CN110685721A - Jet-anchored net hanging construction method for roadway surrounding rock support - Google Patents

Jet-anchored net hanging construction method for roadway surrounding rock support Download PDF

Info

Publication number
CN110685721A
CN110685721A CN201911143949.6A CN201911143949A CN110685721A CN 110685721 A CN110685721 A CN 110685721A CN 201911143949 A CN201911143949 A CN 201911143949A CN 110685721 A CN110685721 A CN 110685721A
Authority
CN
China
Prior art keywords
steel
plastic grating
roadway
hanging
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201911143949.6A
Other languages
Chinese (zh)
Inventor
张军贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Vocational and Technical College
Original Assignee
Taizhou Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Vocational and Technical College filed Critical Taizhou Vocational and Technical College
Priority to CN201911143949.6A priority Critical patent/CN110685721A/en
Publication of CN110685721A publication Critical patent/CN110685721A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to a roadway construction method, in particular to a shotcrete net hanging net construction method for roadway surrounding rock support. The method solves the problem of net hanging of the steel-plastic grating in the roadway engineering, and comprises the following steps: determining the smoothness of surrounding rocks, cleaning loose broken stones on the surface of the surrounding rocks, determining the width of the steel-plastic grating, drilling, symmetrically laying the steel-plastic grating according to the arch crown → the arch waist → the side wall → the bottom foot in sequence, installing an anchor rod, checking the installation quality, and supplementing and hanging. By the aid of the net hanging method, a roadway construction working face is saved, roadway net hanging efficiency is improved, labor intensity of constructors is reduced, stability of roadway surrounding rocks is guaranteed, and safety and high efficiency of roadway excavation are guaranteed.

Description

Jet-anchored net hanging construction method for roadway surrounding rock support
Technical Field
The invention relates to a shotcrete net hanging net supporting method, in particular to a shotcrete net hanging net construction method for roadway surrounding rock supporting.
Background
When the stability problem of surrounding rocks in the construction of roadways and the like is solved, the shotcrete net support becomes the most common technology due to the obvious technical advantages. The technical advancement and the effect reliability of the shotcrete-anchor net support are proved by a large amount of engineering practices and are widely applied in the aspects of improving the stress state of the surrounding rock of the roadway, enhancing the bearing capacity of the surrounding rock of the roadway, improving the integrity of the surrounding rock of the roadway, increasing the stability of the surrounding rock of the roadway and the like.
In the traditional process of spray-anchor net support, the commonly used anchor net material is a metal net, and the net hanging construction method is mature, but with the appearance of new materials, the steel-plastic grating is gradually applied to roadway surrounding rock support, and the steel-plastic grating net is unreasonable according to the net hanging method of the metal net in the engineering construction process due to the characteristics of large area and light weight of a single net, so that how to adopt a reasonable net hanging construction method according to the characteristics of the steel-plastic grating and the actual situation of a construction site becomes one of key technologies to be solved by technical personnel.
Disclosure of Invention
The invention provides a construction method of a shotcrete net hanging net for a surrounding rock support of a roadway, aiming at solving the problem of construction of the shotcrete net hanging net for the surrounding rock support of the roadway in the process of constructing the roadway support.
The invention has the technical scheme that the construction method of the shotcrete net hanging net for the roadway surrounding rock support comprises the following steps:
A. before the steel-plastic grating net hanging construction, the flatness of the surrounding rock surface is determined, and loose broken stones on the surface of the surrounding rock are cleaned;
B. determining the width of the steel-plastic grating according to the side length of the excavation section of the roadway, and marking the position of the center line of the steel-plastic grating;
C. calculating the number of sections of the required steel-plastic grating according to the formula (a),
N= L/L0(a)
in the formula: n is the number of sections of the steel-plastic grating; l is the depth length of the roadway support; l is0The length of the single steel-plastic grating;
D. drilling holes by using an anchor rod drilling machine, wherein the arrangement distance of anchor holes is 80cm multiplied by 80cm, the position is accurate, the difference between the deviation and the design requirement is less than 50mm, the anchor holes are ensured to be vertical to the contour line of the roadway, the direction error of the anchor holes is less than 5 degrees, the depth of the anchor holes is consistent with the length of anchor rods, and after the drilling is finished, sundries such as residues, accumulated water and the like in the holes are cleaned;
E. conveying the steel-plastic grating to the section of the roadway to be supported, and in one section, symmetrically paving the steel-plastic grating according to the arch crown → arch waist → arch foot in sequence, wherein the length of the overlapping part of the grating is 15-20 cm;
F. installing an anchor rod, firstly cleaning rock residues and accumulated water in the anchor hole by using an air blower, when cleaning, standing an operator at one side of an orifice, strictly prohibiting a constructor from standing at the same position with the direction of the orifice, fixing a resin anchoring agent at the bottom of the anchor hole by using a drill rod, ensuring that the anchor rod is pushed to the resin anchoring agent, sleeving a steel wire mesh, an anchor disc, a screw cap and a special sleeve on the other end of the anchor rod, then driving the anchor rod by using a drilling machine, driving the anchor rod to rotate by using the drilling machine, uniformly stirring the anchoring agent for about 20 seconds, closing the drilling machine, applying pressure to the anchor rod by using the drilling machine, screwing the screw cap after 2min, controlling the torque at 150 N.m, and finally unloading the drilling machine;
G. the steel-plastic grating laying mode of each section is carried out according to the step E and the step F;
H. after the steel-plastic grating is hung, checking the quality of the hanging net, and if the steel-plastic grating is damaged in the hanging net process, performing local hanging supplement;
further, the width of the steel-plastic grating mesh belt in the steps A-H is 10mm-20mm, and the size of the steel-plastic grating mesh is 10cm multiplied by 10 cm-15 cm multiplied by 15 cm.
Furthermore, in the step H, the repair hanging length is 30-50cm longer from the damaged part to two sides, and the repair hanging width is 30-50cm longer from the damaged part to two sides.
Compared with the existing net hanging technology, the invention has the advantages of strong operability, simple net hanging process, high net hanging speed, high net hanging quality and low labor intensity of technical personnel. Because the steel-plastic grating is cut on the ground, the working surface of the steel-plastic grating is large, the construction is convenient, and meanwhile, the working surface of an underground roadway is indirectly enlarged; compared with the traditional metal net, the steel-plastic grating has light weight, so that the single-sheet net hanging area is large, and the net hanging efficiency is high. The steel-plastic grating has certain flexibility, can be coordinately deformed with surrounding rocks of a roadway, and has good supporting effect.
The invention will be further explained with reference to the drawings.
Drawings
FIG. 1 is a schematic diagram of the sequence of hanging nets on the section of a roadway
FIG. 2 is a schematic view of the center line of a steel-plastic grille
FIG. 3 is a schematic view of a steel-plastic grille partially hung
In the figure: 1. vault, arch waist, side wall, bottom foot, 5 steel-plastic grating, 6 center line, width of steel-plastic grating and length of single steel-plastic grating; the damaged part of the steel-plastic grating; repairing and hanging the length of the damaged steel-plastic grating; and repairing and hanging the width of the damaged steel-plastic grating.
Detailed Description
The invention relates to a construction method of a shotcrete net hanging net for roadway surrounding rock support, which comprises the following steps:
A. before the construction of the steel-plastic grating hanging net 5, the flatness of the surrounding rock surface is determined, and loose broken stones on the surface of the surrounding rock are cleaned;
B. determining the width of the steel-plastic grating 5 according to the side length of the excavation section of the roadway, and marking the central line position 6 of the steel-plastic grating 5, as shown in fig. 2;
C. the number of required sections of the steel-plastic grating 5 is calculated according to the formula (a),
N= L/L0(a)
in the formula:Nthe number of the sections of the steel-plastic grating 5; l is the depth length of the roadway support; l is0The length of the single steel-plastic grating 5;
D. drilling holes by using an anchor rod drilling machine, wherein the arrangement distance of anchor holes is 80cm multiplied by 80cm, the position is accurate, the difference between the deviation and the design requirement is less than 50mm, the anchor holes are ensured to be vertical to the contour line of the roadway, the direction error of the anchor holes is less than 5 degrees, the depth of the anchor holes is consistent with the length of anchor rods, and after the drilling is finished, sundries such as residues, accumulated water and the like in the holes are cleaned;
E. conveying the steel-plastic grating 5 to the section of the roadway to be supported, wherein in one section, the steel-plastic grating 5 is symmetrically laid in sequence according to the arch crown 1 → arch waist 2 → side wall 3 → footing 4, and the length of the lap joint of the steel-plastic grating 5 is 15-20 cm, as shown in figure 1;
F. installing an anchor rod, firstly cleaning rock residues and accumulated water in the anchor hole by using an air blower, when cleaning, standing an operator at one side of an orifice, strictly prohibiting a constructor from standing at the same position with the direction of the orifice, fixing a resin anchoring agent at the bottom of the anchor hole by using a drill rod, ensuring that the anchor rod is pushed to the resin anchoring agent, sleeving a steel wire mesh, an anchor disc, a screw cap and a special sleeve on the other end of the anchor rod, then driving the anchor rod by using a drilling machine, driving the anchor rod to rotate by using the drilling machine, uniformly stirring the anchoring agent for about 20 seconds, closing the drilling machine, applying pressure to the anchor rod by using the drilling machine, screwing the screw cap after 2min, controlling the torque at 150 N.m, and finally unloading the drilling machine;
G. the steel-plastic grating 5 of each section is laid according to the step E and the step F;
H. after the steel-plastic grating 5 is hung, the quality of the hung net is checked, if the steel-plastic grating is damaged in the net hanging process, partial hanging is carried out, and the hanging size of the steel-plastic grating 5 is shown in figure 3.
The construction method of the shotcrete net hanging net for supporting the surrounding rock of the roadway is described in detail, the principle and the implementation mode of the invention are explained by applying specific examples, and the description of the examples is only used for helping to understand the method and the core idea of the invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, there may be variations in the specific embodiments and the application scope, and in summary, the content of the present specification should not be construed as a limitation to the present invention.

Claims (3)

1. The invention relates to a construction method of a shotcrete net hanging net for roadway surrounding rock support, which comprises the following steps:
A. before the steel-plastic grating (5) is subjected to net hanging construction, the smoothness of the surrounding rock surface is determined, and loose broken stones on the surface of the surrounding rock are cleaned;
B. determining the width of the steel-plastic grating (1) according to the side length of the excavation section of the roadway, and marking the central line position (6) of the steel-plastic grating (5), as shown in figure 2;
C. calculating the number of sections of the required steel-plastic grating (5) according to the formula (a),
N= L/L0(a)
in the formula: n is the number of sections of the steel-plastic grating; l is the depth length of the roadway support; l0 is the length of the single sheet steel-plastic grid;
D. drilling holes by using an anchor rod drilling machine, wherein the arrangement distance of anchor holes is 80cm multiplied by 80cm, the position is accurate, the difference between the deviation and the design requirement is less than 50mm, the anchor holes are ensured to be vertical to the contour line of the roadway, the direction error of the anchor holes is less than 5 degrees, the depth of the anchor holes is consistent with the length of anchor rods, and after the drilling is finished, sundries such as residues, accumulated water and the like in the holes are cleaned;
E. the method comprises the following steps of conveying the steel-plastic grating (5) to a roadway section needing to be supported, wherein in one section, the steel-plastic grating (5) is symmetrically laid in sequence according to arch crown (1) → arch waist (2) → side wall (3) → footing (4), and the length of the overlapping part of the steel-plastic grating (5) is 15-20 cm, as shown in fig. 1;
F. installing an anchor rod, firstly cleaning rock residues and accumulated water in the anchor hole by using an air blower, when cleaning, standing an operator at one side of an orifice, strictly prohibiting a constructor from standing at the same position with the direction of the orifice, fixing a resin anchoring agent at the bottom of the anchor hole by using a drill rod, ensuring that the anchor rod is pushed to the resin anchoring agent, sleeving a steel wire mesh, an anchor disc, a screw cap and a special sleeve on the other end of the anchor rod, then driving the anchor rod by using a drilling machine, driving the anchor rod to rotate by using the drilling machine, uniformly stirring the anchoring agent for about 20 seconds, closing the drilling machine, applying pressure to the anchor rod by using the drilling machine, screwing the screw cap after 2min, controlling the torque at 150 N.m, and finally unloading the drilling machine;
G. the steel-plastic grating (5) of each section is laid according to the step E and the step F;
H. after the steel-plastic grating (5) is hung, the quality of the hanging net is checked, if the steel-plastic grating is damaged in the net hanging process, partial hanging supplement is carried out, and the hanging supplement size of the steel-plastic grating (5) is shown in figure 3.
2. The shotcrete net hanging construction method for roadway surrounding rock support according to claim 1, wherein the width of the steel-plastic grating (5) in the steps A-H is 10mm-20mm, and the mesh size of the steel-plastic grating (5) is 10cm x 10 cm-15 cm x 15 cm.
3. The shotcrete net hanging net construction method for roadway surrounding rock support according to claim 1, wherein in the step H, local hanging repair is carried out, the steel-plastic grating (5) hanging repair length is 30-50cm longer from a damaged position to two sides, and the steel-plastic grating (5) hanging repair width is 30-50cm longer from the damaged position to two sides.
CN201911143949.6A 2019-11-20 2019-11-20 Jet-anchored net hanging construction method for roadway surrounding rock support Withdrawn CN110685721A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911143949.6A CN110685721A (en) 2019-11-20 2019-11-20 Jet-anchored net hanging construction method for roadway surrounding rock support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911143949.6A CN110685721A (en) 2019-11-20 2019-11-20 Jet-anchored net hanging construction method for roadway surrounding rock support

Publications (1)

Publication Number Publication Date
CN110685721A true CN110685721A (en) 2020-01-14

Family

ID=69117122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911143949.6A Withdrawn CN110685721A (en) 2019-11-20 2019-11-20 Jet-anchored net hanging construction method for roadway surrounding rock support

Country Status (1)

Country Link
CN (1) CN110685721A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215562A (en) * 2021-12-10 2022-03-22 黄健松 Supporting device for spraying slurry on geogrid

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635378A (en) * 2012-04-20 2012-08-15 中钢集团马鞍山矿山研究院有限公司 New process for high-strength resin anchor construction
CN102996148A (en) * 2012-11-22 2013-03-27 中交第二公路勘察设计研究院有限公司 High-ground stress soft rock highway tunnel supporting method
CN104453936A (en) * 2014-12-09 2015-03-25 山东科技大学 Roadway surrounding rock geogrid construction method
CN204324796U (en) * 2014-10-28 2015-05-13 山东科技大学 A kind ofly mould grid linked network supporting construction for the steel in bolting with wire mesh engineering

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635378A (en) * 2012-04-20 2012-08-15 中钢集团马鞍山矿山研究院有限公司 New process for high-strength resin anchor construction
CN102996148A (en) * 2012-11-22 2013-03-27 中交第二公路勘察设计研究院有限公司 High-ground stress soft rock highway tunnel supporting method
CN204324796U (en) * 2014-10-28 2015-05-13 山东科技大学 A kind ofly mould grid linked network supporting construction for the steel in bolting with wire mesh engineering
CN104453936A (en) * 2014-12-09 2015-03-25 山东科技大学 Roadway surrounding rock geogrid construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215562A (en) * 2021-12-10 2022-03-22 黄健松 Supporting device for spraying slurry on geogrid
CN114215562B (en) * 2021-12-10 2024-01-30 珠海建航建筑劳务有限公司 Support device for spraying soil engineering grid

Similar Documents

Publication Publication Date Title
CN109595004B (en) Tunnel two-expansion four-expansion excavation method
CN110593909A (en) Tunnel secondary lining dismounting and replacing construction method
CN111997624A (en) Shallow-buried large-section underground excavation rectangular tunnel construction method
CN107829569A (en) Masonry panel fracture unit method
CN109488347B (en) Excavation construction method for special stratum chamber
CN114382509A (en) Section tunnel collapse construction method and support device
Xue et al. Deformation failure mechanism and application of the backfill along the goaf-side retained roadway
Broch et al. The inner lining system in Norwegian traffic tunnels
CN110685721A (en) Jet-anchored net hanging construction method for roadway surrounding rock support
CN113074003B (en) Small clear distance tunnel deformation inhibition method for argillaceous sandstone stratum
CN107514266A (en) Shield export & import bolt anchorage soil body construction method
CN110685722A (en) Tunnel lining steel belt reinforcing structure and construction method
CN112412467B (en) Construction method of ventilation vertical shaft (200-600 m) with extra-long highway tunnel by' well reversing method
CN113847050A (en) Construction method of extra-long highway tunnel in lava mountain area
CN103046765B (en) Construction process for continued application of air-raid shelter
CN110616716B (en) Foundation pit net hanging anchoring guniting construction process and construction identification plate
CN109024670B (en) Underground comprehensive pipe gallery protection and reinforcement system penetrating through buried high-voltage cable and reinforcement method
CN116446915A (en) Shallow tunnel portal supporting structure and construction method
CN106320189A (en) Transverse reinforcing construction method of existing railway line T beam
CN113738422B (en) Determination method of soft rock roadway floor heave amount calculation, control and control method
CN112228076B (en) Fast excavation construction method for hard rock large-span tunnel
KR100795849B1 (en) Nature stone engineering method use self drilling nail
CN114483054A (en) Non-explosive excavation construction method for pilot tunnel in upper soft and lower hard stratum
CN105756078A (en) External expansion and lamination type digging and base-enlarging foundation and construction method thereof
CN114622577B (en) Super-high cutting cliff wall construction and relief restoration treatment construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination