CN110629680A - Assembling and transporting device for full-bridge arc-shaped steel beam - Google Patents

Assembling and transporting device for full-bridge arc-shaped steel beam Download PDF

Info

Publication number
CN110629680A
CN110629680A CN201910702704.6A CN201910702704A CN110629680A CN 110629680 A CN110629680 A CN 110629680A CN 201910702704 A CN201910702704 A CN 201910702704A CN 110629680 A CN110629680 A CN 110629680A
Authority
CN
China
Prior art keywords
arc
bridge
transportation
shaped steel
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910702704.6A
Other languages
Chinese (zh)
Inventor
李佳斌
张腾飞
孙阳
孙文阁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd
China Railway Design Corp
Shanghai Civil Engineering Co Ltd of CREC
Construction Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd
China Railway Design Corp
Shanghai Civil Engineering Co Ltd of CREC
Construction Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd, China Railway Design Corp, Shanghai Civil Engineering Co Ltd of CREC, Construction Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Beijing Shenyang Passenger Dedicated Railway Beijing And Hebei Co Ltd
Priority to CN201910702704.6A priority Critical patent/CN110629680A/en
Publication of CN110629680A publication Critical patent/CN110629680A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • E01F8/0023Details, e.g. foundations
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

An assembling and transporting device for full-bridge arc-shaped steel beams comprises an assembling jig frame and a transporting device, wherein the assembling jig frame and the transporting device are arranged on a bridge deck; the assembling jig frame comprises frames, frame connecting pieces, baffle fixing plates, inner arc fixing baffles and outer arc fixing baffles, each frame is rectangular, a plurality of frames form an arc-shaped support along an arc, column feet are arranged at two ends of the arc-shaped support, a plurality of baffle fixing plates are welded on the arc-shaped support along an arc, and each baffle fixing plate is welded with the inner arc fixing baffle and the outer arc fixing baffle; the transportation device comprises a transportation rail, a transportation vehicle and winches, wherein the transportation rail is fixed on a bridge deck along the bridge trend, the transportation vehicle is installed on the transportation rail, the two winches are respectively installed at two ends of a bridge, steel wire ropes of the two winches are all connected with the transportation vehicle, the assembling jig frame has the functions of preventing deformation and positioning the assembled steel beam segments, and the transportation device facilitates short-distance transportation of the steel beam segments on the bridge deck.

Description

Assembling and transporting device for full-bridge arc-shaped steel beam
Technical Field
The invention belongs to the technical field of fixed buildings, relates to facilities used in construction of roads, railways or bridges, and particularly relates to an assembling and transporting device for full-bridge arc-shaped steel beams.
Background
According to the construction background of the high-speed railway totally-enclosed sound barrier engineering, the design scheme of the engineering needs to arrange an arc-shaped steel beam on a bridge as a steel structure main body framework. But the whole-line mileage of the bridge is long, the terrain along the line under the bridge is narrow and complicated, and the area of the assembly site is large and cannot be single. Meanwhile, when hoisting operation is carried out under the bridge, each continuous point needs to be provided with an assembling platform, and the assembling and transporting scheme under the bridge has the defects of large difficulty in later-stage engineering operation and maintenance and high cost due to the influence of terrain.
Disclosure of Invention
The invention aims at the problems and provides an assembling and transporting device for full-bridge arc-shaped steel beams.
The purpose of the invention can be realized by the following technical scheme: an assembling and transporting device for full-bridge arc-shaped steel beams comprises an assembling jig frame and a transporting device, wherein the assembling jig frame and the transporting device are arranged on a bridge deck; the assembling jig frame comprises frames, frame connecting pieces, baffle fixing plates, inner arc fixing baffles and outer arc fixing baffles, wherein each frame is rectangular, a plurality of frames are distributed along an arc, the inner arc sides of two adjacent frames are welded and connected, and the outer arc sides of the two adjacent frames are welded and connected through the frame connecting pieces, so that the plurality of frames integrally form an arc support; the transportation device comprises a transportation rail, a transportation vehicle and two winches, wherein the transportation rail is fixed on a bridge deck along the trend of the bridge, the transportation vehicle is arranged on the transportation rail, the two winches are respectively arranged at two ends of the bridge, and the steel wire ropes of the two winches are connected with the transportation vehicle.
Further, the frame is formed by welding and connecting H-shaped steel.
Furthermore, a baffle fixing plate is welded in the middle of the arc top, the column feet at the two ends, the arc top and the column foot at each end of the arc support respectively.
Furthermore, the baffle fixing plate is connected with the inner arc edge and the outer arc edge of the arc-shaped support.
Further, the transportation track is a channel steel.
Further, the transport vechicle includes car support, car platform, universal wheel, the car support is rectangular frame form, and the top surface of car support installs the car platform, and the bottom surface of car support is installed and is transported track matched with universal wheel. Furthermore, the vehicle bracket is formed by welding and connecting H-shaped steel.
Compared with the prior art, the invention has the beneficial effects that: it all directly sets up on the bridge floor to assemble bed-jig and conveyer, assembles the bed-jig and has shape and locate function of preapring for an unfavorable turn of events to the girder steel section of assembling, and conveyer makes things convenient for the short distance transportation of girder steel section on the bridge floor. The whole assembling and transporting device is simple in structure, cheap to erect, labor-saving to operate, safe, reliable, economical and practical.
Drawings
Fig. 1 is a schematic structural view of the assembled jig frame of the present invention.
Fig. 2 is a schematic structural view of the transportation device of the present invention.
Fig. 3 is another schematic view of the transportation device of the present invention.
Fig. 4 is a schematic structural view of a vehicle frame of the transport vehicle of the present invention.
The parts in the figures are numbered as follows:
1 frame
2 frame connecting piece
3 baffle plate fixing plate
4 inner arc fixed baffle
5 outer arc fixed baffle
6 arc girder steel
7 transportation rail
8 vehicle support
9 vehicle platform
10 Universal wheel
11 hoist
12 bridge.
Detailed Description
The following detailed description of the embodiments of the present invention will be given in conjunction with the accompanying drawings to make it clear to those skilled in the art how to practice the present invention. While the invention has been described in connection with preferred embodiments thereof, these embodiments are merely illustrative, and not restrictive, of the scope of the invention.
An assembling and transporting device for full-bridge arc-shaped steel beams comprises an assembling jig frame and a transporting device which are arranged on a bridge deck.
Referring to fig. 1, the assembling jig frame comprises a frame 1, a frame connecting piece 2, a baffle fixing plate 3, an inner arc fixing baffle 4 and an outer arc fixing baffle 5.
Referring to the dashed boxes in fig. 1, each of the frames 1 is rectangular and is formed by welding four H-shaped steels of 200 × 150 × 6 × 8. A plurality of frames 1 distribute along the arc and the inner arc side welded connection of two adjacent frames 1, outer arc side pass through 2 welded connection of frame connecting piece for a plurality of frames 1 wholly constitute the arc support, and the both ends of arc support are the column base. Wherein, the frame connecting piece 2 can also be H-shaped steel.
Arc support's arc top, both ends column base, arc top and the centre of every end column base have welded a baffle fixed plate 3 respectively, baffle fixed plate 3 is thickness t =12 mm's steel sheet and is connected with arc support's interior arc limit and outer arc limit, erects the welding on every baffle fixed plate 3 and has interior arc fixed stop 4 and outer arc fixed stop 5, and interior arc fixed stop 4 and outer arc fixed stop 5 are used for blocking arc girder steel 6's interior arc limit and outer arc limit respectively, realize the location to arc girder steel 6.
When actually assembling the arc-shaped steel beam 6, the on-site construction environment needs to be inspected, and the arc-shaped steel beam is assembled on the bridge deck with the operation conditions of deck assembling, transporting and hoisting. The complete arc-shaped steel beam 6 consists of three steel beam sections, the three steel beam sections are transported to an arc-shaped steel beam assembling area on a bridge deck through a transporting device, and the assembling process is as follows:
(1) hoisting the first section of steel beam segment to the central point of the assembling jig frame, clamping the arc top and the splicing parts at the two ends of the first section of steel beam segment between an inner arc fixed baffle 4 and an outer arc fixed baffle 5 on a corresponding baffle fixed plate 3 respectively, and performing secondary fixing at the arc top of the first section of steel beam segment by using a combined buckle;
(2) hoisting a second section of steel beam segment to the right side of the central point on the assembling jig, respectively clamping the left end splicing part and the right end column foot of the second section of steel beam segment between an inner arc fixed baffle 4 and an outer arc fixed baffle 5 on a corresponding baffle fixed plate 3, and then secondarily fixing the right end column foot of the second section of steel beam segment by using a combined buckle;
(2) and hoisting the third section of steel beam segment to the left side of the central point on the assembling jig, respectively clamping the right end splicing part and the left end column foot part of the third section of steel beam segment between the inner arc fixed baffle 4 and the outer arc fixed baffle 5 on the corresponding baffle fixed plate 3, and secondarily fixing the left end column foot part of the third section of steel beam segment by using a combined buckle.
Referring to fig. 2 and 3, the transportation device comprises transportation rails 7, a transportation vehicle and a winch 11, wherein the two transportation rails 7 are parallel and fixed on the bridge deck along the bridge trend, the transportation rails 7 are 20# channel steel, the transport vechicle includes car support 8, car platform 9, universal wheel 10, refer to fig. 4, car support 8 is the rectangular frame 1 form of length 14.3m, width 5.6m and comprises many specifications 200 × 150 × 6 × 8H shaped steel welded connection, the top surface welding of car support 8 has car platform 9, three universal wheel 10 is installed respectively to the bottom surface both sides of car support 8, universal wheel 10 is 4t universal wheel, the universal wheel 10 of car support 8 bottom surface both sides is installed respectively in two transportation tracks 7, two hoists 11 are installed respectively in the both ends department of bridge, hoist 11 is 5t hoist, the wire rope of two hoist 11 all is connected with the transport vechicle.
During actual construction, the transportation rail 7 is laid along the deck of the bridge 12, and the two winches 11 are respectively installed at both ends of the bridge 12. During operation, the winch 11 pulls the transport vehicle to move along the transport rails 7 through the steel wire rope, so that the steel beam segments on the transport vehicle are transported to the arc-shaped steel beam assembling area, and then the arc-shaped steel beams are assembled on the assembling jig frame.
It should be noted that many variations and modifications of the embodiments of the present invention fully described are possible and are not to be considered as limited to the specific examples of the above embodiments. The above examples are given by way of illustration of the invention and are not intended to limit the invention. In conclusion, the scope of the present invention should include those changes or substitutions and modifications which are obvious to those of ordinary skill in the art.

Claims (7)

1. An assembling and transporting device for full-bridge arc-shaped steel beams is characterized by comprising an assembling jig frame and a transporting device, wherein the assembling jig frame and the transporting device are arranged on a bridge deck;
the assembling jig frame comprises frames, frame connecting pieces, baffle fixing plates, inner arc fixing baffles and outer arc fixing baffles, wherein each frame is rectangular, a plurality of frames are distributed along an arc, the inner arc sides of two adjacent frames are welded and connected, and the outer arc sides of the two adjacent frames are welded and connected through the frame connecting pieces, so that the plurality of frames integrally form an arc support;
the transportation device comprises a transportation rail, a transportation vehicle and two winches, wherein the transportation rail is fixed on a bridge deck along the trend of the bridge, the transportation vehicle is arranged on the transportation rail, the two winches are respectively arranged at two ends of the bridge, and the steel wire ropes of the two winches are connected with the transportation vehicle.
2. The assembly transportation device for full-bridge arc-shaped steel beams according to claim 1, wherein the frame is formed by welding and connecting H-shaped steel.
3. The assembling and transporting device for the full-bridge arc-shaped steel beam as claimed in claim 1, wherein a baffle fixing plate is welded to the arc top, the column bases at the two ends, the arc top and the middle of each column base at the end of the arc support respectively.
4. The assembling and transporting device for the full-bridge arc-shaped steel beam as claimed in claim 1, wherein the baffle fixing plate is connected with the inner arc edge and the outer arc edge of the arc-shaped support.
5. The assembly transportation device for full-bridge arc-shaped steel beams according to claim 1, wherein the transportation rail is a channel steel.
6. The assembling and transporting device for the full-bridge arc-shaped steel beam as claimed in claim 1, wherein the transporting vehicle comprises a vehicle support, a vehicle platform and universal wheels, the vehicle support is in a rectangular frame shape, the vehicle platform is mounted on the top surface of the vehicle support, and the universal wheels matched with the transporting rails are mounted on the bottom surface of the vehicle support.
7. The assembly transportation device for full-bridge arc-shaped steel beams according to claim 6, wherein the vehicle bracket is formed by welding and connecting H-shaped steel.
CN201910702704.6A 2019-07-31 2019-07-31 Assembling and transporting device for full-bridge arc-shaped steel beam Pending CN110629680A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910702704.6A CN110629680A (en) 2019-07-31 2019-07-31 Assembling and transporting device for full-bridge arc-shaped steel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910702704.6A CN110629680A (en) 2019-07-31 2019-07-31 Assembling and transporting device for full-bridge arc-shaped steel beam

Publications (1)

Publication Number Publication Date
CN110629680A true CN110629680A (en) 2019-12-31

Family

ID=68969098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910702704.6A Pending CN110629680A (en) 2019-07-31 2019-07-31 Assembling and transporting device for full-bridge arc-shaped steel beam

Country Status (1)

Country Link
CN (1) CN110629680A (en)

Similar Documents

Publication Publication Date Title
CN110747761B (en) Dismantling construction method for temporary supporting system of small box girder type hidden cover beam prefabricated on road and bridge
CN110878530B (en) Installation and construction method of steel box girder of steel structure bridge
KR100991190B1 (en) The bridge inspection and the repair method for which a circular travelling rail mobile bridge inspection car and this were used
US6684793B2 (en) Viaduct for a railway line or the like
CN111335178B (en) Small-curve-radius steel box girder bridge girder erection machine and erection construction method
CN215436391U (en) Overhead rail intermediate connecting beam structure and PRT (primary reflection technology) traffic rail
CN211735108U (en) Assembling and transporting device for full-bridge arc-shaped steel beam
JP2001146716A (en) Erection method for bridge beam
CN110629680A (en) Assembling and transporting device for full-bridge arc-shaped steel beam
CN116949946A (en) Construction method for bridge bridging of small-radius curve bridge
CN110080117B (en) Movable simple concrete guardrail template vehicle and manufacturing method thereof
CN111705682A (en) Construction method and equipment for removing and rebuilding superstructure of widened bridge across electrified railway
KR101032366B1 (en) Supporting structure for horizontal loads of crane with integrated multiple-purpose inspection path
CN203834353U (en) Beam bottom operating device
JP3991067B1 (en) Temporary bridge between railway platforms
JP7299103B2 (en) Elevated structure construction system and construction method
CN110626943B (en) Special chassis of inverted gantry crane for single-line T-beam bridge and mounting method
JP6873435B2 (en) Suspended scaffolding and its erection method
CN111824191A (en) Method special for transporting assembled box girder of heavy prefabricated arch bridge
CN110616642A (en) Girder of bridge transporting frame machine
JPS5812894Y2 (en) Assembly bridge for construction site
CN217971246U (en) Rail-mounted area overhead working truck operation auxiliary device
CN217027200U (en) Template operation trolley and operation system for construction of height-gradient retaining wall
KR20110001991U (en) Self Movable Gantry Crane
JP4961268B2 (en) Precast floor slab transport method and transport mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination