CN104481076A - Method of top-layer ceiling anti-leakage structure process - Google Patents

Method of top-layer ceiling anti-leakage structure process Download PDF

Info

Publication number
CN104481076A
CN104481076A CN201410831301.9A CN201410831301A CN104481076A CN 104481076 A CN104481076 A CN 104481076A CN 201410831301 A CN201410831301 A CN 201410831301A CN 104481076 A CN104481076 A CN 104481076A
Authority
CN
China
Prior art keywords
support
connecting component
tank
type connecting
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410831301.9A
Other languages
Chinese (zh)
Inventor
徐国俭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Original Assignee
SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JUTONG DECORATION GROUP Co Ltd filed Critical SHANGHAI JUTONG DECORATION GROUP Co Ltd
Priority to CN201410831301.9A priority Critical patent/CN104481076A/en
Publication of CN104481076A publication Critical patent/CN104481076A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a method of a top-layer ceiling anti-leakage structure process. A bracket (5) is an I-shaped steel bracket (51) or a groove steel bracket (52); groove type connection pieces (3) are fixed on base plates (2) by welding or using screws; the positions of the groove type connection pieces (3) correspond to the bracket (5); mounting holes for mounting fixing screws (4) are formed in the position, which is used for mounting the bracket (5), of a wall body and the base plates (2); the two ends of the bracket (5) are clamped on the groove type connection pieces (3) respectively by two base plates (2) fixedly provided with the groove type connection pieces (3) respectively; one base plate (2) is fixed on the wall body (1) by the fixing screws (4), and other base plate (2) is fixed on the wall body (1) by the fixed screws (4) by adjusting a gap between the groove type connection pieces (3) and the bracket (5); then a keel and a suspended ceiling are mounted on the lower part. The top layer does not need to be drilled, so that a waterproof layer of a roof is not influenced and water is not leaked from the top layer.

Description

A kind of method of top layer ceiling anti-leakage structure technique
Technical field
The invention discloses a kind of method of top layer ceiling anti-leakage structure technique, belong to building decoration field.
Background technology
In upholstery process, the installation steps of furred ceiling are as follows:
1) before formal construction, the line of ink marker whether level of metope bullet is first measured with horizontal tube.
2) plaster tablet suspended ceiling is fixed on firmly on keel bracket, selects the good pine of nail-holding ability.
3) because keel are wooden, therefore must be noted that fire prevention, at keel surface uniform brushing fireproof paint, wait whole keel all to see white, then follow closely on the wall.
4) keel surface just starts to be combined with after having carried out fire prevention process, is fixed at two keel junction Oblique 45 Degrees with ail gun.
5) just framework is fixed on the wall after fixing keel frame, whether the spacing between each framework of careful inspection is not more than 300mm just can have enough fastness, will consider according to the distance of in-site installation band lamp, Down lamp, shot-light, otherwise the gypsum plank on it easily sinks, fracture.
6) during formal upper gypsum plank, fix gypsum plank with drywall screw, nail can not get rusty, and ensures that gypsum plank is attractive in appearance for a long time.
7) hole for nailing on gypsum plank usually can be filled up hole for nailing with antirust hole for nailing putty or cement and process.
8) the gap special putty joint filling existed between two block gypsum plates.
9) paste with break-preventing adhesive tape on surface again after completing gap with gap filler, can prevent expands with heat and contract with cold causes end face to ftracture.To paste while remove bubble with scraper when pasting, allow adhesive tape and gypsum plank thoroughly combine closely.
10) for the furred ceiling that form compare is special, the process in later stage is extremely important.
11), after repairing basic configuration, with the edge of a sand papering furred ceiling, the corner angle on limit and burr are all removed.
Furred ceiling is fixed on keel, and keel are fixed on support, then fixes support with the muscle that hangs being fixed on roof.In actual use, hang muscle uneven in the drilling depth on roof, destroy waterproofing course, create infiltration, touch wooden keel, furred ceiling etc., serious corrosion can be produced, have a strong impact on the Long-Time Service of furred ceiling.
Summary of the invention
The end face furred ceiling of top layer is not holed, and makes the support of furred ceiling with channel-section steel or i iron, and rough ground is fixed on channel-section steel support, and installation of ceiling is at rough ground.End face is not holed, make the waterproofing course on roof unaffected, guarantees that end face is without infiltration.
Because support does not hang muscle, in order to install keel, the parts such as furred ceiling, the weight ratio that the support of furred ceiling made by channel-section steel or i iron originally had the weight support frame hanging muscle heavier, adopt the connection of reinforcing for this reason in the contact position of body of wall and support, ensure channel-section steel or the stable installation of flange beam stand.
A method for top layer ceiling anti-leakage structure technique, is characterized in that, a kind of step of method of top layer ceiling anti-leakage structure technique is as follows:
1) support 5 is flange beam stand 51 or channel-section steel support 52, is fixed on backing plate 2 by tank-type connecting component 3 by welding or screw, and the position of tank-type connecting component 3 is corresponding with support 5;
2) the reserved installing hole installing hold-down screw 4 on the position being arranged on body of wall at support 5 and on backing plate 2;
3) get the backing plate 2 that two pieces are fixed with tank-type connecting component 3 respectively, the two ends of support 5 are stuck on tank-type connecting component 3;
4) be fixed on body of wall 1 by one piece of backing plate 2 by hold-down screw 4, another block, through the adjustment in tank-type connecting component 3 and support 5 gap, is fixed on body of wall 1 by hold-down screw 4, installs keel and furred ceiling afterwards in bottom.
Described tank-type connecting component 3 is channel-section steel.
Described backing plate 2 is the steel plate that 10mm ~ 12mm is thick.
When described support 5 is flange beam stand 51, described tank-type connecting component 3 is four, is distributed in four limits of flange beam stand 51.
When described support 5 is channel-section steel support 52, described tank-type connecting component 3 is one, is fastened on the bottom of channel-section steel support 52.
The opening upwards of described channel-section steel support 52.
Accompanying drawing explanation
Fig. 1 is a kind of structure chart of method of top layer ceiling anti-leakage structure technique;
Fig. 2 is former mounting method structure chart;
The structure chart of the method junction of a kind of top layer ceiling of Fig. 3 anti-leakage structure technique;
Fig. 4 tank-type connecting component 3 and flange beam stand 51 junction sectional view;
Fig. 5 tank-type connecting component 3 and channel-section steel support 52 junction sectional view.
Specific embodiments
Illustrate below in conjunction with embodiment, embodiment 1: tank-type connecting component 3 is channel-section steel.Backing plate 2 is the steel plate that 10mm is thick.Support 5 is flange beam stand 51, and tank-type connecting component 3 is four, is distributed in four limits of flange beam stand 51.
Be fixed on backing plate 2 by tank-type connecting component 3 by welding or screw, the position of tank-type connecting component 3 is corresponding with support 5; The reserved installing hole installing hold-down screw 4 on the position being arranged on body of wall at support 5 and on backing plate 2; Get the backing plate 2 that two pieces are fixed with tank-type connecting component 3 respectively, the two ends of support 5 are stuck on tank-type connecting component 3; Be fixed on body of wall 1 by one piece of backing plate 2 by hold-down screw 4, another block, through the adjustment in tank-type connecting component 3 and support 5 gap, is fixed on body of wall 1 by hold-down screw 4, installs keel and furred ceiling afterwards in bottom.
Embodiment 2: tank-type connecting component 3 is channel-section steel.Backing plate 2 is the steel plate that 12mm is thick.Support 5 is channel-section steel support 52, and tank-type connecting component 3 is one, is fastened on the bottom of channel-section steel support 52.
Be fixed on backing plate 2 by tank-type connecting component 3 by welding or screw, the position of tank-type connecting component 3 is corresponding with support 5; The reserved installing hole installing hold-down screw 4 on the position being arranged on body of wall at support 5 and on backing plate 2; Get the backing plate 2 that two pieces are fixed with tank-type connecting component 3 respectively, the two ends of support 5 are stuck on tank-type connecting component 3, the opening upwards of channel-section steel support 52; Be fixed on body of wall 1 by one piece of backing plate 2 by hold-down screw 4, another block, through the adjustment in tank-type connecting component 3 and support 5 gap, is fixed on body of wall 1 by hold-down screw 4, installs keel and furred ceiling afterwards in bottom.

Claims (6)

1. a method for top layer ceiling anti-leakage structure technique, is characterized in that, a kind of step of method of top layer ceiling anti-leakage structure technique is as follows:
1) support (5) is flange beam stand (51) or channel-section steel support (52), be fixed on backing plate (2) by tank-type connecting component (3) by welding or screw, the same support in the position (5) of tank-type connecting component (3) is corresponding;
2) on the position being arranged on body of wall at support (5) and the upper reserved installing hole installing hold-down screw (4) of backing plate (2);
3) get the backing plate (2) that two pieces are fixed with tank-type connecting component (3) respectively, the two ends of support (5) are stuck on tank-type connecting component (3);
4) one piece of backing plate (2) is fixed on body of wall (1) by hold-down screw (4), another block is through the adjustment in tank-type connecting component (3) and support (5) gap, be fixed on body of wall (1) by hold-down screw (4), in bottom, keel and furred ceiling be installed afterwards.
2. the method for a kind of top layer ceiling anti-leakage structure technique according to claim 1, is characterized in that: described tank-type connecting component (3) is channel-section steel.
3. the method for a kind of top layer ceiling anti-leakage structure technique according to claim 1, is characterized in that: described backing plate (2) is the thick steel plate of 10mm ~ 12mm.
4. the method for a kind of top layer ceiling anti-leakage structure technique according to claim 1, it is characterized in that: when described support (5) is for flange beam stand (51), described tank-type connecting component (3) is four, is distributed in four limits of flange beam stand (51).
5. the method for a kind of top layer ceiling anti-leakage structure technique according to claim 1, it is characterized in that: when described support (5) is for channel-section steel support (52), described tank-type connecting component (3) is one, is fastened on the bottom of channel-section steel support (52).
6. the method for a kind of top layer ceiling anti-leakage structure technique according to claim 1 or 5, is characterized in that: the opening upwards of described channel-section steel support (52).
CN201410831301.9A 2014-12-23 2014-12-23 Method of top-layer ceiling anti-leakage structure process Pending CN104481076A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410831301.9A CN104481076A (en) 2014-12-23 2014-12-23 Method of top-layer ceiling anti-leakage structure process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410831301.9A CN104481076A (en) 2014-12-23 2014-12-23 Method of top-layer ceiling anti-leakage structure process

Publications (1)

Publication Number Publication Date
CN104481076A true CN104481076A (en) 2015-04-01

Family

ID=52755671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410831301.9A Pending CN104481076A (en) 2014-12-23 2014-12-23 Method of top-layer ceiling anti-leakage structure process

Country Status (1)

Country Link
CN (1) CN104481076A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616843A (en) * 2019-09-02 2019-12-27 合肥高丽今生实业有限公司 Full-built-in top plate for integral bathroom and mounting method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2118103U (en) * 1991-05-16 1992-10-07 北京市建材轻钢制品厂 Simple keel
US5619833A (en) * 1995-01-26 1997-04-15 Neff; Eric S. Suspended ceiling system
CN1721635A (en) * 2004-07-14 2006-01-18 沃辛顿阿姆斯特朗风险投资公司 Molding for drywall ceiling grid
CN102287046A (en) * 2011-06-24 2011-12-21 吴方伯 Building template
CN103352532A (en) * 2013-06-21 2013-10-16 江苏华顶建设工程股份有限公司 End connector of suspended ceiling framework

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2118103U (en) * 1991-05-16 1992-10-07 北京市建材轻钢制品厂 Simple keel
US5619833A (en) * 1995-01-26 1997-04-15 Neff; Eric S. Suspended ceiling system
CN1721635A (en) * 2004-07-14 2006-01-18 沃辛顿阿姆斯特朗风险投资公司 Molding for drywall ceiling grid
CN102287046A (en) * 2011-06-24 2011-12-21 吴方伯 Building template
CN103352532A (en) * 2013-06-21 2013-10-16 江苏华顶建设工程股份有限公司 End connector of suspended ceiling framework

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616843A (en) * 2019-09-02 2019-12-27 合肥高丽今生实业有限公司 Full-built-in top plate for integral bathroom and mounting method thereof
CN110616843B (en) * 2019-09-02 2021-06-11 合肥高丽今生实业有限公司 Full-built-in top plate for integral bathroom and mounting method thereof

Similar Documents

Publication Publication Date Title
CN103938764B (en) The rapid constructing method of indoor secondary light partition wall and this partition wall
CN109930734B (en) Gypsum board suspended ceiling construction method
CN104695703B (en) Exempt from boring shear wall construction template system and shear wall construction method
CN106168067A (en) A kind of construction method of light steel keel partition
CN112814249B (en) Suspended ceiling construction process
CN102912960A (en) Wall decoration structure for old building reconstruction and construction method
US10314441B2 (en) Shower hob apparatus
CN201809918U (en) Composite decorative fireproofing heat preservation dry-hang board
CN104499614A (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN106401024B (en) Prevent cracked partitions
CN105735603A (en) Mounting device for movable decorative plate
JP6563673B2 (en) Design panel, wall structure and construction method
CN108035502A (en) Ceramic tile dried hanging method
CN103321329A (en) Finished-product partition ground rail system and construction method thereof
CN106401026B (en) Light steel keel system for preventing partition wall cracking
CN114086677A (en) Heat-preservation construction process
CN216446411U (en) Mounting structure of decorative hanging plate
CN105369910A (en) Heat bridge cutoff internal thermal insulation system and construction method thereof
CN103628602A (en) Building curtain wall glass fiber reinforcement composite board mounting assembly and method
CN111206737A (en) Wall connecting piece of plug-in type low-carbon heat-preservation energy-saving plate
KR20190078792A (en) Multi system bracket
KR102210564B1 (en) Ceramic tile putty method
CN212130268U (en) Indoor door installation infrastructure
CN207892173U (en) A kind of stull no-welding structure that stone material back of the body bolt is cladding
CN105604287A (en) Paving method of prefabricated composite wallboards

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150401

RJ01 Rejection of invention patent application after publication