CN110630183A - Full casing combined construction method capable of realizing line production - Google Patents

Full casing combined construction method capable of realizing line production Download PDF

Info

Publication number
CN110630183A
CN110630183A CN201910956606.5A CN201910956606A CN110630183A CN 110630183 A CN110630183 A CN 110630183A CN 201910956606 A CN201910956606 A CN 201910956606A CN 110630183 A CN110630183 A CN 110630183A
Authority
CN
China
Prior art keywords
full
casing
rotation
self
propelled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910956606.5A
Other languages
Chinese (zh)
Inventor
贾学强
苏陈
张继光
马云龙
邱红臣
丁洪亮
张明杰
张梦慈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou XCMG Foundation Construction Machinery Co Ltd
Original Assignee
Xuzhou XCMG Foundation Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou XCMG Foundation Construction Machinery Co Ltd filed Critical Xuzhou XCMG Foundation Construction Machinery Co Ltd
Priority to CN201910956606.5A priority Critical patent/CN110630183A/en
Publication of CN110630183A publication Critical patent/CN110630183A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Abstract

A full-casing combined construction method capable of realizing line production is a combined construction method of self-propelled full-casing full-rotation equipment and a rotary drilling rig, and comprises the following specific steps: a. the self-propelled full-casing full-return equipment is used for placing the casing in place; b. after the casing is lowered to a preset depth, continuing to increase the lowering resistance, and taking soil in the casing of the rotary drilling rig; c. a self-propelled full-casing full-rotation drilling machine is used for carrying a full-rotation working device in situ to rotate for a preset angle or the self-propelled full-casing full-rotation equipment is withdrawn for a preset angle, and a casing opening is made; d. placing a rotary drilling rig in place, and taking soil in the sleeve; e. after the rotary drilling rig finishes taking earth, turning the upper vehicle by 90 degrees or withdrawing the upper vehicle for a preset distance to make the sleeve out; f. the self-propelled full-casing full-rotation drilling machine carries the full-rotation working device in situ to rotate to a working position, and continues to drive the casing below. The invention combines the characteristics of two kinds of construction equipment, fully utilizes the two kinds of construction equipment, forms flow process and improves the construction efficiency.

Description

Full casing combined construction method capable of realizing line production
Technical Field
The invention relates to a full casing construction method, in particular to a full casing combined construction method capable of realizing line production, and belongs to the technical field of full casing construction methods.
Background
At the present stage, along with the higher and higher requirements on green and environment-friendly construction in the field of engineering construction, the full casing construction method is used as a hole forming process without mud, and the application of the full casing construction method is more and more extensive. In the full casing construction method, in order to improve the casing construction efficiency, a rotary drilling rig is usually selected to carry out casing soil taking, but under the current construction condition, due to the structural size of two kinds of construction equipment, special configuration requirements such as part of masts and short drill rods are usually required to be dismantled for the rotary drilling rig matched with the rotary drilling rig, in part of engineering applications, the working face of the rotary drilling rig is reduced on site or lifted to avoid size interference between the masts and the rotary drilling rig, in addition, most of the current full casing full rotary equipment is inconvenient to turn around, so that the utilization rate of the rotary drilling equipment and the full rotary equipment is low, and the whole construction economy of the full casing is poor. Although partially all-casing fully-revolving devices are currently available that are self-propelled, the same problem cannot be solved due to the functional settings.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention provides a full casing combined construction method capable of realizing line production.
The invention is realized according to the following technical scheme:
a full-casing combined construction method capable of realizing line production is a combined construction method of self-propelled full-casing full-rotation equipment and a rotary drilling rig, and comprises the following specific steps:
a. the self-propelled full-casing full-return equipment is used for placing the casing in place;
b. after the casing is lowered to a preset depth, continuing to increase the lowering resistance, and taking soil in the casing of the rotary drilling rig;
c. a self-propelled full-casing full-rotation drilling machine is used for carrying a full-rotation working device in situ to rotate for a preset angle or the self-propelled full-casing full-rotation equipment is withdrawn for a preset angle, and a casing opening is made;
d. placing a rotary drilling rig in place, and taking soil in the sleeve;
e. after the rotary drilling rig finishes taking earth, turning the upper vehicle by 90 degrees or withdrawing the upper vehicle for a preset distance to make the sleeve out;
f. the self-propelled full-casing full-rotation drilling machine carries the full-rotation working device in situ to rotate to a working position, and continues to drive the casing below.
Furthermore, if the rotary drilling rig takes too long time to extract soil, the self-propelled full-casing full-rotation equipment can move to the next hole position to put the casing.
Further, when the rotary digging and soil taking time exceeds 1h, and the time consumed by the self-propelled full-casing full-rotation equipment to move to the next hole site and move from the hole site to the original position does not exceed half of the rotary digging and soil taking time, the rotary digging and soil taking time of the rotary digging and soil taking machine is considered to be too long.
Furthermore, if the time for lowering the casing pipe by the self-propelled full-casing full-rotation equipment is too long, the rotary drilling rig can move to the next hole site to perform pre-soil-borrowing operation on the premise of not influencing the casing pipe verticality and the hole wall stability.
Further, when the time for lowering the casing pipe by the self-propelled full-casing pipe full-rotation equipment exceeds 1h, and the time consumed by moving the rotary drilling rig to the next hole site and moving the rotary drilling rig from the hole site to the original position does not exceed half of the time for lowering the casing pipe, the rotary drilling and soil taking time is considered to be too long.
Further, in the step a, the self-propelled full-casing full-rotation equipment automatically moves to a hole site to be constructed, after centering, the full-casing full-rotation working device on the equipment is placed on the ground or a road base plate along the mast of the equipment, and the mast is separated from the working device through the quick separation device, so that the full-rotation working device is prevented from being interfered by the mast when working, and the construction verticality is ensured by leveling through the leveling oil cylinder arranged at the bottom of the working device.
Furthermore, in the step c, after the self-propelled full-casing full-rotation equipment is withdrawn, the self-propelled full-casing full-rotation equipment needs to be adjusted vertically and positioned again when being returned to the original position, interference is avoided by adopting a rotation mode, namely the self-propelled full-casing full-rotation drilling machine is used for carrying the full-rotation working device in the original position for at least 90 degrees, and a casing outlet is made.
Further, the self-walking full-sleeve full-rotation equipment has the function that the self-walking and full-rotation working device can carry out at least 90 degrees along with the loading of the main machine.
Further, in order to avoid the requirement that the rotary drilling rig is provided with a short drill rod, the sleeve removal position is in a stroke space of a pressing and pulling oil cylinder of the full-rotation working device.
Furthermore, the self-propelled full-casing full-rotation equipment and the rotary drilling rig can be arranged on a working surface with the same height for construction during construction.
The invention has the beneficial effects that:
the invention can realize the line production of two kinds of combined construction equipment, does not make special configuration requirements on the rotary digging drilling machine, does not require the heightening or reduction treatment on the construction working surface, greatly improves the equipment utilization rate, has more efficient construction and maximizes the economic benefit.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, illustrate embodiments of the invention and, together with the description, serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic diagram of the cooperation state of two devices during soil taking of a rotary excavating casing;
FIG. 2 is a schematic diagram of the matching state of the two devices when the casing is placed in the full casing device;
FIG. 3 is a proposed sleeve removal position for the self-propelled full sleeve apparatus;
fig. 4 is a construction flow chart.
Detailed Description
In order to make the implementation objects, technical solutions and advantages of the present invention clearer, the technical solutions in the embodiments of the present invention will be described in more detail below with reference to the accompanying drawings in the embodiments of the present invention. In the drawings, the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The described embodiments are only some, but not all embodiments of the invention. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention. Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
FIG. 1 is a schematic diagram showing the cooperation state of two devices during soil taking of a rotary excavating casing; FIG. 2 is a schematic diagram showing the fitting state of the two devices when the full casing device is used for placing a casing; fig. 3 shows the proposed casing removal position of the self-propelled full casing installation, and fig. 4 shows the construction flow chart.
The technical scheme adopted by the invention is a line-production all-casing combined construction method, which is a combined construction method of self-propelled all-casing all-rotation equipment and a rotary drilling rig, and comprises the following specific steps:
a. the self-propelled full-casing full-return equipment is used for placing the casing in place;
b. after the casing is lowered for a certain depth, the lowering resistance is increased continuously, and the rotary drilling rig needs to dig out soil in the casing;
c. a self-propelled full-casing full-rotation drilling machine is used for carrying a full-rotation working device in situ to rotate for a preset angle or the self-propelled full-casing full-rotation equipment is withdrawn for a preset angle, and a casing opening is made;
d. placing a rotary drilling rig in place, and taking soil in the sleeve;
e. after the rotary drilling rig finishes taking earth, the upper vehicle rotates by 90 degrees or is withdrawn for a certain distance, and the sleeve is made out;
f. the self-propelled full-casing full-slewing drilling machine carries the full slewing working device in situ to rotate to a working position, and continues to drive the casing below;
g. if the soil taking time of the rotary drilling rig is too long, the self-propelled full-casing full-rotation equipment can be moved to the next hole site to put the casing;
h. if the time for lowering the casing pipe of the self-propelled full-casing full-rotation equipment is too long, the rotary drilling rig can move to the next hole position to carry out pre-soil-borrowing work.
The above process is further illustrated below:
the self-propelled full-casing full-rotation equipment automatically moves to a hole site to be constructed, after centering, the full-casing full-rotation working device on the equipment is placed on the ground or a road base plate along the mast of the equipment, and the mast is separated from the working device through the quick separation device, so that the full-rotation working device is prevented from being interfered by the mast when working, and the construction verticality is ensured by leveling through the leveling oil cylinder arranged at the bottom of the working device.
After positioning and verticality adjustment are finished, hoisting a casing into the full-rotation working device by using vehicle-mounted hoisting equipment carried by the equipment to lower the casing, and when the casing reaches a certain depth or meets a complex stratum, taking soil in the casing of the rotary drilling rig, so that casing lowering resistance is reduced;
the self-propelled full-rotation in-situ carrying full-rotation work is rotated for a certain angle or the equipment is withdrawn for a certain angle, a sleeve opening is made out, and the interference between the rotary drilling rig structure and the self-propelled full-rotation equipment is avoided; considering that the equipment needs to be adjusted vertically and positioned again when being returned to the original position after being withdrawn, the invention proposes to adopt a rotation mode to avoid interference. When the mode is adopted to avoid interference, special configuration requirements on the rotary digging drilling machine are not required, and no raising or lowering treatment is required on a construction operation surface.
It should be noted that in the manner of yielding the casing, the casing needs to be removed first, and in order to avoid the requirement that the rotary drilling rig is configured with a short drill rod, the casing removal position proposed by the invention is in the stroke space of the pressing and pulling oil cylinder of the full-rotation working device.
After the rotary drilling rig finishes soil taking, the upper vehicle rotates for 90 degrees or is withdrawn for a preset distance, and the casing pipe is made. The soil taking in the rotary drilling sleeve can be delayed or delayed, and the advanced sleeve pre-soil taking is carried out on the premise of not influencing the perpendicularity of the sleeve and the stability of the hole wall.
The self-propelled full-casing full-rotation drilling machine carries the full-rotation working device in situ to rotate to a working position, and the casing is continuously lowered.
The self-propelled full-casing full-rotation drilling rig and the rotary drilling rig both belong to self-propelled equipment, when one kind of equipment works, the other kind of equipment can be moved to the next hole site operation according to construction requirements, and the displacement of the two kinds of equipment is exchanged, so that the flow process is realized.
If the soil taking time of the rotary drilling rig is too long, the self-propelled full-casing full-rotation equipment can be moved to the next hole position to place the casing. The soil taking time of the rotary drilling rig is measured according to the field practice condition, and when the rotary drilling soil taking time exceeds 1h, the time consumed by the self-propelled full-casing full-rotation equipment to move to the next hole site and move from the hole site to the original position does not exceed half of the rotary drilling soil taking time, namely the rotary drilling soil taking time is considered to be too long.
If the time for lowering the casing pipe by the self-propelled full-casing pipe full-rotation equipment is too long, the rotary drilling rig can move to the next hole site to carry out pre-soil-borrowing work on the premise of not influencing the casing pipe verticality and the hole wall stability. The length of time for lowering the casing of the self-propelled full-casing full-rotation equipment is measured according to field practice conditions, and the time consumed by moving the rotary drilling rig to the next hole site and moving the rotary drilling rig from the hole site to the original position does not exceed half of the casing lowering time when the time for lowering the casing of the self-propelled full-casing full-rotation equipment exceeds 1h, namely the time for digging the soil is considered to be too long.
It should be noted that the self-propelled all-casing all-rotation equipment should have the function of the self-propelled and all-rotation working device for at least 90 degrees along with the loading of the main machine. The self-propelled full-casing full-rotation equipment and the rotary drilling rig can be arranged on a working surface at the same height for construction during construction.
In conclusion, the invention combines the characteristics of two kinds of construction equipment, fully utilizes the two kinds of construction equipment, forms flow process and improves the construction efficiency.
Finally, it should be noted that the above examples are only used to illustrate the technical solutions of the present invention and not to limit the same; although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art will understand that: modifications to the specific embodiments of the invention or equivalent substitutions for parts of the technical features may be made; without departing from the spirit of the present invention, it is intended to cover all aspects of the invention as defined by the appended claims.

Claims (10)

1. A full casing combined construction method capable of realizing line production is characterized in that the full casing combined construction method is a combined construction method of self-propelled full casing full-rotation equipment and a rotary drilling rig, and comprises the following specific steps:
a. the self-propelled full-casing full-return equipment is used for placing the casing in place;
b. after the casing is lowered to a preset depth, continuing to increase the lowering resistance, and taking soil in the casing of the rotary drilling rig;
c. a self-propelled full-casing full-rotation drilling machine is used for carrying a full-rotation working device in situ to rotate for a preset angle or the self-propelled full-casing full-rotation equipment is withdrawn for a preset angle, and a casing opening is made;
d. placing a rotary drilling rig in place, and taking soil in the sleeve;
e. after the rotary drilling rig finishes taking earth, turning the upper vehicle by 90 degrees or withdrawing the upper vehicle for a preset distance to make the sleeve out;
f. the self-propelled full-casing full-rotation drilling machine carries the full-rotation working device in situ to rotate to a working position, and continues to drive the casing below.
2. The line-workable full casing combination construction method according to claim 1, wherein: if the soil taking time of the rotary drilling rig is too long, the self-propelled full-casing full-rotation equipment can be moved to the next hole position to place the casing.
3. The line-workable full casing combination construction method according to claim 2, wherein: when the rotary digging and soil taking time exceeds 1h, and the time consumed by moving the self-propelled full-casing full-rotation equipment to the next hole site and moving the self-propelled full-casing full-rotation equipment from the hole site to the original position does not exceed half of the rotary digging and soil taking time, the rotary digging and soil taking time of the rotary digging and soil taking machine is considered to be too long.
4. The line-workable full casing combination construction method according to claim 1, wherein: if the time for lowering the casing pipe by the self-propelled full-casing pipe full-rotation equipment is too long, the rotary drilling rig can move to the next hole site to carry out pre-soil-borrowing work on the premise of not influencing the casing pipe verticality and the hole wall stability.
5. The line-workable full casing combination construction method according to claim 4, wherein: when the time for lowering the casing pipe by the self-propelled full-casing pipe full-rotation equipment exceeds 1h, and the time consumed by moving the rotary drilling rig to the next hole site and moving the rotary drilling rig from the hole site to the original position does not exceed half of the time for lowering the casing pipe, the rotary drilling and soil taking time is considered to be too long.
6. The line-workable full casing combination construction method according to claim 1, wherein: in the step a, the self-propelled full-casing full-rotation equipment automatically moves to a hole site to be constructed, after centering, the full-casing full-rotation working device on the equipment is placed on the ground or a road base plate along the mast of the equipment, and the mast is separated from the working device through the quick separation device, so that the full-rotation working device is prevented from being interfered by the mast when working, and the construction verticality is ensured by leveling through the leveling oil cylinder arranged at the bottom of the working device.
7. The line-workable full casing combination construction method according to claim 1, wherein: in the step c, after the self-propelled full-casing full-rotation equipment is withdrawn, the self-propelled full-casing full-rotation equipment needs to be adjusted vertically and positioned again when being restored to the original position, interference is avoided by adopting a rotation mode, namely the self-propelled full-casing full-rotation drilling machine is used for carrying the full-rotation working device in the original position for at least 90 degrees, and a casing outlet is made.
8. The line-workable full casing combination construction method according to claim 1, wherein: the self-propelled full-sleeve full-rotation equipment has the function that the self-propelled and full-rotation working device can carry out at least 90 degrees along with the loading of the main machine.
9. The line-workable full casing combination construction method according to claim 1, wherein: in order to avoid the requirement that the rotary drilling rig is provided with a short drill rod, the sleeve removing position is in a stroke space of a pressing and pulling oil cylinder of the full-rotation working device.
10. The line-workable full casing combination construction method according to claim 1, wherein: the self-propelled full-casing full-rotation equipment and the rotary drilling rig can be arranged on a working surface at the same height for construction during construction.
CN201910956606.5A 2019-10-10 2019-10-10 Full casing combined construction method capable of realizing line production Pending CN110630183A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910956606.5A CN110630183A (en) 2019-10-10 2019-10-10 Full casing combined construction method capable of realizing line production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910956606.5A CN110630183A (en) 2019-10-10 2019-10-10 Full casing combined construction method capable of realizing line production

Publications (1)

Publication Number Publication Date
CN110630183A true CN110630183A (en) 2019-12-31

Family

ID=68976073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910956606.5A Pending CN110630183A (en) 2019-10-10 2019-10-10 Full casing combined construction method capable of realizing line production

Country Status (1)

Country Link
CN (1) CN110630183A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113294138A (en) * 2021-06-03 2021-08-24 中铁第五勘察设计院集团有限公司 Full-sleeve full-rotary drilling machine device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201695956U (en) * 2010-06-23 2011-01-05 北京市三一重机有限公司 Lower mast device
CN105887813A (en) * 2016-05-07 2016-08-24 深圳市宏业基基础工程有限公司 Large-diameter super-long pile construction method in karst area through full-casing pipe full rotating and rotary drilling
CN207609374U (en) * 2017-12-13 2018-07-13 徐州盾安重工机械制造有限公司 Lift self-travel type full-sleeve full-rotation drill
CN108589707A (en) * 2018-05-14 2018-09-28 上海腾尚基础工程有限公司 A kind of full-sleeve long screw auger and churning driven combined type construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201695956U (en) * 2010-06-23 2011-01-05 北京市三一重机有限公司 Lower mast device
CN105887813A (en) * 2016-05-07 2016-08-24 深圳市宏业基基础工程有限公司 Large-diameter super-long pile construction method in karst area through full-casing pipe full rotating and rotary drilling
CN207609374U (en) * 2017-12-13 2018-07-13 徐州盾安重工机械制造有限公司 Lift self-travel type full-sleeve full-rotation drill
CN108589707A (en) * 2018-05-14 2018-09-28 上海腾尚基础工程有限公司 A kind of full-sleeve long screw auger and churning driven combined type construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113294138A (en) * 2021-06-03 2021-08-24 中铁第五勘察设计院集团有限公司 Full-sleeve full-rotary drilling machine device

Similar Documents

Publication Publication Date Title
CN108149699B (en) Recoverable dewatering well device capable of achieving well fast and construction method thereof
CN103628463A (en) Construction method for ultra-deep vibroflotation gravel pile of complicated stratum
CN110644551B (en) Pile driver and construction method thereof
CN111894450A (en) Combined construction method for percussion drill and rotary drill in thick sand gravel layer
CN101982614A (en) Method for drilling rocks into pile by utilizing all casing drill
CN110630183A (en) Full casing combined construction method capable of realizing line production
CN204401612U (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction equipment
CN207609374U (en) Lift self-travel type full-sleeve full-rotation drill
CN111794259B (en) Method for preventing underground diaphragm wall from collapsing groove of neighboring existing building of high underground water level area
CN104975611A (en) Sinking device and method for well point drawdown pipe of liquid soil layer
CN106968596B (en) Controllable compaction grouting pile driving construction equipment
CN113090192B (en) Complex stratum rotary drilling steel sleeve matched hole forming method
JP3159346U (en) Telescopic ring plate type underground shaft drill
CN210151806U (en) Plate type ground anchor construction machine
CN107012872A (en) Mud construction method of deep foundation ditch
CN208328962U (en) A kind of drainage of foundation pit device under the head positioned at low pressure water
CN202718104U (en) Squeezing-expanding support plate steel pipe filling pile
CN207974768U (en) Rotary excavating extruding expanding drilling head and rotary drilling rig including it
CN102094431A (en) Horizontal plugging construction method for subway station construction confined water
CN109555476B (en) High-stability construction rotary drilling rig
JP4504752B2 (en) Construction method and apparatus for tubular precast concrete member
CN215367483U (en) Bottom hole mud-water dredging device of foundation pit dewatering pipe well
CN215208176U (en) Miniature steel pipe pile steel pipe hoist device in finite space
CN204436260U (en) Combination type rotating digs drill bit
CN214997449U (en) Rotary drilling and steel sleeve lowering device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191231

RJ01 Rejection of invention patent application after publication