router through remote access.
As a preferred scheme, the method further comprises an operation and maintenance prompting function, and after the set operation and maintenance cycle time is up, operation and maintenance personnel are prompted to maintain the equipment, wherein the maintenance comprises equipment integrity check, equipment environment check, equipment fault check, ICT equipment pressure test, virus checking and killing of a server, network security policy setting, Vlan, VPN, MAC black and white list, port forwarding and NAT application management setting.
Preferably, the operation and maintenance cycle is more than 1 day.
As a preferred scheme, the operation and maintenance reminding function further comprises threshold reminding, and when the monitored parameters exceed the set threshold, the operation and maintenance unit prompts the operation and maintenance personnel to rapidly arrive at the site for detection; the threshold value is divided into a first-level threshold value and a second-level threshold value, and when the system monitors that the parameter exceeds the second-level threshold value, the server in the equipment is remotely shut down.
As a preferred scheme, after the operation and maintenance unit continuously monitors a period, the operation and maintenance unit provides a periodic report according to the period data, and the report content includes the CPU load rate, the memory load rate, the disk load rate, the CPU temperature and the GPU temperature of each device in the IT area in the period, the CPU load rate, the memory load rate and the network load rate of each device in the CT area, and the environment and power data of the equipment.
Preferably, the period data includes mean data, maximum values, minimum value data, and time points at which the extreme value data occurs within a period.
Preferably, the sensor module comprises an air conditioner remote control, a temperature and humidity sensor and a smoke sensor.
The invention has the following beneficial effects:
(1) according to the ICT integrated operation and maintenance method, the first server is arranged to monitor all the second servers, the switch is integrated with the first sensing module and the second sensing module, internal signal parameters of the cabinet unit are monitored, the network delay time is low, the problems that the distance between the servers is long or multi-stage switch jumping exists are solved, the whole ICT integrated equipment is convenient to maintain, the efficiency is high, all the servers and network equipment are monitored, the network delay time is low, and power, environment and network monitoring are integrated.
Drawings
Fig. 1 is a distribution diagram of an ICT integrated operation and maintenance system provided by an embodiment of the present invention;
fig. 2 is a block diagram of an ICT integrated operation and maintenance system provided in an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 and 2, in a preferred embodiment of the present invention, an ICT integrated operation and maintenance system includes a server area, a network area, a distribution box, an operation display module, and a sensor module; the server area is provided with a first service area and a second service area, and the first server area and the second server area respectively comprise a plurality of servers; the network area comprises a switch, a router and a firewall; the distribution box comprises a UPS module and a gateway; the distribution box is electrically connected with the switch, the router, the firewall and the server respectively; the server comprises a first server and a second server; the switches comprise a first switch and a second switch; the first server is respectively in signal connection with a first switch and a second switch; the first switch is in signal connection with a second server; the second switch is in signal connection with the sensor module through the gateway; and the operation display module is in signal connection with the server.
The preferred embodiment of the present invention further provides an ICT integrated operation and maintenance method, where the UPS module monitors the situation of the utility power, and if the utility power is cut off, the operation and maintenance unit controls the plurality of servers to be powered off.
In the preferred embodiment of the invention, the operation display module can display the acquired signals of the temperature and humidity, the door control, the air conditioner remote control, the smoke and the water sensor.
In the preferred embodiment of the invention, the signals comprise the temperature and humidity inside and outside the equipment, the set temperature, humidity and air volume of the air conditioner, smoke signals inside and outside the equipment, water immersion signals, electric parameters of each server, overall electric parameters and UPS parameters.
In a preferred embodiment of the invention, the electrical parameters include voltage, current, harmonics, reactive power, active power, apparent power, voltage harmonics, current harmonics, reactive power, active power, apparent power and on/off of the circuit.
In a preferred embodiment of the present invention, the UPS parameters include battery temperature, battery power, input voltage, current, power, output voltage, current, power, utility status, load factor, and efficiency.
In the preferred embodiment of the invention, the system further comprises a remote login module, so that operation and maintenance personnel can log in the server where the operation and maintenance unit is located through a network and access the server, the switch, the firewall and the router through remote access.
In the preferred embodiment of the present invention, the system further includes an operation and maintenance prompting function, and when the set operation and maintenance cycle time is reached, the system prompts operation and maintenance personnel to maintain the equipment, where the maintenance includes equipment integrity check, equipment environment check, equipment fault check, ICT equipment pressure test, virus killing of the server, network security policy setting, Vlan, VPN, MAC black and white lists, port forwarding, and NAT application management setting.
In a preferred embodiment of the present invention, the operation and maintenance period is 1 day or more.
In the preferred embodiment of the invention, the operation and maintenance reminding function further comprises threshold reminding, and when the monitored parameters exceed the set threshold, the operation and maintenance unit prompts the operation and maintenance personnel to rapidly arrive at the site for detection; the threshold value is divided into a first-level threshold value and a second-level threshold value, and when the system monitors that the parameter exceeds the second-level threshold value, the server in the equipment is remotely shut down.
In a preferred embodiment of the present invention, after the operation and maintenance unit continuously monitors a period, the operation and maintenance unit provides a periodic report according to the period data, where the report content includes a CPU load rate, a memory load rate, a disk load rate, a CPU temperature, and a GPU temperature of each device in the IT area, a CPU load rate, a memory load rate, and a network load rate of each device in the CT area, and environment and power data of the device.
In a preferred embodiment of the present invention, the period data includes the points in time at which the average data, the maximum value, the minimum value data, and the extreme value data occur within the period.
In the ICT integrated operation and maintenance method in the preferred embodiment of the invention, the first server is arranged to monitor all the second servers, and the switch is integrated with the first sensing module and the second sensing module, so that the signal parameters in the cabinet unit are monitored, the network delay time is low, and the problems of long distance between the servers or multi-stage switch skip are solved, so that the whole ICT integrated equipment is convenient to maintain, the efficiency is higher, all the servers and the network equipment are monitored, the network delay time is low, and power, environment and network monitoring are integrated.
In a preferred embodiment of the invention, the sensor module comprises an air conditioner remote control, a temperature and humidity sensor and a smoke sensor
The above description is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and substitutions can be made without departing from the technical principle of the present invention, and these modifications and substitutions should also be regarded as the protection scope of the present invention.
Claims (12)
1. An ICT integration operation and maintenance system is characterized in that: the system comprises a server area, a network area, a distribution box, an operation display module and a sensor module; the server area is provided with a first service area and a second service area, and the first server area and the second server area respectively comprise a plurality of servers; the network area comprises a switch, a router and a firewall; the distribution box comprises a UPS module and a gateway;
the distribution box is electrically connected with the switch, the router, the firewall and the server respectively;
the server comprises a first server and a second server; the switches comprise a first switch and a second switch;
the first server is respectively in signal connection with a first switch and a second switch; the first switch is in signal connection with a second server; the second switch is in signal connection with the sensor module through the gateway; and the operation display module is in signal connection with the server.
2. The operation and maintenance method of the ICT integrated operation and maintenance system according to claim 1, wherein the UPS module monitors the condition of the utility power, and if the utility power is cut off, the operation and maintenance unit controls the plurality of servers to be powered off.
3. The ICT integrated operation and maintenance method according to claim 2, further comprising an operation display module, wherein the operation display module can display the acquired signals of the temperature and humidity, the door control, the air conditioner remote control, the smoke and the water sensor.
4. The ICT integrated operation and maintenance method according to claim 2, wherein the signals comprise temperature and humidity inside and outside the equipment, set temperature, humidity and air volume of an air conditioner, smoke signals inside and outside the equipment, water immersion signals, electric parameters of each server, total electric parameters and UPS parameters.
5. The ICT integrated operation and maintenance method according to claim 4, wherein the electrical parameters comprise voltage, current, harmonic, reactive power, active power, apparent power, voltage harmonic, current harmonic, reactive power, active power, apparent power and on-off of circuit.
6. The ICT integrated operation and maintenance method according to claim 4, wherein the UPS parameters include battery temperature, battery capacity, input voltage, current, power, output voltage, current, power, utility status, load factor and efficiency.
7. The ICT integrated operation and maintenance method according to claim 2, further comprising a remote login module for logging in the server where the operation and maintenance unit is located through a network by an operation and maintenance person, and accessing the server, the switch, the firewall and the router through remote access.
8. The ICT integrated operation and maintenance method according to claim 2, further comprising an operation and maintenance prompting function, wherein after the set operation and maintenance cycle time is reached, operation and maintenance personnel are prompted to maintain the equipment, and the maintenance includes equipment integrity check, equipment environment check, equipment fault check, ICT equipment pressure test, virus checking and killing of the server, network security policy setting, Vlan, VPN, MAC black and white list, port forwarding and NAT application management setting.
9. The ICT integrated operation and maintenance method according to claim 8, wherein the operation and maintenance reminding function further comprises threshold reminding, and when each parameter is monitored to exceed a set threshold, the operation and maintenance unit prompts the operation and maintenance personnel to rapidly arrive at the site for detection; the threshold value is divided into a first-level threshold value and a second-level threshold value, and when the system monitors that the parameter exceeds the second-level threshold value, the server in the equipment is remotely shut down.
10. The ICT integrated operation and maintenance method according to claim 8, wherein the operation and maintenance unit provides periodic reports according to the periodic data after continuously monitoring a period, the report contents include CPU load rate, memory load rate, disk load rate, CPU temperature and GPU temperature of each device in the IT area, CPU load rate, memory load rate and network load rate of each device in the CT area, environment and power data of the device; the period data includes mean data, maximum values, minimum value data, and time points at which extreme value data occurs within a period.
11. The ICT integrated operation and maintenance method according to claim 1, wherein the sensor module comprises an air conditioner remote control, a temperature and humidity sensor and a smoke sensor.
12. The ICT integrated operation and maintenance method according to claim 1, wherein the distribution box further comprises a switch power supply, and the sensor is powered by a DC power supply.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910993214.6A CN110727222A (en) | 2019-10-18 | 2019-10-18 | ICT (information communication technology) integrated operation and maintenance system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910993214.6A CN110727222A (en) | 2019-10-18 | 2019-10-18 | ICT (information communication technology) integrated operation and maintenance system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110727222A true CN110727222A (en) | 2020-01-24 |
Family
ID=69220317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910993214.6A Pending CN110727222A (en) | 2019-10-18 | 2019-10-18 | ICT (information communication technology) integrated operation and maintenance system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110727222A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113162241A (en) * | 2021-05-17 | 2021-07-23 | 上海中通吉网络技术有限公司 | Machine room server commercial power outage monitoring processing and alarming method |
CN114002488A (en) * | 2021-09-29 | 2022-02-01 | 苏州浪潮智能科技有限公司 | Automatic monitoring and adjusting method, device and system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104267689A (en) * | 2014-09-22 | 2015-01-07 | 中国科学院寒区旱区环境与工程研究所 | Super computer room outage early warning and automatic power-on management method based on video image differentiation |
CN105739665A (en) * | 2016-01-26 | 2016-07-06 | 西安电子科技大学 | UPS (Uninterrupted Power Supply) monitoring management method |
CN105785946A (en) * | 2016-03-22 | 2016-07-20 | 国网山东省电力公司章丘市供电公司 | Machine room environment control integrated monitoring platform |
CN107241214A (en) * | 2017-05-04 | 2017-10-10 | 国网天津静海供电有限公司 | A kind of mobile phone A PP computer room operational systems |
CN109521680A (en) * | 2018-09-21 | 2019-03-26 | 国网天津静海供电有限公司 | A kind of automatic machine room palm skeleton |
CN210464551U (en) * | 2019-10-18 | 2020-05-05 | 广州市锐赛科技有限公司 | ICT integrated equipment |
-
2019
- 2019-10-18 CN CN201910993214.6A patent/CN110727222A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104267689A (en) * | 2014-09-22 | 2015-01-07 | 中国科学院寒区旱区环境与工程研究所 | Super computer room outage early warning and automatic power-on management method based on video image differentiation |
CN105739665A (en) * | 2016-01-26 | 2016-07-06 | 西安电子科技大学 | UPS (Uninterrupted Power Supply) monitoring management method |
CN105785946A (en) * | 2016-03-22 | 2016-07-20 | 国网山东省电力公司章丘市供电公司 | Machine room environment control integrated monitoring platform |
CN107241214A (en) * | 2017-05-04 | 2017-10-10 | 国网天津静海供电有限公司 | A kind of mobile phone A PP computer room operational systems |
CN109521680A (en) * | 2018-09-21 | 2019-03-26 | 国网天津静海供电有限公司 | A kind of automatic machine room palm skeleton |
CN210464551U (en) * | 2019-10-18 | 2020-05-05 | 广州市锐赛科技有限公司 | ICT integrated equipment |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113162241A (en) * | 2021-05-17 | 2021-07-23 | 上海中通吉网络技术有限公司 | Machine room server commercial power outage monitoring processing and alarming method |
CN114002488A (en) * | 2021-09-29 | 2022-02-01 | 苏州浪潮智能科技有限公司 | Automatic monitoring and adjusting method, device and system |
CN114002488B (en) * | 2021-09-29 | 2024-01-16 | 苏州浪潮智能科技有限公司 | Automatic monitoring and adjusting method, device and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107200248B (en) | A kind of elevator Internet of Things operation real-time monitoring system based on cloud platform | |
CN109617240A (en) | A kind of power consumer switchgear house operational system | |
KR102257375B1 (en) | Combiner box for photovoltaic module with intelligent safety management | |
CN111367209A (en) | Internet of things intelligent safety power utilization management system | |
CN103701212A (en) | Method and system for monitoring and analyzing power grid safety and stability control device | |
CN106199261B (en) | Electric appliance Degree of Ageing Internet-based continues detection system and detection method | |
CN105226814A (en) | GPRS Based Intelligent Control distribution box system | |
CN110727222A (en) | ICT (information communication technology) integrated operation and maintenance system and method | |
CN106444592A (en) | Comprehensive intelligent environment centralized supervision central server and system | |
CN203984351U (en) | A kind of photovoltaic active safety system | |
CN109743365B (en) | Method, device and system for monitoring power transmission line | |
CN108011447A (en) | A kind of monitoring power station equipment, Power Station Monitored Control System | |
CN110611714A (en) | Comprehensive energy application control system based on Internet of things big data cloud platform | |
CN204334464U (en) | Photovoltaic DC-to-AC converter device for monitoring running state | |
CN206370730U (en) | Low-voltage distribution apparatus with fault pre-alarming and warning information wireless transmission function | |
CN106569461A (en) | Distributed power control device | |
CN115942155B (en) | Equipment monitoring method, device and system | |
CN206863552U (en) | A kind of Hybrid Decision-making environment centralized supervision central server system | |
CN207907933U (en) | A kind of server room monitoring device | |
CN206742868U (en) | A kind of intelligent energy storage grid management systems | |
CN104699043A (en) | Online storage battery monitoring system | |
CN210608222U (en) | Terminal block terminal of intelligence | |
CN204669079U (en) | A kind of safety control for resident's distribution | |
KR20180077979A (en) | a power peak lowering system having a power storage system and a real-time estimation of power demand | |
CN210608694U (en) | Intelligent power distribution room monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |