CN110630819B - Dock oil hose stinger - Google Patents
Dock oil hose stinger Download PDFInfo
- Publication number
- CN110630819B CN110630819B CN201911026439.0A CN201911026439A CN110630819B CN 110630819 B CN110630819 B CN 110630819B CN 201911026439 A CN201911026439 A CN 201911026439A CN 110630819 B CN110630819 B CN 110630819B
- Authority
- CN
- China
- Prior art keywords
- bracket
- pulley block
- carrier roller
- roller
- slide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/01—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets for supporting or guiding the pipes, cables or protective tubing, between relatively movable points, e.g. movable channels
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/26—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting the pipes all along their length, e.g. pipe channels or ducts
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Ship Loading And Unloading (AREA)
Abstract
The invention discloses a wharf oil delivery hose pipe bracket which comprises an onshore base bracket, a bridge frame and an shipboard bracket, wherein the onshore base bracket comprises a first bracket, a first carrier roller, a first upright roller, a first slide rail and a first adjusting leg, the top side of the first bracket is transversely and uniformly provided with the first carrier roller which is horizontally arranged, the first bracket at the left side and the right side of the horizontal carrier roller is longitudinally and uniformly provided with the first upright roller, the first bracket below the first carrier roller is longitudinally provided with two parallel first slide rails, and four corners at the bottom side of the first bracket are respectively provided with the first adjusting leg. The invention has the characteristics of protecting the oil delivery hose from being damaged in the processes of distribution, recovery and operation, reducing the risk of oil spill, improving the working environment of the hose, prolonging the service life, avoiding the fatigue damage or leakage of the oil delivery hose due to abrasion to cause sea surface pollution, and simultaneously having safety, rapidness and reduced operation risk in the aspects of installation and disassembly.
Description
Technical Field
The invention relates to a stinger, in particular to a stinger for a dock oil hose.
Background
The current transportation volume of petroleum is at the head of the relative transportation volume of various goods in the world, along with the year-by-year increase of oil water transportation, the loading and unloading operation of oil products at a wharf is more and more frequent, the loading and unloading of oil at the wharf is realized by connecting a hose or an oil transportation arm with a ship for oil transportation, the oil transportation hose is generally a rubber hose and a composite hose, and the hose mainly bears the effects of gravity, internal oil pressure, stretching, torsion bending moment, dynamic bending and the like. According to a certain petrochemical scrapping statistics, 92 rubber hoses are damaged by the outer wall, accounting for 71%, and 5 rubber hoses among 9 scrapped composite hoses are damaged by the outer wall, accounting for 33%, wherein the main reason of the outer wall damage is aging or external force action. Such as: when the wharf is assembled and disassembled, the weakest place is the oil conveying hose, the oil conveying hose is easy to break under stress at a lifting point, wear and extrusion fracture due to friction generated by sliding on the ground, or the hose bends and droops at a gap between the wharf and a pulley and is easy to break due to extrusion of an oil tanker, the probability importance and the key importance of basic events causing oil spill accidents are analyzed, the phenomenon that the oil spill accidents can be quickly reduced by reducing the damage of pipelines due to external force is found, and measures are easy to take. Meanwhile, the national emphasis on safety and environmental protection requires the standardization of wharf operation, and the main risks of wharf oil loading and unloading operation include fire explosion, oil leakage and personnel operation safety. In order to protect the oil delivery hose in the oil loading and unloading process, the oil delivery hose protection bracket is designed to ensure the safe oil loading and unloading operation of the wharf and has a very wide application prospect.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention provides the stinger for the oil conveying hose of the wharf, which is used for protecting the oil conveying hose from being damaged in the processes of distribution, recovery and operation, reducing the risk of oil spillage, improving the working environment of the hose, prolonging the service life, saving the cost and ensuring the safety of the oil conveying hose during oil loading and unloading operation of the wharf.
The technical scheme adopted by the invention is as follows:
a wharf oil delivery hose stinger comprises an onshore base bracket, a bridge frame and an shipboard bracket, wherein the onshore base bracket comprises a first bracket, a first carrier roller, a first upright roller, a first slide rail and a first adjusting leg, the top side of the first bracket is transversely and uniformly provided with the horizontally arranged first carrier roller, the first brackets at the left side and the right side of the horizontal carrier roller are longitudinally and uniformly provided with the first upright roller, the first bracket below the first carrier roller is longitudinally provided with two parallel first slide rails, and four corners at the bottom side of the first bracket are respectively provided with the first adjusting leg;
the shipboard bracket comprises a second bracket, a second carrier roller, a second slide rail and second adjusting support legs, wherein a pair of second adjusting support legs are symmetrically arranged at the bottom side of one end of the second bracket, the second carrier roller is transversely, uniformly and horizontally arranged on the second bracket, and the second slide rail is longitudinally arranged on the second bracket above the second carrier roller in parallel;
the bridge frame comprises a third bracket, third carrier rollers, second upright column rollers, a front pulley block and a rear pulley block, wherein the third bracket is rectangular, the third carrier rollers are transversely and uniformly arranged on the third bracket, the second upright column rollers are longitudinally and uniformly arranged on the third bracket on the left side and the right side of the third carrier roller, the front pulley block is arranged at the front end of the third bracket in a swinging manner through a connecting plate, and the rear pulley block is fixedly arranged at the rear end of the third bracket downwards at 90 degrees through a supporting arm;
the bridge is respectively erected and connected on a first slide rail of the first bracket and a second slide rail of the second bracket through the front pulley block and the rear pulley block, so that the onshore base bracket, the bridge and the shipboard bracket form a whole.
The two ends of the first sliding rail and the second sliding rail are respectively provided with a first pulley limiting plate and a second pulley limiting plate, the first adjusting supporting leg and the second adjusting supporting leg are respectively composed of an upper fixing section and a lower adjusting section, the upper fixing section and the lower adjusting section are correspondingly provided with a plurality of pin holes in a distributed mode, each pin hole corresponds to different telescopic heights, and height adjustment is achieved by changing the positions of positioning pins of the upper fixing section and the lower adjusting section in the pin holes.
The first sliding rail is arranged on the inner side of the first bracket, the second sliding rail is arranged on the outer side of the second bracket, one end of the connecting plate is connected with the third bracket through a rotatable first pin shaft, the other end of the connecting plate is connected with a front pulley block clamping plate through a second pin shaft, a front pulley block is arranged in the front pulley block clamping plate, the third bracket is fixedly connected with the supporting arm, the supporting arm is connected with a rear pulley block clamping plate through a third pin shaft, and a rear pulley block is arranged in the rear pulley block clamping plate.
The two ends of the central shaft of the first carrier roller, the two ends of the central shaft of the second carrier roller and the two ends of the central shaft of the third carrier roller are respectively fixed on the first bracket, the second bracket and the third bracket, and the bottoms of the central shafts of the first upright post roller and the second upright post roller are respectively fixed on the first bracket and the third bracket.
The front pulley block is set into 2 groups and symmetrically arranged, the rear pulley block is set into 2 groups and symmetrically arranged, and each group of pulleys is provided with 4 rollers.
The gyro wheel is established to two-layer about, and every layer is 2 gyro wheels, the gyro wheel is installed respectively through the shaft on back pulley group splint and front pulley group splint.
The invention has the beneficial effects that:
1. has simple structure, simple and convenient use and convenient manufacture, assembly and disassembly.
2. The oil conveying hose can be prevented from being broken due to stress at a lifting point, or being worn and cracked due to extrusion due to friction generated by sliding on the ground, or being cracked due to extrusion of an oil tanker due to bending and drooping of the hose at a gap between a wharf and a pulley, so that the oil conveying hose is protected in the oil loading and unloading process.
3. After the oil hose wear-resistant device is used, the oil hose is only discarded in annual pressure test and aging, or the wear condition of the bracket after damage is tracked and analyzed, the hose is not worn out, and the service life of the hose is prolonged.
Drawings
The invention is further illustrated by means of the attached drawings, but the embodiments in the drawings do not constitute any limitation to the invention, and for a person skilled in the art, other drawings can be obtained on the basis of the following drawings without inventive effort.
FIG. 1 is a side view of an on-shore base carriage of the present invention;
FIG. 2 is a front view of an on-shore base carriage of the present invention;
FIG. 3 is a top view of the on-shore base carriage of the present invention;
FIG. 4 is a side view of a bridge of the present invention;
FIG. 5 is a front view of a bridge of the present invention;
FIG. 6 is a top view of a bridge of the present invention;
FIG. 7 is a side view of the upper deck carrier of the present invention;
FIG. 8 is an elevation view of the upper carrier of the present invention;
FIG. 9 is a top view of the upper deck carrier of the present invention;
fig. 10 is a side view of the pulley block of the present invention.
In the figure: the support arm comprises a first bracket 1, a first carrier roller 2, a first upright column roller 3, a first sliding rail 4, a first adjusting supporting leg 5, a second bracket 6, a second carrier roller 7, a second sliding rail 8, a second adjusting supporting leg 9, a third bracket 10, a third carrier roller 11, a second upright column roller 12, a front pulley block 13, a rear pulley block 14, a first pulley limiting plate 15, a second pulley limiting plate 16, a positioning pin 17, a pin hole 18, a connecting plate 19, a first pin shaft 20, a second pin shaft 21, a front pulley block clamping plate 22, a roller 23, a locking bolt 24, a third pin shaft 25 and a support arm 26.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the following detailed description of the present invention is provided with reference to the accompanying drawings and specific embodiments, and it is to be noted that the embodiments and features of the embodiments of the present application can be combined with each other without conflict.
As shown in fig. 1 to 10, a stinger for a dock oil hose comprises a shore base bracket, a bridge frame and a ship bracket.
As shown in fig. 1, 2 and 3, the onshore base bracket comprises a first bracket 1, a first carrier roller 2, a first upright roller 3, a first slide rail 4 and first adjusting legs 5, wherein the top side of the first bracket 1 is transversely and uniformly provided with the first carrier rollers 2 which are horizontally arranged, the first bracket 1 on the left side and the right side of the horizontal carrier rollers is longitudinally and uniformly provided with the first upright roller 3, the first bracket 1 below the first carrier rollers 2 is longitudinally provided with two parallel first slide rails 4, and the four corners of the bottom side of the first bracket 1 are respectively provided with the first adjusting legs 5.
As shown in fig. 7, 8 and 9, the shipboard carrier includes a second carrier 6, a second carrier roller 7, a second slide rail 8 and a second adjusting leg 9, a pair of second adjusting legs 9 is symmetrically disposed on a bottom side of one end of the second carrier 6, the second carrier rollers 7 are horizontally and uniformly arranged on the second carrier 6, and the second slide rail 8 is longitudinally and parallelly disposed on the second carrier 6 above the second carrier rollers 7.
As shown in fig. 4, 5, 6 and 10, the bridge frame includes a third bracket 10, a third idler roller 11, a second column roller 12, a front pulley block 13 and a rear pulley block 14, wherein the third bracket 10 is rectangular, the third idler rollers 11 are evenly arranged on the third bracket 10 in the transverse direction, the second column rollers 12 are evenly arranged on the third bracket 10 on the left and right sides of the third idler roller 11 in the longitudinal direction, the front pulley block 13 is arranged at the front end of the third bracket 10 in a swingable manner through a connecting plate 19, and the rear pulley block 14 is fixedly arranged at the rear end of the third bracket 10 in a downward direction at 90 degrees through a supporting arm 26.
The bridge is respectively erected and connected on the first slide rail 4 of the first bracket 1 and the second slide rail 8 of the second bracket 6 through a front pulley block 13 and a rear pulley block 14, so that the onshore base bracket, the bridge and the shipboard bracket form a whole.
As shown in fig. 1, 2, 3, 7, 8 and 9, two ends of the first slide rail 4 and the second slide rail 8 are respectively provided with a first pulley limit plate 15 and a second pulley limit plate 16, the first adjusting leg 5 and the second adjusting leg 9 are respectively composed of an upper fixing section and a lower adjusting section, the upper fixing section and the lower adjusting section are correspondingly provided with a plurality of pin holes 18, each pin hole 18 corresponds to a different telescopic height, and the height adjustment is realized by changing the positions of the positioning pins 17 of the upper fixing section and the lower adjusting section in the pin holes 18.
The first slide rail 4 is arranged on the inner side of the first bracket 1, the second slide rail 8 is arranged on the outer side of the second bracket 6, one end of the connecting plate 19 is connected with the third bracket 10 through a rotatable first pin shaft 20, the other end of the connecting plate is connected with a front pulley block clamping plate 22 through a second pin shaft 21, a front pulley block 13 is arranged in the front pulley block clamping plate 22, the third bracket 10 is fixedly connected with a supporting arm 26, the supporting arm 26 is connected with a rear pulley block clamping plate through a third pin shaft 25, and a rear pulley block 14 is arranged in the rear pulley block clamping plate.
The two ends of the central shaft of the first carrier roller 2, the second carrier roller 7 and the third carrier roller 11 are respectively fixed on the first bracket 1, the second bracket 6 and the third bracket 10, and the bottoms of the central shafts of the first upright column roller 3 and the second upright column roller 12 are respectively fixed on the first bracket 1 and the third bracket 10.
As shown in fig. 4 and 10, the front pulley blocks 13 are symmetrically arranged in 2 groups, the rear pulley blocks 14 are symmetrically arranged in 2 groups, and each group of pulleys is provided with 4 rollers 23.
The rollers 23 are arranged into an upper layer and a lower layer, each layer is provided with 2 rollers 23, and the rollers 23 are respectively arranged on the rear pulley block clamping plate and the front pulley block clamping plate 22 through wheel shafts.
And the rear pulley block clamping plate and the front pulley block clamping plate 22 are both provided with locking bolts 24.
The working principle is as follows:
when the oil port height adjusting device is used, a ship upper section bracket is erected on the ground through a second adjusting supporting leg 9 at one end of a second bracket 6, the other end of the second bracket 6 is placed on a ship board edge rail and can be fixed by a rope or does not need to be fixed, and the height can be adjusted by adjusting the second adjusting supporting leg 9 so as to meet the height requirements of loading and unloading oil ports of different ships, so that the whole ship upper section bracket is placed below a loading and unloading oil port on the ship;
the shore base bracket is placed at a connection interface of an oil delivery hose on the shore of a wharf, the height of the first bracket 1 can be adjusted through four first adjusting support legs 5 at the bottom of the first bracket 1, and the requirements of oil loading and unloading interfaces with different heights are met;
then the bridge is arranged between the shore base bracket and the shipboard bracket, wherein a front pulley block 13 of the bridge is inserted into a first slide rail 4 at the middle part of the shore base bracket, a rear pulley block 14 is inserted into a second slide rail 8 at the upper part of the shipboard bracket, and a first pulley limit plate 15 and a second pulley limit plate 16 at two ends of the first slide rail 4 and the second slide rail 8 are respectively arranged, after the bridge is arranged, the front pulley block 13 and the rear pulley block 14 can respectively slide back and forth in the first slide rail 4 and the second slide rail 8, the first pulley limit plate 15 and the second pulley limit plate 16 can bear specific push-pull force, the rollers 23 are prevented from separating from the first slide rail 4 and the second slide rail 8, so as to prevent the bridge from separating from the shore base bracket and the shipboard bracket, a connecting plate 19 can drive the bridge to freely rotate on a first pin shaft 20 and a second pin shaft 21, thereby enabling the whole bridge to generate displacement in the horizontal direction and the vertical direction within, the extension or the shortening of the whole bridge is realized, the bridge can freely slide along the first slide rail 4 and the second slide rail 8 of the base bracket and the shipboard bracket on the shore, when the overlap joint end of the shipboard bracket and the shipboard is lifted or lowered, the sliding of the bridge along the first slide rail 4 and the second slide rail 8 is not influenced, and the complex working condition of the bridge on the water surface when the oil tanker loads and unloads is met.
After the oil conveying hose is installed, the oil conveying hose conveys oil on the first carrier roller 2, the third carrier roller 11 and the second carrier roller 7 of the onshore base bracket, the bridge and the shipboard bracket, the oil conveying hose slides along each carrier roller when extending or shortening on the first carrier roller 2, the third carrier roller 11 and the second carrier roller 7, the friction is very small, if the distance between an oil tanker and a wharf is not large, the oil conveying hose can be supported only by the onshore base bracket and the shipboard section bracket, and the suspension section distance of the oil conveying hose between the two brackets is very short, so that the oil conveying hose can be well protected without the bridge.
In the using process, the oil delivery hose is curled from the connection interface of the oil delivery hose on the quay and is always connected to an oil loading and unloading interface on a ship of the oil tanker through the first carrier roller 2, the third carrier roller 11 and the second carrier roller 7, the absolute expansion length of the winding sections of the hose on the first bracket 1, the second bracket 6 and the third bracket 10 is ensured to be more than or equal to the displacement variable of the oil delivery hose caused by the change of external environment in the loading and unloading process, namely the absolute value difference between the bending length of the oil delivery hose on the first bracket 1, the second bracket 6 and the third bracket 10 and the absolute value difference between the lengths of the first bracket 1, the second bracket 6 and the third bracket 10 are more than the displacement length of the oil delivery hose required by the sea tide amplitude, the draft depth change and the swinging amplitude of the oil tanker, when the oil tanker is loaded or the sea water falls, the part of the oil delivery hose which is bent and placed on the first bracket 1, the second bracket 6 and the third bracket 10 is straightened, when the oil tanker is unloaded or sea water rises and tides, part of the oil delivery hoses which are bent and placed on the first bracket 1, the second bracket 6 and the third bracket 10 are compressed, when the oil tanker swings and shakes, the oil delivery hoses are simultaneously straightened or compressed, the oil delivery hoses which are bent and placed on the first bracket 1, the second bracket 6 and the third bracket 10 move along with the rolling of the first carrier roller 2, the third carrier roller 11 and the second carrier roller 7, the friction is small, the oil delivery hoses are supported by the first bracket 1, the second bracket 6 and the third bracket 10 and do not need to be lifted, the suspended section is shortened, the sliding scratch and sling lifting stress of the oil delivery hoses on the ground are avoided, and the possibility of being extruded by the oil tanker is also avoided.
After the oil delivery hose is connected with the oil tanker, the oil delivery hose is folded and twisted at the span between the wharf and the oil tanker, the oil tanker shakes and pulls on the sea surface, and the oil delivery hose is subjected to the actions of torque, friction, abrasion and extrusion and has the risks of breakage and breakage.
The above embodiments are merely descriptions of the embodiments of the present invention, and do not limit the concept and scope of the present invention, and equivalent structures and direct or indirect applications of the technical solutions of the present invention by those skilled in the art should fall within the protection scope of the present invention without departing from the design solutions of the present invention.
Claims (6)
1. The utility model provides a pier oil hose stinger which characterized in that: the offshore base bracket comprises a first bracket (1), first carrier rollers (2), first upright column rollers (3), first sliding rails (4) and first adjusting supporting legs (5), wherein the horizontally arranged first carrier rollers (2) are transversely and uniformly arranged on the top side of the first bracket (1), the first upright column rollers (3) are longitudinally and uniformly arranged on the first bracket (1) on the left side and the right side of each horizontal carrier roller, the two parallel first sliding rails (4) are longitudinally arranged on the first bracket (1) below the first carrier rollers (2), and the first adjusting supporting legs (5) are respectively arranged at four corners of the bottom side of the first bracket (1);
the shipboard bracket comprises a second bracket (6), a second carrier roller (7), a second sliding rail (8) and second adjusting supporting legs (9), wherein a pair of second adjusting supporting legs (9) are symmetrically arranged at the bottom side of one end of the second bracket (6), the second carrier rollers (7) are transversely, uniformly and horizontally arranged on the second bracket (6), and the second sliding rail (8) is longitudinally arranged on the second bracket (6) above the second carrier roller (7) in parallel;
the bridge frame comprises a third bracket (10), a third carrier roller (11), a second upright column roller (12), a front pulley block (13) and a rear pulley block (14), wherein the third bracket (10) is rectangular, the third carrier roller (11) is transversely and uniformly arranged on the third bracket (10), the second upright column roller (12) is longitudinally and uniformly arranged on the third bracket (10) on the left side and the right side of the third carrier roller (11), the front end of the third bracket (10) is provided with the front pulley block (13) in a swinging manner through a connecting plate (19), and the rear end of the third bracket (10) is downwards fixedly provided with the rear pulley block (14) at 90 degrees through a supporting arm (26);
the crane span structure is respectively erected and connected on a first slide rail (4) of the first bracket (1) and a second slide rail (8) of the second bracket (6) through a front pulley block (13) and a rear pulley block (14), so that the shore base bracket, the crane span structure and the shipboard bracket form a whole.
2. The stinger of claim 1, wherein: first slide rail (4) are equipped with first pulley limiting plate (15) and second pulley limiting plate (16) respectively with the both ends of second slide rail (8), first regulation landing leg (5) and second regulation landing leg (9) are become with down section group by last fixed station respectively, go up the fixed station and down distribute on the section group correspondingly and be equipped with a plurality of pinholes (18), and every pinhole (18) correspond different flexible height, realize the adjustment of height through changing the position of fixed station and down section's locating pin (17) in pinhole (18).
3. The stinger of claim 1, wherein: first slide rail (4) set up the inboard in first bracket (1), second slide rail (8) set up the outside at second bracket (6), connecting plate (19) one end is connected with third bracket (10) through rotatable first round pin axle (20), and the other end is connected with preceding assembly pulley splint (22) through second round pin axle (21), is equipped with preceding assembly pulley (13) in preceding assembly pulley splint (22), third bracket (10) and support arm (26) fixed connection, support arm (26) are connected with back assembly pulley splint through third round pin axle (25), are equipped with back assembly pulley (14) in the back assembly pulley splint.
4. The stinger of claim 1, wherein: the two ends of the central shaft of the first carrier roller (2), the two ends of the central shaft of the second carrier roller (7) and the two ends of the central shaft of the third carrier roller (11) are respectively fixed on the first bracket (1), the second bracket (6) and the third bracket (10), and the bottoms of the central shafts of the first upright column roller (3) and the second upright column roller (12) are respectively fixed on the first bracket (1) and the third bracket (10).
5. The stinger of claim 3, wherein: the front pulley block (13) is set into 2 groups and symmetrically arranged, the rear pulley block (14) is set into 2 groups and symmetrically arranged, and each group of pulleys of the front pulley block (13) and the rear pulley block (14) is provided with 4 rollers (23).
6. The stinger of claim 5, wherein: the idler wheels (23) are arranged into an upper layer and a lower layer, each layer is provided with 2 idler wheels (23), and the idler wheels (23) are respectively arranged on the rear pulley block clamping plate and the front pulley block clamping plate (22) through wheel shafts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911026439.0A CN110630819B (en) | 2019-10-26 | 2019-10-26 | Dock oil hose stinger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911026439.0A CN110630819B (en) | 2019-10-26 | 2019-10-26 | Dock oil hose stinger |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110630819A CN110630819A (en) | 2019-12-31 |
CN110630819B true CN110630819B (en) | 2021-05-07 |
Family
ID=68978085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911026439.0A Active CN110630819B (en) | 2019-10-26 | 2019-10-26 | Dock oil hose stinger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110630819B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112900328A (en) * | 2021-01-21 | 2021-06-04 | 楼焕 | Rolling device for preventing natural gas pipeline from being damaged and accelerating transportation |
CN113639099A (en) * | 2021-07-21 | 2021-11-12 | 上海外高桥造船有限公司 | Marine low-temperature liquid fuel or cargo filling hose support and filling system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6719008B1 (en) * | 1999-07-13 | 2004-04-13 | Fmc Technologies, S.A. | Offshore loading system by suspended piping |
CA2570728A1 (en) * | 2006-12-14 | 2008-06-14 | Guy Rodrigue | Guide apparatus to guide axial pipe movement |
CN101725765A (en) * | 2008-10-15 | 2010-06-09 | 徐州重型机械有限公司 | Built-in cable and hydraulic hose conveying device |
CN202252345U (en) * | 2011-08-24 | 2012-05-30 | 宝山钢铁股份有限公司 | Adjustable cable pulley |
CN108488485A (en) * | 2018-04-03 | 2018-09-04 | 航天晨光股份有限公司 | A kind of naval vessel Large Diameter Pipeline delivery hose suspension arrangement and its installation method |
CN208204210U (en) * | 2018-04-01 | 2018-12-07 | 上海外高桥造船有限公司 | The fixed bracket of pipe fitting peculiar to vessel |
CN208457334U (en) * | 2018-04-02 | 2019-02-01 | 中国水利水电第五工程局有限公司 | A kind of concrete prefabricated pipe push pipe coaster |
CN209294788U (en) * | 2018-12-06 | 2019-08-23 | 中交第二航务工程勘察设计院有限公司 | A kind of liquefied natural gas filling harbour connection between ship and bank structure |
-
2019
- 2019-10-26 CN CN201911026439.0A patent/CN110630819B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6719008B1 (en) * | 1999-07-13 | 2004-04-13 | Fmc Technologies, S.A. | Offshore loading system by suspended piping |
CA2570728A1 (en) * | 2006-12-14 | 2008-06-14 | Guy Rodrigue | Guide apparatus to guide axial pipe movement |
CN101725765A (en) * | 2008-10-15 | 2010-06-09 | 徐州重型机械有限公司 | Built-in cable and hydraulic hose conveying device |
CN202252345U (en) * | 2011-08-24 | 2012-05-30 | 宝山钢铁股份有限公司 | Adjustable cable pulley |
CN208204210U (en) * | 2018-04-01 | 2018-12-07 | 上海外高桥造船有限公司 | The fixed bracket of pipe fitting peculiar to vessel |
CN208457334U (en) * | 2018-04-02 | 2019-02-01 | 中国水利水电第五工程局有限公司 | A kind of concrete prefabricated pipe push pipe coaster |
CN108488485A (en) * | 2018-04-03 | 2018-09-04 | 航天晨光股份有限公司 | A kind of naval vessel Large Diameter Pipeline delivery hose suspension arrangement and its installation method |
CN209294788U (en) * | 2018-12-06 | 2019-08-23 | 中交第二航务工程勘察设计院有限公司 | A kind of liquefied natural gas filling harbour connection between ship and bank structure |
Also Published As
Publication number | Publication date |
---|---|
CN110630819A (en) | 2019-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2018250351B2 (en) | Elastomeric load compensators for load compensation of cranes | |
CN110630819B (en) | Dock oil hose stinger | |
US8312828B2 (en) | Preloading to reduce loads and save steel on topsides and grillage of catamaran systems | |
CN203358825U (en) | Special boarding ladder for FPSO (Floating Production Storage and Offloading) | |
EP2559614B1 (en) | Vessel and method for removal and/or installation of at least a part of a sea platform | |
CN106151767A (en) | Unmanned boat contained pipeline maintenance piping support structure | |
CN203666931U (en) | Wharf boarding ladder | |
CN202321980U (en) | Lifting hook special for steel tube | |
CN207700033U (en) | A kind of position compensation extension type is gone on board trestle | |
CN202558500U (en) | Folding arm type oil conveying arm crane with dual center-revolving oil-conveying pipes | |
CN102050377B (en) | Method for installing combined hoist and oil production platform drilling equipment | |
CN103274023A (en) | Simple-erecting access board between offshore floats | |
WO2018218802A1 (en) | Crossing ladder for dual-boat wharf mooring | |
CN221367390U (en) | Marine tidal water compensation boarding trestle | |
CN103193152A (en) | Hoisting device and method of chain bucket ship unloader | |
CN100532243C (en) | Truss type spud leg single slice lifting slings | |
CN111547625A (en) | Rail crane transportation turns to platform truck | |
CN221091162U (en) | Modular boarding ladder | |
CN111706714A (en) | Installation method of vertical pipe protection frame | |
CN205713203U (en) | Hydraulic pressure skid beam device | |
CN216190357U (en) | Platform hanging basket | |
CN107792315A (en) | It is a kind of to move in parallel guard board structure for what ship was stopped | |
CN109368508A (en) | The offshore lifting method of large size valve on floating production storage offloading's standpipe | |
CN112279063B (en) | Adjustable beam plate hoisting protection device and installation method | |
KR200466983Y1 (en) | Worker movable platform in the ship |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |