CN110616843A - Full-built-in top plate for integral bathroom and mounting method thereof - Google Patents
Full-built-in top plate for integral bathroom and mounting method thereof Download PDFInfo
- Publication number
- CN110616843A CN110616843A CN201910849993.2A CN201910849993A CN110616843A CN 110616843 A CN110616843 A CN 110616843A CN 201910849993 A CN201910849993 A CN 201910849993A CN 110616843 A CN110616843 A CN 110616843A
- Authority
- CN
- China
- Prior art keywords
- roof
- cylinder
- top plate
- thick bamboo
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/30—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Residential Or Office Buildings (AREA)
Abstract
The invention discloses a full-built-in top plate for an integral bathroom and an installation method thereof, wherein the full-built-in top plate comprises a keel frame and a top plate, the keel frame comprises reinforcing ribs and inserting cylinders, and two transversely or longitudinally adjacent inserting cylinders are fixedly connected through the reinforcing ribs; the middle end of the inner wall of the inserting cylinder is provided with an annular groove, the upper end of the inner wall of the inserting cylinder is provided with two opposite sliding grooves, the sliding grooves are communicated with the annular groove, a magnet ring is arranged between the sliding grooves, and the magnet ring is fixedly connected with the inner wall of the inserting cylinder; through the section of thick bamboo and the fixed section of thick bamboo of inserting that set up, can realize fixed section of thick bamboo and insert a section of thick bamboo grafting fixed, the magnet ring also can adsorb fixed section of thick bamboo simultaneously, ensures the fixed effect of fixed section of thick bamboo, and people's of being convenient for installation and dismantlement, roof and the section of thick bamboo one-to-one of inserting compare in current frame-type keel frame mounting means, have reduced the use of middle frame, the installation cost of reduction.
Description
Technical Field
The invention relates to the technical field of bathroom top plates, in particular to a full-built-in top plate for an integral bathroom and an installation method thereof.
Background
The integral bathroom comprises a top, a bottom, walls and all bathroom facilities. Be different from traditional bathroom, whole bathroom is the disposable shaping of batch production, and is small and exquisite, and is exquisite, the function is complete, save the bathroom area, and exempt from to use the bathroom heater, it is very clean, be favorable to sanitation and hygiene, the notion of whole bathroom derives from Japan, whole bathroom is also called whole bathroom, the system bathroom, current house ornamentation furred ceiling field, the integrated furred ceiling of almag has become the main melody of current furred ceiling fitment consumption, current aluminium pinch plate furred ceiling all adopts frame-type mounting means, press the panel interval with triangular keel and light gauge steel one-tenth vertical direction and connect, pave into the installation frame of aluminium pinch plate, then impress in the triangular keel seam with two limits parallels of aluminium pinch plate.
However, the conventional ceiling board has the following disadvantages when being installed:
1. because the adjacent top plates are connected through the middle frame to form a gap, the installation is not flexible and the reliability is low.
2. Because the gaps between the adjacent top plates are large, water drops are generated on the surfaces of the top plates due to water vapor in the using process, and the mixture of the mold and the water and the mixture of the dust and the water form water drops to be adsorbed on the ceiling along the gaps between the top plates, so that the ceiling is mildewed.
Disclosure of Invention
The present invention is directed to a full interior ceiling for a unit bathroom and a method for installing the same, which solves the above-mentioned problems of the prior art.
In order to achieve the purpose, the invention provides the following technical scheme: a full built-in top plate for an integral bathroom and an installation method thereof comprise a keel frame and a top plate, wherein the keel frame comprises reinforcing ribs and inserting cylinders, and two inserting cylinders which are adjacent in the transverse or longitudinal direction are fixedly connected through the reinforcing ribs;
the middle end of the inner wall of the inserting cylinder is provided with an annular groove, the upper end of the inner wall of the inserting cylinder is provided with two opposite sliding grooves, the sliding grooves are communicated with the annular groove, a magnet ring is arranged between the sliding grooves, and the magnet ring is fixedly connected with the inner wall of the inserting cylinder;
the roof upper end fixed mounting has a solid fixed cylinder, gu fixed cylinder bottom is close to axle center department fixed mounting and has hollow pole, and communicates each other between hollow pole and the solid fixed cylinder, hollow pole bottom runs through the roof and extends to the roof outside, and fixed connection between hollow pole and the roof, hollow pole inside rotation installs the connecting rod, the connecting rod top extends to solid fixed cylinder inside and fixedly connected with fixture block.
Preferably, both sides of the lower end of the top plate are fixedly connected with water baffles.
Preferably, the fixed cylinder outer wall both sides are seted up jaggedly, the fixture block both ends are run through the breach and are extended to the fixed cylinder outside, the fixture block top is close to axle center department fixedly connected with axis of rotation, the axis of rotation top is rotated and is installed inside the bearing frame of the inside top fixed mounting of fixed cylinder, hollow pole and fixedly connected with adjust knob are run through to the connecting rod bottom.
Preferably, the surface of one end of the top plate is fixedly provided with two insertion blocks, the surface of the other end of the top plate is provided with two insertion slots, and the two insertion slots are matched with each other.
Preferably, the top plate is connected with the inserting cylinder in an inserting mode through a fixed cylinder, and the fixed cylinder and the inserting cylinder are matched with each other.
Preferably, a sealing ring is embedded at the joint of the top plate and the hollow rod.
Preferably, the thickness of the fixture block is adapted to the width of the annular groove.
Preferably, the top plate is square, and the adjacent top plates are mutually inserted into the slots through the insertion blocks.
Preferably, the fixed cylinder is made of an iron material.
Preferably, the method comprises the following installation steps:
s1, comparing the design drawing with the field situation, determining the specific position of the electrical appliance and the keel frame, determining the installation height of the top plate, and the bath heater can exert the maximum effect within 2.1-2.3 m.
And S2, after the height is determined, horizontally installing the corner lines, fixing the corner lines by screws or glue (to prevent the ceramic tiles from being damaged), and neatly splicing the opposite corners at the turning positions without obvious gaps.
And S3, after the keel frame is positioned, punching by using a percussion drill, cutting according to the specific length, assembling a suspender screw, and fastening the suspender screw in the drilled hole, wherein the process can be carried out simultaneously with the previous step.
S4, installing the keel frame at the top of the house, fixing the inserting cylinder by using bolts, properly adjusting the inserting cylinder after the keel frame is installed, and gradually fastening screws at the connecting part to ensure the straightness.
And S5, selecting square top plates to be installed one by one according to the bending angle of the corner of the house.
S6, during installation, the adjusting knob is rotated firstly, the fixture block can be driven to rotate through the connecting rod, when the position of the fixture block is rotated to correspond to the position of the sliding groove, the fixed cylinder can be inserted into the inserting cylinder, when the fixture block enters the annular groove along the sliding groove, the adjusting knob is rotated again, the fixture block is clamped into the annular groove, the fixed cylinder and the inserting cylinder are fixedly connected in an inserting mode, meanwhile, the magnet ring can also adsorb the fixed cylinder, and the fixing effect is guaranteed.
S7, when two adjacent top plates are installed, the insertion blocks of one group of top plates can be inserted into the insertion grooves of the adjacent top plates, and then the fixing barrel and the insertion barrel are fixed in an inserted mode.
And S8, cutting the top plate with the corner not conforming to the size to enable the top plate to be in seamless fit with the wall, and then installing the top plate.
Compared with the prior art, the invention has the beneficial effects that:
1. insert a section of thick bamboo and a fixed section of thick bamboo through setting up, when in-service use, rotate adjust knob earlier, can drive the fixture block through the connecting rod and rotate, treat that the position of fixture block rotates when corresponding with the position of spout, can insert the fixed section of thick bamboo in inserting a section of thick bamboo, the fixture block then gets into in the ring channel along the spout, rotate adjust knob again, make the fixture block card go into in the ring channel, the fixture block then can support fixed section of thick bamboo, thereby realize fixed section of thick bamboo and insert a section of thick bamboo grafting fixed, the magnet ring also can adsorb fixed section of thick bamboo simultaneously, ensure the fixed effect of fixed section of thick bamboo, the people's of being convenient for installation and dismantlement, the roof with insert a section of thick bamboo one-to-one, compare in current frame-type keel frame mounting.
2. Through the breakwater that sets up, during the roof installation, two sets of adjacent roofs make up the breakwater, then can form the triangle-shaped structure, when the roof surface produced the water droplet, because the height that highly is higher than the roof of breakwater, so the water droplet can not slide to the gap between the adjacent roof along the roof in, then can avoid taking place the condition that mildenes and rot between the adjacent roof gap, also can not make the water droplet pass through the gap and be adsorbed by the ceiling.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the insertion tube of the present invention;
FIG. 3 is a schematic view of the structure of the fixed cylinder of the present invention;
FIG. 4 is a schematic diagram of the insertion structure of the insertion tube and the fixed tube according to the present invention;
FIG. 5 is a schematic view of the top plate assembly of the present invention;
fig. 6 is a schematic view of the top plate structure of the present invention.
In the figure: 1-keel frame; 2-reinforcing ribs; 3-inserting a cylinder; 4-a top plate; 5-a chute; 6-a magnetic ring; 7-an annular groove; 8-a fixed cylinder; 9-notch; 10-a fixture block; 11-adjusting knob; 12-a hollow bar; 13-a bearing seat; 14-a rotating shaft; 15-a connecting rod; 16-a sealing ring; 17-a water baffle; 18-an insert block; 19-slot.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1:
referring to fig. 1-6, the present invention provides a technical solution: a full built-in top plate for an integral bathroom and an installation method thereof comprise a keel frame 1 and a top plate 4, wherein the keel frame 1 comprises reinforcing ribs 2 and inserting barrels 3, two transversely or longitudinally adjacent inserting barrels 3 are fixedly connected through the reinforcing ribs 2 to form a grid-shaped structure, and the structure is firm and is not easy to deform; an annular groove 7 is formed in the middle end of the inner wall of the inserting cylinder 3, two opposite sliding grooves 5 are formed in the upper end of the inner wall of the inserting cylinder 3, the sliding grooves 5 are communicated with the annular groove 7, a magnet ring 6 is arranged between the sliding grooves 5, and the magnet ring 6 is fixedly connected with the inner wall of the inserting cylinder 3, so that the fixing cylinder 8 can be adsorbed by the magnet ring 6, and the fixing effect is improved; 4 upper ends of roof fixed mounting have a solid fixed cylinder 8, solid fixed cylinder 8 bottom is close to axle center department fixed mounting has hollow rod 12, and communicates each other between hollow rod 12 and the solid fixed cylinder 8, hollow rod 12 bottom runs through roof 4 and extends to roof 4 outsidely, and fixed connection between hollow rod 12 and the roof 4, when rotating fixture block 10, only need rotate connecting rod 15 can, need not rotate hollow rod 12, and fixed connection between hollow rod 12 and the roof 4 has ensured the stability of roof 4 installation, the problem of easy slope can not appear, hollow rod 12 internally mounted has connecting rod 15, connecting rod 15 top extends to solid fixed cylinder 8 inside and fixedly connected with fixture block 10. Wherein, the two sides of the outer wall of the fixed cylinder 8 are provided with notches 9, the two ends of the fixture block 10 penetrate through the notches 9 and extend to the outside of the fixed cylinder 8, the top end of the fixture block 10 near the axis is fixedly connected with a rotating shaft 14, the top end of the rotating shaft 14 is rotatably installed inside a bearing seat 13 fixedly installed at the top end inside the fixed cylinder 8, the bottom end of the connecting rod 15 penetrates through the hollow rod 12 and is fixedly connected with an adjusting knob 11, when the fixture block 10 is installed, the adjusting knob 11 is firstly rotated, that is, the fixture block 10 can be driven to rotate by the connecting rod 15, when the position of the fixture block 10 is rotated to correspond to the position of the chute 5, the fixed cylinder 8 can be inserted into the insertion cylinder 3, the fixture block 10 enters the annular groove 7 along the chute 5, then the adjusting knob 11 is rotated, the fixture block 10 is clamped into the annular groove 7, the fixture, magnet ring 6 also can adsorb fixed section of thick bamboo 8 simultaneously, ensures the fixed effect of fixed section of thick bamboo 8, and people's of being convenient for installation and dismantlement, roof 4 with insert a 3 one-to-one, compare in current frame-type keel frame mounting means, reduced middle frame's use, the installation cost of reduction.
Wherein, the junction of roof 4 and hollow pole 12 is inlayed and is had sealing washer 16, can not make the water droplet on roof 4 surface along the junction of roof 4 and hollow pole 12 and enter into roof 4 upper surface, then can avoid roof 4 to take place the condition of mildening and rot.
The thickness of the fixture block 10 is adapted to the width of the annular groove 7, so that the fixture block 10 is ensured not to be separated from the annular groove 7 under the rotation without external force.
The top plate 4 is square, and the adjacent top plates 4 are inserted into the slots 19 through the insertion blocks 18.
The fixed cylinder 8 is made of an iron material, and the magnet ring 6 is ensured to be capable of adsorbing the fixed cylinder 8.
Example 2:
referring to fig. 1-6, the present invention provides a technical solution: a full built-in top plate for an integral bathroom and an installation method thereof comprise a keel frame 1 and a top plate 4, wherein the keel frame 1 comprises reinforcing ribs 2 and inserting barrels 3, and two transversely or longitudinally adjacent inserting barrels 3 are fixedly connected through the reinforcing ribs 2; an annular groove 7 is formed in the middle end of the inner wall of the inserting cylinder 3, two opposite sliding grooves 5 are formed in the upper end of the inner wall of the inserting cylinder 3, the sliding grooves 5 are communicated with the annular groove 7, a magnet ring 6 is arranged between the sliding grooves 5, and the magnet ring 6 is fixedly connected with the inner wall of the inserting cylinder 3; the upper end of the top plate 4 is fixedly provided with a fixed cylinder 8, the bottom end of the fixed cylinder 8 is fixedly provided with a hollow rod 12 near the axis center, the hollow rod 12 is communicated with the fixed cylinder 8, the bottom end of the hollow rod 12 penetrates through the top plate 4 and extends to the outside of the top plate 4, the hollow rod 12 is fixedly connected with the top plate 4, a connecting rod 15 is rotatably arranged inside the hollow rod 12, the top end of the connecting rod 15 extends into the fixed cylinder 8 and is fixedly connected with a clamping block 10, two sides of the lower end of the top plate 4 are fixedly connected with water baffles 17, and the water baffles 17 are combined by two groups of adjacent top plates 4 to form a triangular structure, when water drops are generated on the surface of the top plate 4, the water drops cannot slide into gaps between the adjacent top plates 4 along the top plate 4, so that the mildew between the gaps of the adjacent top plates 4 can be avoided, the water drops can not be adsorbed by the ceiling through the gap, wherein, 4 one end fixed surface of roof has the inserted block 18, and the inserted block 18 is equipped with two, slot 19 has been seted up on 4 other end surfaces of roof, and slot 19 is equipped with two, mutually support between inserted block 18 and the slot 19, when installing adjacent roof 4, also can insert the inserted block 18 in the slot 19, ensure the stability between adjacent roof 4, also can make the diminishing of gap between adjacent roof 4 simultaneously, improve holistic aesthetic property.
The above embodiments are combined.
In several embodiments of the present invention, it should be understood that the disclosed apparatus may be implemented in other manners, the welding or screwing or winding connection between the components shown or discussed may be accomplished by auxiliary equipment, such as welding with a welding gun, screwing with a wrench, etc., the apparatus components may be made of various materials, such as metal materials, e.g., aluminum alloy, steel, copper, etc., and may be formed by casting or by mechanical stamping, etc.
The working principle is as follows: comparing a design drawing with a field situation, determining specific positions of an electric appliance and a keel frame 1, determining the installation height of a top plate 4, wherein a bathroom heater can generally play the maximum effect within 2.1-2.3 m, making a horizontal installation angle line after the height is determined, fixing the angle line by using screws or glue (preventing ceramic tiles from being damaged), regularly splicing and pasting the opposite angles at the turning positions without obvious gaps, drilling holes by using a percussion drill after the position of the keel frame 1 is determined, cutting and assembling suspender screws according to specific lengths, fastening the suspender screws in the drilled holes, wherein the step can be carried out simultaneously with the previous step, installing the keel frame 1 at the top of a house, fixing an inserting cylinder 3 by using bolts, properly adjusting after the installation, gradually fastening the screws at the connecting positions to ensure the straightness, selecting square top plates 4 to be installed one by one according to the bending angle of the corner of the house, firstly rotating an adjusting knob 11 to drive a fixture block 10 to rotate through a connecting rod 15 during the installation, treat that the position of fixture block 10 rotates when corresponding with the position of spout 5, can insert a fixed section of thick bamboo 8 in the section of thick bamboo 3, fixture block 10 then gets into in the ring channel 7 along spout 5, rotate adjust knob 11 again, make fixture block 10 block go into in the ring channel 7, fixture block 10 then can support fixed section of thick bamboo 8 fixedly, thereby realize fixed section of thick bamboo 8 and insert a section of thick bamboo 3 grafting and fix, magnet ring 6 also can adsorb fixed section of thick bamboo 8 simultaneously, ensure the fixed effect of fixed section of thick bamboo 8, when installing two adjacent roof plates 4, can insert the inserted block 18 of a set of roof plate 4 in the slot 19 of adjacent roof plate 4, then will accomplish fixed section of thick bamboo 8 and insert a section of thick bamboo 3 grafting and fix again, cut out the roof that the edge department is not conform to the size, make the top, 4 and wall seamless cooperation, can accomplish the roof.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes performed by the present specification and drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.
Claims (10)
1. The utility model provides a full built-in roof for whole bathroom, includes keel frame (1) and roof (4), its characterized in that: the keel frame (1) comprises reinforcing ribs (2) and inserting cylinders (3), wherein two transversely or longitudinally adjacent inserting cylinders (3) are fixedly connected through the reinforcing ribs (2);
an annular groove (7) is formed in the middle end of the inner wall of the inserting cylinder (3), two opposite sliding grooves (5) are formed in the upper end of the inner wall of the inserting cylinder (3), the sliding grooves (5) are communicated with the annular groove (7), a magnet ring (6) is arranged between the sliding grooves (5), and the magnet ring (6) is fixedly connected with the inner wall of the inserting cylinder (3);
roof (4) upper end fixed mounting has a solid fixed cylinder (8), gu fixed cylinder (8) bottom is close to axle center department fixed mounting and has hollow rod (12), and communicates each other between hollow rod (12) and solid fixed cylinder (8), hollow rod (12) bottom runs through roof (4) and extends to roof (4) outside, and fixed connection between hollow rod (12) and roof (4), hollow rod (12) internal rotation installs connecting rod (15), connecting rod (15) top extends to solid fixed cylinder (8) inside and fixedly connected with fixture block (10).
2. A full interior ceiling for a unit bathroom according to claim 1, wherein: and water baffles (17) are fixedly connected to two sides of the lower end of the top plate (4).
3. A full interior ceiling for a unit bathroom according to claim 1, wherein: breach (9) are seted up to solid fixed cylinder (8) outer wall both sides, breach (9) and extension to solid fixed cylinder (8) outside are run through at fixture block (10) both ends, fixture block (10) top is close to axle center department fixedly connected with axis of rotation (14), axis of rotation (14) top is rotated and is installed inside solid fixed cylinder (8) inside top fixed mounting's bearing frame (13), hollow pole (12) and fixedly connected with adjust knob (11) are run through to connecting rod (15) bottom.
4. A full interior ceiling for a unit bathroom according to claim 1, wherein: roof (4) one end fixed surface installs inserted block (18), and inserted block (18) are equipped with two, slot (19) have been seted up on roof (4) other end surface, and slot (19) are equipped with two, mutually support between inserted block (18) and slot (19).
5. A full interior ceiling for a unit bathroom according to claim 1, wherein: roof (4) are through a fixed section of thick bamboo (8) with insert a section of thick bamboo (3) plug-in connection, a fixed section of thick bamboo (8) with insert and mutually support between a section of thick bamboo (3).
6. A full interior ceiling for a unit bathroom according to claim 1, wherein: and a sealing ring (16) is embedded at the joint of the top plate (4) and the hollow rod (12).
7. A full interior ceiling for a unit bathroom according to claim 1, wherein: the thickness of the clamping block (10) is adapted to the width of the annular groove (7).
8. A full interior ceiling for a unit bathroom according to claim 1, wherein: the top plates (4) are square, wherein the adjacent top plates (4) are mutually inserted and connected with the insertion grooves (19) through the insertion blocks (18).
9. A full interior ceiling for a unit bathroom according to claim 1, wherein: the fixed cylinder (8) is made of iron materials.
10. A method of installing a full interior ceiling for a unit bathroom according to claim 1, wherein: the method comprises the following installation steps:
s1, comparing the design drawing with the field situation, determining the specific position of the electrical appliance and the keel frame, determining the installation height of the top plate, and the bath heater can exert the maximum effect within 2.1-2.3 m.
And S2, after the height is determined, horizontally installing the corner lines, fixing the corner lines by screws or glue (to prevent the ceramic tiles from being damaged), and neatly splicing the opposite corners at the turning positions without obvious gaps.
And S3, after the keel frame is positioned, punching by using a percussion drill, cutting according to the specific length, assembling a suspender screw, and fastening the suspender screw in the drilled hole, wherein the process can be carried out simultaneously with the previous step.
S4, installing the keel frame at the top of the house, fixing the inserting cylinder by using bolts, properly adjusting the inserting cylinder after the keel frame is installed, and gradually fastening screws at the connecting part to ensure the straightness.
And S5, selecting square top plates to be installed one by one according to the bending angle of the corner of the house.
S6, during installation, the adjusting knob is rotated firstly, the fixture block can be driven to rotate through the connecting rod, when the position of the fixture block is rotated to correspond to the position of the sliding groove, the fixed cylinder can be inserted into the inserting cylinder, when the fixture block enters the annular groove along the sliding groove, the adjusting knob is rotated again, the fixture block is clamped into the annular groove, the fixed cylinder and the inserting cylinder are fixedly connected in an inserting mode, meanwhile, the magnet block can also adsorb the fixed cylinder, and the fixing effect is guaranteed.
S7, when two adjacent top plates are installed, the insertion blocks of one group of top plates can be inserted into the insertion grooves of the adjacent top plates, and then the fixing barrel and the insertion barrel are fixed in an inserted mode.
And S8, cutting the top plate with the corner not conforming to the size to enable the top plate to be in seamless fit with the wall, and then installing the top plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910849993.2A CN110616843B (en) | 2019-09-02 | 2019-09-02 | Full-built-in top plate for integral bathroom and mounting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910849993.2A CN110616843B (en) | 2019-09-02 | 2019-09-02 | Full-built-in top plate for integral bathroom and mounting method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110616843A true CN110616843A (en) | 2019-12-27 |
CN110616843B CN110616843B (en) | 2021-06-11 |
Family
ID=68922791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910849993.2A Active CN110616843B (en) | 2019-09-02 | 2019-09-02 | Full-built-in top plate for integral bathroom and mounting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110616843B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112064871A (en) * | 2020-08-05 | 2020-12-11 | 业之峰诺华家居装饰集团股份有限公司 | Light steel keel gypsum board corner cracking-proof ceiling structure and construction process thereof |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4406930A1 (en) * | 1994-03-04 | 1995-09-07 | Manfred Klein | Connector device for supporting structure and panelling in coffer ceilings |
CN200992763Y (en) * | 2007-01-04 | 2007-12-19 | 广东省建筑装饰工程有限公司 | Ceiling unit structure hanging aluminium slat under hyperboloid grid third quavter |
WO2008090579A2 (en) * | 2007-01-24 | 2008-07-31 | Antonio Guerrasio S.R.L. | Suspended ceiling system using existing reversed t-bar ceiling supports |
KR20100060858A (en) * | 2008-11-28 | 2010-06-07 | 최지호 | A supporting device of carring channel for ceiling |
CN202139744U (en) * | 2011-06-09 | 2012-02-08 | 陈华良 | Space hyperbolic quadrangular unit type suspended ceiling adapter claw piece |
CN104481076A (en) * | 2014-12-23 | 2015-04-01 | 上海聚通装饰集团有限公司 | Method of top-layer ceiling anti-leakage structure process |
CN205035954U (en) * | 2015-09-18 | 2016-02-17 | 安徽工程大学 | Drip proof bathroom top |
CN106988469A (en) * | 2017-05-08 | 2017-07-28 | 湖南工学院 | Integrated ceiling system |
CN106996155A (en) * | 2017-05-19 | 2017-08-01 | 合肥荣事达电子电器集团有限公司 | A kind of seamless aluminum-pinch furred ceiling of plug-in type and its installation method |
CN107060181A (en) * | 2017-05-25 | 2017-08-18 | 广州康普顿至高建材有限公司 | A kind of spring clip cross assembling keel and its installation method |
CN206844454U (en) * | 2017-04-17 | 2018-01-05 | 中源晟朝股份有限公司 | Indoor ceiling board connecting structure |
CN206903031U (en) * | 2017-05-19 | 2018-01-19 | 合肥荣事达电子电器集团有限公司 | A kind of seamless aluminum-pinch furred ceiling of plug-in type |
CN207211481U (en) * | 2017-09-14 | 2018-04-10 | 青岛普集智能家居有限公司 | Keel are stitched in one kind |
CN207419821U (en) * | 2017-11-08 | 2018-05-29 | 深圳市建信装饰工程有限公司 | A kind of mounting structure of suspended ceiling decorative plate |
CN208473091U (en) * | 2018-06-06 | 2019-02-05 | 深圳市第一建筑工程有限公司 | A kind of ceiling structure |
CN208733905U (en) * | 2018-07-16 | 2019-04-12 | 江苏华欣装饰集团有限公司 | Can modular assembly hang ceiling panel structure |
-
2019
- 2019-09-02 CN CN201910849993.2A patent/CN110616843B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4406930A1 (en) * | 1994-03-04 | 1995-09-07 | Manfred Klein | Connector device for supporting structure and panelling in coffer ceilings |
CN200992763Y (en) * | 2007-01-04 | 2007-12-19 | 广东省建筑装饰工程有限公司 | Ceiling unit structure hanging aluminium slat under hyperboloid grid third quavter |
WO2008090579A2 (en) * | 2007-01-24 | 2008-07-31 | Antonio Guerrasio S.R.L. | Suspended ceiling system using existing reversed t-bar ceiling supports |
KR20100060858A (en) * | 2008-11-28 | 2010-06-07 | 최지호 | A supporting device of carring channel for ceiling |
CN202139744U (en) * | 2011-06-09 | 2012-02-08 | 陈华良 | Space hyperbolic quadrangular unit type suspended ceiling adapter claw piece |
CN104481076A (en) * | 2014-12-23 | 2015-04-01 | 上海聚通装饰集团有限公司 | Method of top-layer ceiling anti-leakage structure process |
CN205035954U (en) * | 2015-09-18 | 2016-02-17 | 安徽工程大学 | Drip proof bathroom top |
CN206844454U (en) * | 2017-04-17 | 2018-01-05 | 中源晟朝股份有限公司 | Indoor ceiling board connecting structure |
CN106988469A (en) * | 2017-05-08 | 2017-07-28 | 湖南工学院 | Integrated ceiling system |
CN106996155A (en) * | 2017-05-19 | 2017-08-01 | 合肥荣事达电子电器集团有限公司 | A kind of seamless aluminum-pinch furred ceiling of plug-in type and its installation method |
CN206903031U (en) * | 2017-05-19 | 2018-01-19 | 合肥荣事达电子电器集团有限公司 | A kind of seamless aluminum-pinch furred ceiling of plug-in type |
CN107060181A (en) * | 2017-05-25 | 2017-08-18 | 广州康普顿至高建材有限公司 | A kind of spring clip cross assembling keel and its installation method |
CN207211481U (en) * | 2017-09-14 | 2018-04-10 | 青岛普集智能家居有限公司 | Keel are stitched in one kind |
CN207419821U (en) * | 2017-11-08 | 2018-05-29 | 深圳市建信装饰工程有限公司 | A kind of mounting structure of suspended ceiling decorative plate |
CN208473091U (en) * | 2018-06-06 | 2019-02-05 | 深圳市第一建筑工程有限公司 | A kind of ceiling structure |
CN208733905U (en) * | 2018-07-16 | 2019-04-12 | 江苏华欣装饰集团有限公司 | Can modular assembly hang ceiling panel structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112064871A (en) * | 2020-08-05 | 2020-12-11 | 业之峰诺华家居装饰集团股份有限公司 | Light steel keel gypsum board corner cracking-proof ceiling structure and construction process thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110616843B (en) | 2021-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110616843B (en) | Full-built-in top plate for integral bathroom and mounting method thereof | |
CN102704712A (en) | Integrated bathroom made of composite material and assembly method of integrated bathroom | |
CN211172812U (en) | Assembled steel construction building externally-hung wallboard | |
CN212405635U (en) | Connecting structure for double-layer curved curtain wall | |
CN109750769A (en) | A kind of interlockable demarcation plate and its manufacturing method | |
CN218040577U (en) | Cable bridge provided with corner orientation structure | |
CN203701357U (en) | Unit type glass rib external decorating system | |
KR20100104765A (en) | A prefabbing shielding wall | |
CN106917917A (en) | A kind of exterior wall pipe installation bracket | |
CN103046675A (en) | Internal inclined glass curtain wall with large-size shutters arranged outdoors | |
CN211059077U (en) | Mounting structure of air exchange fan of prefabricated building | |
CN204456549U (en) | A kind of frame concealed curtain wall 90 ° of inner corner trim syndetons | |
CN216476491U (en) | Shower partition frame reinforcing structure | |
CN217268041U (en) | Light steel structure assembly decorates integration building | |
CN213539483U (en) | Assembled lightweight steel structure wall | |
CN218933658U (en) | Outdoor support canopy | |
CN220117976U (en) | Assembled door frame structure | |
CN210507960U (en) | Glass curtain wall | |
CN204983249U (en) | Prevent acoustic partition wall | |
CN220954102U (en) | Assembled aluminum plate curtain wall construction | |
CN213539392U (en) | Two glass official working are stood roof beam structure that cuts off | |
CN219753492U (en) | Movable house | |
CN203905323U (en) | Finished metal water drip in building construction | |
CN220414614U (en) | Anti-seepage open type large and small seam aluminum plate curtain wall | |
CN217630765U (en) | Suspended ceiling board connecting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |