CN110666014A CN201910933829.XA CN201910933829A CN110666014A CN 110666014 A CN110666014 A CN 110666014A CN 201910933829 A CN201910933829 A CN 201910933829A CN 110666014 A CN110666014 A CN 110666014A
Authority
CN
China
Prior art keywords
pipe
blank
laying
spinning
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910933829.XA
Other languages
Chinese (zh)
Inventor
何东明
刘满仓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shagang Group Co Ltd
Zhangjiagang Hongchang Steel Plate Co Ltd
Original Assignee
Jiangsu Shagang Group Co Ltd
Zhangjiagang Hongchang Steel Plate Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shagang Group Co Ltd, Zhangjiagang Hongchang Steel Plate Co Ltd filed Critical Jiangsu Shagang Group Co Ltd
Priority to CN201910933829.XA priority Critical patent/CN110666014A/en
Publication of CN110666014A publication Critical patent/CN110666014A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D11/00Bending not restricted to forms of material mentioned in only one of groups B21D5/00, B21D7/00, B21D9/00; Bending not provided for in groups B21D5/00 - B21D9/00; Twisting
    • B21D11/06Bending into helical or spiral form; Forming a succession of return bends, e.g. serpentine form
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D11/00Bending not restricted to forms of material mentioned in only one of groups B21D5/00, B21D7/00, B21D9/00; Bending not provided for in groups B21D5/00 - B21D9/00; Twisting
    • B21D11/22Auxiliary equipment, e.g. positioning devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/16Heating or cooling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

The invention discloses a laying pipe bending process, which comprises the following steps: a. heating and insulating the spinning pipe blank; b. heating the blank of the spinning pipe at 950 +/-30 ℃, and adjusting the heating time according to the blank heating requirement: when the initial rolling temperature of the steel grade in the furnace is less than 1000 ℃, the heating time is 8min +/-1 min; when the initial rolling temperature of the steel grade in the furnace is more than 1000 ℃, the heating time is 7min +/-1 min; c. bending the spinning pipe blank by using a pipe bending machine; d. and naturally cooling the bent spinning pipe blank. The laying pipe bending process disclosed by the invention has the advantages of simple steps, easiness in implementation, no need of cooling equipment such as water cooling or air cooling and the like, improvement on laying pipe bending efficiency, convenience in workshop production, convenience in ensuring the consistency of finished laying pipes bent by workshop workers and production quality.

Description

Laying pipe bending process
Technical Field
The invention relates to the technical field of a laying pipe bending process, in particular to a laying pipe bending process.
Background
A laying pipe is a very important device in a high-speed wire rod production line, and is a consumable product in a high-speed wire rod production line because it becomes a wire rod after passing through a rotating laying pipe from a furnace in the high-speed wire rod production line, and can be regarded as a die, and the laying pipe needs to be replaced at regular time when the high-speed wire rod production reaches a certain amount. In the actual production process, workshop workers need to bend the laying pipe frequently to ensure production. Workshop workers usually do not have a fixed bending process in the bending process, so that the finished product quality of the laying pipe is easily uneven, the bending process of the existing laying pipe bending process is complex, large cooling equipment is required, and the high-frequency practical requirement of the laying pipe in the workshop is not met; the spinning pipe blank has various pipes with different specifications and different pipe rolling temperatures.
Disclosure of Invention
The invention provides a laying pipe bending process for solving the problems, and the specific technical scheme is as follows:
a laying pipe bending process comprises the following steps:
a. heating and insulating the spinning pipe blank;
b. heating the blank of the spinning pipe at 950 +/-30 ℃, and adjusting the heating time according to the specification requirement of the blank:
when the initial rolling temperature of the steel grade in the furnace is less than 1000 ℃, the heating time is 8min +/-1 min,
when the initial rolling temperature of the steel grade in the furnace is more than 1000 ℃, the heating time is 7min +/-1 min;
c. bending the spinning pipe blank by using a pipe bending machine;
d. and naturally cooling the bent spinning pipe blank.
As a modification of the scheme, the weight of the spinning pipe blank in the step a is 27 plus or minus 0.1kg, and the mass of the final spinning pipe in the step d is 27 plus or minus 0.1 kg.
In the step c, when the laying pipe is bent, the distance between the clamping blocks on the pipe bending machine is 70mm +/-2 mm.
In the step a, the heat preservation temperature of the spinning pipe blank is 500 ℃, and the heat preservation time is not less than 5 hours.
As a modification of this embodiment, in step c, the bending of the laying pipe blank is completed within 5 min.
Compared with the prior art, the technical scheme adopted by the invention has the technical effects that:
1. the laying pipe bending process disclosed by the invention has the advantages of simple steps, easiness in implementation, no need of cooling equipment such as water cooling or air cooling and the like, improvement on laying pipe bending efficiency, convenience in workshop production, convenience in ensuring the consistency of finished laying pipes bent by workshop workers and production quality.
2. According to the bending process of the laying pipe, disclosed by the invention, different heat preservation times are adopted for pipes with different specifications according to different blanks, so that the pipes with different specifications can achieve a better use effect.
Detailed Description
The following describes embodiments of the present invention in detail.
Example 1
A laying pipe bending process comprises the following steps:
a. heating and insulating the spinning pipe blank, wherein the weight of a single spinning pipe blank is 27 +/-0.1 kg, the starting rolling temperature of the steel used by the spinning pipe blank is 900-;
b. heating the blank of the spinning pipe at 950 ℃ for 8.5 min;
c. bending the spinning pipe blank by using a pipe bending machine; when the laying pipe is bent, the distance between the fixture blocks on the pipe bender is 70mm, and the bending process is finished within 5 min;
d. and naturally cooling the bent spinning pipe blank to finally obtain the spinning pipe with the mass of 27 +/-0.1 kg.
Example 2
A laying pipe bending process comprises the following steps:
a. heating and insulating the spinning pipe blank, wherein the weight of a single spinning pipe blank is 27 +/-0.1 kg, the starting rolling temperature of the steel used by the spinning pipe blank is 1000-;
b. heating the spinning pipe blank at 950 +/-30 ℃ for 7 min;
c. bending the spinning pipe blank by using a pipe bending machine; when the laying pipe is bent, the distance between the fixture blocks on the pipe bender is 70mm, and the bending process is finished within 5 min;
d. and naturally cooling the bent spinning pipe blank to finally obtain the spinning pipe with the mass of 27 +/-0.1 kg.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are included in the scope of the present invention.

Claims (5)

1. A laying pipe bending process is characterized by comprising the following steps:
a. heating and insulating the spinning pipe blank;
b. heating the blank of the spinning pipe at 950 +/-30 ℃, and adjusting the heating time according to the blank heating requirement:
when the initial rolling temperature of the steel grade in the furnace is less than 1000 ℃, the heating time is 8min +/-1 min,
when the initial rolling temperature of the steel grade in the furnace is more than 1000 ℃, the heating time is 7min +/-1 min;
c. bending the spinning pipe blank by using a pipe bending machine;
d. and naturally cooling the bent spinning pipe blank.
2. The laying pipe bending process according to claim 1, wherein the laying pipe billet weight in a is 27 ± 0.1kg, and the final laying pipe mass in step d is 27 ± 0.1 kg.
3. The laying pipe bending process according to claim 2, wherein in said step c, the spacing between the blocks of the pipe bender is 70mm ± 2mm during bending of the laying pipe.
4. The laying pipe bending process according to claim 3, wherein in step a, the laying pipe blank is kept at a temperature of 500 ℃ for not less than 5 hours.
5. The laying pipe bending process according to claim 4, wherein in said step c, laying pipe billet bending is completed within 5 minutes.
CN201910933829.XA 2019-09-29 2019-09-29 Laying pipe bending process Pending CN110666014A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910933829.XA CN110666014A (en) 2019-09-29 2019-09-29 Laying pipe bending process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910933829.XA CN110666014A (en) 2019-09-29 2019-09-29 Laying pipe bending process

Publications (1)

Publication Number Publication Date
CN110666014A true CN110666014A (en) 2020-01-10

Family

ID=69080159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910933829.XA Pending CN110666014A (en) 2019-09-29 2019-09-29 Laying pipe bending process

Country Status (1)

Country Link
CN (1) CN110666014A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101157974A (en) * 2007-10-18 2008-04-09 武汉钢铁(集团)公司 Spinning tube bending nitrogen cooling process
CN106311831A (en) * 2015-07-10 2017-01-11 北京京诚瑞信长材工程技术有限公司 Pipe bender
CN110064674A (en) * 2019-04-20 2019-07-30 北京杜根鸿运科技发展有限公司 A kind of compound spinneret and its manufacturing method
CN110205469A (en) * 2019-06-27 2019-09-06 山东莱钢永锋钢铁有限公司 A kind of spinneret manufacture craft

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101157974A (en) * 2007-10-18 2008-04-09 武汉钢铁(集团)公司 Spinning tube bending nitrogen cooling process
CN106311831A (en) * 2015-07-10 2017-01-11 北京京诚瑞信长材工程技术有限公司 Pipe bender
CN110064674A (en) * 2019-04-20 2019-07-30 北京杜根鸿运科技发展有限公司 A kind of compound spinneret and its manufacturing method
CN110205469A (en) * 2019-06-27 2019-09-06 山东莱钢永锋钢铁有限公司 A kind of spinneret manufacture craft

Similar Documents

Publication Publication Date Title
CN104551561A (en) Nut processing technology
CN104439984A (en) Machining process of aviation screw
CN102434725B (en) A kind of manufacture method of large-caliber stainless steel seamless pipe
CN102174671A (en) Thermal treatment production line of high-strength stirrup
CN109175283B (en) Heat pipe material pipe processing technology
CN101439350A (en) Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle
CN108097792B (en) A kind of processing technology of Automobile Chassis Parts
CN102240698A (en) Reducing and hot-pressing formation method for high-pressure bend elliptical pipe billet
CN103286481A (en) Manufacturing method of novel solid welding wires
CN104174807B (en) The manufacture method of a kind of heavy caliber titanium thick-wall tube
CN104148437A (en) Production method of double-metal composite pipe
CN110666014A (en) Laying pipe bending process
CN105252234A (en) Process for machining gear ring
CN204353199U (en) Bright aluminum alloy welding wire roll milling apparatus
CN105171344B (en) A kind of preparation method of square steel tube
CN107497979A (en) Low stress stainless steel ring manufacture method
CN106807784A (en) A kind of drawing process for producing prestressing force twisted wire
CN109127974A (en) A kind of forging method of helmet magnesium lithium-base alloy guide rail
CN104972029A (en) Forging method of wire clamp body for high voltage iron tower
CN104438885A (en) High-precision bending die manufacturing method
CN105478521B (en) The process that hafnium filament is drawn
CN105839036B (en) A kind of heat treatment method of almag
CN103667936A (en) Nut preparation method
CN101972775A (en) Method for overcoming difficulty in rolling free cutting steel
CN103773926A (en) Heat treatment process for special-shaped forging

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200110