CN101439350A - Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle - Google Patents

Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle Download PDF

Info

Publication number
CN101439350A
CN101439350A CNA2008103063897A CN200810306389A CN101439350A CN 101439350 A CN101439350 A CN 101439350A CN A2008103063897 A CNA2008103063897 A CN A2008103063897A CN 200810306389 A CN200810306389 A CN 200810306389A CN 101439350 A CN101439350 A CN 101439350A
Authority
CN
China
Prior art keywords
pipe
heating
steel pipe
seamless steel
gas cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008103063897A
Other languages
Chinese (zh)
Other versions
CN101439350B (en
Inventor
尹人洁
成海涛
晏如
边华川
张涛
李旭
马欢鱼
王婀娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Chengdu Iron & Steel Co Ltd
Panzhihua Iron and Steel Group Corp
Original Assignee
Pangang Group Chengdu Iron & Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Chengdu Iron & Steel Co Ltd filed Critical Pangang Group Chengdu Iron & Steel Co Ltd
Priority to CN 200810306389 priority Critical patent/CN101439350B/en
Publication of CN101439350A publication Critical patent/CN101439350A/en
Application granted granted Critical
Publication of CN101439350B publication Critical patent/CN101439350B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Steel (AREA)

Abstract

The invention relates to a method for manufacturing a seamless steel pipe of a large-aperture high pressure cylinder for producing a trailer and belongs to the field of manufacturing a seamless steel pipe. The invention mainly solves the technical problem of satisfying the physical dimension precision and the quality requirements on internal and external surfaces of the seamless steel pipe of the large-aperture high pressure cylinder for the trailer at low cost. The invention adopts the technical proposal that after being perforated, a heavy-section round wave steel ingot is formed by being rolled by a step rolled mill and then drawn by a drawing aperture enlarging machine set; the tolerance of the wall thickness of a pipe blank rolled by the step rolled mill is S-8<10> percent and the extreme deviation is less than or equal to 2.5 mm; when the drawing pipe expander set is expanded and manufactured, the aperture enlargement ratio is controlled to be less than 25 percent when the pipe blank is heated each time; the aperture enlargement and the wall reduction are conducted for at most 4 times; the aperture enlargement magnitude of each time is not larger than 45 mm; and the expanding and manufacturing temperature is larger than 780 DEG C at the last expanding and manufacturing.

Description

A kind of manufacture method of producing the seamless steel pipe of gas cylinder with heavy caliber for hauled vehicle
Technical field
The present invention relates to a kind of manufacture method of producing the seamless steel pipe of gas cylinder with heavy caliber for hauled vehicle, belong to seamless steel pipe and make the field.
Background technology
In recent years, the manufacturing of gas cylinder adopts thin-wall seamless steel pipe to make from adopting steel billet to make to turn to through the punching drawing, and becomes world development trends.Vehicle CNG trailer bottle and gas station roll up with the gas cylinder demand, and the demand to the major diameter gas cylinder tube on the market also increases thereupon.Gas cylinder with seamless steel pipe except the mechanical properties such as intensity that require steel pipe meet the demands, also require in light weight, reduce unnecessary burden, therefore higher to geometric accuracy such as the diameter of gas cylinder tube, wall thickness and surfaces externally and internally quality requirement, the producer that can produce gas cylinder tube at present seldom, cost is higher.The steel pipe of domestic this description is all from the import of Italian Da Er exposed penstock factory.Italy Da Er exposed penstock factory, blank adopts continuous casting garden base, for pipe, adopts advanced plug expander production technology to produce this kind by MPM retained mandrel tandem rolling tube machine again.This advanced process equipment is the best approach of modern production major diameter, middle thin-wall seamless steel pipe.But equipment investment is huge, and cost is too high.
Reporting that Jiangsu Chengde Steelpipe Co., Ltd has developed is used to make gas cylinder hot rolling seamless large-diameter pipes, steel pipe trade mark 4130X, outer diameter of steel pipes (D) ∮ 559mm, permissible variation ± 1.0%; Thickness of steel pipe (S) 17.0mm, permissible variation 0~+ 25%.Jiangsu Chengde Steelpipe Co., Ltd's blank adopts continuous cast round billets to produce this kind gas cylinder steel pipe through the production technology of secondary punch.The gas cylinder steel pipe that this production technology is produced, poor, the inside and outside surface quality of dimensional accuracy of products is poor, and product quality can not meet the demands, and need reach by the reconditioning of surfaces externally and internally machinery.And yield poorly, the production cost height.
Gas cylinder with heavy caliber for hauled vehicle by in the major diameter, the thick seamless steel pipe of thin-walled is prepared from.Employed seamless steel pipe diameter is bigger, and length is also longer, also requires wall thinner sometimes, and requiring has higher performance, so more be difficult to produce.In the high-quality heavy caliber, the thick seamless steel pipe of thin-walled requires outer diameter of steel pipes ∮ 426~559mm, and is even bigger; (2) thickness of steel pipe 10~20mm; (3) steel pipe length reaches 11.0m; (4) steel pipe will be by the ultrasonic examination of C5 equivalent among standard GB/T5777; (5) obdurability of steel pipe is good, has higher impact property-40 ℃ impact value 〉=40J especially at low temperatures; (6) yield tensile ratio≤0.85; (7) wall thickness tolerance S ± 12.5% of steel pipe, and require the steel pipe horizontal stroke, vertically wall thickness is even, thickness of steel pipe precision height.It is low that production cost need be developed at present in this area, the preparation method of the thick seamless steel pipe of thin-walled in the major diameter of product geometric accuracy height, satisfactory preparation gas cylinder with heavy caliber for hauled vehicle that the surfaces externally and internally quality is high.
Summary of the invention
It is low that the technical problem to be solved in the present invention provides a kind of new production cost, in the high satisfactory preparation gas cylinder with heavy caliber for hauled vehicle of product geometric accuracy, surfaces externally and internally quality, the preparation method of the thick seamless steel pipe of thin-walled.
The scheme of this method is with the steel ingot perforation of big section circle wave after 20 inches Pilger mill millings expand system through 100 tons of drawing formula expanding machines again and form.Wherein, the wall thickness tolerance of the pipe of 20 inches Pilger mill millings
Figure A200810306389D00051
Extreme difference≤2.5mm.
When 100 tons of drawing formula pipe expanding set expand system in the inventive method, adopt the mode of texturing of small deformation amount multi-pass, total enlarging rate≤35% is guaranteed the dimensional accuracy of fished pipe; The mode of texturing of described small deformation amount multi-pass is meant the every heating of pipe once: enlarging rate is controlled at below 25%, is not more than 4 hole enlargements and subtracts wall, and each hole enlargement amount is not more than 45mm, and simultaneously last 1 expansion system temperature must be greater than 780 ℃.
Further, this method may further comprise the steps:
A, preparation steel ingot are as blank;
B, the heating of big section circle wave steel ingot: big section circle wave steel ingot is when annular furnace heats, the spacing that steel ingot is arranged in stove is 500~700mm, burner hearth keeps little reducing atmosphere, male and female face, not saturating, the overheated or burn-off phenomenon of heating must not appear in heating, 8~11 hours heat time heating times, 1240~1270 ℃ of the steel temperature of coming out of the stove;
The online heat centering of c: the steel ingot through the annular furnace heating adopts the centering of online machinery heat, its internal point centre deviation requirement≤5mm.
The round wave steel ingot of big section after the d heating adopts Mannesmann piercing machine perforation preparation hollow billet: the hollow billet after requiring to bore a hole is visual straight, and total length external diameter size is consistent;
E sends hollow billet into Rolling Production pipe on 20 inches Pilger milling trains.Wherein the tube blank size precision is a wall thickness tolerance
Figure A200810306389D0005100003QIETU
, extreme difference≤2.5mm.
F goes to 100 tons of drawing formula pipe expanding set with the pipe of producing on 20 inches Pilger milling trains, adopts 100 tons of drawing formula pipe expanding set, with the mode of texturing expansion system of small deformation amount multi-pass, total enlarging rate≤35%, guarantees the dimensional accuracy of fished pipe; The mode of texturing of described small deformation amount multi-pass is meant the every heating of pipe once, and enlarging rate is controlled at below 25%, is not more than 4 hole enlargements and subtracts wall, and each hole enlargement amount is not more than 45mm, and the last system temperature that expands must be made the final finished pipe greater than 780 ℃ of expansions.
Wherein, pipe heats at every turn and carries out in walking-beam furnace, and burner hearth keeps reducing atmosphere, evenly heats 1000~1080 ℃ of heating-up temperatures 40~80 minutes.
Produce the seamless large-diameter pipes outer diameter of steel pipes ∮ 426~559mm of gas cylinder with heavy caliber for hauled vehicle described in the above-mentioned manufacture method,, wall thickness 10~20mm, the wall thickness tolerance S ± 12.5mm of steel pipe.
Specifically, to produce the manufacture method of the seamless steel pipe steel pipe of heavy caliber trailer gas cylinder be to be finished by following steps in the present invention:
(1) blank: adopt the big section circle wave steel ingot steel ingot of smelting through the concise stove of LF+VD application of vacuum as blank, preferred adopt press Chinese patent 200620036533.6 " tube rolling ingot mould " in disclosed technology is cast in disclosed mould and the Chinese patent application 200610022411.6 " casting method of killed steel " the round wave steel ingot of satisfactory big section.
(2) big section circle wave steel ingot heating: big section circle wave steel ingot is when annular furnace heats, the spacing that steel ingot is arranged in stove is 500~700mm, burner hearth keeps little reducing atmosphere, male and female face, not saturating, the overheated or burn-off phenomenon of heating must not appear in heating, 8~11 hours heat time heating times, 1240~1270 ℃ of the steel temperature of coming out of the stove;
(3) online heat centering: the steel ingot through the annular furnace heating adopts the centering of online machinery heat, its internal point centre deviation requirement≤5mm.
(4) Mannesmann piercing machine perforation: according to different production specifications, select corresponding perforating head size, capillary outer diameter control≤640mm, the back hollow billet length≤4m that guarantees to bore a hole, the hollow billet after requiring to bore a hole is visual straight, and total length external diameter size is consistent.
(5) 20 inches Pilger milling trains: the distortion of this steel pipe is mainly finished on 20 inches Pilger milling trains (claiming rotary forging mill again).Select rolling groove size and plug size according to rolling specs, plug length is exposed 400mm after should guaranteeing to penetrate hollow billet.Select suitable feed quantity by factors such as rolling wall thickness, rolling temperature and rolling kinds, guarantee that wall thickness is even, no convex closure in surface and outer folding.The pipe wall thickness tolerance
Figure A200810306389D00061
Extreme difference is controlled at≤2.5mm.The pipe geometric accuracy that this unit provides directly has influence on the geometric accuracy of fished pipe.
(6) 100 tons of pipes that drawing formula pipe expanding set provides 20 inches Pilger milling trains, after the hydraulic pressure pipe-expanding machine expanded into horn mouth with pipe end, in the whole heating of step heating-furnace, the pipe after the heating (having had horn mouth) was delivered to and is expanded system on 100 tons of drawing formula pipe expanders.
Wherein, the selection of tube blank size: because the main feature of drawing formula pipe expander flow of metal is that the pipe diameter increases, wall thickness reduction, and tube wall is when changing, according to the mobile law of minimum resistance of plastic deformation, the trend that the tube wall radial thickness changes is " thin point is thin more ", so according to the unit capacity for pipe, should provide large-sized pipe as far as possible, to reduce the enlarging rate of 100 tons of drawing formula pipe expanding set, the enlarging rate that is distributed in 100 tons of drawing formula pipe expanding set answers≤35%.
Enlarging rate computing formula: E=(D 2-D 1)/D 1* 100%
D in the formula 1, D 2Be respectively the external diameter of expander front and back.
During expander, pipe heats in walking-beam furnace, and burner hearth keeps little reducing atmosphere, and male and female face, overheated or burn-off phenomenon must not appear in heating, 40~80 minutes heat time heating times, 1000~1080 ℃ of heating-up temperatures;
The distribution principle of drawing formula pipe expanding set enlarging rate: the every heating of pipe once: enlarging rate is controlled at below 25%, is not more than 4 hole enlargements and subtracts wall, and each hole enlargement amount is not more than 45mm, last expand the system temperature must be greater than 780 ℃.Determine the heating number of times according to the tube blank size that is provided, production tube size and mentioned above principle.
(7) production tube is through vertical pressure straightener aligning → finishing → ultrasonic examination → packing warehouse-in.
It is rolling for pipe on 20 inches Pilger milling trains that beneficial effect of the present invention is to have developed the employing steel ingot, expand the production technology of system again through 100 tons of drawing formula pipe expanding set, by adopting the unique manufacturing process technology, produce the high-quality major diameter that meets the demands, the thick trailer of middle thin-walled gas cylinder seamless steel pipe.The inventive method technology is simple, cost is low, and output is big, is fit to big industrial production, for this area provides a kind of new selection.
The specific embodiment
1, require the steel pipe specification and the steel grade of preparation,
The steel pipe kind that embodiment of the invention requirement prepares, specific targets see Table 1.
Table 1
Figure A200810306389D00071
Annotate: grade of steel is to adopt 4130 in the ASTM A519 standard.
Nominal wall thickness: it is other with actual wall thickness phase region specifying and being used to design, this use, and actual wall thickness can be in the fluctuation up and down of nominal.
Minimum wall thickness (MINI W.): specify the minimum wall thickness (MINI W.) that is used to design, this use is other with actual wall thickness phase region, and actual wall thickness can fluctuate more than minimum wall thickness (MINI W.).
Usually the user can adopt a kind of form in nominal wall thickness or two kinds of forms of minimum wall thickness (MINI W.) to order goods.
2, production technology:
(1) the big section circle wave steel ingot of smelting through the concise stove of LF+VD application of vacuum; See Table 2.
Table 2
Numbering Circle wave steel ingot (diameter mm/ ton)
1 ∮580/4.0
2 ∮550/3.3
3 ∮500/2.5
2, use the inventive method to produce steel pipe
(1) big section circle wave steel ingot: through the raw material that the concise stove of LF+VD application of vacuum is smelted use Chinese patent 200620036533.6 " tube rolling ingot mould " in disclosed mould and the Chinese patent application 200610022411.6 " casting method of killed steel " disclosed technology casting meet the round wave steel ingot of big section that table 3 requires.
(2) steel ingot heating: big section circle wave steel ingot is when annular furnace heats, the spacing that steel ingot is arranged in stove is 500~700mm, burner hearth keeps little reducing atmosphere, male and female face, not saturating, the overheated or burn-off phenomenon of heating must not appear in heating, 8~11 hours heat time heating times, 1240~1270 ℃ of the steel temperature of coming out of the stove;
Concrete parameter sees Table 3.
(3) online heat centering: the steel ingot through the annular furnace heating adopts the centering of online machinery heat, its internal point centre deviation requirement≤5mm.
(4) Mannesmann piercing machine perforation:, select corresponding perforating head size, capillary outer diameter control≤640mm according to different production specifications, back hollow billet length≤4m guarantees to bore a hole, hollow billet after requiring to bore a hole is visual straight, and total length external diameter size is consistent, and concrete parameter sees Table 3.
(5) 20 inches Pilger milling trains: the distortion of this steel pipe is mainly finished on 20 inches Pilger milling trains (claiming rotary forging mill again).Select rolling groove size and plug size according to rolling specs, plug length is exposed 400mm after should guaranteeing to penetrate hollow billet.Select suitable feed quantity by factors such as rolling wall thickness, rolling temperature and rolling kinds, guarantee that wall thickness is even, no convex closure in surface and outer folding.The pipe wall thickness tolerance
Figure A200810306389D00081
Extreme difference is controlled at≤2.5mm.The pipe geometric accuracy that this unit provides directly has influence on the geometric accuracy of fished pipe, and rolling concrete parameter sees Table 3.
(6) 100 tons of drawing formula pipe expanding set are made the final finished pipe with the pipe expansion of 20 inches pilgrim rolling units production.
Expansion system, heating process parameter see Table 4.
Table 4 expands the system technological parameter
Numbering Pipe external diameter mm Pipe wall thickness mm Production tube external diameter mm Production tube wall thickness mm Heating-up temperature ℃ Heat time heating time (minute) Heating number of times (inferior) Rolling pass Total enlarging rate Hot external diameter mm
1 ∮476 23 ∮559 19.5 1050~1080 70~80 1 4 times 17.3% 564~566
2 ∮476 18.7 ∮559 14.1 1030~1060 60~70 1 4 times 16.8% 564~566
3 ∮426 15 ∮559 10.3 1000~1040 40~60 2 6 times 26.1% 564~566
(7) the production tube physical dimension sees Table 5.
The physical dimension of table 5 product
Figure A200810306389D00082
Figure A200810306389D00091
(8) the sample heat treatment performance sees Table 6.
The performance test results of table 6 sample
Figure A200810306389D00101
Above result shows: the inventive method adopts steel ingot by 20 inches pilgrim rolling unit tubulation bases, expands system through 100 tons of drawing formula pipe expanding set again.Can obtain product geometric accuracy height, surfaces externally and internally quality and the satisfactory major diameter trailer of mechanical property gas cylinder seamless steel pipe, the simple cost of method is low, and output is big, is fit to big industrial production.

Claims (4)

  1. [claim 1] is used to produce the manufacture method of gas cylinder with heavy caliber for hauled vehicle seamless steel pipe, it is characterized in that it is after 20 inches Pilger mill millings with the perforation of big section circle wave steel ingot, expand system through 100 tons of drawing formula hole enlargement units again and form, wherein the pipe wall thickness tolerance of 20 inches Pilger mill millings
    Figure A200810306389C0002112820QIETU
    , extreme difference≤2.5mm.
  2. [claim 2] manufacture method that is used to produce the gas cylinder with heavy caliber for hauled vehicle seamless steel pipe according to claim 1, it is characterized in that: when 100 tons of drawing formula pipe expanding set expand system, adopt the mode of texturing of small deformation amount multi-pass, total enlarging rate≤35% is guaranteed the dimensional accuracy of fished pipe; The mode of texturing of described small deformation amount multi-pass is meant the every heating of pipe once: enlarging rate is controlled at below 25%, is not more than 4 hole enlargements and subtracts wall, and each hole enlargement amount is not more than 45mm, and simultaneously last 1 expansion system temperature must be greater than 780 ℃.
  3. The production method of [claim 3] gas cylinder with heavy caliber for hauled vehicle seamless steel pipe according to claim 2 is characterized in that may further comprise the steps:
    A, the satisfactory big section circle wave steel ingot of preparation;
    B, the heating of big section circle wave steel ingot: big section circle wave steel ingot is when annular furnace heats, the spacing that steel ingot is arranged in stove is 500~700mm, burner hearth keeps little reducing atmosphere, male and female face, not saturating, the overheated or burn-off phenomenon of heating must not appear in heating, 8~11 hours heat time heating times, 1240~1270 ℃ of the steel temperature of coming out of the stove;
    The online heat centering of c: the steel ingot through the annular furnace heating adopts the centering of online machinery heat, its internal point centre deviation requirement≤5mm;
    The round wave steel ingot of big section after the d heating adopts Mannesmann piercing machine perforation preparation hollow billet: the hollow billet after requiring to bore a hole is visual straight, and total length external diameter size is consistent;
    E sends into hollow billet on 20 inches Pilger milling trains and produces pipe.Wherein the tube blank size precision is a wall thickness tolerance
    Figure A200810306389C0002112847QIETU
    , extreme difference≤2.5mm;
    F makes the final finished pipe with drawing formula pipe expanding set with the pipe expansion: after the hydraulic pressure pipe-expanding machine expands into horn mouth with the pipe pipe end, in the whole heating of step heating-furnace, pipe after the heating is delivered to and is expanded system on 100 tons of drawing formula pipe expanders, mode of texturing with small deformation amount multi-pass expands system, total enlarging rate≤35% is guaranteed the dimensional accuracy of fished pipe; The mode of texturing of described small deformation amount multi-pass is meant the every heating of pipe once: enlarging rate is controlled at below 25%, is not more than 4 hole enlargements and subtracts wall, and each hole enlargement amount is not more than 45mm, and last simultaneously expansion system temperature must be greater than 780 ℃; Wherein, pipe heats at every turn and carries out in walking-beam furnace, and burner hearth keeps reducing atmosphere, evenly heats 1000~1080 ℃ of heating-up temperatures 40~80 minutes.
  4. The manufacture method of [claim 4] production gas cylinder with heavy caliber for hauled vehicle according to claim 1 seamless steel pipe, it is characterized in that: described production gas cylinder with heavy caliber for hauled vehicle seamless steel pipe external diameter ∮ 426~559mm, wall thickness 10~20mm, wall thickness tolerance S ± 12.5% of steel pipe.
CN 200810306389 2008-12-19 2008-12-19 Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle Active CN101439350B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810306389 CN101439350B (en) 2008-12-19 2008-12-19 Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810306389 CN101439350B (en) 2008-12-19 2008-12-19 Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle

Publications (2)

Publication Number Publication Date
CN101439350A true CN101439350A (en) 2009-05-27
CN101439350B CN101439350B (en) 2013-11-06

Family

ID=40724033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810306389 Active CN101439350B (en) 2008-12-19 2008-12-19 Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle

Country Status (1)

Country Link
CN (1) CN101439350B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102069104A (en) * 2010-11-30 2011-05-25 攀钢集团钢铁钒钛股份有限公司 Method for producing seamless steel tube for big-caliber long tube air bottle in hot rolling mode
CN101631402B (en) * 2009-07-25 2011-08-10 衡阳鸿大特种钢管有限公司 Multi-section medium frequency heating method for pipe expanding set and device thereof
CN101786112B (en) * 2010-01-21 2012-02-01 四川安吉精密管业制造有限公司 Manufacturing method of gas cylinder steel tube for long-tube trailer
CN102873512A (en) * 2012-09-29 2013-01-16 攀钢集团成都钢钒有限公司 Manufacture method of large-caliber medium-and-thick-wall seamless steel tube for nuclear power plant
CN102974979A (en) * 2012-11-26 2013-03-20 衡阳华菱钢管有限公司 Method for shaping pipe die blanks using steel ingot large reducing ratio process
CN103978063A (en) * 2014-04-24 2014-08-13 张红霞 Dissimilar metal tubular product, preparation method and application thereof
CN104438336A (en) * 2014-12-06 2015-03-25 常熟市东鑫钢管有限公司 Rolling method for 35CrMo ultra-thick wall seamless steel pipe
CN105710147A (en) * 2016-02-05 2016-06-29 攀钢集团成都钢钒有限公司 Production method for drawing type expanded extra-large-caliber J55 casing pipes
CN105834217A (en) * 2016-03-25 2016-08-10 江苏武进不锈股份有限公司 Preparation process of large-diameter duplex stainless steel seamless steel tube and application to oceanographic engineering
CN105921524A (en) * 2016-05-11 2016-09-07 天津钢管集团股份有限公司 Controlled rolling method in seamless pipe hot rolling process
CN106339560A (en) * 2016-08-31 2017-01-18 凯迈(洛阳)气源有限公司 Method for designing wall thickness parameters of high pressure gas cylinder, and method for molding high pressure gas cylinder
CN110788141A (en) * 2019-10-24 2020-02-14 衡阳华菱钢管有限公司 Seamless steel tube, manufacturing method and high-pressure gas cylinder thereof
CN113909305A (en) * 2021-09-22 2022-01-11 江苏天淮钢管有限公司 Hot continuous rolling production method of 530 mm large-caliber seamless steel pipe

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101631402B (en) * 2009-07-25 2011-08-10 衡阳鸿大特种钢管有限公司 Multi-section medium frequency heating method for pipe expanding set and device thereof
CN101786112B (en) * 2010-01-21 2012-02-01 四川安吉精密管业制造有限公司 Manufacturing method of gas cylinder steel tube for long-tube trailer
CN102069104A (en) * 2010-11-30 2011-05-25 攀钢集团钢铁钒钛股份有限公司 Method for producing seamless steel tube for big-caliber long tube air bottle in hot rolling mode
CN102873512B (en) * 2012-09-29 2015-08-26 攀钢集团成都钢钒有限公司 The manufacture method of thick-walled seamless steel pipes in used in nuclear power station heavy caliber
CN102873512A (en) * 2012-09-29 2013-01-16 攀钢集团成都钢钒有限公司 Manufacture method of large-caliber medium-and-thick-wall seamless steel tube for nuclear power plant
CN102974979A (en) * 2012-11-26 2013-03-20 衡阳华菱钢管有限公司 Method for shaping pipe die blanks using steel ingot large reducing ratio process
CN102974979B (en) * 2012-11-26 2016-08-31 衡阳华菱钢管有限公司 A kind of method using steel ingot big diameter-reducing formation die blank
CN103978063B (en) * 2014-04-24 2016-03-09 佛山晓世科技服务有限公司 Dissimilar metal tubing and its preparation method and application
CN103978063A (en) * 2014-04-24 2014-08-13 张红霞 Dissimilar metal tubular product, preparation method and application thereof
CN104438336A (en) * 2014-12-06 2015-03-25 常熟市东鑫钢管有限公司 Rolling method for 35CrMo ultra-thick wall seamless steel pipe
CN105710147A (en) * 2016-02-05 2016-06-29 攀钢集团成都钢钒有限公司 Production method for drawing type expanded extra-large-caliber J55 casing pipes
CN105710147B (en) * 2016-02-05 2017-11-10 攀钢集团成都钢钒有限公司 Drawing type expands the production method of super-large diameter J55 sleeve pipes processed
CN105834217A (en) * 2016-03-25 2016-08-10 江苏武进不锈股份有限公司 Preparation process of large-diameter duplex stainless steel seamless steel tube and application to oceanographic engineering
CN105921524A (en) * 2016-05-11 2016-09-07 天津钢管集团股份有限公司 Controlled rolling method in seamless pipe hot rolling process
CN106339560A (en) * 2016-08-31 2017-01-18 凯迈(洛阳)气源有限公司 Method for designing wall thickness parameters of high pressure gas cylinder, and method for molding high pressure gas cylinder
CN106339560B (en) * 2016-08-31 2019-05-10 凯迈(洛阳)气源有限公司 A kind of high pressure gas cylinder wall thickness Parameters design and forming method
CN110788141A (en) * 2019-10-24 2020-02-14 衡阳华菱钢管有限公司 Seamless steel tube, manufacturing method and high-pressure gas cylinder thereof
CN110788141B (en) * 2019-10-24 2021-10-15 衡阳华菱钢管有限公司 Seamless steel tube, manufacturing method and high-pressure gas cylinder thereof
CN113909305A (en) * 2021-09-22 2022-01-11 江苏天淮钢管有限公司 Hot continuous rolling production method of 530 mm large-caliber seamless steel pipe

Also Published As

Publication number Publication date
CN101439350B (en) 2013-11-06

Similar Documents

Publication Publication Date Title
CN101439350B (en) Method for producing seamless steel pipe for producing gas cylinder with heavy caliber for hauled vehicle
CN101444793B (en) Method for fabricating seamless steel pipes for large-diameter high-pressure gas cylinders used in trailer production
RU2445181C2 (en) Method and device for production of hollow body from round billet
CN102873512B (en) The manufacture method of thick-walled seamless steel pipes in used in nuclear power station heavy caliber
CN102294379B (en) Method for manufacturing seamless steel pipe for high-pressure gas cylinder with large caliber
CN102039313B (en) Method for producing large-diameter seamless steel pipe for gas cylinder
CN101327492A (en) Process and system for manufacturing hot-rolled seamless tube
CN102303065B (en) Method for manufacturing seamless steel tube for vehicle-mounted large-diameter high pressure gas cylinder
CN1919530A (en) Manufacturing technique of heavy caliber alloy seamless steel pipe
CN106180195B (en) 508 millimeters of heavy caliber seamless steel pipe hot continuous rolling process
CN103736734A (en) Process of preparing high-chromium alloy supper 13-Cr seamless steel tubes through CPE (cross-roll piercing and elongation) hot rolling mill
CN102069104A (en) Method for producing seamless steel tube for big-caliber long tube air bottle in hot rolling mode
CN105234200A (en) On-line tube-expanding production process of large-diameter seamless steel tubes
CN105234179A (en) Technique for sizing thick-walled seamless steel tubes through two-roller skew rolling mill and technique for rolling thick-walled seamless steel tubes through two-roller skew rolling mill
CN103464507A (en) Production method for high-precision austenite seamless steel pipe
CN101444792B (en) Method for producing seamless steel pipes used for large-diameter high-pressure gas cylinders
CN102873126B (en) Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN101020192A (en) Hot rolling process of seamless steel pipe
CN108237197B (en) A kind of forging method improving the flaw detection of structural steel large-sized ring part
CN105290281B (en) The production method of the nickeliferous ring forging of large thick-wall
CN212944648U (en) Novel stretch reducing machine with polygonal hole pattern
CN114260314B (en) Manufacturing method of titanium alloy seamless tube blank with diameter-thickness ratio larger than 20
CN201534182U (en) Extrusion forming die of reducing trouser-shaped tee
CN201534198U (en) Bending forming die for reducing trouser-shaped tee
CN114178465B (en) Manufacturing method of ultra-large caliber thick-wall seamless steel pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant